{"id":2156,"date":"2025-06-26T19:00:19","date_gmt":"2025-06-26T13:30:19","guid":{"rendered":"https:\/\/mediumturquoise-hedgehog-745891.hostingersite.com\/blogs\/?p=2156"},"modified":"2026-03-10T14:28:45","modified_gmt":"2026-03-10T08:58:45","slug":"upcoming-industries-in-india","status":"publish","type":"post","link":"https:\/\/www.entrepreneurindia.co\/blogs\/upcoming-industries-in-india\/","title":{"rendered":"60+ Upcoming Industries in India You Can\u2019t Ignore"},"content":{"rendered":"\r\n<p class=\"wp-block-paragraph\">India is entering a transformative growth phase in 2024\u201325, driven by large-scale investments across energy, infrastructure, manufacturing, and technology. The following table highlights key upcoming industries in India along with the projects set to shape the nation&#8217;s economic future.<\/p>\r\n\r\n\r\n\r\n<div id=\"ez-toc-container\" class=\"ez-toc-v2_0_82_2 counter-hierarchy ez-toc-counter ez-toc-custom ez-toc-container-direction\">\n<div class=\"ez-toc-title-container\">\n<p class=\"ez-toc-title\" style=\"cursor:inherit\">Table of Contents<\/p>\n<span class=\"ez-toc-title-toggle\"><a href=\"#\" class=\"ez-toc-pull-right ez-toc-btn ez-toc-btn-xs ez-toc-btn-default ez-toc-toggle\" aria-label=\"Toggle Table of Content\"><span class=\"ez-toc-js-icon-con\"><span class=\"\"><span class=\"eztoc-hide\" style=\"display:none;\">Toggle<\/span><span class=\"ez-toc-icon-toggle-span\"><svg style=\"fill: #999;color:#999\" xmlns=\"http:\/\/www.w3.org\/2000\/svg\" class=\"list-377408\" width=\"20px\" height=\"20px\" viewBox=\"0 0 24 24\" fill=\"none\"><path d=\"M6 6H4v2h2V6zm14 0H8v2h12V6zM4 11h2v2H4v-2zm16 0H8v2h12v-2zM4 16h2v2H4v-2zm16 0H8v2h12v-2z\" fill=\"currentColor\"><\/path><\/svg><svg style=\"fill: #999;color:#999\" class=\"arrow-unsorted-368013\" xmlns=\"http:\/\/www.w3.org\/2000\/svg\" width=\"10px\" height=\"10px\" viewBox=\"0 0 24 24\" version=\"1.2\" baseProfile=\"tiny\"><path d=\"M18.2 9.3l-6.2-6.3-6.2 6.3c-.2.2-.3.4-.3.7s.1.5.3.7c.2.2.4.3.7.3h11c.3 0 .5-.1.7-.3.2-.2.3-.5.3-.7s-.1-.5-.3-.7zM5.8 14.7l6.2 6.3 6.2-6.3c.2-.2.3-.5.3-.7s-.1-.5-.3-.7c-.2-.2-.4-.3-.7-.3h-11c-.3 0-.5.1-.7.3-.2.2-.3.5-.3.7s.1.5.3.7z\"\/><\/svg><\/span><\/span><\/span><\/a><\/span><\/div>\n<nav><ul class='ez-toc-list ez-toc-list-level-1 ' ><li class='ez-toc-page-1 ez-toc-heading-level-2'><a class=\"ez-toc-link ez-toc-heading-1\" href=\"https:\/\/www.entrepreneurindia.co\/blogs\/upcoming-industries-in-india\/#Table_of_Upcoming_Industries_In_india\" >Table of Upcoming Industries In india<\/a><ul class='ez-toc-list-level-3' ><li class='ez-toc-heading-level-3'><a class=\"ez-toc-link ez-toc-heading-2\" href=\"https:\/\/www.entrepreneurindia.co\/blogs\/upcoming-industries-in-india\/#Related_Top_Agrochemicals_to_Manufacture_in_India\" >Related: Top Agrochemicals to Manufacture in India<\/a><\/li><\/ul><\/li><li class='ez-toc-page-1 ez-toc-heading-level-2'><a class=\"ez-toc-link ez-toc-heading-3\" href=\"https:\/\/www.entrepreneurindia.co\/blogs\/upcoming-industries-in-india\/#Brief_Summaries\" >Brief Summaries<\/a><ul class='ez-toc-list-level-3' ><li class='ez-toc-heading-level-3'><a class=\"ez-toc-link ez-toc-heading-4\" href=\"https:\/\/www.entrepreneurindia.co\/blogs\/upcoming-industries-in-india\/#Gujarat_Hybrid_Renewable_Energy_Park_Kutch\" >Gujarat Hybrid Renewable Energy Park (Kutch)<\/a><\/li><li class='ez-toc-page-1 ez-toc-heading-level-3'><a class=\"ez-toc-link ez-toc-heading-5\" href=\"https:\/\/www.entrepreneurindia.co\/blogs\/upcoming-industries-in-india\/#Reliances_Jamnagar_Green_Energy_Gigafactory\" >Reliance\u2019s Jamnagar Green Energy Gigafactory<\/a><\/li><li class='ez-toc-page-1 ez-toc-heading-level-3'><a class=\"ez-toc-link ez-toc-heading-6\" href=\"https:\/\/www.entrepreneurindia.co\/blogs\/upcoming-industries-in-india\/#Tata_Semiconductor_A_T_Facility_Assam\" >Tata Semiconductor A&amp;T Facility, Assam<\/a><\/li><li class='ez-toc-page-1 ez-toc-heading-level-3'><a class=\"ez-toc-link ez-toc-heading-7\" href=\"https:\/\/www.entrepreneurindia.co\/blogs\/upcoming-industries-in-india\/#Palakkad_Smart_Industrial_City\" >Palakkad Smart Industrial City<\/a><\/li><li class='ez-toc-page-1 ez-toc-heading-level-3'><a class=\"ez-toc-link ez-toc-heading-8\" href=\"https:\/\/www.entrepreneurindia.co\/blogs\/upcoming-industries-in-india\/#National_Industrial_Corridor_Nodes_12_Cities\" >National Industrial Corridor Nodes (12 Cities)<\/a><\/li><li class='ez-toc-page-1 ez-toc-heading-level-3'><a class=\"ez-toc-link ez-toc-heading-9\" href=\"https:\/\/www.entrepreneurindia.co\/blogs\/upcoming-industries-in-india\/#Pachpadra_Refinery_Petrochemicals_Hub_Rajasthan\" >Pachpadra Refinery &amp; Petrochemicals Hub, Rajasthan<\/a><\/li><li class='ez-toc-page-1 ez-toc-heading-level-3'><a