Best Business Opportunities in Madhya Pradesh - Identification and Selection of right Project, Thrust areas for Investment, Industry Startup and Entrepreneurship


Why start your own Business?

Entrepreneurs frequently start their own businesses as a result of their dreams and passions. It might be tough to find the drive to put out your best efforts when you work for someone else. 

Entrepreneurs get the freedom to set their schedules. You will be able to spend more time with your family and friends once the company is established and you have hired people to do the majority of the critical tasks.  

You have the potential to manipulate your surroundings. By creating new job opportunities, you may create employment and strengthen the economy. There is no limit to how profitable your own company will be if you work hard and stay focused. Your established business can be passed down to your kids or grandsons.

 

What makes Madhya Pradesh an excellent place to start a Business?

 

Infrastructure and industries in Madhya Pradesh; 

The state, located in central India and is known as the “heart of India,” has benefited from substantial infrastructure projects, with both North-South and East-West corridors passing through it. 

Madhya Pradesh has an excellent infrastructure to assist industrial development. There are 550 trains crossing the state every day, a 5,000-kilometer National Highway network, five commercial airports with 100+ flights, and six inland container depots (ICDs). The state owns an oil refinery at Bina with an annual capacity of 6 MMT. The state’s installed power capacity is about 23,400 MW, with renewable energy sources accounting for 35% of that. 

The state is a significant producer of horticulture crops and provides attractive opportunities for the food processing industry. There are many business options available in Madhya Pradesh, including textile manufacturing, automobile manufacturing, cement production, food production, soya farming, and agricultural equipment manufacturing.

 

Railways in Madhya Pradesh; 

Uttar Pradesh (northeast), Rajasthan (northwest), Maharashtra (south), Gujarat (west) and Chhattisgarh (southeast) surround Madhya Pradesh. With a total of 20 important junctions, Madhya Pradesh has excellent rail connectivity. Several criss-cross rail networks operate through the state. The West Central Railway Zone of Indian Railways is headquartered in Jabalpur Junction. Every day, more than 455 trains pass through Madhya Pradesh. Bhopal, the state capital, has 220 trains passing through it. The North-South and East-West corridors go across the state of Madhya Pradesh.

 

Airports in Madhya Pradesh;

Madhya Pradesh is easily accessible from all parts of India. In Madhya Pradesh, there are several airports: Raja Bhoj International Airport (Bhopal Airport), Devi Ahilyabai Holkar Airport (Indore Airport) (International), Rajmata Vijaya Raje Scindia Air Terminal (Gwalior Airport) (Domestic), Dumna Airport (Jabalpur Airport) (Domestic), and Khajuraho Airport (Domestic).

 

Road connectivity in Madhya Pradesh; 

Madhya Pradesh has a 160,000-kilometer road network. Thirty-eight national highways cross the state with a total length of 7,854 kilometres. The length of state roadways is around 11,000 kilometres. The Narmada Expressway is a proposed 8-lane expressway in Madhya Pradesh that will connect Amarkantak in the state’s eastern end to the state’s western end along the Narmada River through Dindori, Shahpura, Jabalpur, and Alirajpur. Gujarat and Chhattisgarh would be connected by 1,300 km of roadways.

 

Agriculture in Madhya Pradesh; 

The Chambal valley, the Malwa Plateau, and the Rewa Plateau are the main farmed areas. Another fertile area is the Narmada valley, which is covered in river-borne alluvium. Rice, wheat, sorghum (jowar), corn (maise), pulses (legumes such as peas, beans, or lentils), and peanuts are the most important crops (groundnuts). Rice is farmed mostly in the east, where there is greater rainfall, although wheat and sorghum are more important in western Madhya Pradesh. In India, the state produces the most soybeans. Linseed, sesame, sugarcane, cotton, and inferior millets are other crops grown in hilly terrain.

In the western district of Mandsaur, near Rajasthan, along with the southwestern district of Khandwa [East Nimar]) the state is a major producer of opium and marijuana.

 

Madhya Pradesh’s Mineral Resources; 

Manganese is the most abundant mineral in the state, along with Glass sand, dolomite, and rock phosphate. It is India’s largest cement producer, accounting for 14% of its total cement production. Malanjkhand, Balaghat, is home to India’s largest open-cast copper mine. Singrauli coalfield has Asia’s thickest coal seam (135 mm). The state is India’s only diamond-producing state and a key producer of coal, limestone, copper, diaspora, and pyrophyllite.

 

Business-Friendly Policies in Madhya Pradesh; 

The state is situated in a key geographic location and is rich in natural resources. One of Madhya Pradesh’s focus areas for economic growth is increasing investments in industrial development. The state is quickly expanding and provides numerous business potential in a variety of industries. Madhya Pradesh’s industry-oriented transparent policies and hassle-free investment procedures aim to make the state a global investment hub. 

A huge land bank, a 24x7 power supply, and an improved law and order situation distinguish Madhya Pradesh as an investment-friendly state. The state has implemented a “single table” model to expedite project approvals and clear applications. The state is ranked in the top 10 states for business ease. There is a conducive climate for investors to visit and invest.

 

What are the steps for Starting a Business in Madhya Pradesh?

 

Decide on a Business Structure; 

Conducting research and reflecting on the following questions is the first step in beginning your business: 

What are my goals and objectives?

Do I wish to hire employees or operate as a sole proprietor?

What are my financial needs, and how much funds do I have on hand? 

This data will assist you in the construction of your business structure. Each company has its own set of needs, and legal organisations are not a one-size-fits-all solution.

 

2. Develop a Business Plan; 

Entrepreneurs who are planning to start a business usually ignore the importance of a business plan. You should have a sound business strategy even if your venture is self-funded. A business plan will essentially describe how much money you’ll need to invest upfront, how much money you’ll need to spend each month or quarter, and when you’ll, you’ll be able to start making money.

 

List of options to consider while forming a business in Madhya Pradesh; 

Limited Liability Company (LLC)

A sole proprietorship 

Partnership Deed 

 

Establishing a Business in Madhya Pradesh requires the following documents; 

Among the crucial steps in starting a business in Madhya Pradesh is to ensure you have all relevant permits and licences. Any paperwork error can negate your efforts. 

When it comes to starting a business, there are several legal regulations and documents that must be completed. Some of those  documents;

 

Digital Signature Certificate (DSC)

Director Identification Number (DIN)

Registration on the MCA Portal

Certificate of Incorporation

 

1. Create a strategy for Ensuring Compliance; 

Even if you own a small business, you are bound by some laws and regulations that govern larger corporations. Regulations controlling advertising, marketing, financing, intellectual property, and consumer privacy are just a few examples. Businesses with employees may be subject to additional state and local requirements in Madhya Pradesh.

