The importance of infrastructure for sustained economic development is well recognized in a country. India will be a high growth economy over the next decade. India’s infrastructure spending at present accounts for just 4 per cent of GDP as compared to china’s 9 percent. This emphasizes the need to step up expenditure in this sector. The need of the hour is significant private-sector participation. Physical infrastructure covering transportation, power and communication through its backward and forward linkages facilitates growth; social infrastructure including water supply, sanitation, sewage disposal, education and health, which are in the nature of primary services, has a direct impact on the quality of life. The feasibility of infrastructure projects in ports, roads, airports and railways with private-sector majority ownership is already evident. The government also expects a substantial increase in the share of private sector investments in infrastructure from 19 per cent in the Tenth Plan to around 30 per cent in the Eleventh Plan. The biggest increase in private participation is expected in roads (from 5 per cent to 36), ports (47 per cent to 74 per cent) and railways (less than 1 per cent to 20 per cent). The Planning Commission estimates that the remaining infrastructure investments will be funded by the central and state government.

Urban infrastructure is reeling under pressure with the transport infrastructure crumbling and a shortfall of over 20 million housing units. Besides, water supply and sanitation systems in most cities are in urgent need of upgradation. The primary healthcare facilities in India require significant additional investment.

The efficacy of private sector participation in infrastructure development would be contingent upon the capability to commercialize these projects whereby recovery of investments would be through a system of user charges. There is a potential for public private partnerships (PPPs) to contribute more and help bridge the infrastructure gap in India. There has been considerable progress in the last ten years in attracting private investment into the infrastructure sectors; first in telecommunications, then in ports and roads, and in individual projects in other sectors. Forty-six percent of plan outlay has been earmarked for developing infrastructure as the sector has received much priority in the annual budget of India for 2010-2011.

For a long term investor, the investment opportunities are significant across a wide spectrum of infrastructure assets. Recent initiatives such as permitting take-out financing by India Infrastructure Finance Company (IIFCL) are encouraging as this enables commercial banks to rotate capital and infuse additional liquidity into the system. There is no doubt that Indian infrastructure is poised for a great leap forward.


We can provide you detailed project reports on the following topics. Please select the projects of your interests.
Each detailed project reports cover all the aspects of business, from analysing the market, confirming availability of various necessities such as plant & machinery, raw materials to forecasting the financial requirements. The scope of the report includes assessing market potential, negotiating with collaborators, investment decision making, corporate diversification planning etc. in a very planned manner by formulating detailed manufacturing techniques and forecasting financial aspects by estimating the ost of raw material, formulating the cash flow statement, projecting the balance sheet etc.
We also offer self-contained Pre-Investment and Pre-Feasibility Studies, Market Surveys and Studies, Preparation of Techno-Economic Feasibility Reports, Identification and Selection of Plant and Machinery, Manufacturing Process and or Equipment required, General Guidance, Technical and Commercial Counseling for setting up new industrial projects on the following topics. Many of the engineers, project consultant & industrial consultancy firms in India and worldwide use our project reports as one of the input in doing their analysis.


We can modify the project capacity and project cost as per your requirement.
We can also prepare project report on any subject as per your requirement.

Add multiple items to inquiry

Select the items and then press Add to inquiry button

Sort by :
Mini Aerodrome
Mini Aerodrome

An aerodrome or airdrome is a location from which aircraft flight operations take place, regardless of whether they involve... Read More

Capacity : Flight Landing Charges : 4,320 Nos./annum Annually Lease Charages of Shops (20 Nos.) : 12 Nos./a
Plant and Machinery cost: 442.00 Lakhs
Working Capital : 0.00
Rate of Return (ROR):0.00%
Break Even Point (BEP):0.00 %
TCI :0.00 Lakhs
Cost of Project : 6777.00Lakhs
Add To Inquiry Basket
Cement Plant
Cement Plant