class=\"ez-toc-link ez-toc-heading-10\" href=\"https:\/\/www.entrepreneurindia.co\/blogs\/upcoming-industries-in-india\/#Vizhinjam_Deepwater_Transshipment_Port_Kerala\" >Vizhinjam Deepwater Transshipment Port, Kerala<\/a><\/li><li class='ez-toc-page-1 ez-toc-heading-level-3'><a class=\"ez-toc-link ez-toc-heading-11\" href=\"https:\/\/www.entrepreneurindia.co\/blogs\/upcoming-industries-in-india\/#Jalna_Dry_Port_MMIP_Maharashtra\" >Jalna Dry Port (MMIP), Maharashtra<\/a><\/li><li class='ez-toc-page-1 ez-toc-heading-level-3'><a class=\"ez-toc-link ez-toc-heading-12\" href=\"https:\/\/www.entrepreneurindia.co\/blogs\/upcoming-industries-in-india\/#Applied_Materials_R_D_Centre_Bengaluru\" >Applied Materials R&amp;D Centre, Bengaluru<\/a><\/li><li class='ez-toc-page-1 ez-toc-heading-level-3'><a class=\"ez-toc-link ez-toc-heading-13\" href=\"https:\/\/www.entrepreneurindia.co\/blogs\/upcoming-industries-in-india\/#Adani_Groups_Clean_Energy_Expansion\" >Adani Group\u2019s Clean Energy Expansion<\/a><\/li><li class='ez-toc-page-1 ez-toc-heading-level-3'><a class=\"ez-toc-link ez-toc-heading-14\" href=\"https:\/\/www.entrepreneurindia.co\/blogs\/upcoming-industries-in-india\/#Related_Top_Business_Ideas_Suggested_by_NPCS_for_Each_states_of_India\" >Related: Top Business Ideas Suggested by NPCS for Each states of India<\/a><\/li><\/ul><\/li><li class='ez-toc-page-1 ez-toc-heading-level-2'><a class=\"ez-toc-link ez-toc-heading-15\" href=\"https:\/\/www.entrepreneurindia.co\/blogs\/upcoming-industries-in-india\/#Conclusion\" >Conclusion<\/a><\/li><\/ul><\/nav><\/div>\n<h2 class=\"wp-block-heading has-text-align-center\"><span class=\"ez-toc-section\" id=\"Table_of_Upcoming_Industries_In_india\"><\/span>Table of Upcoming Industries In india<span class=\"ez-toc-section-end\"><\/span><\/h2>\r\n\r\n\r\n\r\n<figure class=\"wp-block-table\">\r\n<table class=\"has-fixed-layout\">\r\n<thead>\r\n<tr>\r\n<td><strong>Project \/ Industry<\/strong><\/td>\r\n<td><strong>Location<\/strong><\/td>\r\n<td><strong>Description<\/strong><\/td>\r\n<td><strong>Investment \/ Scale<\/strong><\/td>\r\n<td><strong>Timeline<\/strong><\/td>\r\n<\/tr>\r\n<\/thead>\r\n<tbody>\r\n<tr>\r\n<td><strong>Solar + Wind Hybrid Park<\/strong><\/td>\r\n<td>Vighakot, Kutch, Gujarat<\/td>\r\n<td>World&#8217;s largest hybrid renewable energy park combining solar PV, wind, and storage<\/td>\r\n<td>30\u202fGW capacity, \u20b940,000\u202fCr transmission investment<\/td>\r\n<td>First 1\u202fGW commissioned Mar \u201924; full by Dec \u201926<\/td>\r\n<\/tr>\r\n<tr>\r\n<td><strong>Dhirubhai Ambani Green Energy Giga Complex<\/strong><\/td>\r\n<td>Jamnagar, Gujarat<\/td>\r\n<td>Integrated gigafactory (solar modules, batteries, electrolyzers, fuel cells)<\/td>\r\n<td>\u20b975,000\u202fCr (US$10\u202fBillion), scaling to 100\u202fGWh storage by 2030<\/td>\r\n<td>Ongoing; Phase I by 2024, Phase II through 2026<\/td>\r\n<\/tr>\r\n<tr>\r\n<td><strong>Tata Semiconductor Assembly &amp; Test Facility (TSAT)<\/strong><\/td>\r\n<td>Jagiroad, Assam<\/td>\r\n<td>India\u2019s first indigenous greenfield semiconductor A&amp;T plant in the Northeast<\/td>\r\n<td>\u20b927,000\u202fCr; ~25\u201330\u202fk jobs<\/td>\r\n<td>Construction starts 2024; first phase operational by mid\u20112025<\/td>\r\n<\/tr>\r\n<tr>\r\n<td><strong>Palakkad Industrial Smart City<\/strong><\/td>\r\n<td>Palakkad, Kerala<\/td>\r\n<td>Greenfield industrial city under Kochi\u2013Bengaluru corridor, ICT-enabled<\/td>\r\n<td>\u20b928,600\u202fCr across all 12 nodes; Palakkad share ~\u20b910,000\u202fCr<\/td>\r\n<td>Land ready, DPR\/tendering underway (approved Aug \u201924)<\/td>\r\n<\/tr>\r\n<tr>\r\n<td><strong>12 New Industrial Nodes (NICDP)<\/strong><\/td>\r\n<td>Across 10 states<\/td>\r\n<td>Smart industrial corridors along six national routes<\/td>\r\n<td>\u20b928,602\u202fCr investment overall<\/td>\r\n<td>Approval Aug \u201924; lot under implementation<\/td>\r\n<\/tr>\r\n<tr>\r\n<td><strong>Pachpadra Refinery &amp; Petrochem Hub<\/strong><\/td>\r\n<td>Pachpadra (Balotra), Rajasthan<\/td>\r\n<td>PSU refinery + integrated petrochem sector<\/td>\r\n<td>9\u202fmtpa refining + 2\u202fmtpa petrochem capacity; \u20b9??? Cr<\/td>\r\n<td>Commissioning expected by 2024\u201325<\/td>\r\n<\/tr>\r\n<tr>\r\n<td><strong>Vizhinjam Deepwater Transshipment Port<\/strong><\/td>\r\n<td>Kerala<\/td>\r\n<td>India\u2019s first deepwater container transshipment port<\/td>\r\n<td>\u20b98,800\u202fCr<\/td>\r\n<td>Inaugurated May 2, 2025<\/td>\r\n<\/tr>\r\n<tr>\r\n<td><strong>Jalna Dry Port \/ Multi-modal Logistics Park<\/strong><\/td>\r\n<td>Jalna, Maharashtra<\/td>\r\n<td>Inland container terminal supporting DMIC corridor<\/td>\r\n<td>500\u202facre site, up to 10\u202fM TEU capacity<\/td>\r\n<td>Inaugurated