Best Business Opportunities in Mizoram - Identification and Selection of right Project, Thrust areas for Investment, Industry Startup and Entrepreneurship

 

Mizoram is a state of India. It is located in the northeastern part of the country and is bounded by Myanmar (Burma) to the east and south and Bangladesh to the west and by the states of Tripura to the northwest, Assam to the north, and Manipur to the northeast. The capital is Aizawl, in the north-central part of the state. Agriculture is the dominant economic activity of Mizoram, engaging more than two-thirds of the workforce. Two types of agriculture are practiced: terrace cultivation, in which crops are planted on relatively permanent, graduated terraces on the sides of hills and mountains to conserve water and reduce soil loss; and shifting agriculture, in which tracts called jhum are cleared by burning, cultivated for a limited period of time. Mizoram has a population of 1,091,014 with 552,339 males and 538,675 females. This reflects a 22.8% growth since 2001 census; still, Mizoram is second least populated state of India. The sex ratio of the state is 976 females per thousand males, higher than the national ratio 940. The density of population is 52 persons per square kilometer. Mizoram gross state domestic product (GSDP) in 2011-2012 was about 6991 crore (US$1.1 billion). The state's gross state domestic product (GSDP) growth rate was nearly 10% annually over 2001-2013 period. With international borders with Bangladesh and Myanmar, it is an important port state for Southeast Asian imports to India, as well as exports from India.

TOURISM

Mizoram, the Land of the Highlanders, is sandwiched between Myanmar, Bangladesh and the states of Tripura, Assam and Manipur. The rivers, peaks, plains and the lakes are the treasures of Mizoram. It is full of high ranges running from north to south covered by greenery throughout the year. The Mizoram State Government begins to recognize tourism as an important sector of the economy which needs to be developed for greater income generation. More emphasis on sustainable eco-tourism, adventure tourism, village tourism and rural tourism would bring in high - value tourism. With the increase of tourist the need for budget hotels has been acutely felt.

Tourism has emerged as an important economic activity and one of the fastest growing industries in the world. Globally, Tourism is the fastest growing industry and in terms of value, it comes third only after petroleum and Transport Industry.

As such, Tourism Department in Mizoram is also one of the fastest growing Departments in Mizoram. The Department has achieved these objectives by constructing Tourist Lodge, Tourist Resort and other Tourist amenities in difference places of Mizoram through liberal financing of Ministry of Tourism, Government of India.


INDUSTRIAL POLICY

The Industrial Policy of Mizoram State was first notified on 15.3.1989 to give direction to the strategy for Industrial development of the State. It laid stress on reducing shifting cultivation by encouraging a shift from primary to secondary sectors while protecting the Socio-Cultural and ethnic identity of the indigenous enterprise of Mizoram.

In view of the National Industrial Policy which laid special emphasis for the development of Industries in the North Eastern Region, the Govt. of Mizoram had notified new Industrial Policy 2000 for accelerated Industrial and Economic development of the State. The Government had adopted the approach for identification of thrust areas and promoting them with fiscal and other incentives packages. Broad policy of Foreign Direct Investment (FDI) and Investment from outside the State has been adopted on Joint venture (JV) mode to safeguard the interest of the tribal population of Mizoram. Various administrative support system and market support system are also announced. The Govt. of Mizoram is mandated in giving sustainable employment and introducing better utilization of land by introducing New Land Use Programme (NLUP).

OBJECTIVES

•        To create infrastructure facilities, provide incentives and marketing as well as technical support to industries.

•        To provide skill development and training for educated youth to develop entrepreneurial skills and make them self-employed.

•        To create employment opportunities particularly to the vulnerable section of the society and people in rural area, ensuring inclusive development.

•        To reduce sectoral and regional imbalance in the industrial development in the State by promoting Industries under all sectors.

•        To create proper linkage of processing Industries with the farm produce of agriculture, horticulture, forest and livestock’s.

•        To attract investment in the state.

IDENTIFICATION OF THRUST AREAS

Thrust will be given for those industries based on value addition of locally available resources. Special incentives will be formulated for speedy development of industrial units engaged in any of the following thrust sector Enterprises.

•        Forest-based Industries

The vast bamboo and other forest resources of Mizoram will be optimally harvested for setting up of Industry for manufacturing of various high value bamboo and other forest based products.

•        Food Processing Industries

Primary production of various food items, whether agricultural based, horticultural or livestock based will be linked with processing Industries.

•        Handloom Industries

Handloom sector will continue to receive serious attention of the Govt. Utmost importance will be given for improving quality product by introducing improved design, packaging, branding.

•        Handicraft Industries

The traditional skill of Mizo people will be upgraded and diversified for market competitiveness of handicraft products.

•        Plantain fibre and hill brooms

The Govt. will encourage value addition of hill-brooms. The flow of raw and unprocessed broom outside the state will be discouraged by giving attention towards value addition to help local industry.

•        Textile related industries

Bulk production of readymade garments will be encouraged as this sector is having good potential for market outside the state and export.

•        Animal Feed and poultry feed Industries

The Government is giving thrust towards having sufficient meat and meat products for which farming has been encouraged.