Cement is a material with adhesive and cohesive properties which make it capable of bonding minerals fragments into a compact whole. It can be defi... Read More

Capacity : 200 MT/Day
Plant and Machinery cost: 755.00 Lakhs
Working Capital : 0.00
Rate of Return (ROR):17.22%
Break Even Point (BEP):61.78 %
TCI :1254.00 Lakhs
Cost of Project : 1254.00Lakhs
Add To Inquiry Basket
Solar Power Plant
Solar Power Plant

Renewable energy in India comes under the purview of the Ministry of New and Renewable Energy. India was the first country in the world to set up a... Read More

Capacity : Solar Power 10 MW: 60,000 KWH/ Day
Plant and Machinery cost: 5512.00 Lakhs
Working Capital : 0.00
Rate of Return (ROR):5.68%
Break Even Point (BEP):53.14 %
TCI :8447.00 Lakhs
Cost of Project : 8447.00Lakhs
Add To Inquiry Basket
India Emerging Business Opportunities  Cold Chain Sector (Why to Invest, Project Potential, Core Financials, Market Size & Industry Analysis)
India Emerging Business Opportunities Cold Chain Sector (Why to Invest, Project Potential, Core Financials, Market Size & Industry Analysis)

India Emerging Business Opportunities: Cold Chain Sector (Why to Invest, Project Potential, Core Financials... Read More

Capacity : 0.00
Plant and Machinery cost: 0.00 Lakhs
Working Capital : 0.00
Rate of Return (ROR):1.00%
Break Even Point (BEP):0.00 %
TCI :0.00 Lakhs
Cost of Project : 0.00Lakhs
Add To Inquiry Basket
FOOD PARK
FOOD PARK

Food Parks are comprehensive industrial estates for food processing units where the industries would have provision of common facilities like cold ... Read More

Capacity :
Plant and Machinery cost: 0.00 Lakhs
Working Capital : 0.00
Rate of Return (ROR):1.00%
Break Even Point (BEP):0.00 %
TCI :0.00 Lakhs
Cost of Project : 0.00Lakhs
Add To Inquiry Basket
SOLAR PHOTOVOLTAIC (PV)  MODULES ASSEMBLING PLANT (10 MW)
SOLAR PHOTOVOLTAIC (PV) MODULES ASSEMBLING PLANT (10 MW)

Photovoltaic (PV) is the field of te... Read More

Capacity : 1 No./Annum
Plant and Machinery cost: 1241.00 Lakhs
Working Capital : 0.00
Rate of Return (ROR):60.00%
Break Even Point (BEP):60.00 %
TCI :1778.00 Lakhs
Cost of Project : 1778.00Lakhs
Add To Inquiry Basket
POLYTECHNIC COLLEGE (Technical Education Institution)
POLYTECHNIC COLLEGE (Technical Education Institution)

Technical Education plays a vital role in human resource development of the country by creating skilled manpower, enhancing industrial productivity... Read More

Capacity :
Plant and Machinery cost: 790.00 Lakhs
Working Capital : 0.00
Rate of Return (ROR):33.00%
Break Even Point (BEP):46.00 %
TCI :1573.00 Lakhs
Cost of Project : 1573.00Lakhs
Add To Inquiry Basket
Cement Plant
Cement Plant

Cement industry is one of the most important basic industries on which depends the economic health of a developing country. In fact the important i... Read More

Capacity : 5000 MT/Day
Plant and Machinery cost: 10500.00 Lakhs
Working Capital : 0.00
Rate of Return (ROR):41.00%
Break Even Point (BEP):79.00 %
TCI :17500.00 Lakhs
Cost of Project : 17500.00Lakhs
Add To Inquiry Basket
Special Economic Zone (SEZ)
Special Economic Zone (SEZ)