Mar 2024; expansion underway<\/td>\r\n<\/tr>\r\n<tr>\r\n<td><strong>Applied Materials R&amp;D Centre<\/strong><\/td>\r\n<td>Bengaluru<\/td>\r\n<td>Semiconductor-equipment R&amp;D facility by Applied Materials<\/td>\r\n<td>$400\u202fM investment; expected $2\u202fB in ecosystem<\/td>\r\n<td>Construction underway<\/td>\r\n<\/tr>\r\n<tr>\r\n<td><strong>Adani Clean Energy Investment<\/strong><\/td>\r\n<td>Across India<\/td>\r\n<td>Massive nationwide expansion in clean energy generation<\/td>\r\n<td>$100\u202fBn over 5 years; 100\u202fGW by 2030<\/td>\r\n<td>Ongoing<\/td>\r\n<\/tr>\r\n<tr>\r\n<td>\u00a0<\/td>\r\n<td>\u00a0<\/td>\r\n<td>\u00a0<\/td>\r\n<td>\u00a0<\/td>\r\n<td>\u00a0<\/td>\r\n<\/tr>\r\n<tr>\r\n<td><strong>Pithampur Sector 7 Industrial Hub<\/strong><\/td>\r\n<td>Pithampur, MP<\/td>\r\n<td>19 industries incl. auto, pharma, electronics<\/td>\r\n<td>\u20b97,253\u202fCr; generates 9,248 jobs<\/td>\r\n<td>Land pooling underway; infrastructure \u20b92,000\u202fCr<\/td>\r\n<\/tr>\r\n<tr>\r\n<td><strong>Sector 164 Electronics Hub<\/strong><\/td>\r\n<td>Noida, UP<\/td>\r\n<td>10 acres for electronics mfg under EMC 2.0<\/td>\r\n<td>Plot allocated, anchor units being identified<\/td>\r\n<td>Ongoing since June 2025<\/td>\r\n<\/tr>\r\n<tr>\r\n<td><strong>HCL\u2013Foxconn Semiconductor Fabs<\/strong><\/td>\r\n<td>Yamuna Expy, UP<\/td>\r\n<td>Chips and display drivers unit with Foxconn<\/td>\r\n<td>\u20b93,706\u202fCr; plus \u20b912,000\u202fCr from multiple units<\/td>\r\n<td>Cabinet approval Jun 2025<\/td>\r\n<\/tr>\r\n<tr>\r\n<td><strong>Tesla EV Imports + showroom scheme<\/strong><\/td>\r\n<td>India-wide<\/td>\r\n<td>Tesla selling imported EVs under new policy<\/td>\r\n<td>CBU imports \u2265$35k; investment \u2265\u20b94,150\u202fCr<\/td>\r\n<td>Scheme open Jun\u2013Oct 2025<\/td>\r\n<\/tr>\r\n<tr>\r\n<td><strong>Dassault\u2013Reliance Falcon Jet Assembly<\/strong><\/td>\r\n<td>Nagpur, MH<\/td>\r\n<td>Final assembly for Falcon 2000 business jets<\/td>\r\n<td>Multi\u2011year, first jets by 2028<\/td>\r\n<td>Production start 2025<\/td>\r\n<\/tr>\r\n<tr>\r\n<td><strong>HAL SSLV Launch Rocket Production<\/strong><\/td>\r\n<td>India-wide<\/td>\r\n<td>Manufacturing of Small Satellite Launch Vehicle<\/td>\r\n<td>\u20b9511\u202fCr ($59\u202fM) contract<\/td>\r\n<td>Manufacturing from 2025<\/td>\r\n<\/tr>\r\n<tr>\r\n<td><strong>Adani Clean Energy Investment<\/strong><\/td>\r\n<td>All-India<\/td>\r\n<td>Annual \u20b915\u201320\u202fBn (~$100\u202fBn\/5 yrs) in clean energy<\/td>\r\n<td>Build 100\u202fGW capacity by 2030<\/td>\r\n<td>Ongoing plan Jun 2025<\/td>\r\n<\/tr>\r\n<tr>\r\n<td><strong>Adani &amp; Reliance in North-East India<\/strong><\/td>\r\n<td>NE India<\/td>\r\n<td>Roads, airports, hydro energy, LNG, BG plants<\/td>\r\n<td>\u20b9500\u202fBn each over 10 yrs<\/td>\r\n<td>Investment 2025\u201335<\/td>\r\n<\/tr>\r\n<tr>\r\n<td><strong>Panattoni Industrial Park<\/strong><\/td>\r\n<td>Hosur, TN<\/td>\r\n<td>25-acre Grade-A industrial-logistics park<\/td>\r\n<td>\u20ac100\u202fM (~\u20b9210\u202fCr)<\/td>\r\n<td>CKD ramp-up in next few yrs<\/td>\r\n<\/tr>\r\n<tr>\r\n<td><strong>NLC 500\u202fMWh Battery Storage (BESS)<\/strong><\/td>\r\n<td>Tamil Nadu<\/td>\r\n<td>Huge battery energy storage system for grid<\/td>\r\n<td>Scale 500\u202fMWh<\/td>\r\n<td>Augmented\/growing project 2025<\/td>\r\n<\/tr>\r\n<tr>\r\n<td><strong>Khavda Renewable Energy Park<\/strong><\/td>\r\n<td>Kutch, GJ<\/td>\r\n<td>Massive solar-wind park under KREP<\/td>\r\n<td>\u20b91.5\u202fTn (~$18\u202fB), world-scale<\/td>\r\n<td>Land\/Infrastr. underway, finishing by 2027<\/td>\r\n<\/tr>\r\n<tr>\r\n<td><strong>Central Vista Redevelopment<\/strong><\/td>\r\n<td>New Delhi<\/td>\r\n<td>New Parliament, secretariat, civic area<\/td>\r\n<td>\u20b920,000\u202fCr<\/td>\r\n<td>Completed by 2026<\/td>\r\n<\/tr>\r\n<tr>\r\n<td><strong>GIFT City Phase II<\/strong><\/td>\r\n<td>Gandhinagar, GJ<\/td>\r\n<td>Financial &amp; technology hub expansion<\/td>\r\n<td>\u20b978,000\u202fCr<\/td>\r\n<td>Ongoing through 2030<\/td>\r\n<\/tr>\r\n<tr>\r\n<td><strong>Navi Mumbai Intl Airport<\/strong><\/td>\r\n<td>Navi Mumbai, MH<\/td>\r\n<td>Greenfield airport to ease Mumbai traffic<\/td>\r\n<td>\u20b916,700\u202fCr<\/td>\r\n<td>Operational by 2024<\/td>\r\n<\/tr>\r\n<tr>\r\n<td><strong>Kochi Water Metro<\/strong><\/td>\r\n<td>Kochi, KL<\/td>\r\n<td>Integrated water transport on 10 islands<\/td>\r\n<td>\u20b91,137\u202fCr<\/td>\r\n<td>Trial run\/partial ops; complete 2025<\/td>\r\n<\/tr>\r\n<tr>\r\n<td><strong>Sagarmala Port Projects<\/strong><\/td>\r\n<td>Across India<\/td>\r\n<td>Coastal port-led infra upgrades<\/td>\r\n<td>500+ projects, many under implementation<\/td>\r\n<td>Ongoing<\/td>\r\n<\/tr>\r\n<tr>\r\n<td><strong>Bharatmala