 

2. Get Commercial Insurance ; 

Any legal or financial concerns that threaten your business will have an immediate impact on you. It’s crucial to protect your company against liability damages, not only because many clients want it, but also to protect yourself and your future stability. Naturally, the insurance that is right for your company will differ greatly, depending on your industry, the size of your company, and the kind of clients you work with, among other factors.

 

3. Register the name of Your Business; 

The name of your company is frequently used as a label. Prospective customers build an impression of a company based on its name. The name should be easy to recall and understand. Make sure your company’s name is recognisable and describes the services you offer. It’s important to remember that your company name should not already be in use. You must register your business name and, if necessary, copyright it to ensure that no one else uses it.

 

4. Build an effective Business Policy; 

An enterprise’s success will be aided by the development of an efficient business policy. It is something that both employees and management benefit from. It makes it simple to achieve the required planned growth.

 

 

AD_20Art21

Reasons for buying our reports:

• This report helps you to identify a profitable project for investing or diversifying into by throwing light to crucial areas like industry size, market potential of the product and reasons for investing in the product

• This report provides vital information on the product like its characteristics and segmentation

• This report helps you market and place the product correctly by identifying the target customer group of the product 

• This report helps you understand the viability of the project by disclosing details like machinery required, project costs and snapshot of other project financials

• The report provides a glimpse of government regulations applicable on the industry

• The report provides forecasts of key parameters which helps to anticipate the industry performance and make sound business decisions.

 

Our Approach:

• Our research reports broadly cover Indian markets, present analysis, outlook and forecast for a period of five years.

• The market forecasts are developed on the basis of secondary research and are cross-validated through interactions with the industry players

• We use reliable sources of information and databases. And information from such sources is processed by us and included in the report



We can provide you detailed project reports on the following topics. Please select the projects of your interests.
Each detailed project reports cover all the aspects of business, from analysing the market, confirming availability of various necessities such as plant & machinery, raw materials to forecasting the financial requirements. The scope of the report includes assessing market potential, negotiating with collaborators, investment decision making, corporate diversification planning etc. in a very planned manner by formulating detailed manufacturing techniques and forecasting financial aspects by estimating the ost of raw material, formulating the cash flow statement, projecting the balance sheet etc.
We also offer self-contained Pre-Investment and Pre-Feasibility Studies, Market Surveys and Studies, Preparation of Techno-Economic Feasibility Reports, Identification and Selection of Plant and Machinery, Manufacturing Process and or Equipment required, General Guidance, Technical and Commercial Counseling for setting up new industrial projects on the following topics. Many of the engineers, project consultant & industrial consultancy firms in India and worldwide use our project reports as one of the input in doing their analysis.


We can modify the project capacity and project cost as per your requirement.
We can also prepare project report on any subject as per your requirement.

Add multiple items to inquiry

Select the items and then press Add to inquiry button

Sort by :
Business Opportunities in Production of Dicyandiamide  (DCDA)
Business Opportunities in Production of Dicyandiamide (DCDA)

 

Dicyandiamide is ... Read More

Capacity : Dicyandiamide (DCDA) 5 MT Per Day
Plant and Machinery cost: 45.00 Lakhs
Working Capital : 0.00
Rate of Return (ROR):29.00%
Break Even Point (BEP):57.00 %
TCI :0.00 Lakhs
Cost of Project : 270.00Lakhs
Add To Inquiry Basket
Emerging Business of Shrimp Processing  (EOU)
Emerging Business of Shrimp Processing (EOU)

 

Shrimp are decapo... Read More

Capacity : Shrimp Processing (per Pack 1 Kg Size) 19,500 Kgs Per Day
Plant and Machinery cost: 202.00 Lakhs
Working Capital : 0.00
Rate of Return (ROR):30.00%
Break Even Point (BEP):57.00 %
TCI :0.00 Lakhs
Cost of Project : 1465.00Lakhs
Add To Inquiry Basket
Investment Opportunities in Business of IV Fluids (BFS Technology)
Investment Opportunities in Business of IV Fluids (BFS Technology)

 

Intravenous fluid... Read More

Capacity : IV Fluids (500 ml Size Bottle) 50,000 Bottles per day
Plant and Machinery cost: 3449.00 Lakhs
Working Capital : 0.00
Rate of Return (ROR):20.00%
Break Even Point (BEP):41.00 %
TCI :0.00 Lakhs
Cost of Project : 4089.00Lakhs
Add To Inquiry Basket
Start Business of A-2 Cow Milk Processing (Milk, Butter, Ghee & Paneer)
Start Business of A-2 Cow Milk Processing (Milk, Butter, Ghee & Paneer)

Milk is the most important source of protein and is consumed by people all over the w... Read More

Capacity : A-2 Milk (1 Ltr Tetra Pack) 2,250 Kgs per day Butter (100 & 500 gms Pack) 46 Kgs per day Paneer (4 P
Plant and Machinery cost: 19.00 Lakhs
Working Capital : 0.00
Rate of Return (ROR):25.00%
Break Even Point (BEP):58.00 %
TCI :0.00 Lakhs
Cost of Project : 484.00Lakhs
Add To Inquiry Basket
Start Production of  Paracetamol (BP,IP,USP Grade)
Start Production of Paracetamol (BP,IP,USP Grade)

Read More

Capacity : Paracetamol Powder (IP/BP Grade 50 MT Per Day Acetic Acid (31% Conc.) By Product 72 MT Per Day
Plant and Machinery cost: 962.00 Lakhs
Working Capital : 0.00
Rate of Return (ROR):32.00%
Break Even Point (BEP):52.00 %
TCI :0.00 Lakhs
Cost of Project : 2887.00Lakhs
Add To Inquiry Basket
Industrial and Pharmaceutical Grade Starch from Cassava, Maize and Tacca Roots
Industrial and Pharmaceutical Grade Starch from Cassava, Maize and Tacca Roots

 

Cassava, sorghum,... Read More

Capacity : Industrial Grade Starch 37.5 MT Per Day Pharmaceutical Grade Starch 12.5 MT Per Day
Plant and Machinery cost: 257.00 Lakhs
Working Capital : 0.00
Rate of Return (ROR):28.00%
Break Even Point (BEP):76.00 %
TCI :0.00 Lakhs
Cost of Project : 1255.00Lakhs
Add To Inquiry Basket
Production of  Copper Wire Drawing & Enamelling
Production of Copper Wire Drawing & Enamelling

 

Copper is one of ... Read More

Capacity : Copper Wire (0.914 to 0.376 mm) 350 Kgs per day Enamelled Copper Wire (0.914 to 0.376 mm) 350 Kgs pe
Plant and Machinery cost: 432.00 Lakhs
Working Capital : 0.00
Rate of Return (ROR):28.00%
Break Even Point (BEP):46.00 %
TCI :0.00 Lakhs
Cost of Project : 1233.00Lakhs
Add To Inquiry Basket
Profitable Industry of Bamboo Sticks
Profitable Industry of Bamboo Sticks

 