-

Read More
Capacity :
Plant and Machinery cost: 0.00 Lakhs
Working Capital : 0.00
Rate of Return (ROR):0.00%
Break Even Point (BEP):0.00 %
TCI :0.00 Lakhs
Cost of Project : 0.00Lakhs
Add To Inquiry Basket
Pharmaceutical College (B-Pharma & D-Pharma)
Pharmaceutical College (B-Pharma & D-Pharma)

-

Read More
Capacity : 250 Students
Plant and Machinery cost: 125.00 Lakhs
Working Capital : 0.00
Rate of Return (ROR):12.00%
Break Even Point (BEP):71.00 %
TCI :396.00 Lakhs
Cost of Project : 396.00Lakhs
Add To Inquiry Basket
Concentrated Manganese Ore
Concentrated Manganese Ore

India holds a leading position as a source of manganese ore. The output of this mineral being the third largest in the world. The ore occurs in var... Read More

Capacity : 7500 MT/Annum
Plant and Machinery cost: 127.00 Lakhs
Working Capital : 0.00
Rate of Return (ROR):42.00%
Break Even Point (BEP):40.00 %
TCI :656.00 Lakhs
Cost of Project : 656.00Lakhs
Add To Inquiry Basket
BIOMASS GASIFICATION POWER PLANT
BIOMASS GASIFICATION POWER PLANT

Bio-gas power plant is one of the sources of non-conventional energy. The biomass fuels are solid carbonaceous materials derived from living plants... Read More

Capacity : 1000 KWh or 1 MW.
Plant and Machinery cost: 475.00 Lakhs
Working Capital : 0.00
Rate of Return (ROR):12.00%
Break Even Point (BEP):66.00 %
TCI :691.00 Lakhs
Cost of Project : 691.00Lakhs
Add To Inquiry Basket
Cold Storage
Cold Storage

Cold storage industry is a very impo... Read More

Capacity : 1000 MT
Plant and Machinery cost: 23.00 Lakhs
Working Capital : 0.00
Rate of Return (ROR):37.00%
Break Even Point (BEP):48.00 %
TCI :77.00 Lakhs
Cost of Project : 77.00Lakhs
Add To Inquiry Basket
School (Residential)
School (Residential)

Compulsory state education begins at 5 years but permissive legislation allows local education authorities to build also for children of 3 to 5 yea... Read More

Capacity : 700 students
Plant and Machinery cost: 209.00 Lakhs
Working Capital : 0.00
Rate of Return (ROR):12.00%
Break Even Point (BEP):70.00 %
TCI :687.00 Lakhs
Cost of Project : 687.00Lakhs
Add To Inquiry Basket
NameCapacityRate of return (ROR):Cost of project
4 Star Hotel 55 Rooms, 5 Suits, 2 Banquet Hall & Conference Hall 24.00 2634.00
Mega Food Park 0 0.00 0.00
Industrial Training Insti... Total number of students: 3600 students/annum (each trade 120 students) 16 Trade 1 year duration 14 27.00 2476.00
Residential School 5000 Nos of students 0.35 4887.00
Warehouse Sacks Storage:50,000 Sacks/Day 23.72 771.00
Controlled Atmosphere Col... Seasonal Commodity:11 MT/Day,Cold Storage (Rental):44 MT/Day 19.00 1022.00
Golf Course 20000 MEMBERS 26.00 2100.00
Market Research Report on... 1.00 0.00
TOWNSHIP Villa with Private Swimming Pool 280 Nos.,Shopping Arcade 150 Nos. Shops, EWS Houses 30 Nos. 28.00 3440.00
MANAGEMENT COLLEGE (BBA, ... 660 Nos. Students, Hostlers 90% = 600 Nos. 23.00 85.00
RESIDENTIAL APARTMENT 252 Flats 31.78 8200.00
COMPRESSED BIOGAS 1200 MT/Annum 43.00 447.00
THREE STAR HOTEL Single Room - 30 Nos. Double Room - 40 Nos. Suites - 10 Nos. Banquet Hall - 1 Number 48.00 1500.00
Water Park 1000 visitors / Day 41.00 362.00
GOOD OPPORTUNITIES IN CEM... 0 0.00 0.00
NURSERY SCHOOL 400 Children 42.00 66.00
BENEFICIATION OF CHROMIUM... 30,000 MT/ Annum each ores 45.00 3528.00
BANQUET HALL 75.00 496.00
Biogas Power Plant from C... 1000 KWh or 1 MWh 22.00 1245.00
POWER TRANSFORMER UPTO 40... 1 No./day 52.00 717.00
Solar Photovoltaic System 0 0.00 0.00
Solar Power Plant 0 0.00 0.00
Salt Glazed Stoneware Pip... 12 MT/day 44.00 126.00
Greenhouse (Plant Micropr... 10000 NOS./day 31.00 462.00
Pharmaceutical College (B... B. Pharma 100 Student, D. Pharma 150 Student 0.00 396.43
Precast RCC Sleeper for ... 120,000 Pcs/annum 26.00 1970.00
Cold Storage 5000 MT 24.00 770.00
COAL BASED POWER PLANT (5... 500 MW 56.00 158700.00
CAPTIVE POWER PLANT 5 MW 33.00 2097.00
Solar Cell 10000 Nos. / Day 45.00 358.00
123
« Back1 2Next »