Road Corridors<\/strong><\/td>\r\n<td>All-India<\/td>\r\n<td>National highways &amp; freight corridors<\/td>\r\n<td>\u20b95.35\u202fTn<\/td>\r\n<td>Phase I under progress<\/td>\r\n<\/tr>\r\n<tr>\r\n<td><strong>Chenab Rail Bridge<\/strong><\/td>\r\n<td>J&amp;K<\/td>\r\n<td>World\u2019s tallest railway bridge<\/td>\r\n<td>\u20b91,250\u202fCr<\/td>\r\n<td>Nearing completion 2025<\/td>\r\n<\/tr>\r\n<tr>\r\n<td><strong>Puga Geothermal Project<\/strong><\/td>\r\n<td>Ladakh<\/td>\r\n<td>India\u2019s 1st geothermal power facility<\/td>\r\n<td>\u20b95,000\u202fCr<\/td>\r\n<td>Exploratory stage; ops by 2025<\/td>\r\n<\/tr>\r\n<tr>\r\n<td><strong>Bina Petrochemical Complex<\/strong><\/td>\r\n<td>MP<\/td>\r\n<td>2.15\u202fL jobs, \u20b950,000\u202fCr plant<\/td>\r\n<td>Under construction<\/td>\r\n<td>Ongoing 2025<\/td>\r\n<\/tr>\r\n<tr>\r\n<td><strong>Nagarnar Steel Plant<\/strong><\/td>\r\n<td>Chhattisgarh<\/td>\r\n<td>3\u202fMTPA greenfield steel mill<\/td>\r\n<td>\u20b925,500\u202fCr<\/td>\r\n<td>Nearly ready<\/td>\r\n<\/tr>\r\n<tr>\r\n<td><strong>Barmer Refinery (HPCL-Rajasthan)<\/strong><\/td>\r\n<td>Rajasthan<\/td>\r\n<td>9\u202fmtpa refinery + petro hub<\/td>\r\n<td>\u20b9??; commission Jan\u202f2024<\/td>\r\n<td>Ongoing operations<\/td>\r\n<\/tr>\r\n<tr>\r\n<td><strong>2G Ethanol Refineries<\/strong><\/td>\r\n<td>Panipat\/Bhatinda\/Odisha<\/td>\r\n<td>Biofuel facilities by IOCL\/HPCL\/BPCL<\/td>\r\n<td>Multiple underconstruction<\/td>\r\n<td>Ongoing 2025<\/td>\r\n<\/tr>\r\n<tr>\r\n<td><strong>INOXCVA Cryogenic Plant<\/strong><\/td>\r\n<td>Vadodara, GJ<\/td>\r\n<td>India\u2019s largest cryogenic equipment plant<\/td>\r\n<td>Under construction<\/td>\r\n<td>Ongoing<\/td>\r\n<\/tr>\r\n<tr>\r\n<td><strong>HAL Aircraft &amp; Helicopter Factories<\/strong><\/td>\r\n<td>Tumakuru\/Nashik\/Bengaluru<\/td>\r\n<td>LCA, HTT-40, helicopter gear units<\/td>\r\n<td>Rash scale greenfield<\/td>\r\n<td>Nashik underway; Tumakuru complete<\/td>\r\n<\/tr>\r\n<tr>\r\n<td><strong>Kulasekarapattinam Spaceport<\/strong><\/td>\r\n<td>TN<\/td>\r\n<td>SSLV spaceport development<\/td>\r\n<td>Under construction<\/td>\r\n<td>Ready by 2025<\/td>\r\n<\/tr>\r\n<tr>\r\n<td><strong>Bihar Small Modular Reactors<\/strong><\/td>\r\n<td>Nawada, Bihar<\/td>\r\n<td>First-of-its-kind nuclear SMR project<\/td>\r\n<td>~1\u202fGW; central government assisted<\/td>\r\n<td>Pilot\u202f~\u202f2030 manufacturingtodayindia.com+1nicdc.in+1timesofindia.indiatimes.compib.gov.in+4reuters.com+4en.wikipedia.org+4<\/td>\r\n<\/tr>\r\n<tr>\r\n<td><strong>Assam Thermal Power Plant<\/strong><\/td>\r\n<td>Bilasipara, Assam<\/td>\r\n<td>3,400\u202fMW coal-fired power generation<\/td>\r\n<td>Multi-thousand crore<\/td>\r\n<td>Commission by 2027<\/td>\r\n<\/tr>\r\n<tr>\r\n<td><strong>Bihar Battery Storage &amp; SCADA Upgrade<\/strong><\/td>\r\n<td>Bihar<\/td>\r\n<td>2,000\u202fMW BESS + SCADA substation monitoring<\/td>\r\n<td>\u20b9617\u202fCr for substation; BESS via VGF<\/td>\r\n<td>Approvals 2025<\/td>\r\n<\/tr>\r\n<tr>\r\n<td><strong>Sector 7 Expansion<\/strong><\/td>\r\n<td>Pithampur, MP<\/td>\r\n<td>19 industries: auto, pharma, electronics<\/td>\r\n<td>\u20b97,253\u202fCr; 272\u202fha land<\/td>\r\n<td>Infrastructure by 2025<\/td>\r\n<\/tr>\r\n<tr>\r\n<td><strong>Gujarat Electronics Policy<\/strong><\/td>\r\n<td>Gujarat<\/td>\r\n<td>Incentivizing component\/EMS fabs<\/td>\r\n<td>\u20b935,000\u202fCr investments targeted<\/td>\r\n<td>Projects 2025+<\/td>\r\n<\/tr>\r\n<tr>\r\n<td><strong>Ganga Expressway<\/strong><\/td>\r\n<td>Uttar Pradesh<\/td>\r\n<td>1,047\u202fkm greenfield expressway + industrial corridor<\/td>\r\n<td>\u20b937,350\u202fCr; 6\u2011lane (8)<\/td>\r\n<td>Phase\u202f1 by Dec\u202f2025<\/td>\r\n<\/tr>\r\n<tr>\r\n<td><strong>Chennai Aero Park<\/strong><\/td>\r\n<td>Chennai, TN<\/td>\r\n<td>Aerospace components hub<\/td>\r\n<td>~250\u202facre, expandable to 700\u202facre<\/td>\r\n<td>Land allotment underway<\/td>\r\n<\/tr>\r\n<tr>\r\n<td><strong>Chennai\u2013Bengaluru Industrial Corridor<\/strong><\/td>\r\n<td>TN\/Karnataka<\/td>\r\n<td>Logistics\/industrial corridor + IMCs<\/td>\r\n<td>Multiple nodes (Tumakuru, Ponneri&#8230;)<\/td>\r\n<td>DPR\/Tendering 2025<\/td>\r\n<\/tr>\r\n<tr>\r\n<td><strong>Semicon Megaplants<\/strong><\/td>\r\n<td>Panvel, Dholera, MP<\/td>\r\n<td>Multiple fabs &amp; ATMP\/OSAT facilities<\/td>\r\n<td>\u20b991,000\u202fCr + \u20b940,000\u202fCr proposals<\/td>\r\n<td>Fab commissioning 2025\u201327<\/td>\r\n<\/tr>\r\n<tr>\r\n<td><strong>Coal India Mine Re-openings<\/strong><\/td>\r\n<td>Various States<\/td>\r\n<td>32 closed mines reopened + 5 new ones<\/td>\r\n<td>Private partnerships; capex ongoing<\/td>\r\n<td>Multiple launches in 2025<\/td>\r\n<\/tr>\r\n<tr>\r\n<td><strong>Jewar International