Bamboo is a tribe... Read More

Capacity : Bamboo Sticks 4 MT Per Day
Plant and Machinery cost: 443.00 Lakhs
Working Capital : 0.00
Rate of Return (ROR):26.00%
Break Even Point (BEP):45.00 %
TCI :0.00 Lakhs
Cost of Project : 791.00Lakhs
Add To Inquiry Basket
Profit Making Manufacturing Business of Alloy Wheels for 2 Wheeler Motorcycle, Bikes Best Business in Automobile Sector
Profit Making Manufacturing Business of Alloy Wheels for 2 Wheeler Motorcycle, Bikes Best Business in Automobile Sector

 

Allo... Read More

Capacity : 0
Plant and Machinery cost: 0.00 Lakhs
Working Capital : 0.00
Rate of Return (ROR):0.00%
Break Even Point (BEP):0.00 %
TCI :0.00 Lakhs
Cost of Project : 0.00Lakhs
Add To Inquiry Basket
Start Lucrative Manufacturing Business of Milk Powder (Baby Milk for 0 to 5 year, Milk Powder for Coffee and Tea)
Start Lucrative Manufacturing Business of Milk Powder (Baby Milk for 0 to 5 year, Milk Powder for Coffee and Tea)

Milk... Read More

Capacity : 0
Plant and Machinery cost: 0.00 Lakhs
Working Capital : 0.00
Rate of Return (ROR):0.00%
Break Even Point (BEP):0.00 %
TCI :0.00 Lakhs
Cost of Project : 0.00Lakhs
Add To Inquiry Basket
Production Business of Eco Friendly Bamboo Toothbrush Most Profitable Business Ideas in Bamboo Industry
Production Business of Eco Friendly Bamboo Toothbrush Most Profitable Business Ideas in Bamboo Industry

Bamboo toothbrushes Read More

Capacity : 0
Plant and Machinery cost: 0.00 Lakhs
Working Capital : 0.00
Rate of Return (ROR):0.00%
Break Even Point (BEP):0.00 %
TCI :0.00 Lakhs
Cost of Project : 0.00Lakhs
Add To Inquiry Basket
Profitable Business Industry of  Electric Motors
Profitable Business Industry of Electric Motors

 

An e... Read More

Capacity : 5 KW Three Phase Induction Motors120 Nos Per Day 10 KW Three Phase Induction Motors 20 Nos Per Day 1
Plant and Machinery cost: 467.00 Lakhs
Working Capital : 0.00
Rate of Return (ROR):26.00%
Break Even Point (BEP):41.00 %
TCI :0.00 Lakhs
Cost of Project : 3949.00Lakhs
Add To Inquiry Basket
Investment Opportunities in Carbonated Health Drinks
Investment Opportunities in Carbonated Health Drinks

 

Carb... Read More

Capacity : Carbonated Health Drinks Size 250 ml 8,000 Packs Per Day Carbonated Health Drinks Size 330 ml 4,000
Plant and Machinery cost: 49.00 Lakhs
Working Capital : 0.00
Rate of Return (ROR):31.00%
Break Even Point (BEP):59.00 %
TCI :0.00 Lakhs
Cost of Project : 299.00Lakhs
Add To Inquiry Basket
Business Industry of  Stone Plastic Composite (SPC) Flooring Tiles
Business Industry of Stone Plastic Composite (SPC) Flooring Tiles

 

Stone plastic com... Read More

Capacity : Stone Plastic Composite (SPC) Flooring Tiles 3,000 Sq,mtr Per Day
Plant and Machinery cost: 408.00 Lakhs
Working Capital : 0.00
Rate of Return (ROR):28.00%
Break Even Point (BEP):65.00 %
TCI :0.00 Lakhs
Cost of Project : 1011.00Lakhs
Add To Inquiry Basket
Investment Opportunities in Waste Lubricating Oil  Recycling Plant
Investment Opportunities in Waste Lubricating Oil Recycling Plant

 

Waste oil is made... Read More

Capacity : Used Lubricating Oil 20,000 Ltrs per day Spent Clay as by product 2,105 Ltrs per day
Plant and Machinery cost: 127.00 Lakhs
Working Capital : 0.00
Rate of Return (ROR):27.00%
Break Even Point (BEP):50.00 %
TCI :0.00 Lakhs
Cost of Project : 753.00Lakhs
Add To Inquiry Basket
Automated Vehicle Scrapping  and Recycling Unit
Automated Vehicle Scrapping and Recycling Unit

 

The disassembly o... Read More

Capacity : 1000 Vehicles per Month
Plant and Machinery cost: 497.00 Lakhs
Working Capital : 0.00
Rate of Return (ROR):29.00%
Break Even Point (BEP):40.00 %
TCI :0.00 Lakhs
Cost of Project : 2090.00Lakhs
Add To Inquiry Basket
Azodicarbonamide Using Urea and Hydrazine Hydrate
Azodicarbonamide Using Urea and Hydrazine Hydrate

 

The chemical comp... Read More

Capacity : Azodicarbonamide Powder 40 MT Per Day Ammonia 10.6 MT Per Day Hydrochloric Acid (38% Conc.) 20.1 MT
Plant and Machinery cost: 1951.00 Lakhs
Working Capital : 0.00
Rate of Return (ROR):25.00%
Break Even Point (BEP):50.00 %
TCI :0.00 Lakhs
Cost of Project : 3109.00Lakhs
Add To Inquiry Basket
Rising Demand of  Rice Husk based Biodegradable Cutlery
Rising Demand of Rice Husk based Biodegradable Cutlery

 

People have been ... Read More

Capacity : Biodegradable Cutlery (Per Set 6 Pcs. Flatware) 1,852 Sets per day
Plant and Machinery cost: 29.00 Lakhs
Working Capital : 0.00
Rate of Return (ROR):26.00%
Break Even Point (BEP):67.00 %
TCI :0.00 Lakhs
Cost of Project : 135.00Lakhs
Add To Inquiry Basket
Profitable Business of Magnesium Sulphate
Profitable Business of Magnesium Sulphate

Magnesium sulphate is an inorganic salt with the formula MgSO4 Read More

Capacity : 72 MT Per Day
Plant and Machinery cost: 256.00 Lakhs
Working Capital : 0.00
Rate of Return (ROR):29.00%
Break Even Point (BEP):58.00 %
TCI :0.00 Lakhs
Cost of Project : 900.00Lakhs
Add To Inquiry Basket
Business Industry of Grain Processing (Grading, Cleaning & Packaging of Rice & Pulses)
Business Industry of Grain Processing (Grading, Cleaning & Packaging of Rice & Pulses)

Grain processing, as exempli... Read More

Capacity : Moong Dal 1 MT Per Day Masur Dal 1 MT Per Day Toor Dal 1.5 MT Per Day Chana Dal 1 MT Per Day Kabul
Plant and Machinery cost: 63.00 Lakhs
Working Capital : 0.00
Rate of Return (ROR):31.00%
Break Even Point (BEP):58.00 %
TCI :0.00 Lakhs
Cost of Project : 165.00Lakhs
Add To Inquiry Basket
Setting up a Multispeciality Hospital (200 Bedded)
Setting up a Multispeciality Hospital (200 Bedded)