INCENTIVES

The incentives offered under the Rules for the grant of incentives/subsidies under the Industrial Policy of Mizoram State are-

•        Subsidies on the cost of Project Report 

•        Land subsidy

•        Factory rent subsidy

•        Manpower development subsidy

•        Interest subsidy

•        Power subsidy

•        Subsidy on Power Line 

•        Subsidy on Power Generating set

•        State Transport subsidy on Plant and Machinery 

 

Reasons for buying our reports:

• This report helps you to identify a profitable project for investing or diversifying into by throwing light to crucial areas like industry size, market potential of the product and reasons for investing in the product

• This report provides vital information on the product like its characteristics and segmentation

• This report helps you market and place the product correctly by identifying the target customer group of the product 

• This report helps you understand the viability of the project by disclosing details like machinery required, project costs and snapshot of other project financials

• The report provides a glimpse of government regulations applicable on the industry

• The report provides forecasts of key parameters which helps to anticipate the industry performance and make sound business decisions.

 

Our Approach:

• Our research reports broadly cover Indian markets, present analysis, outlook and forecast for a period of five years.

• The market forecasts are developed on the basis of secondary research and are cross-validated through interactions with the industry players

• We use reliable sources of information and databases. And information from such sources is processed by us and included in the report


We can provide you detailed project reports on the following topics. Please select the projects of your interests.
Each detailed project reports cover all the aspects of business, from analysing the market, confirming availability of various necessities such as plant & machinery, raw materials to forecasting the financial requirements. The scope of the report includes assessing market potential, negotiating with collaborators, investment decision making, corporate diversification planning etc. in a very planned manner by formulating detailed manufacturing techniques and forecasting financial aspects by estimating the ost of raw material, formulating the cash flow statement, projecting the balance sheet etc.
We also offer self-contained Pre-Investment and Pre-Feasibility Studies, Market Surveys and Studies, Preparation of Techno-Economic Feasibility Reports, Identification and Selection of Plant and Machinery, Manufacturing Process and or Equipment required, General Guidance, Technical and Commercial Counseling for setting up new industrial projects on the following topics. Many of the engineers, project consultant & industrial consultancy firms in India and worldwide use our project reports as one of the input in doing their analysis.


We can modify the project capacity and project cost as per your requirement.
We can also prepare project report on any subject as per your requirement.

Add multiple items to inquiry

Select the items and then press Add to inquiry button

Sort by :
Rising Demand of  Rice Husk based Biodegradable Cutlery
Rising Demand of Rice Husk based Biodegradable Cutlery

 

People have been ... Read More

Capacity : Biodegradable Cutlery (Per Set 6 Pcs. Flatware) 1,852 Sets per day
Plant and Machinery cost: 29.00 Lakhs
Working Capital : 0.00
Rate of Return (ROR):26.00%
Break Even Point (BEP):67.00 %
TCI :0.00 Lakhs
Cost of Project : 135.00Lakhs
Add To Inquiry Basket
Profitable Business of Magnesium Sulphate
Profitable Business of Magnesium Sulphate

Magnesium sulphate is an inorganic salt with the formula MgSO4 Read More

Capacity : 72 MT Per Day
Plant and Machinery cost: 256.00 Lakhs
Working Capital : 0.00
Rate of Return (ROR):29.00%
Break Even Point (BEP):58.00 %
TCI :0.00 Lakhs
Cost of Project : 900.00Lakhs
Add To Inquiry Basket
Business Industry of Grain Processing (Grading, Cleaning & Packaging of Rice & Pulses)
Business Industry of Grain Processing (Grading, Cleaning & Packaging of Rice & Pulses)

Grain processing, as exempli... Read More

Capacity : Moong Dal 1 MT Per Day Masur Dal 1 MT Per Day Toor Dal 1.5 MT Per Day Chana Dal 1 MT Per Day Kabul
Plant and Machinery cost: 63.00 Lakhs
Working Capital : 0.00
Rate of Return (ROR):31.00%
Break Even Point (BEP):58.00 %
TCI :0.00 Lakhs
Cost of Project : 165.00Lakhs
Add To Inquiry Basket
Setting up a Multispeciality Hospital (200 Bedded)
Setting up a Multispeciality Hospital (200 Bedded)

A hospital is a health care institution providing patient treatment with specialized m... Read More

Capacity : 200 Bedded Hospital
Plant and Machinery cost: 14000.00 Lakhs
Working Capital : 0.00
Rate of Return (ROR):27.00%
Break Even Point (BEP):50.00 %
TCI :0.00 Lakhs
Cost of Project : 21248.00Lakhs
Add To Inquiry Basket
Start Manufacturing of Aluminium Ingots from Aluminium Scrap
Start Manufacturing of Aluminium Ingots from Aluminium Scrap

Aluminum, is a light weight,... Read More

Capacity : Aluminium Alloy Ingots14 MT per day Aluminium Scrap 0.23 MT per day
Plant and Machinery cost: 700.00 Lakhs
Working Capital : 0.00
Rate of Return (ROR):0.00%
Break Even Point (BEP):0.00 %
TCI :0.00 Lakhs
Cost of Project : 3315.00Lakhs
Add To Inquiry Basket
Calcium Sennosides from Senna Leaves Production Business Plan
Calcium Sennosides from Senna Leaves Production Business Plan

Calcium Sennoside are the m... Read More

Capacity : 400 Kgs per Day
Plant and Machinery cost: 291.00 Lakhs
Working Capital : 0.00
Rate of Return (ROR):28.00%
Break Even Point (BEP):59.00 %
TCI :0.00 Lakhs
Cost of Project : 607.00Lakhs
Add To Inquiry Basket
PSA Oxygen Plant
PSA Oxygen Plant

 

PSA p... Read More

Capacity : 30 to 36 cylinders per day
Plant and Machinery cost: 45.00 Lakhs
Working Capital : 0.00
Rate of Return (ROR):0.00%
Break Even Point (BEP):0.00 %
TCI :0.00 Lakhs
Cost of Project : 0.00Lakhs
Add To Inquiry Basket
PSA Oxygen Gas Plant
PSA Oxygen Gas Plant