Airport<\/strong><\/td>\r\n<td>Greater Noida, UP<\/td>\r\n<td>India\u2019s 2nd busiest greenfield airport<\/td>\r\n<td>\u20b929,560\u202fCr<\/td>\r\n<td>Terminal ops by 2025<\/td>\r\n<\/tr>\r\n<tr>\r\n<td><strong>Mumbai Coastal Road Project<\/strong><\/td>\r\n<td>Mumbai, MH<\/td>\r\n<td>29\u202fkm urban expressway &amp; sea link<\/td>\r\n<td>\u20b917,843\u202fCr<\/td>\r\n<td>Sectional openings 2025<\/td>\r\n<\/tr>\r\n<tr>\r\n<td><strong>Zoji La Tunnel<\/strong><\/td>\r\n<td>J&amp;K<\/td>\r\n<td>14\u202fkm strategic alpine tunnel<\/td>\r\n<td>\u20b98,000\u202fCr<\/td>\r\n<td>Expected late\u20112025<\/td>\r\n<\/tr>\r\n<tr>\r\n<td><strong>Delhi\u2013Mumbai Expressway<\/strong><\/td>\r\n<td>Multiple States<\/td>\r\n<td>1,350\u202fkm greenfield corridor<\/td>\r\n<td>\u20b91\u202fLakh\u202fCr<\/td>\r\n<td>To open by end\u20112025<\/td>\r\n<\/tr>\r\n<tr>\r\n<td><strong>Bharatmala Road Network<\/strong><\/td>\r\n<td>Nationwide<\/td>\r\n<td>National highways &amp; freight routes<\/td>\r\n<td>\u20b95.35\u202fTn<\/td>\r\n<td>Ongoing through 2027<\/td>\r\n<\/tr>\r\n<tr>\r\n<td><strong>Smart Cities Mission<\/strong><\/td>\r\n<td>100 Cities<\/td>\r\n<td>Urban infrastructure modernization<\/td>\r\n<td>\u20b91.65\u202fL\u202fCr; 8k+ projects<\/td>\r\n<td>Rolling through 2025<\/td>\r\n<\/tr>\r\n<tr>\r\n<td><strong>Gati Shakti Master Plan<\/strong><\/td>\r\n<td>Nation-wide<\/td>\r\n<td>Integrated multi-modal logistics plan<\/td>\r\n<td>\u20b9100\u202fTn<\/td>\r\n<td>In phases to 2030<\/td>\r\n<\/tr>\r\n<tr>\r\n<td><strong>Kanpur\u2013Lucknow Expressway<\/strong><\/td>\r\n<td>UP<\/td>\r\n<td>High-speed logistics corridor<\/td>\r\n<td>\u20b94,000\u202fCr+<\/td>\r\n<td>2025 delivery<\/td>\r\n<\/tr>\r\n<tr>\r\n<td><strong>Mumbai\u2013Delhi Dedicated Freight Corridor<\/strong><\/td>\r\n<td>Western DFC<\/td>\r\n<td>1,508\u202fkm dedicated cargo rail line<\/td>\r\n<td>\u20b91.1\u202fLakh\u202fCr<\/td>\r\n<td>Cargo ops by 2025<\/td>\r\n<\/tr>\r\n<tr>\r\n<td><strong>Jewar Airport Related MRO<\/strong><\/td>\r\n<td>UP<\/td>\r\n<td>Maintenance\/repair hub for airlines<\/td>\r\n<td>Likely \u20b91k+ Cr<\/td>\r\n<td>Post\u20112025 build-up<\/td>\r\n<\/tr>\r\n<tr>\r\n<td><strong>UP Global Captive Centre<\/strong><\/td>\r\n<td>Lucknow, UP<\/td>\r\n<td>Tata\u2019s IT\/skill hub in eastern UP<\/td>\r\n<td>\u20b9?; thousands of jobs<\/td>\r\n<td>Under planning<\/td>\r\n<\/tr>\r\n<tr>\r\n<td><strong>UP Temple Architecture Museum<\/strong><\/td>\r\n<td>Ayodhya, UP<\/td>\r\n<td>Culture-tourism infrastructure<\/td>\r\n<td>\u20b9?<\/td>\r\n<td>Under development<\/td>\r\n<\/tr>\r\n<tr>\r\n<td><strong>Tesla EV Showrooms<\/strong><\/td>\r\n<td>India-wide<\/td>\r\n<td>Tesla EV import &amp; sales network<\/td>\r\n<td>\u2265\u20b94,150\u202fCr capex for CBUs<\/td>\r\n<td>Scheme window mid-2025<\/td>\r\n<\/tr>\r\n<tr>\r\n<td><strong>Rare Earth Magnet Subsidy<\/strong><\/td>\r\n<td>All\u202fIndia<\/td>\r\n<td>Scheme to boost local magnet mfg<\/td>\r\n<td>TBD subsidy (in 20 days)<\/td>\r\n<td>Launch by mid\u20112025<\/td>\r\n<\/tr>\r\n<tr>\r\n<td><strong>Bihar SMR Nuclear Plant<\/strong><\/td>\r\n<td>Nawada, Bihar<\/td>\r\n<td>Small Modular Reactor (SMR) nuclear power facility<\/td>\r\n<td>~1\u202fGW; central support<\/td>\r\n<td>Pilot by 2030 timesofindia.indiatimes.com+1timesofindia.indiatimes.com+1timesproperty.com+4m.economictimes.com+4reuters.com+4<\/td>\r\n<\/tr>\r\n<tr>\r\n<td><strong>Shaktipeeth Expressway (Infrastructure)<\/strong><\/td>\r\n<td>MH\u2013GO<\/td>\r\n<td>800\u202fkm access-controlled highway<\/td>\r\n<td>\u20b984,000\u202fCr; \u20b920,000\u202fCr just for land<\/td>\r\n<td>Acquisition by Dec\u202f2025<\/td>\r\n<\/tr>\r\n<tr>\r\n<td><strong>Aerospace Park Truncated<\/strong><\/td>\r\n<td>Devanahalli, Bengaluru<\/td>\r\n<td>High-tech defence &amp; aerospace hub<\/td>\r\n<td>Land downsized by 495\u202facre<\/td>\r\n<td>Revised plan active<\/td>\r\n<\/tr>\r\n<tr>\r\n<td><strong>Vijayawada Roads Upgrade<\/strong><\/td>\r\n<td>Vijayawada, AP<\/td>\r\n<td>Six arterial road-widening schemes<\/td>\r\n<td>\u20b9100\u202fCr<\/td>\r\n<td>Completion by 2026<\/td>\r\n<\/tr>\r\n<tr>\r\n<td><strong>Delhi\u2013Dehradun Expressway<\/strong><\/td>\r\n<td>Delhi\u2013Uttarakhand<\/td>\r\n<td>210\u202fkm expressway with wildlife corridor<\/td>\r\n<td>\u20b912,000\u202fCr<\/td>\r\n<td>Fully open by ~July\u202f2025<\/td>\r\n<\/tr>\r\n<tr>\r\n<td><strong>GFX P2 Highway (Bhopal)<\/strong><\/td>\r\n<td>MP<\/td>\r\n<td>38\u202fkm link avoiding wetlands<\/td>\r\n<td>\u20b93,000\u202fCr total project<\/td>\r\n<td>Re-scoped, minimal delays<\/td>\r\n<\/tr>\r\n<tr>\r\n<td><strong>Plug\u2011and\u2011Play Industrial Parks Scheme<\/strong><\/td>\r\n<td>Pan\u2011India<\/td>\r\n<td>Central funding to ready parks<\/td>\r\n<td>\u20b92,500\u202fCr