A hospital is a health care institution providing patient treatment with specialized m... Read More

Capacity : 200 Bedded Hospital
Plant and Machinery cost: 14000.00 Lakhs
Working Capital : 0.00
Rate of Return (ROR):27.00%
Break Even Point (BEP):50.00 %
TCI :0.00 Lakhs
Cost of Project : 21248.00Lakhs
Add To Inquiry Basket
Start Manufacturing of Aluminium Ingots from Aluminium Scrap
Start Manufacturing of Aluminium Ingots from Aluminium Scrap

Aluminum, is a light weight,... Read More

Capacity : Aluminium Alloy Ingots14 MT per day Aluminium Scrap 0.23 MT per day
Plant and Machinery cost: 700.00 Lakhs
Working Capital : 0.00
Rate of Return (ROR):0.00%
Break Even Point (BEP):0.00 %
TCI :0.00 Lakhs
Cost of Project : 3315.00Lakhs
Add To Inquiry Basket
Calcium Sennosides from Senna Leaves Production Business Plan
Calcium Sennosides from Senna Leaves Production Business Plan

Calcium Sennoside are the m... Read More

Capacity : 400 Kgs per Day
Plant and Machinery cost: 291.00 Lakhs
Working Capital : 0.00
Rate of Return (ROR):28.00%
Break Even Point (BEP):59.00 %
TCI :0.00 Lakhs
Cost of Project : 607.00Lakhs
Add To Inquiry Basket
Manufacturing Business of Zinc Oxide from Zinc Dross (White Seal)
Manufacturing Business of Zinc Oxide from Zinc Dross (White Seal)

Zinc oxide has been known since ancient times, its use as a pigment is relatively rec... Read More

Capacity : 12 MT per Day
Plant and Machinery cost: 181.00 Lakhs
Working Capital : 0.00
Rate of Return (ROR):31.00%
Break Even Point (BEP):59.00 %
TCI :0.00 Lakhs
Cost of Project : 595.00Lakhs
Add To Inquiry Basket
Prestressed Concrete Sleepers Complete Feasibility Study Report
Prestressed Concrete Sleepers Complete Feasibility Study Report

Concrete sleepers are one of the most important applications of a railway track syste... Read More

Capacity : 1,000 Pcs per Day
Plant and Machinery cost: 2659.00 Lakhs
Working Capital : 0.00
Rate of Return (ROR):27.00%
Break Even Point (BEP):40.00 %
TCI :0.00 Lakhs
Cost of Project : 3812.00Lakhs
Add To Inquiry Basket
Business Plan for Manufacturing Camphor Powder (Technical Grade)
Business Plan for Manufacturing Camphor Powder (Technical Grade)

Camphor (Cinnamomumcamphora) is a white, crystalline substance with a strong odor and... Read More

Capacity : 600 Kgs Per day
Plant and Machinery cost: 96.00 Lakhs
Working Capital : 0.00
Rate of Return (ROR):29.00%
Break Even Point (BEP):67.00 %
TCI :0.00 Lakhs
Cost of Project : 160.00Lakhs
Add To Inquiry Basket
Set up your own Maize Processing Plant with Cogeneration Plant
Set up your own Maize Processing Plant with Cogeneration Plant

Maize is the third most imp... Read More

Capacity : Maize Starch 150 MT Per Day Liquid Glucose 20 MT Per Day Maltodextrin 18 MT Per Day Gluten as by Pro
Plant and Machinery cost: 13600.00 Lakhs
Working Capital : 0.00
Rate of Return (ROR):21.00%
Break Even Point (BEP):32.00 %
TCI :0.00 Lakhs
Cost of Project : 17100.00Lakhs
Add To Inquiry Basket
Recycling of Lithium Ion Battery Business
Recycling of Lithium Ion Battery Business

 

Because of the popularity of smart phones and ... Read More

Capacity : Copper 1.4 MT Per Day Aluminium 0.8 MT Per Day Graphite 1.8 MT Per Day Carbon Black 0.3 MT Per Day L
Plant and Machinery cost: 200.00 Lakhs
Working Capital : 0.00
Rate of Return (ROR):27.00%
Break Even Point (BEP):55.00 %
TCI :0.00 Lakhs
Cost of Project : 422.00Lakhs
Add To Inquiry Basket
Start Production Business of AAC Blocks from Silica Sand and Lime Stone Powder
Start Production Business of AAC Blocks from Silica Sand and Lime Stone Powder

In construction, the innova... Read More

Capacity : 300 Cu.Mtres Per Day
Plant and Machinery cost: 600.00 Lakhs
Working Capital : 0.00
Rate of Return (ROR):25.00%
Break Even Point (BEP):51.00 %
TCI :0.00 Lakhs
Cost of Project : 1070.00Lakhs
Add To Inquiry Basket
Start Production of Ethanol from Broken Rice
Start Production of Ethanol from Broken Rice

 

Ethanol is a clea... Read More

Capacity : Ethanol 30 Units per day Cattle feed as by Product 27 Units per day
Plant and Machinery cost: 2400.00 Lakhs
Working Capital : 0.00
Rate of Return (ROR):26.00%
Break Even Point (BEP):41.00 %
TCI :0.00 Lakhs
Cost of Project : 3900.00Lakhs
Add To Inquiry Basket
Set up Lithium Ion Battery Production Business Investment Opportunity in Battery Industry
Set up Lithium Ion Battery Production Business Investment Opportunity in Battery Industry

 

A Read More

Capacity : 0
Plant and Machinery cost: 0.00 Lakhs
Working Capital : 0.00
Rate of Return (ROR):0.00%
Break Even Point (BEP):0.00 %
TCI :0.00 Lakhs
Cost of Project : 0.00Lakhs
Add To Inquiry Basket
Detailed Project Report on Bromelain Enzyme from Pineapple Stems
Detailed Project Report on Bromelain Enzyme from Pineapple Stems

Pineapple extract, commonly known as bromelain enzyme from pineapple stems, includes p... Read More

Capacity : 8 MT Per Day
Plant and Machinery cost: 170.00 Lakhs
Working Capital : 0.00
Rate of Return (ROR):28.00%
Break Even Point (BEP):63.00 %
TCI :0.00 Lakhs
Cost of Project : 656.00Lakhs
Add To Inquiry Basket
Steel Shots and Grits (Steel Abrasives) Manufacturing Business
Steel Shots and Grits (Steel Abrasives) Manufacturing Business

Steel shots are spherical grains formed by atomizing (granulating) molten steel; thes... Read More