PSA plants take... Read More

Capacity : 180 to 200 cylinders per day
Plant and Machinery cost: 99.00 Lakhs
Working Capital : 0.00
Rate of Return (ROR):0.00%
Break Even Point (BEP):0.00 %
TCI :0.00 Lakhs
Cost of Project : 0.00Lakhs
Add To Inquiry Basket
Production Business of Razor Blade for Safety Razor and Disposable Safety Razor
Production Business of Razor Blade for Safety Razor and Disposable Safety Razor

 

The double-edged ... Read More

Capacity : Disposable Safety Razors: 864,000 Units per Day Razor Blade: 172,800 Units per Day Steel Scrap: 500
Plant and Machinery cost: 467.00 Lakhs
Working Capital : 0.00
Rate of Return (ROR):34.51%
Break Even Point (BEP):43.43 %
TCI :0.00 Lakhs
Cost of Project : 2285.00Lakhs
Add To Inquiry Basket
Investing into Business of Ductile Iron Pipe FittingsInvesting into Business of Ductile Iron Pipe Fittings
Investing into Business of Ductile Iron Pipe FittingsInvesting into Business of Ductile Iron Pipe Fittings

 

Casting Read More

Capacity : 12 MT per Day
Plant and Machinery cost: 311.00 Lakhs
Working Capital : 0.00
Rate of Return (ROR):33.83%
Break Even Point (BEP):55.20 %
TCI :0.00 Lakhs
Cost of Project : 1135.00Lakhs
Add To Inquiry Basket
Business of Disposable Safety Razors
Business of Disposable Safety Razors

 

The double-edged ... Read More

Capacity : Razor Blade for Safety Razors Pack of 5 pcs each: 57,600 Units per Day Steel Scrap: 500 Units per Da
Plant and Machinery cost: 393.00 Lakhs
Working Capital : 0.00
Rate of Return (ROR):57.75%
Break Even Point (BEP):28.02 %
TCI :0.00 Lakhs
Cost of Project : 815.00Lakhs
Add To Inquiry Basket
Emerging Business of Ductile Iron Pipe Fittings Highly Demandable Industry of DI Pipe Fittings
Emerging Business of Ductile Iron Pipe Fittings Highly Demandable Industry of DI Pipe Fittings

Pipe fittings, also known a... Read More

Capacity : 0
Plant and Machinery cost: 0.00 Lakhs
Working Capital : 0.00
Rate of Return (ROR):0.00%
Break Even Point (BEP):0.00 %
TCI :0.00 Lakhs
Cost of Project : 0.00Lakhs
Add To Inquiry Basket
Extraction of Essential Oil from Lemon Grass
Extraction of Essential Oil from Lemon Grass

Oil of lemongrass is one of the most important essential Oils. Large quantities are used for the extraction of citr... Read More

Capacity : Lemon Grass Oil (10 ml Size Pack) 1,334 Ltrs per Day
Plant and Machinery cost: 43.00 Lakhs
Working Capital : 0.00
Rate of Return (ROR):34.60%
Break Even Point (BEP):69.69 %
TCI :0.00 Lakhs
Cost of Project : 607.00Lakhs
Add To Inquiry Basket
Production of Bicarbonate Cartridge Acid Concentrate Hot Disinfectant Cold Disinfectant
Production of Bicarbonate Cartridge Acid Concentrate Hot Disinfectant Cold Disinfectant

 

Bicarbonate Cartri... Read More

Capacity : Bicarbonate Cartridge 720g 166.7 Nos. per day Bicarbonate Cartridge 650g 500.0 Nos. per day Acid Co
Plant and Machinery cost: 53.00 Lakhs
Working Capital : 0.00
Rate of Return (ROR):25.28%
Break Even Point (BEP):35.25 %
TCI :0.00 Lakhs
Cost of Project : 1153.00Lakhs
Add To Inquiry Basket
Profitable Industry of Surgical Methylated Spirit Denatured Alcohol Surgical Spirit
Profitable Industry of Surgical Methylated Spirit Denatured Alcohol Surgical Spirit

 

Methylated spirits... Read More

Capacity : Surgical Methylated Spirit 1 Ltr Size Bottle 4,000.0 Nos. Per Day Surgical Methylated Spirit 5 Ltr S
Plant and Machinery cost: 79.00 Lakhs
Working Capital : 0.00
Rate of Return (ROR):27.53%
Break Even Point (BEP):54.72 %
TCI :0.00 Lakhs
Cost of Project : 265.00Lakhs
Add To Inquiry Basket
Manufacturing of Rubber Powder from Waste Tyres
Manufacturing of Rubber Powder from Waste Tyres

 

Rubber is polymer ... Read More

Capacity : Rubber Powder 5.0 MT per day By Product Steel Wire 1.4 MT per day
Plant and Machinery cost: 46.00 Lakhs
Working Capital : 0.00
Rate of Return (ROR):26.98%
Break Even Point (BEP):61.44 %
TCI :0.00 Lakhs
Cost of Project : 191.00Lakhs
Add To Inquiry Basket
Start extraction of Cashew Nut Shell Oil and Cardanol
Start extraction of Cashew Nut Shell Oil and Cardanol

 

Cashew (Botanical ... Read More

Capacity : Cashew Nut Shell Oil 11.0 MT per day Cardanol 5.5 MT per day De-Oiled Cashew Nut Shell Cake (bye Pro
Plant and Machinery cost: 323.00 Lakhs
Working Capital : 0.00
Rate of Return (ROR):26.72%
Break Even Point (BEP):52.53 %
TCI :0.00 Lakhs
Cost of Project : 752.00Lakhs
Add To Inquiry Basket
Setup a Manufacturing Plant of  Disposable Plastic Syringes with Needles
Setup a Manufacturing Plant of Disposable Plastic Syringes with Needles