DIY capex<\/td>\r\n<td>Budget 2025 rollout<\/td>\r\n<\/tr>\r\n<tr>\r\n<td><strong>Dahej Industrial Park Expansion<\/strong><\/td>\r\n<td>Dahej, GJ<\/td>\r\n<td>New infrastructure and capacity<\/td>\r\n<td>\u20b91,200\u202fCr<\/td>\r\n<td>JV underway<\/td>\r\n<\/tr>\r\n<tr>\r\n<td><strong>Tech Units near Noida Airport<\/strong><\/td>\r\n<td>Yamuna Expy, UP<\/td>\r\n<td>3 tech majors, ~\u20b94,000\u202fCr<\/td>\r\n<td>EMC 2.0 cluster<\/td>\r\n<td>Soon post-approvals<\/td>\r\n<\/tr>\r\n<tr>\r\n<td><strong>TotalEnergies LNG Deal<\/strong><\/td>\r\n<td>GSPC, GJ<\/td>\r\n<td>400\u202fktpa supply over 10 yrs<\/td>\r\n<td>Long-term sourcing<\/td>\r\n<td>Agreement from 2026<\/td>\r\n<\/tr>\r\n<tr>\r\n<td><strong>Trivandrum Shipyard Poovar<\/strong><\/td>\r\n<td>Poovar, Kerala<\/td>\r\n<td>Deep-water ship-building repair yard<\/td>\r\n<td>PPP model underway<\/td>\r\n<td>2025 planning phase<\/td>\r\n<\/tr>\r\n<tr>\r\n<td><strong>Vadhavan Greenfield Port<\/strong><\/td>\r\n<td>Maharashtra<\/td>\r\n<td>New coastal port under Bharatmala<\/td>\r\n<td>Massive port\/logistics node<\/td>\r\n<td>In planning<\/td>\r\n<\/tr>\r\n<tr>\r\n<td><strong>Ahmedabad\u2013Dholera Expressway<\/strong><\/td>\r\n<td>Gujarat<\/td>\r\n<td>Industrial corridor highway<\/td>\r\n<td>Part of major expressway network<\/td>\r\n<td>DPR in progress<\/td>\r\n<\/tr>\r\n<tr>\r\n<td><strong>Neue Delhi Industrial Zones<\/strong><\/td>\r\n<td>Western\/NW Delhi<\/td>\r\n<td>Three modern industrial townships<\/td>\r\n<td>Turnkey development<\/td>\r\n<td>Planning stage<\/td>\r\n<\/tr>\r\n<tr>\r\n<td><strong>HSMC Fab Consortium<\/strong><\/td>\r\n<td>Multiple states<\/td>\r\n<td>Semiconductor fabs (multiple nodes)<\/td>\r\n<td>\u20b929,000+\u202fCr<\/td>\r\n<td>Under land &amp; tech tie-ups<\/td>\r\n<\/tr>\r\n<tr>\r\n<td><strong>Tata\u2013Powerchip Fab (Dholera)<\/strong><\/td>\r\n<td>Dholera, GJ<\/td>\r\n<td>28\u202fnm semiconductor fab<\/td>\r\n<td>\u20b991,000\u202fCr<\/td>\r\n<td>Commissioning starts ~2026<\/td>\r\n<\/tr>\r\n<tr>\r\n<td><strong>ISMC Tower Semiconductor Fab<\/strong><\/td>\r\n<td>Karnataka<\/td>\r\n<td>JV fab for 65\u202fnm analog chips<\/td>\r\n<td>$3\u202fB investment<\/td>\r\n<td>MoU signed<\/td>\r\n<\/tr>\r\n<tr>\r\n<td><strong>Micron Fab (Gujarat)<\/strong><\/td>\r\n<td>Gujarat<\/td>\r\n<td>Memory semiconductor plant<\/td>\r\n<td>$2.75\u202fB<\/td>\r\n<td>Under construction<\/td>\r\n<\/tr>\r\n<tr>\r\n<td><strong>OSAT \/ ATMP Unit (Kaynes)<\/strong><\/td>\r\n<td>Sanand, GJ<\/td>\r\n<td>Assembly\/test facility<\/td>\r\n<td>\u20b93,300\u202fCr+ var.<\/td>\r\n<td>Construction underway<\/td>\r\n<\/tr>\r\n<tr>\r\n<td><strong>Cricket Semicon Fab<\/strong><\/td>\r\n<td>Madhya Pradesh<\/td>\r\n<td>Analog &amp; power IC fab<\/td>\r\n<td>$1\u202fB MoU<\/td>\r\n<td>Early-stage planning<\/td>\r\n<\/tr>\r\n<\/tbody>\r\n<\/table>\r\n<\/figure>\r\n\r\n\r\n\r\n<h3 class=\"wp-block-heading\"><span class=\"ez-toc-section\" id=\"Related_Top_Agrochemicals_to_Manufacture_in_India\"><\/span>Related: <a href=\"https:\/\/mediumturquoise-hedgehog-745891.hostingersite.com\/blogs\/top-agrochemicals-to-manufacture\/\" rel=\"nofollow noopener\" target=\"_blank\">Top Agrochemicals to Manufacture in India<\/a><span class=\"ez-toc-section-end\"><\/span><\/h3>\r\n\r\n\r\n\r\n<h2 class=\"wp-block-heading\"><span class=\"ez-toc-section\" id=\"Brief_Summaries\"><\/span><strong>Brief Summaries<\/strong><span class=\"ez-toc-section-end\"><\/span><\/h2>\r\n\r\n\r\n\r\n<h3 class=\"wp-block-heading\"><span class=\"ez-toc-section\" id=\"Gujarat_Hybrid_Renewable_Energy_Park_Kutch\"><\/span><strong>Gujarat Hybrid Renewable Energy Park (Kutch)<\/strong><span class=\"ez-toc-section-end\"><\/span><\/h3>\r\n\r\n\r\n\r\n<p class=\"wp-block-paragraph\">Touted as the world\u2019s largest hybrid solar-wind energy project, the Gujarat Hybrid Renewable Energy Park aims to generate 30\u202fGW of clean power by late 2026. With integrated energy storage and transmission systems, it plays a pivotal role in India&#8217;s decarbonization and energy transition strategy.<\/p>\r\n\r\n\r\n\r\n<h3 class=\"wp-block-heading\"><span class=\"ez-toc-section\" id=\"Reliances_Jamnagar_Green_Energy_Gigafactory\"><\/span><strong>Reliance\u2019s Jamnagar Green Energy Gigafactory<\/strong><span class=\"ez-toc-section-end\"><\/span><\/h3>\r\n\r\n\r\n\r\n<p class=\"wp-block-paragraph\">The Dhirubhai Ambani Green Energy Giga Complex in Jamnagar, valued at \u20b975,000 crore, integrates solar module production, battery storage, and hydrogen technologies. This end-to-end clean energy hub is set to become India&#8217;s most advanced new-energy manufacturing ecosystem, aligning seamlessly with upcoming industries in India such as green hydrogen, energy storage solutions, electric mobility, renewable energy equipment manufacturing, and sustainable infrastructure.