Showing 121 - 74 of 74 Product(s)

Subject of your Interest

Information

  • One Lac / Lakh / Lakhs is equivalent to one hundred thousand (100,000)
  • One Crore is equivalent to ten million (10,000,000)
  • T.C.I is Total Capital Investment
  • We can modify the project capacity and project cost as per your requirement.
  • We can also prepare project report on any subject as per your requirement.
  • Caution: The project's cost, capacity and return are subject to change without any notice. Future projects may have different values of project cost, capacity or return.

ABOUT NPCS

 

NIIR PROJECT CONSULTANCY SERVICES (NPCS) is a reliable name in the industrial world for offering integrated technical consultancy services. NPCS is manned by engineers, planners, specialists, financial experts, economic analysts and design specialists with extensive experience in the related industries.

Our various services are: Detailed Project Report,  Business Plan for Manufacturing Plant, Start-up Ideas, Business Ideas for Entrepreneurs, Start up Business Opportunities, entrepreneurship projects, Successful Business Plan, Industry Trends, Market Research, Manufacturing Process, Machinery, Raw Materials, project report, Cost and Revenue, Pre-feasibility study for Profitable Manufacturing Business, Project Identification, Project Feasibility and Market Study, Identification of Profitable Industrial Project Opportunities, Business Opportunities, Investment Opportunities for Most Profitable Business in India, Manufacturing Business Ideas, Preparation of Project Profile, Pre-Investment and Pre-Feasibility Study, Market Research Study, Preparation of Techno-Economic Feasibility Report, Identification and Section of Plant, Process, Equipment, General Guidance, Startup Help, Technical and Commercial Counseling for setting up new industrial project and Most Profitable Small Scale Business.

NPCS also publishes varies process technology, technical, reference, self employment and startup books, directory, business and industry database, bankable detailed project report, market research report on various industries, small scale industry and profit making business. Besides being used by manufacturers, industrialists and entrepreneurs, our publications are also used by professionals including project engineers, information services bureau, consultants and project consultancy firms as one of the input in their research.

Our Detailed Project report aims at providing all the critical data required by any entrepreneur vying to venture into Project. While expanding a current business or while venturing into new business, entrepreneurs are often faced with the dilemma of zeroing in on a suitable product/line.

 


And before diversifying/venturing into any product, wish to study the following aspects of the identified product:


• Good Present/Future Demand
• Export-Import Market Potential
• Raw Material & Manpower Availability
• Project Costs and Payback Period


We at NPCS, through our reliable expertise in the project consultancy and market research field, Provides exhaustive information about the project, which satisfies all the above mentioned requirements and has high growth potential in the markets. And through our report we aim to help you make sound and informed business decision.