 

Disposable Syringes are made of plas... Read More

Capacity : Disposable Plastic Syringes with Needles 1 ml Size each Packed in Polypack: 50,000.0 Nos. per day D
Plant and Machinery cost: 524.00 Lakhs
Working Capital : 0.00
Rate of Return (ROR):30.78%
Break Even Point (BEP):35.60 %
TCI :0.00 Lakhs
Cost of Project : 345.00Lakhs
Add To Inquiry Basket
Profitable Business of Disposable Safety Razors Investment Opportunities in Men Grooming Products Industry
Profitable Business of Disposable Safety Razors Investment Opportunities in Men Grooming Products Industry

 

Disposable safety razors have a design that is very s... Read More

Capacity : 0
Plant and Machinery cost: 0.00 Lakhs
Working Capital : 0.00
Rate of Return (ROR):0.00%
Break Even Point (BEP):0.00 %
TCI :0.00 Lakhs
Cost of Project : 0.00Lakhs
Add To Inquiry Basket
Investment Opportunities in Production of Dual Feed Distillery Ethanol as Bio Fuel Set up an Ethanol Production Plant
Investment Opportunities in Production of Dual Feed Distillery Ethanol as Bio Fuel Set up an Ethanol Production Plant

Ethanol is a colourless, pu... Read More

Capacity : 0
Plant and Machinery cost: 0.00 Lakhs
Working Capital : 0.00
Rate of Return (ROR):0.00%
Break Even Point (BEP):0.00 %
TCI :0.00 Lakhs
Cost of Project : 0.00Lakhs
Add To Inquiry Basket
Magnesium Stearate
Magnesium Stearate

 

Magnesium stearat... Read More

Capacity : Magnesium Stearate 10.0 MT Per Day
Plant and Machinery cost: 301.00 Lakhs
Working Capital : 0.00
Rate of Return (ROR):44.00%
Break Even Point (BEP):28.00 %
TCI :0.00 Lakhs
Cost of Project : 515.00Lakhs
Add To Inquiry Basket
Production of Bromelain Enzyme from Pineapple Stems Money Making Business Idea
Production of Bromelain Enzyme from Pineapple Stems Money Making Business Idea

Bromelain is a combination ... Read More

Capacity : 0
Plant and Machinery cost: 0.00 Lakhs
Working Capital : 0.00
Rate of Return (ROR):0.00%
Break Even Point (BEP):0.00 %
TCI :0.00 Lakhs
Cost of Project : 0.00Lakhs
Add To Inquiry Basket
30 Bedded Hospital Business Plan
30 Bedded Hospital Business Plan

A hospital is supposed to treat patients suffering from various ailments. Doctors with their dedicated spirit serve the nation at large by providin... Read More

Capacity : Special Ward Patients : 2 Patients / Day General Ward Patients: 16 Patients / Day Double Bedded Pati
Plant and Machinery cost: 347.00 Lakhs
Working Capital : 0.00
Rate of Return (ROR):20.00%
Break Even Point (BEP):55.00 %
TCI :0.00 Lakhs
Cost of Project : 604.00Lakhs
Add To Inquiry Basket
Construction Opportunities in Geotextiles for Roadways
Construction Opportunities in Geotextiles for Roadways

Geotextiles were used in roadway construction to stabilize roadways and their edges. These early geotextiles were made from natural fibres, fabrics... Read More

Capacity : Geotextiles for Road & Construction: 2,934 Kgs / Day
Plant and Machinery cost: 326.00 Lakhs
Working Capital : 0.00
Rate of Return (ROR):28.00%
Break Even Point (BEP):57.00 %
TCI :0.00 Lakhs
Cost of Project : 665.00Lakhs
Add To Inquiry Basket
Disposable Nitrile Examination Gloves - Medical Grade, Powder Free, Disposable, Non Sterile, Food Safe, Textured
Disposable Nitrile Examination Gloves - Medical Grade, Powder Free, Disposable, Non Sterile, Food Safe, Textured

Nitrile gloves are a kind of disposable gloves made up of rubber, this suggests there's no risk of latex allergies. Th... Read More

Capacity : Disposable Nitrile Gloves (Powder Free): 500,000 Pcs. / Day
Plant and Machinery cost: 1321.00 Lakhs
Working Capital : 0.00
Rate of Return (ROR):30.00%
Break Even Point (BEP):45.00 %
TCI :0.00 Lakhs
Cost of Project : 2890.00Lakhs
Add To Inquiry Basket
Active Pharma Ingredients (API) Manufacturing (Azithromycin, Cefixime, Telmisartan, Diclofenac sodium, Aceclofenac)
Active Pharma Ingredients (API) Manufacturing (Azithromycin, Cefixime, Telmisartan, Diclofenac sodium, Aceclofenac)

Active pharmaceutical ingredients are the active substances that are utilized in the manufacture of a drug and have a ... Read More

Capacity : Azithromycin: 500 Kgs / Day Cefixime: 500 Kgs / Day Telmisartan: 50 Kgs / Day Diclofenac Sodium: 500
Plant and Machinery cost: 155.00 Lakhs
Working Capital : 0.00
Rate of Return (ROR):31.00%
Break Even Point (BEP):61.00 %
TCI :0.00 Lakhs
Cost of Project : 729.00Lakhs
Add To Inquiry Basket
Castor Oil from Castor Seeds Manufacturing Business
Castor Oil from Castor Seeds Manufacturing Business