Capacity : 40 MT per day
Plant and Machinery cost: 722.00 Lakhs
Working Capital : 0.00
Rate of Return (ROR):28.00%
Break Even Point (BEP):66.00 %
TCI :0.00 Lakhs
Cost of Project : 1884.00Lakhs
Add To Inquiry Basket
PVC Edge Banding Tape Manufacturing Business
PVC Edge Banding Tape Manufacturing Business

A piece of trim that hides ... Read More

Capacity : PVC Edge Banding Tape (Size 22 mm, 50 meter, 1 mm Roll) 303,030 Meter Per Day
Plant and Machinery cost: 372.00 Lakhs
Working Capital : 0.00
Rate of Return (ROR):30.00%
Break Even Point (BEP):47.00 %
TCI :0.00 Lakhs
Cost of Project : 1383.00Lakhs
Add To Inquiry Basket
Manufacturing of  Ascorbic Acid (Powder) from Sorbitol
Manufacturing of Ascorbic Acid (Powder) from Sorbitol

Vitamin C, also known as as... Read More

Capacity : Ascorbic Acid (Powder) 8.3 MT Per Day Carbon Di-oxide by Product 11.6 MT Per Day Sodium Hyd
Plant and Machinery cost: 803.00 Lakhs
Working Capital : 0.00
Rate of Return (ROR):29.00%
Break Even Point (BEP):48.00 %
TCI :0.00 Lakhs
Cost of Project : 2444.00Lakhs
Add To Inquiry Basket
AAC Blocks from Silica Sand and Lime Stone Powder How to Start Production Business in Construction Sector
AAC Blocks from Silica Sand and Lime Stone Powder How to Start Production Business in Construction Sector

 

Aerated Concrete is a c... Read More

Capacity : 0
Plant and Machinery cost: 0.00 Lakhs
Working Capital : 0.00
Rate of Return (ROR):0.00%
Break Even Point (BEP):0.00 %
TCI :0.00 Lakhs
Cost of Project : 0.00Lakhs
Add To Inquiry Basket
Pre Feasibility Report on Liquor from Mahua Flowers
Pre Feasibility Report on Liquor from Mahua Flowers

 

Mahua liquor is a... Read More

Capacity : Liquor 750 ml Size: 667 Bottles/Day Liquor 375 ml Size:1,334 Bottles/Day Liquor 180 ml: 2,778 Bottle
Plant and Machinery cost: 220.00 Lakhs
Working Capital : 0.00
Rate of Return (ROR):33.00%
Break Even Point (BEP):57.00 %
TCI :0.00 Lakhs
Cost of Project : 500.00Lakhs
Add To Inquiry Basket
Start Flexographic Ink for Milk Pouches, Soap Covers,  Woven Sacks and Jute Bags Manufacturing Business
Start Flexographic Ink for Milk Pouches, Soap Covers, Woven Sacks and Jute Bags Manufacturing Business

For milk pouches, soap wraps, woven sacks, and jute bags, flexographic ink, also know... Read More

Capacity : R Non-Absorbent Substrate Flexographic Ink: 160 Kgs/Day | R Absorbent Substrate: 160 Kgs/Day
Plant and Machinery cost: 47.00 Lakhs
Working Capital : 0.00
Rate of Return (ROR):27.00%
Break Even Point (BEP):55.00 %
TCI :0.00 Lakhs
Cost of Project : 64.00Lakhs
Add To Inquiry Basket
Start Automated Vehicle Scrapping and Recycling Unit Business
Start Automated Vehicle Scrapping and Recycling Unit Business

Vehicles that are no longer... Read More

Capacity : Spare Parts:375 Units/Day •Waste Oil:450 Units/Day•Waste Tyre:2250 Units/Day•Engines:50 Units/Day•St
Plant and Machinery cost: 1000.00 Lakhs
Working Capital : 0.00
Rate of Return (ROR):32.00%
Break Even Point (BEP):36.00 %
TCI :0.00 Lakhs
Cost of Project : 5100.00Lakhs
Add To Inquiry Basket
Lithium Ion Battery Recycling Detailed Project report on How to Start Battery Recycling Business
Lithium Ion Battery Recycling Detailed Project report on How to Start Battery Recycling Business

 

A lithium ion battery i... Read More

Capacity : 0
Plant and Machinery cost: 0.00 Lakhs
Working Capital : 0.00
Rate of Return (ROR):0.00%
Break Even Point (BEP):0.00 %
TCI :0.00 Lakhs
Cost of Project : 0.00Lakhs
Add To Inquiry Basket
Want to start a Calcium Propionate Manufacturing Business Calcium Propionate market is projected to register a CAGR of over three Percent
Want to start a Calcium Propionate Manufacturing Business Calcium Propionate market is projected to register a CAGR of over three Percent

Calcium propionate (also called calcium propanoate) is a chemical compound, whose sal... Read More

Capacity : 0
Plant and Machinery cost: 0.00 Lakhs
Working Capital : 0.00
Rate of Return (ROR):0.00%
Break Even Point (BEP):0.00 %
TCI :0.00 Lakhs
Cost of Project : 0.00Lakhs
Add To Inquiry Basket
3-Chloropivaloyl Chloride Manufacturing Business Plan
3-Chloropivaloyl Chloride Manufacturing Business Plan

3-chloropivaloyl chloride i... Read More

Capacity : 3-Chloropivaloyl Chloride: 4 MT Per Day | Hydrochoric Acid (30%)- by product: 3 MT Per Day
Plant and Machinery cost: 252.00 Lakhs
Working Capital : 0.00
Rate of Return (ROR):27.00%
Break Even Point (BEP):62.00 %
TCI :0.00 Lakhs
Cost of Project : 686.00Lakhs
Add To Inquiry Basket
Start Quartz Slabs Manufacturing Business
Start Quartz Slabs Manufacturing Business

Quartz is the most plentifu... Read More

Capacity : 250 Nos. per day
Plant and Machinery cost: 1600.00 Lakhs
Working Capital : 0.00
Rate of Return (ROR):27.00%
Break Even Point (BEP):49.00 %
TCI :0.00 Lakhs
Cost of Project : 3200.00Lakhs
Add To Inquiry Basket
Project Profile on Sodium Hypochlorite Manufacturing
Project Profile on Sodium Hypochlorite Manufacturing

The active ingredient of ch... Read More

Capacity : 4500 MT Per Annum
Plant and Machinery cost: 55.00 Lakhs
Working Capital : 0.00
Rate of Return (ROR):27.00%
Break Even Point (BEP):60.00 %
TCI :0.00 Lakhs
Cost of Project : 214.00Lakhs
Add To Inquiry Basket
Rice Husk based Biodegradable Cutlery Making Plant
Rice Husk based Biodegradable Cutlery Making Plant