 

The report contains all the data which will help an entrepreneur find answers to questions like:

• Why I should invest in this project?
• What will drive the growth of the product?
• What are the costs involved?
• What will be the market potential?


The report first focuses on enhancing the basic knowledge of the entrepreneur about the main product, by elucidating details like product definition, its uses and applications, industry segmentation as well as an overall overview of the industry sector in India. The report then helps an entrepreneur identify the target customer group of its product. It further helps in making sound investment decision by listing and then elaborating on factors that will contribute to the growth of product consumption in India and also talks about the foreign trade of the product along with the list of top importing and top exporting countries. Report includes graphical representation and forecasts of key data discussed in the above mentioned segment. It further explicates the growth potential of the product.

The report includes other market data like key players in the Industry segment along with their contact information and recent developments. It includes crucial information like raw material requirements, list of machinery and manufacturing process for the plant. Core project financials like plant capacity, costs involved in setting up of project, working capital requirements, projected revenue and profit are further listed in the report.


Reasons for buying the report:

• This report helps you to identify a profitable project for investing or diversifying into by throwing light to crucial areas like industry size, demand of the product and reasons for investing in the product.

• This report provides vital information on the product like its definition, characteristics and segmentation.

• This report helps you market and place the product correctly by identifying the target customer group of the product.

• This report helps you understand the viability of the project by disclosing details like raw materials required, manufacturing process, project costs and snapshot of other project financials.

• The report provides forecasts of key parameters which helps to anticipate the industry performance and make sound business decision.

 

Our Approach:


• Our research reports broadly cover Indian markets, present analysis, outlook and forecast.

• The market forecasts are developed on the basis of secondary research and are cross-validated through interactions with the industry players. 

• We use reliable sources of information and databases.  And information from such sources is processed by us and included in the report.

 

Our Market Survey cum Detailed Techno Economic Feasibility Report Contains following information:

 

 

Ø  Introduction

·         Project Introduction

·         Project Objective and Strategy

·         Concise History of the Product

·         Properties

·         BIS (Bureau of Indian Standards) Provision & Specification

·         Uses & Applications

 

Ø  Market Study and Assessment

·         Current Indian Market Scenario

·         Present Market Demand and Supply

·         Estimated Future Market Demand and Forecast

·         Statistics of Import & Export

·         Names & Addresses of Existing Units (Present Players)

·         Market Opportunity

 

Ø  Raw Material

·         List of Raw Materials

·         Properties of Raw Materials

·         Prescribed Quality of Raw Materials

·         List of Suppliers and Manufacturers

 

Ø  Personnel (Manpower) Requirements

·         Requirement of Staff & Labor (Skilled and Unskilled) Managerial, Technical, Office Staff and Marketing Personnel

 

Ø  Plant and Machinery

·         List of Plant & Machinery

·         Miscellaneous Items

·         Appliances & Equipments

·         Laboratory Equipments & Accessories

·         Electrification

·         Electric Load & Water

·         Maintenance Cost

·         Sources of Plant & Machinery (Suppliers and Manufacturers)

 

Ø  Manufacturing Process and Formulations

·         Detailed Process of Manufacture with Formulation

·         Packaging Required

·         Process Flow Sheet Diagram

 

Ø  Infrastructure and Utilities

·         Project Location

·         Requirement of Land Area

·         Rates of the Land

·         Built Up Area

·         Construction Schedule

·         Plant Layout and Requirement of Utilities

 

Project at a Glance

Along with financial details as under:

 

  •     Assumptions for Profitability workings

  •    Plant Economics

  •    Production Schedule

  •    Land & Building

            Factory Land & Building

            Site Development Expenses

  •    Plant & Machinery

             Indigenous Machineries

            Other Machineries (Miscellaneous, Laboratory etc.)