The castor oil plant, Ricin us common is, may be a species of flowering plant within the spurge family, Euphorbiaceous... Read More

Capacity : Castor Oil: 5 MT / Day Castor De-Oiled Cake: 7.2 MT / Day
Plant and Machinery cost: 106.00 Lakhs
Working Capital : 0.00
Rate of Return (ROR):29.00%
Break Even Point (BEP):64.00 %
TCI :0.00 Lakhs
Cost of Project : 374.00Lakhs
Add To Inquiry Basket
Surgical & N95 Mask Manufacturing Business Plan
Surgical & N95 Mask Manufacturing Business Plan

A surgical mask, also referred to as a procedure mask, medical mask or just as a face mask, is meant to be worn by health professionals during surg... Read More

Capacity : Surgical Face Masks (each Pkts = 25 Pcs.): 576 Pkts / Day N95 Face Masks (each Pkts = 5 Pcs.): 2,880
Plant and Machinery cost: 359.00 Lakhs
Working Capital : 0.00
Rate of Return (ROR):28.00%
Break Even Point (BEP):40.00 %
TCI :0.00 Lakhs
Cost of Project : 717.00Lakhs
Add To Inquiry Basket
Earthmover JCB Bucket Pin Manufacturing and JCB Tooth Nuts, Bolt and Pin Bush
Earthmover JCB Bucket Pin Manufacturing and JCB Tooth Nuts, Bolt and Pin Bush

JCB range of Excavators is the best-in-class, which includes a wide array of large, mid & mini Excavators in the r... Read More

Capacity : JCB Bucket Pin 42 mm Diameter : 1,666.7 Kgs / Day JCB Bucket Pin Bush : 1,666.7 Kgs / Day JCB Bucke
Plant and Machinery cost: 147.00 Lakhs
Working Capital : 0.00
Rate of Return (ROR):27.00%
Break Even Point (BEP):56.00 %
TCI :0.00 Lakhs
Cost of Project : 418.00Lakhs
Add To Inquiry Basket
Urea Fertilizer- Start Business in Fertilizer Industry
Urea Fertilizer- Start Business in Fertilizer Industry

Fertilizers provide three primary nutrients: Nitrogen (N), Phosphorus (P) and Potassium (K). Nitrogen supports vegetat... Read More

Capacity : Urea Fertilizer: 972.2 MT / Day
Plant and Machinery cost: 4320.00 Lakhs
Working Capital : 0.00
Rate of Return (ROR):27.00%
Break Even Point (BEP):56.00 %
TCI :0.00 Lakhs
Cost of Project : 15110.00Lakhs
Add To Inquiry Basket
Manufacturing of Gum Arabic (Gum Acacia)
Manufacturing of Gum Arabic (Gum Acacia)

Gum Arabic, also referred to as gum acacia, may be a natural gum harvested from the o... Read More

Capacity : Arabic Gum (Talha): 6.73 MT / Day
Plant and Machinery cost: 296.00 Lakhs
Working Capital : 0.00
Rate of Return (ROR):26.00%
Break Even Point (BEP):58.00 %
TCI :0.00 Lakhs
Cost of Project : 535.00Lakhs
Add To Inquiry Basket
Eco-Friendly Bamboo Based Products Manufacturing- Tissue Paper, Paper Bags & Plates
Eco-Friendly Bamboo Based Products Manufacturing- Tissue Paper, Paper Bags & Plates

 

Eco-Friendly Bamboo Ba... Read More

Capacity : 0
Plant and Machinery cost: 0.00 Lakhs
Working Capital : 0.00
Rate of Return (ROR):0.00%
Break Even Point (BEP):0.00 %
TCI :0.00 Lakhs
Cost of Project : 0.00Lakhs
Add To Inquiry Basket
Business Ideas in Production of Disposable IV Set
Business Ideas in Production of Disposable IV Set

 

Business Ideas in Production of Disposable I... Read More

Capacity : 0
Plant and Machinery cost: 0.00 Lakhs
Working Capital : 0.00
Rate of Return (ROR):0.00%
Break Even Point (BEP):0.00 %
TCI :0.00 Lakhs
Cost of Project : 0.00Lakhs
Add To Inquiry Basket
Vitamin ‘C’ Manufacturing from Sorbitol
Vitamin ‘C’ Manufacturing from Sorbitol

 

Vitamin C is the simplest of the vitamins chemically, and as a result, it was one of the first to be extract... Read More

Capacity : 600 kg/day
Plant and Machinery cost: 371.00 Lakhs
Working Capital : 0.00
Rate of Return (ROR):24.00%
Break Even Point (BEP):50.00 %
TCI :0.00 Lakhs
Cost of Project : 717.00Lakhs
Add To Inquiry Basket
Start A Single Wall Steel Water Bottle Manufacturing Business
Start A Single Wall Steel Water Bottle Manufacturing Business

 

Water bottles come in a variety of shapes, colours, and sizes. A cord is attached to the stainless steel con... Read More

Capacity : 2,000 Nos/ day
Plant and Machinery cost: 138.00 Lakhs
Working Capital : 0.00
Rate of Return (ROR):29.00%
Break Even Point (BEP):64.00 %
TCI :0.00 Lakhs
Cost of Project : 439.00Lakhs
Add To Inquiry Basket
Weaving of Fiberglass Fabric for Composites (Using e Class Imported Yarns)
Weaving of Fiberglass Fabric for Composites (Using e Class Imported Yarns)