People around the world hav... Read More

Capacity : Biodegradable Cutlery (Per Set 6 Pcs. Flatware): 1,852 Sets Per Day
Plant and Machinery cost: 28.00 Lakhs
Working Capital : 0.00
Rate of Return (ROR):27.00%
Break Even Point (BEP):52.00 %
TCI :0.00 Lakhs
Cost of Project : 222.00Lakhs
Add To Inquiry Basket
Lithium Ion Battery LiFePO4 Production Business
Lithium Ion Battery LiFePO4 Production Business

A lithium-ion cell, sometim... Read More

Capacity : Lithium Ion (LiFePO4) Battery Back of Power 4.8 KWH (No. of Cells 800) for Three Wheeler: 26 Nos/Day
Plant and Machinery cost: 289.00 Lakhs
Working Capital : 0.00
Rate of Return (ROR):29.00%
Break Even Point (BEP):54.00 %
TCI :0.00 Lakhs
Cost of Project : 970.00Lakhs
Add To Inquiry Basket
Ferric Pyrophosphate Production Business
Ferric Pyrophosphate Production Business

Ferric Pyrophosphate:

Read More

Capacity : 600 MT Per Annum
Plant and Machinery cost: 48.00 Lakhs
Working Capital : 0.00
Rate of Return (ROR):29.00%
Break Even Point (BEP):74.00 %
TCI :0.00 Lakhs
Cost of Project : 133.00Lakhs
Add To Inquiry Basket
Set Up Production Unit of ADHESIVE (Fevicol Type)
Set Up Production Unit of ADHESIVE (Fevicol Type)

Any substance that is appli... Read More

Capacity : 300 MT Per Annum
Plant and Machinery cost: 40.00 Lakhs
Working Capital : 0.00
Rate of Return (ROR):28.00%
Break Even Point (BEP):70.00 %
TCI :0.00 Lakhs
Cost of Project : 70.00Lakhs
Add To Inquiry Basket
Start Production Business of Tartaric Acid
Start Production Business of Tartaric Acid

 

You may be aware that tartaric acid is frequen... Read More

Capacity : 10 MT per day
Plant and Machinery cost: 400.00 Lakhs
Working Capital : 0.00
Rate of Return (ROR):45.00%
Break Even Point (BEP):53.00 %
TCI :0.00 Lakhs
Cost of Project : 1300.00Lakhs
Add To Inquiry Basket
Production of Malic Acid Powder The Best Manufacturing Business Idea
Production of Malic Acid Powder The Best Manufacturing Business Idea

 

Malic Acid Powder:

Read More

Capacity : 0
Plant and Machinery cost: 0.00 Lakhs
Working Capital : 0.00
Rate of Return (ROR):0.00%
Break Even Point (BEP):0.00 %
TCI :0.00 Lakhs
Cost of Project : 0.00Lakhs
Add To Inquiry Basket
Ferric Pyrophosphate: Start your own Manufacturing Business
Ferric Pyrophosphate: Start your own Manufacturing Business

 

Introduction to Ferric Pyrophosphate: Read More

Capacity : 0
Plant and Machinery cost: 0.00 Lakhs
Working Capital : 0.00
Rate of Return (ROR):0.00%
Break Even Point (BEP):0.00 %
TCI :0.00 Lakhs
Cost of Project : 0.00Lakhs
Add To Inquiry Basket
Flat Glass Manufacturing Business
Flat Glass Manufacturing Business

 

Glass has a microscopic structure similar to that of a liquid, where the various components come together to... Read More

Capacity : 4000 Sq.Mtrs. per day
Plant and Machinery cost: 14000.00 Lakhs
Working Capital : 0.00
Rate of Return (ROR):24.00%
Break Even Point (BEP):30.00 %
TCI :0.00 Lakhs
Cost of Project : 18700.00Lakhs
Add To Inquiry Basket
Start Production Business of Rubber Granules from Waste Tyre
Start Production Business of Rubber Granules from Waste Tyre

Rubber is a polymer of butadiene and one of the most significant chemical components. It is utilised extensively in a ... Read More

Capacity : Rubber Granules 5 MT per Day By Product Steel Wire 0.5 MT per Day
Plant and Machinery cost: 6000000.00 Lakhs
Working Capital : 0.00
Rate of Return (ROR):28.00%
Break Even Point (BEP):60.00 %
TCI :0.00 Lakhs
Cost of Project : 20700000.00Lakhs
Add To Inquiry Basket
Manufacturing of Aluminium Ingots from Aluminium Scrap
Manufacturing of Aluminium Ingots from Aluminium Scrap

Compared to blooms, billets, and slabs, aluminium ingots are very large casting products both in size and shape. Altho... Read More

Capacity : Aluminium Alloy Ingots 12 MT per day Aluminium Scrap 0.20 MT per day
Plant and Machinery cost: 700.00 Lakhs
Working Capital : 0.00
Rate of Return (ROR):26.00%
Break Even Point (BEP):53.00 %
TCI :0.00 Lakhs
Cost of Project : 1100.00Lakhs
Add To Inquiry Basket
Nicotine Sulphate from Tobacco Leaves Production Business
Nicotine Sulphate from Tobacco Leaves Production Business

With human assistance, tobacco is grown, with the leaf being the most valuable component of the plant. Although tobacc... Read More

Capacity : Nicotine Sulphate 3.6 MT per Day Waste Tobacco 28.3 MT per Day
Plant and Machinery cost: 16100000.00 Lakhs
Working Capital : 0.00
Rate of Return (ROR):28.00%
Break Even Point (BEP):55.00 %
TCI :0.00 Lakhs
Cost of Project : 141600000.00Lakhs
Add To Inquiry Basket
Natural Tanning Powder  Production Business
Natural Tanning Powder Production Business

 

Comparatively speaking to other methods of tanning, natural tanning is now the most conventional, classic, a... Read More

Capacity : 600 MT per Annum
Plant and Machinery cost: 3700000.00 Lakhs
Working Capital : 0.00
Rate of Return (ROR):28.00%
Break Even Point (BEP):63.00 %
TCI :0.00 Lakhs
Cost of Project : 27000000.00Lakhs
Add To Inquiry Basket
You Should Read SYour Own Industry in Booming Sectors
You Should Read SYour Own Industry in Booming Sectors

Read More

Capacity : 0
Plant and Machinery cost: 0.00 Lakhs
Working Capital : 0.00
Rate of Return (ROR):0.00%
Break Even Point (BEP):0.00 %
TCI :0.00 Lakhs
Cost of Project : 0.00Lakhs
Add To Inquiry Basket
Set Up Automated Vehicle Scrapping Unit
Set Up Automated Vehicle Scrapping Unit

 

Vehicle scrapping units, also called scrapyards, are now playing an important r... Read More

Capacity : 0
Plant and Machinery cost: 325.00 Lakhs
Working Capital : 0.00
Rate of Return (ROR):26.00%
Break Even Point (BEP):44.00 %
TCI :0.00 Lakhs
Cost of Project : 1455.00Lakhs
Add To Inquiry Basket
Manufacturing Business Plan For ZINC INGOTS
Manufacturing Business Plan For ZINC INGOTS