<\/p>\r\n\r\n\r\n\r\n<h3 class=\"wp-block-heading\"><span class=\"ez-toc-section\" id=\"Tata_Semiconductor_A_T_Facility_Assam\"><\/span><strong>Tata Semiconductor A&amp;T Facility, Assam<\/strong><span class=\"ez-toc-section-end\"><\/span><\/h3>\r\n\r\n\r\n\r\n<p class=\"wp-block-paragraph\">Located in Jagiroad, Assam, this \u20b927,000 crore investment marks India\u2019s first major greenfield semiconductor assembly and testing facility. With an estimated 25,000\u201330,000 jobs, the project is a major boost to India\u2019s electronics and chipmaking ambitions.<\/p>\r\n\r\n\r\n\r\n<h3 class=\"wp-block-heading\"><span class=\"ez-toc-section\" id=\"Palakkad_Smart_Industrial_City\"><\/span><strong>Palakkad Smart Industrial City<\/strong><span class=\"ez-toc-section-end\"><\/span><\/h3>\r\n\r\n\r\n\r\n<p class=\"wp-block-paragraph\">Developed under the Kochi\u2013Bengaluru industrial corridor, the Palakkad Smart City is part of India\u2019s greenfield smart city initiative. It targets high-tech sectors like pharmaceuticals, precision machinery, and electronics, and is backed by robust digital infrastructure.<\/p>\r\n\r\n\r\n\r\n<h3 class=\"wp-block-heading\"><span class=\"ez-toc-section\" id=\"National_Industrial_Corridor_Nodes_12_Cities\"><\/span><strong>National Industrial Corridor Nodes (12 Cities)<\/strong><span class=\"ez-toc-section-end\"><\/span><\/h3>\r\n\r\n\r\n\r\n<p class=\"wp-block-paragraph\">A pan-India initiative spanning states like UP, Bihar, Telangana, and Maharashtra, these 12 nodes under the NICDP are designed to offer next-gen industrial infrastructure. They combine smart-city elements with logistics, utilities, and high-efficiency production zones, supporting the growth of upcoming industries in India such as electric vehicles, advanced manufacturing, renewable energy, green hydrogen, and digital infrastructure.<\/p>\r\n\r\n\r\n\r\n<h3 class=\"wp-block-heading\"><span class=\"ez-toc-section\" id=\"Pachpadra_Refinery_Petrochemicals_Hub_Rajasthan\"><\/span><strong>Pachpadra Refinery &amp; Petrochemicals Hub, Rajasthan<\/strong><span class=\"ez-toc-section-end\"><\/span><\/h3>\r\n\r\n\r\n\r\n<p class=\"wp-block-paragraph\">This massive PSU-led refinery and petrochemical cluster in Rajasthan will deliver 9\u202fmtpa of refining and 2\u202fmtpa of petrochemical output. Expected to create around 100,000 jobs, it will serve as a major downstream industrial zone.<\/p>\r\n\r\n\r\n\r\n<h3 class=\"wp-block-heading\"><span class=\"ez-toc-section\" id=\"Vizhinjam_Deepwater_Transshipment_Port_Kerala\"><\/span><strong>Vizhinjam Deepwater Transshipment Port, Kerala<\/strong><span class=\"ez-toc-section-end\"><\/span><\/h3>\r\n\r\n\r\n\r\n<p class=\"wp-block-paragraph\">India\u2019s first deepwater transshipment hub began operations in May 2025 in Kerala. Capable of handling ultra-large container vessels, the port reduces India\u2019s reliance on overseas ports and boosts domestic maritime capacity.<\/p>\r\n\r\n\r\n\r\n<h3 class=\"wp-block-heading\"><span class=\"ez-toc-section\" id=\"Jalna_Dry_Port_MMIP_Maharashtra\"><\/span><strong>Jalna Dry Port (MMIP), Maharashtra<\/strong><span class=\"ez-toc-section-end\"><\/span><\/h3>\r\n\r\n\r\n\r\n<p class=\"wp-block-paragraph\">Launched in 2024, this inland logistics hub supports the DMIC corridor and is planned to scale up to 10 million TEU in capacity. It\u2019s a key multimodal node connecting hinterlands to global shipping routes.<\/p>\r\n\r\n\r\n\r\n<h3 class=\"wp-block-heading\"><span class=\"ez-toc-section\" id=\"Applied_Materials_R_D_Centre_Bengaluru\"><\/span><strong>Applied Materials R&amp;D Centre, Bengaluru<\/strong><span class=\"ez-toc-section-end\"><\/span><\/h3>\r\n\r\n\r\n\r\n<p class=\"wp-block-paragraph\">With a $400 million investment, this facility focuses on semiconductor equipment R&amp;D. It\u2019s projected to unlock an additional $2 billion in related investments, strengthening India\u2019s position in the global semiconductor supply chain.<\/p>\r\n\r\n\r\n\r\n<h3 class=\"wp-block-heading\"><span class=\"ez-toc-section\" id=\"Adani_Groups_Clean_Energy_Expansion\"><\/span><strong>Adani Group\u2019s Clean Energy Expansion<\/strong><span class=\"ez-toc-section-end\"><\/span><\/h3>\r\n\r\n\r\n\r\n<p class=\"wp-block-paragraph\">With a projected $100 billion investment, Adani\u2019s nationwide clean energy program aims to add 100\u202fGW of solar, wind, and hybrid energy capacity by 2030. This large-scale initiative is central to India\u2019s climate goals and renewable roadmap.