 

Introducti... Read More

Capacity : 0
Plant and Machinery cost: 0.00 Lakhs
Working Capital : 0.00
Rate of Return (ROR):0.00%
Break Even Point (BEP):0.00 %
TCI :0.00 Lakhs
Cost of Project : 0.00Lakhs
Add To Inquiry Basket
Business opportunities in Maize Processing Unit (Starch, Glucose, Germs, Fibres, Gluten & Steep Water)
Business opportunities in Maize Processing Unit (Starch, Glucose, Germs, Fibres, Gluten & Steep Water)

A wide variety of agro-climatic conditions Maize is known a... Read More

Capacity : Maize Starch: 30 MT per day Liquid Glucose: 30 MT per day Gluten: 4.50 MT per day Germs: 6 MT per d
Plant and Machinery cost: 3206.00 Lakhs
Working Capital : 0.00
Rate of Return (ROR):21.00%
Break Even Point (BEP):49.00 %
TCI :0.00 Lakhs
Cost of Project : 4496.00Lakhs
Add To Inquiry Basket
Emerging business opportunities in Production of Adhesive (Fevicol Type)
Emerging business opportunities in Production of Adhesive (Fevicol Type)

Cement, mucilage, glue, and paste are all terms that are fr... Read More

Capacity : 1.0 MT per Day
Plant and Machinery cost: 47.00 Lakhs
Working Capital : 0.00
Rate of Return (ROR):27.00%
Break Even Point (BEP):62.00 %
TCI :0.00 Lakhs
Cost of Project : 165.00Lakhs
Add To Inquiry Basket
Business Ideas and Investment Opportunities in Micronutrients Fertilizer Manufacturing Business
Business Ideas and Investment Opportunities in Micronutrients Fertilizer Manufacturing Business

 

Introducti... Read More

Capacity : 0
Plant and Machinery cost: 0.00 Lakhs
Working Capital : 0.00
Rate of Return (ROR):0.00%
Break Even Point (BEP):0.00 %
TCI :0.00 Lakhs
Cost of Project : 0.00Lakhs
Add To Inquiry Basket
Most Profitable Manufacturing Business of Phenolic Formaldehyde Resin PF Investment Opportunities in Resin Manufacturing Industry
Most Profitable Manufacturing Business of Phenolic Formaldehyde Resin PF Investment Opportunities in Resin Manufacturing Industry

 

Read More

Capacity : 0
Plant and Machinery cost: 0.00 Lakhs
Working Capital : 0.00
Rate of Return (ROR):0.00%
Break Even Point (BEP):0.00 %
TCI :0.00 Lakhs
Cost of Project : 0.00Lakhs
Add To Inquiry Basket
Best Manufacturing Business Ideas of Wine Production from Pineapple and Ginger
Best Manufacturing Business Ideas of Wine Production from Pineapple and Ginger

Introduction:

Read More

Capacity : 0
Plant and Machinery cost: 0.00 Lakhs
Working Capital : 0.00
Rate of Return (ROR):0.00%
Break Even Point (BEP):0.00 %
TCI :0.00 Lakhs
Cost of Project : 0.00Lakhs
Add To Inquiry Basket
Dal Mill, Split Pulses, Roasted Gram Split, Dal & Chana Manufacturing Plant A Profitable Business Idea to Start
Dal Mill, Split Pulses, Roasted Gram Split, Dal & Chana Manufacturing Plant A Profitable Business Idea to Start

 

Introducti... Read More

Capacity : 0
Plant and Machinery cost: 0.00 Lakhs
Working Capital : 0.00
Rate of Return (ROR):0.00%
Break Even Point (BEP):0.00 %
TCI :0.00 Lakhs
Cost of Project : 0.00Lakhs
Add To Inquiry Basket
Start a Production Unit of Ply Board from Poplar & Eucalyptus Wooden Logs Emerging Opportunities in Wood Industry
Start a Production Unit of Ply Board from Poplar & Eucalyptus Wooden Logs Emerging Opportunities in Wood Industry

Introduction

Read More

Capacity : 0
Plant and Machinery cost: 0.00 Lakhs
Working Capital : 0.00
Rate of Return (ROR):0.00%
Break Even Point (BEP):0.00 %
TCI :0.00 Lakhs
Cost of Project : 0.00Lakhs
Add To Inquiry Basket
How to Manufacture the English Willow Cricket Bats Business Plan and Investment Opportunity for Startups
How to Manufacture the English Willow Cricket Bats Business Plan and Investment Opportunity for Startups

Introduction... Read More

Capacity : 0
Plant and Machinery cost: 0.00 Lakhs
Working Capital : 0.00
Rate of Return (ROR):0.00%
Break Even Point (BEP):0.00 %
TCI :0.00 Lakhs
Cost of Project : 0.00Lakhs
Add To Inquiry Basket
Best Profitable Manufacturing and Processing Ideas of Poly Tetra Fluoro Ethylene PTFE Business
Best Profitable Manufacturing and Processing Ideas of Poly Tetra Fluoro Ethylene PTFE Business

 

Read More

Capacity : 0
Plant and Machinery cost: 0.00 Lakhs
Working Capital : 0.00
Rate of Return (ROR):0.00%
Break Even Point (BEP):0.00 %
TCI :0.00 Lakhs
Cost of Project : 0.00Lakhs
Add To Inquiry Basket
How to set up a Chocolate Confectionery Plant (Milk Chocolate, Dark Chocolate, White Chocolate, Orange and Tangy Flavour Toffee, Citric Flavoured Candies & Chocolate Wafers)
How to set up a Chocolate Confectionery Plant (Milk Chocolate, Dark Chocolate, White Chocolate, Orange and Tangy Flavour Toffee, Citric Flavoured Candies & Chocolate Wafers)