 

Zinc ingot is a white or gray color pure zinc metal, which is cast into a block... Read More

Capacity : Zinc Ingots (Purity 98%) 6 MT Per Day
Plant and Machinery cost: 124.00 Lakhs
Working Capital : 0.00
Rate of Return (ROR):29.00%
Break Even Point (BEP):65.00 %
TCI :0.00 Lakhs
Cost of Project : 863.00Lakhs
Add To Inquiry Basket
Manufacturing of Gum Arabic (Gum Acacia)
Manufacturing of Gum Arabic (Gum Acacia)

Gum Arabic, also referred to as gum acacia, may be a natural gum harvested from the o... Read More

Capacity : Arabic Gum (Talha): 6.73 MT / Day
Plant and Machinery cost: 296.00 Lakhs
Working Capital : 0.00
Rate of Return (ROR):26.00%
Break Even Point (BEP):58.00 %
TCI :0.00 Lakhs
Cost of Project : 535.00Lakhs
Add To Inquiry Basket
NameCapacityRate of return (ROR):Cost of project
Manufacturing of Hand San... 0 0.00 0.00
Production of Herbal Ayur... 0 0.00 0.00
Gold and Diamond Jeweller... Gold Jewellery:9.50 Kgs /day Gold Plus Diamond Jewellery :2.38 Kgs / day 34.00 2504.00
Skill Development Centre Engineering Graduates: 250 Students / Batch Supervisory & Workmen Cadre: 250 Students / Batch Each B 15.00 1228.00
Graphite Crucible Graphite Crucible (10 Kgs each): 800 Pcs/day 28.00 1034.00
Hand Sanitizer Hand Sanitizer (50 ml size Bolltes):10,000 Bottles/day 31.00 156.00
Particle Board from Wheat... Particle Board (Size 6x3x0.471') : 5,000,000.0 Sq.Mtrs. / Annum 28.00 930.00
Porcelain Insulators Porcelain Insulators : 500.0 MT / day 29.00 2804.00
Methanol from Bio-Waste Methanol from Biowaste:100.0 MT / day 9.00 32721.00
2nd Revised Edition of Th... 0 0.00 0.00
Business Ideas and Opport... 0 0.00 0.00
Manufacturing Opportuniti... 0 0.00 0.00
Production of A4 and A3 S... 0 0.00 0.00
Investment Opportunities ... 0 0.00 0.00
Start Your Own Industry w... 0 0.00 0.00
Battery Sprayer 400 Pcs per day 29.00 110.00
Lemon-Lime Flavoured Soft... 50000 Bottles per day 29.00 700.00
Condoms 500 Boxes per day 28.00 1963.00
Bioplastic Products Manuf... 0 0.00 0.00
Bio-Based and Biodegradab... 0 0.00 0.00
Business Idea of Double E... 0 0.00 0.00
Biodegradable Sanitary Pa... 0 0.00 0.00
Biodegradable Sanitary Pa... 0 0.00 0.00
Manufacturing of Lemon-Li... 0 0.00 0.00
Startup Business Opportun... 0 0.00 0.00
Manufacturing of Pig Iron... 0 0.00 0.00
Biomass Briquettes from B... 20 MT per day 20.00 94.00
Caustic Soda from Limesto... Caustic Soda from Limestone and Sodium Carbonate: 60 MT per day 29.00 827.00
A Business Plan For Sanit... Sanitary Napkins 4,800 PKTS per day 27.00 84.00
Start Manufacturing Of Bl... - 32.00 985.00
12345678910...

Showing 121 - 180 of 2981 Product(s)

Subject of your Interest

Information

  • One Lac / Lakh / Lakhs is equivalent to one hundred thousand (100,000)
  • One Crore is equivalent to ten million (10,000,000)
  • T.C.I is Total Capital Investment
  • We can modify the project capacity and project cost as per your requirement.
  • We can also prepare project report on any subject as per your requirement.
  • Caution: The project's cost, capacity and return are subject to change without any notice. Future projects may have different values of project cost, capacity or return.

ABOUT NPCS

 

NIIR PROJECT CONSULTANCY SERVICES (NPCS) is a reliable name in the industrial world for offering integrated technical consultancy services. NPCS is manned by engineers, planners, specialists, financial experts, economic analysts and design specialists with extensive experience in the related industries.

Our various services are: Detailed Project Report,  Business Plan for Manufacturing Plant, Start-up Ideas, Business Ideas for Entrepreneurs, Start up Business Opportunities, entrepreneurship projects, Successful Business Plan, Industry Trends, Market Research, Manufacturing Process, Machinery, Raw Materials, project report, Cost and Revenue, Pre-feasibility study for Profitable Manufacturing Business, Project Identification, Project Feasibility and Market Study, Identification of Profitable Industrial Project Opportunities, Business Opportunities, Investment Opportunities for Most Profitable Business in India, Manufacturing Business Ideas, Preparation of Project Profile, Pre-Investment and Pre-Feasibility Study, Market Research Study, Preparation of Techno-Economic Feasibility Report, Identification and Section of Plant, Process, Equipment, General Guidance, Startup Help, Technical and Commercial Counseling for setting up new industrial project and Most Profitable Small Scale Business.

NPCS also publishes varies process technology, technical, reference, self employment and startup books, directory, business and industry database, bankable detailed project report, market research report on various industries, small scale industry and profit making business. Besides being used by manufacturers, industrialists and entrepreneurs, our publications are also used by professionals including project engineers, information services bureau, consultants and project consultancy firms as one of the input in their research.

Our Detailed Project report aims at providing all the critical data required by any entrepreneur vying to venture into Project. While expanding a current business or while venturing into new business, entrepreneurs are often faced with the dilemma of zeroing in on a suitable product/line.

 


And before diversifying/venturing into any product, wish to study the following aspects of the identified product:


• Good Present/Future Demand
• Export-Import Market Potential
• Raw Material & Manpower Availability
• Project Costs and Payback Period


We at NPCS, through our reliable expertise in the project consultancy and market research field, Provides exhaustive information about the project, which satisfies all the above mentioned requirements and has high growth potential in the markets. And through our report we aim to help you make sound and informed business decision.

 

The report contains all the data which will help an entrepreneur find answers to questions like:

• Why I should invest in this project?
• What will drive the growth of the product?
• What are the costs involved?
• What will be the market potential?


The report first focuses on enhancing the basic knowledge of the entrepreneur about the main product, by elucidating details like product definition, its uses and applications, industry segmentation as well as an overall overview of the industry sector in India. The report then helps an entrepreneur identify the target customer group of its product. It further helps in making sound investment decision by listing and then elaborating on factors that will contribute to the growth of product consumption in India and also talks about the foreign trade of the product along with the list of top importing and top exporting countries. Report includes graphical representation and forecasts of key data discussed in the above mentioned segment. It further explicates the growth potential of the product.

