• 0

Project Consultancy, Reports & Profiles


We can provide you detailed project reports on the following topics. Please select the projects of your interests.

Each detailed project reports cover all the aspects of business, from analysing the market, confirming availability of various necessities such as plant & machinery, raw materials to forecasting the financial requirements. The scope of the report includes assessing market potential, negotiating with collaborators, investment decision making, corporate diversification planning etc. in a very planned manner by formulating detailed manufacturing techniques and forecasting financial aspects by estimating the ost of raw material, formulating the cash flow statement, projecting the balance sheet etc.

We also offer self-contained Pre-Investment and Pre-Feasibility Studies, Market Surveys and Studies, Preparation of Techno-Economic Feasibility Reports, Identification and Selection of Plant and Machinery, Manufacturing Process and or Equipment required, General Guidance, Technical and Commercial Counseling for setting up new industrial projects on the following topics. Many of the engineers, project consultant & industrial consultancy firms in India and worldwide use our project reports as one of the input in doing their analysis.

Sort by :
Bitumen Emulsion for Road (Cationic Type)
Bitumen Emulsion for Road (Cationic Type)

Bitumen Emulsion is one kind of speciality chemicals which has large commercial uses as coating material in the road construction and many other co... Read More

Capacity :
5 MT/Day
Plant and Machinery cost:
18.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
50.34%
Break Even Point (BEP):
73.35 %
TCI :
44.00 Lakhs
Cost of Project :
44.00Lakhs
Add To Inquiry Basket
Bitumen
Bitumen

It is non crystalline solid or viscous material having adhesive properties, which is completely soluble in carbon disulfide. It is generally brown ... Read More

Capacity :
20 Tonne/day
Plant and Machinery cost:
14.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
41.00%
Break Even Point (BEP):
49.00 %
TCI :
71.00 Lakhs
Cost of Project :
71.00Lakhs
Add To Inquiry Basket
Bitumen Emulsion
Bitumen Emulsion

Bitumen is defined as “A viscous liquid, or a solid, consisting essentially of hydrocarbons and their derivatives, which is solu... Read More

Capacity :
50 MT/Day
Plant and Machinery cost:
143.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
28.00%
Break Even Point (BEP):
54.00 %
TCI :
372.00 Lakhs
Cost of Project :
372.00Lakhs
Add To Inquiry Basket
Production of Bitumen Emulsion
Production of Bitumen Emulsion

Bitumen emulsion is a liquid product in which bitumen is suspended in a finely divided condition in an aqueous medium and stabilised by suitable ma... Read More

Capacity :
0
Plant and Machinery cost:
0.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
0.00%
Break Even Point (BEP):
0.00 %
TCI :
0.00 Lakhs
Cost of Project :
0.00Lakhs
Add To Inquiry Basket
Production of Bitumen (Polymer Modified Bitumen, Bitumen Emulsion, Cutback Bitumen)
Production of Bitumen (Polymer Modified Bitumen, Bitumen Emulsion, Cutback Bitumen)

 

Bitumen is a typical low-cost thermoplasti... Read More

Capacity :
Polymer Modified Bitumen: 4.0 MT Per Day Bitumen Emulsion: 8.0 MT Per Day Cutback Bitumen : 8.0 MT P
Plant and Machinery cost:
95.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
30.00%
Break Even Point (BEP):
80.00 %
TCI :
0.00 Lakhs
Cost of Project :
540.00Lakhs
Add To Inquiry Basket
Set up a Production Plant of Bitumen, Polymer Modified Bitumen, Bitumen Emulsion, Cutback Bitumen Increasing demand for bitumen in building of national roads, highways, and airport pathways
Set up a Production Plant of Bitumen, Polymer Modified Bitumen, Bitumen Emulsion, Cutback Bitumen Increasing demand for bitumen in building of national roads, highways, and airport pathways

 

Introduct... Read More

Capacity :
0
Plant and Machinery cost:
0.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
0.00%
Break Even Point (BEP):
0.00 %
TCI :
0.00 Lakhs
Cost of Project :
0.00Lakhs
Add To Inquiry Basket
NameCapacityRate of return (ROR):Cost of project
Bitumen Emulsion for Road... 5 MT/Day 50.34 44.00
Bitumen 20 Tonne/day 41.00 71.00
Bitumen Emulsion 50 MT/Day 28.00 372.00
Production of Bitumen Emu... 0 0.00 0.00
Production of Bitumen (Po... Polymer Modified Bitumen: 4.0 MT Per Day Bitumen Emulsion: 8.0 MT Per Day Cutback Bitumen : 8.0 MT P 30.00 540.00
Set up a Production Plant... 0 0.00 0.00

Showing 6 Product(s)

Information

  • One Lac / Lakh / Lakhs is equivalent to one hundred thousand (100,000)
  • One Crore is equivalent to ten million (10,000,000)
  • T.C.I is Total Capital Investment
  • We can modify the project capacity and project cost as per your requirement.
  • We can also prepare project report on any subject as per your requirement.
  • Caution: The project's cost, capacity and return are subject to change without any notice. Future projects may have different values of project cost, capacity or return.