 

Chocolate is a co... Read More

Capacity : Milk Chocolate:1,600 Kgs Per Day Dark Chocolate:1,600 Kgs Per Day White Chocolate:1,600 Kgs Per Day
Plant and Machinery cost: 249.00 Lakhs
Working Capital : 0.00
Rate of Return (ROR):29.00%
Break Even Point (BEP):54.00 %
TCI :0.00 Lakhs
Cost of Project : 671.00Lakhs
Add To Inquiry Basket
Set up a Unit of Carbon Black Manufacturing Business
Set up a Unit of Carbon Black Manufacturing Business

 

Under regulated c... Read More

Capacity : 167 MT per day
Plant and Machinery cost: 2563.00 Lakhs
Working Capital : 0.00
Rate of Return (ROR):49.00%
Break Even Point (BEP):25.00 %
TCI :0.00 Lakhs
Cost of Project : 8249.00Lakhs
Add To Inquiry Basket
Profitable Business Idea for Set up a Production Plant of Packaged Drinking Water with PET Bottles
Profitable Business Idea for Set up a Production Plant of Packaged Drinking Water with PET Bottles

 

Introduct... Read More

Capacity : 0
Plant and Machinery cost: 0.00 Lakhs
Working Capital : 0.00
Rate of Return (ROR):0.00%
Break Even Point (BEP):0.00 %
TCI :0.00 Lakhs
Cost of Project : 0.00Lakhs
Add To Inquiry Basket
Start a Production Unit of Solar Photovoltaic (PV) Cell Solar Power in India is a Fast Developing Industry
Start a Production Unit of Solar Photovoltaic (PV) Cell Solar Power in India is a Fast Developing Industry

Introduction:... Read More

Capacity : 0
Plant and Machinery cost: 0.00 Lakhs
Working Capital : 0.00
Rate of Return (ROR):0.00%
Break Even Point (BEP):0.00 %
TCI :0.00 Lakhs
Cost of Project : 0.00Lakhs
Add To Inquiry Basket
Business Opportunities in Chemical Industry Manufacturing Business Startup of Silica Gel Crystal and Beads
Business Opportunities in Chemical Industry Manufacturing Business Startup of Silica Gel Crystal and Beads

Introduction:... Read More

Capacity : 0
Plant and Machinery cost: 0.00 Lakhs
Working Capital : 0.00
Rate of Return (ROR):0.00%
Break Even Point (BEP):0.00 %
TCI :0.00 Lakhs
Cost of Project : 0.00Lakhs
Add To Inquiry Basket
Set up an Manufacturing Unit of Chocolate and Confectionery Plant (Milk Chocolate, Dark Chocolate, White Chocolate, Orange & Tangy Flavour Toffee, Citric Flavoured Candies & Chocolate Wafers)
Set up an Manufacturing Unit of Chocolate and Confectionery Plant (Milk Chocolate, Dark Chocolate, White Chocolate, Orange & Tangy Flavour Toffee, Citric Flavoured Candies & Chocolate Wafers)

Chocolate is a general term... Read More

Capacity : 0
Plant and Machinery cost: 0.00 Lakhs
Working Capital : 0.00
Rate of Return (ROR):0.00%
Break Even Point (BEP):0.00 %
TCI :0.00 Lakhs
Cost of Project : 0.00Lakhs
Add To Inquiry Basket
How to Manufacture Carbon Black A Profitable Business Idea You Can Start
How to Manufacture Carbon Black A Profitable Business Idea You Can Start

Carbon black is made up of ... Read More

Capacity : 0
Plant and Machinery cost: 0.00 Lakhs
Working Capital : 0.00
Rate of Return (ROR):0.00%
Break Even Point (BEP):0.00 %
TCI :0.00 Lakhs
Cost of Project : 0.00Lakhs
Add To Inquiry Basket
Smartphone Tempered Glass Screen Protector Manufacturing
Smartphone Tempered Glass Screen Protector Manufacturing

 

Smartphone Tempered Glass Screen Protector... Read More

Capacity : 9000 Pcs/Day
Plant and Machinery cost: 102.00 Lakhs
Working Capital : 0.00
Rate of Return (ROR):0.00%
Break Even Point (BEP):0.00 %
TCI :0.00 Lakhs
Cost of Project : 0.00Lakhs
Add To Inquiry Basket
Market Research Report on India Lithium-Ion Battery Market, Growth Rate, Size, Share, Trend, Drivers, Competitive Landscape, Opportunity, Limitations, Technological Landscape, Regulatory Framework, PESTEL Analysis, PORTER’s Analysis, Forecast upto 2027
Market Research Report on India Lithium-Ion Battery Market, Growth Rate, Size, Share, Trend, Drivers, Competitive Landscape, Opportunity, Limitations, Technological Landscape, Regulatory Framework, PESTEL Analysis, PORTER’s Analysis, Forecast upto 2027

Market Research Report on India Lithium-Ion Battery Market, Growth Rate, Size, Share, Trend, Drivers, Competitive ... Read More

Capacity : 0
Plant and Machinery cost: 0.00 Lakhs
Working Capital : 0.00
Rate of Return (ROR):0.00%
Break Even Point (BEP):0.00 %
TCI :0.00 Lakhs
Cost of Project : 0.00Lakhs
Add To Inquiry Basket
Surgical & N95 Masks
Surgical & N95 Masks