  •    Other Fixed Assets

            Furniture & Fixtures

            Pre-operative and Preliminary Expenses

            Technical Knowhow

            Provision of Contingencies

  •   Working Capital Requirement Per Month

             Raw Material

            Packing Material

            Lab & ETP Chemical Cost

           Consumable Store

  •   Overheads Required Per Month And Per Annum

         Utilities & Overheads (Power, Water and Fuel Expenses etc.)

             Royalty and Other Charges

            Selling and Distribution Expenses

  •    Salary and Wages

  •    Turnover Per Annum

  •   Share Capital

            Equity Capital

            Preference Share Capital

 

  •    Annexure 1:: Cost of Project and Means of Finance

  •    Annexure 2::  Profitability and Net Cash Accruals

                Revenue/Income/Realisation

                Expenses/Cost of Products/Services/Items

                Gross Profit

                Financial Charges     

                Total Cost of Sales

                Net Profit After Taxes

                Net Cash Accruals

  •   Annexure 3 :: Assessment of Working Capital requirements

                Current Assets

                Gross Working. Capital

                Current Liabilities

                Net Working Capital

                Working Note for Calculation of Work-in-process

  •    Annexure 4 :: Sources and Disposition of Funds

  •    Annexure 5 :: Projected Balance Sheets

                ROI (Average of Fixed Assets)

                RONW (Average of Share Capital)

                ROI (Average of Total Assets)

  •    Annexure 6 :: Profitability ratios

                D.S.C.R

                Earnings Per Share (EPS)

               

             Debt Equity Ratio

        Annexure 7   :: Break-Even Analysis

                Variable Cost & Expenses

                Semi-Var./Semi-Fixed Exp.

                Profit Volume Ratio (PVR)

                Fixed Expenses / Cost 

                B.E.P

  •   Annexure 8 to 11:: Sensitivity Analysis-Price/Volume

            Resultant N.P.B.T

            Resultant D.S.C.R

   Resultant PV Ratio

   Resultant DER

  Resultant ROI

          Resultant BEP

  •    Annexure 12 :: Shareholding Pattern and Stake Status

        Equity Capital

        Preference Share Capital

  •   Annexure 13 :: Quantitative Details-Output/Sales/Stocks

        Determined Capacity P.A of Products/Services

        Achievable Efficiency/Yield % of Products/Services/Items 

        Net Usable Load/Capacity of Products/Services/Items   

       Expected Sales/ Revenue/ Income of Products/ Services/ Items   

  •    Annexure 14 :: Product wise domestic Sales Realisation

  •    Annexure 15 :: Total Raw Material Cost

  •    Annexure 16 :: Raw Material Cost per unit

  •    Annexure 17 :: Total Lab & ETP Chemical Cost

  •    Annexure 18  :: Consumables, Store etc.,

  •    Annexure 19  :: Packing Material Cost

  •    Annexure 20  :: Packing Material Cost Per Unit

  •    Annexure 21 :: Employees Expenses

  •    Annexure 22 :: Fuel Expenses

  •    Annexure 23 :: Power/Electricity Expenses

  •    Annexure 24 :: Royalty & Other Charges

  •    Annexure 25 :: Repairs & Maintenance Exp.

  •    Annexure 26 :: Other Mfg. Expenses

  •    Annexure 27 :: Administration Expenses

  •    Annexure 28 :: Selling Expenses

  •    Annexure 29 :: Depreciation Charges – as per Books (Total)

  •   Annexure 30   :: Depreciation Charges – as per Books (P & M)

  •   Annexure 31   :: Depreciation Charges - As per IT Act WDV (Total)

  •   Annexure 32   :: Depreciation Charges - As per IT Act WDV (P & M)

  •   Annexure 33   :: Interest and Repayment - Term Loans

  •   Annexure 34   :: Tax on Profits

  •   Annexure 35   ::Projected Pay-Back Period And IRR