The report includes other market data like key players in the Industry segment along with their contact information and recent developments. It includes crucial information like raw material requirements, list of machinery and manufacturing process for the plant. Core project financials like plant capacity, costs involved in setting up of project, working capital requirements, projected revenue and profit are further listed in the report.


Reasons for buying the report:

• This report helps you to identify a profitable project for investing or diversifying into by throwing light to crucial areas like industry size, demand of the product and reasons for investing in the product.

• This report provides vital information on the product like its definition, characteristics and segmentation.

• This report helps you market and place the product correctly by identifying the target customer group of the product.

• This report helps you understand the viability of the project by disclosing details like raw materials required, manufacturing process, project costs and snapshot of other project financials.

• The report provides forecasts of key parameters which helps to anticipate the industry performance and make sound business decision.

 

Our Approach:


• Our research reports broadly cover Indian markets, present analysis, outlook and forecast.

• The market forecasts are developed on the basis of secondary research and are cross-validated through interactions with the industry players. 

• We use reliable sources of information and databases.  And information from such sources is processed by us and included in the report.

 

Our Market Survey cum Detailed Techno Economic Feasibility Report Contains following information:

 

 

Ø  Introduction

·         Project Introduction

·         Project Objective and Strategy

·         Concise History of the Product

·         Properties

·         BIS (Bureau of Indian Standards) Provision & Specification

·         Uses & Applications

 

Ø  Market Study and Assessment

·         Current Indian Market Scenario

·         Present Market Demand and Supply

·         Estimated Future Market Demand and Forecast

·         Statistics of Import & Export

·         Names & Addresses of Existing Units (Present Players)

·         Market Opportunity

 

Ø  Raw Material

·         List of Raw Materials

·         Properties of Raw Materials

·         Prescribed Quality of Raw Materials

·         List of Suppliers and Manufacturers

 

Ø  Personnel (Manpower) Requirements

·         Requirement of Staff & Labor (Skilled and Unskilled) Managerial, Technical, Office Staff and Marketing Personnel

 

Ø  Plant and Machinery

·         List of Plant & Machinery

·         Miscellaneous Items

·         Appliances & Equipments

·         Laboratory Equipments & Accessories

·         Electrification

·         Electric Load & Water

·         Maintenance Cost

·         Sources of Plant & Machinery (Suppliers and Manufacturers)

 

Ø  Manufacturing Process and Formulations

·         Detailed Process of Manufacture with Formulation

·         Packaging Required

·         Process Flow Sheet Diagram

 

Ø  Infrastructure and Utilities

·         Project Location

·         Requirement of Land Area

·         Rates of the Land

·         Built Up Area

·         Construction Schedule

·         Plant Layout and Requirement of Utilities

 

Project at a Glance

Along with financial details as under:

 

  •     Assumptions for Profitability workings

  •    Plant Economics

  •    Production Schedule

  •    Land & Building

            Factory Land & Building

            Site Development Expenses

  •    Plant & Machinery

             Indigenous Machineries

            Other Machineries (Miscellaneous, Laboratory etc.)

  •    Other Fixed Assets

            Furniture & Fixtures

            Pre-operative and Preliminary Expenses

            Technical Knowhow

            Provision of Contingencies

  •   Working Capital Requirement Per Month

             Raw Material

            Packing Material

            Lab & ETP Chemical Cost

           Consumable Store

  •   Overheads Required Per Month And Per Annum

         Utilities & Overheads (Power, Water and Fuel Expenses etc.)

             Royalty and Other Charges

            Selling and Distribution Expenses

  •    Salary and Wages

  •    Turnover Per Annum

  •   Share Capital

            Equity Capital

            Preference Share Capital

 

  •    Annexure 1:: Cost of Project and Means of Finance

  •    Annexure 2::  Profitability and Net Cash Accruals

                Revenue/Income/Realisation

                Expenses/Cost of Products/Services/Items

                Gross Profit

                Financial Charges     

                Total Cost of Sales

                Net Profit After Taxes

                Net Cash Accruals

  •   Annexure 3 :: Assessment of Working Capital requirements

                Current Assets

                Gross Working. Capital

                Current Liabilities

                Net Working Capital

                Working Note for Calculation of Work-in-process

  •    Annexure 4 :: Sources and Disposition of Funds

  •    Annexure 5 :: Projected Balance Sheets

                ROI (Average of Fixed Assets)

                RONW (Average of Share Capital)

                ROI (Average of Total Assets)

  •    Annexure 6 :: Profitability ratios

                D.S.C.R

                Earnings Per Share (EPS)

               

             Debt Equity Ratio

        Annexure 7   :: Break-Even Analysis

                Variable Cost & Expenses

                Semi-Var./Semi-Fixed Exp.

                Profit Volume Ratio (PVR)

                Fixed Expenses / Cost 

                B.E.P

  •   Annexure 8 to 11:: Sensitivity Analysis-Price/Volume

            Resultant N.P.B.T

            Resultant D.S.C.R

   Resultant PV Ratio

   Resultant DER

  Resultant ROI

          Resultant BEP

  •    Annexure 12 :: Shareholding Pattern and Stake Status

        Equity Capital

        Preference Share Capital

  •   Annexure 13 :: Quantitative Details-Output/Sales/Stocks

        Determined Capacity P.A of Products/Services

        Achievable Efficiency/Yield % of Products/Services/Items 

        Net Usable Load/Capacity of Products/Services/Items   

       Expected Sales/ Revenue/ Income of Products/ Services/ Items   

  •    Annexure 14 :: Product wise domestic Sales Realisation

  •    Annexure 15 :: Total Raw Material Cost

  •    Annexure 16 :: Raw Material Cost per unit

  •    Annexure 17 :: Total Lab & ETP Chemical Cost

  •    Annexure 18  :: Consumables, Store etc.,

  •    Annexure 19  :: Packing Material Cost

  •    Annexure 20  :: Packing Material Cost Per Unit

  •    Annexure 21 :: Employees Expenses

  •    Annexure 22 :: Fuel Expenses

  •    Annexure 23 :: Power/Electricity Expenses

  •    Annexure 24 :: Royalty & Other Charges

  •    Annexure 25 :: Repairs & Maintenance Exp.

  •    Annexure 26 :: Other Mfg. Expenses

  •    Annexure 27 :: Administration Expenses

  •    Annexure 28 :: Selling Expenses

  •    Annexure 29 :: Depreciation Charges – as per Books (Total)

  •   Annexure 30   :: Depreciation Charges – as per Books (P & M)

  •   Annexure 31   :: Depreciation Charges - As per IT Act WDV (Total)

  •   Annexure 32   :: Depreciation Charges - As per IT Act WDV (P & M)

  •   Annexure 33   :: Interest and Repayment - Term Loans

  •   Annexure 34   :: Tax on Profits

  •   Annexure 35   ::Projected Pay-Back Period And IRR