<\/p>\r\n\r\n\r\n\r\n<h3 class=\"wp-block-heading\"><span class=\"ez-toc-section\" id=\"Related_Top_Business_Ideas_Suggested_by_NPCS_for_Each_states_of_India\"><\/span><strong>Related<\/strong>: <a href=\"https:\/\/www.niir.org\/blog\/category\/business-ideas\/\" rel=\"nofollow noopener\" target=\"_blank\">Top Business Ideas Suggested by NPCS for Each states of India<\/a><span class=\"ez-toc-section-end\"><\/span><\/h3>\r\n\r\n\r\n\r\n<h2 class=\"wp-block-heading\"><span class=\"ez-toc-section\" id=\"Conclusion\"><\/span>Conclusion<span class=\"ez-toc-section-end\"><\/span><\/h2>\r\n\r\n\r\n\r\n<p class=\"wp-block-paragraph\">In this article, we have tried to clearly highlighed the lists of upcoming industries in India along with the timeline and the businesses working on it to complete these projects. I hope you can get valuable insights to choose your business venture for your upcoming projects.<\/p>\r\n\r\n\r\n\r\n<p class=\"wp-block-paragraph\">If you need any kind of assistance on your business ideas we at NPCS can help you to provide detailed project report. We have been assisting businesses for 40+ Years in starting their <a href=\"https:\/\/www.entrepreneurindia.co\/blogs\/\">business<\/a>.<\/p>\r\n\r\n\r\n\r\n<p class=\"wp-block-paragraph\">&nbsp;<\/p>\r\n","protected":false},"excerpt":{"rendered":"<p>India is entering a transformative growth phase in 2024\u201325, driven by large-scale investments across energy, infrastructure, manufacturing, and technology. The following table highlights key upcoming industries in India along with the projects set to shape the nation&#8217;s economic future. Table of Upcoming Industries In india Project \/ Industry Location Description Investment \/ Scale Timeline Solar [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":2157,"comment_status":"open","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"_crdt_document":"","jnews-multi-image_gallery":[],"jnews_single_post":{"format":"standard","override":[{"template":"2","parallax":"1","fullscreen":"1","layout":"right-sidebar","sidebar":"default-sidebar","second_sidebar":"default-sidebar","sticky_sidebar":"1","share_position":"topbottom","share_float_style":"share-monocrhome","show_share_counter":"1","show_view_counter":"1","show_featured":"1","show_post_meta":"1","show_post_author":"1","post_date_format":"default","post_date_format_custom":"Y\/m\/d","show_post_category":"1","show_post_reading_time":"0","post_reading_time_wpm":"300","post_calculate_word_method":"str_word_count","show_zoom_button":"0","zoom_button_out_step":"2","zoom_button_in_step":"3","show_post_tag":"1","show_prev_next_post":"1","show_popup_post":"1","show_comment_section":"1","number_popup_post":"1","show_author_box":"1","show_post_related":"0","show_inline_post_related":"0"}],"image_override":[{"single_post_thumbnail_size":"crop-500","single_post_gallery_size":"crop-500"}],"trending_post_position":"meta","trending_post_label":"Trending","sponsored_post_label":"Sponsored by","disable_ad":"0","subtitle":""},"jnews_primary_category":[],"jnews_social_meta":[],"jnews_paywall_metabox":{"paragraph_limit":"2","enable_premium_post":"0","enable_free_post":"0","override_paragraph_limit":"0","enable_preview_post":"0","enable_preview_video":"0"},"jnews_override_counter":{"view_counter_number":"0","share_counter_number":"0","like_counter_number":"0","dislike_counter_number":"0"},"footnotes":""},"categories":[1081,1221],"tags":[485,405,650],"class_list":["post-2156","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-manufacturing-business-ideas","category-startup-opportunities","tag-business-ideas","tag-business-models","tag-upcoming-industries"],"_links":{"self":[{"href":"https:\/\/www.entrepreneurindia.co\/blogs\/wp-json\/wp\/v2\/posts\/2156","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.entrepreneurindia.co\/blogs\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.entrepreneurindia.co\/blogs\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.entrepreneurindia.co\/blogs\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/www.entrepreneurindia.co\/blogs\/wp-json\/wp\/v2\/comments?post=2156"}],"version-history":[{"count":4,"href":"https:\/\/www.entrepreneurindia.co\/blogs\/wp-json\/wp\/v2\/posts\/2156\/revisions"}],"predecessor-version":[{"id":5713,"href":"https:\/\/www.entrepreneurindia.co\/blogs\/wp-json\/wp\/v2\/posts\/2156\/revisions\/5713"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.entrepreneurindia.co\/blogs\/wp-json\/wp\/v2\/media\/2157"}],"wp:attachment":[{"href":"https:\/\/www.entrepreneurindia.co\/blogs\/wp-json\/wp\/v2\/media?parent=2156"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.entrepreneurindia.co\/blogs\/wp-json\/wp\/v2\/categories?post=2156"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.entrepreneurindia.co\/blogs\/wp-json\/wp\/v2\/tags?post=2156"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}