A surgical mask, also known as a procedure mask, medical mask or simply as a face mask, is intended to be worn by health professionals during surge... Read More

Capacity : Surgical Face Masks (each Pkts = 25 Pcs.): 1,694 Pkts / day N95 Face Masks (each Pkts = 5 Pcs.): 8,
Plant and Machinery cost: 350.00 Lakhs
Working Capital : 0.00
Rate of Return (ROR):29.00%
Break Even Point (BEP):53.00 %
TCI :0.00 Lakhs
Cost of Project : 865.00Lakhs
Add To Inquiry Basket
Red Oxide Primer
Red Oxide Primer

A primer is a preparatory coating put on materials before painting. Priming ensures better adhesion of paint to the surface, increases paint durabi... Read More

Capacity : Red Oxide Primer (Each Packed in 20 Ltrs Container) : 500 Packs / day
Plant and Machinery cost: 151.00 Lakhs
Working Capital : 0.00
Rate of Return (ROR):28.00%
Break Even Point (BEP):55.00 %
TCI :0.00 Lakhs
Cost of Project : 365.00Lakhs
Add To Inquiry Basket
Manufacturing Ideas of Methyl Ethyl Ketone (MEK), Kraft Paper, Aluminium Ingots from Aluminium Scrap, Nitrile Gloves, Red Oxide Primer, Aluminium Cans for Beverages, Aluminium Anodizing.
Manufacturing Ideas of Methyl Ethyl Ketone (MEK), Kraft Paper, Aluminium Ingots from Aluminium Scrap, Nitrile Gloves, Red Oxide Primer, Aluminium Cans for Beverages, Aluminium Anodizing.

Manufacturing Ideas of Methyl Ethyl Ketone (MEK), Kraft Paper, Aluminium Ingots from Aluminiu... Read More

Capacity : 0
Plant and Machinery cost: 0.00 Lakhs
Working Capital : 0.00
Rate of Return (ROR):0.00%
Break Even Point (BEP):0.00 %
TCI :0.00 Lakhs
Cost of Project : 0.00Lakhs
Add To Inquiry Basket
Emerging Investment Opportunities in Hydrated Lime (Calcium hydroxide) Production from Limestone
Emerging Investment Opportunities in Hydrated Lime (Calcium hydroxide) Production from Limestone

Emerging Investment Opportunities in Hydrated Lime (Calcium hydroxide) Production from Limestone (Calciu... Read More

Capacity : 0
Plant and Machinery cost: 0.00 Lakhs
Working Capital : 0.00
Rate of Return (ROR):0.00%
Break Even Point (BEP):0.00 %
TCI :0.00 Lakhs
Cost of Project : 0.00Lakhs
Add To Inquiry Basket
Production of Toothpaste
Production of Toothpaste

Production of Toothpaste. Emerging Investment Opportunities in Dental Hygiene

A <... Read More

Capacity : 0
Plant and Machinery cost: 0.00 Lakhs
Working Capital : 0.00
Rate of Return (ROR):0.00%
Break Even Point (BEP):0.00 %
TCI :0.00 Lakhs
Cost of Project : 0.00Lakhs
Add To Inquiry Basket
Manufacturing of Downhole Seals Used for Oil and Gas Industry from Synthetic Rubber
Manufacturing of Downhole Seals Used for Oil and Gas Industry from Synthetic Rubber

Manufacturing of Downhole Seals Used for Oil and Gas Industry from Synthetic Rubber.

D... Read More

Capacity : 0
Plant and Machinery cost: 0.00 Lakhs
Working Capital : 0.00
Rate of Return (ROR):0.00%
Break Even Point (BEP):0.00 %
TCI :0.00 Lakhs
Cost of Project : 0.00Lakhs
Add To Inquiry Basket
NameCapacityRate of return (ROR):Cost of project
Start Your Own Industry w... 0 0.00 0.00
Battery Sprayer 400 Pcs per day 29.00 110.00
Lemon-Lime Flavoured Soft... 50000 Bottles per day 29.00 700.00
Condoms 500 Boxes per day 28.00 1963.00
Bioplastic Products Manuf... 0 0.00 0.00
Bio-Based and Biodegradab... 0 0.00 0.00
Business Idea of Double E... 0 0.00 0.00
Biodegradable Sanitary Pa... 0 0.00 0.00
Manufacturing of Lemon-Li... 0 0.00 0.00
Startup Business Opportun... 0 0.00 0.00
Manufacturing of Pig Iron... 0 0.00 0.00
Biomass Briquettes from B... 20 MT per day 20.00 94.00
Caustic Soda from Limesto... Caustic Soda from Limestone and Sodium Carbonate: 60 MT per day 29.00 827.00
Activated Carbon from Bam... 450 MT/Annum 25.00 377.00
Craft Beer Craft Beer (Cans & Bottles 650 ml Size) : 9230 Nos./Day 27.00 1628.00
Potato Products 0 0.00 0.00
Hosiery Cloth (Cotton Pro... 0 0.00 0.00
Acrylic Garments 0 0.00 0.00
NC Thinner Manufacturing ... 0 0.00 0.00
Expanded Polystyrene Manu... 0 0.00 0.00
Moringa Oleifera (Drumsti... 180,000 Kgs. per annum 25.00 307.00
Biodegradable Plastic Bag... Biodegradable Plastic Bags (Per Bag 25 gms Size): 12 MT per day 28.00 1498.00
Manufacturing of Dextrose... 0 0.00 0.00
White Oats Processing 0 0.00 0.00
Manufacturing of Vermicom... 0 0.00 0.00
Manufacturing of Biomass ... 0 0.00 0.00
Manufacturing of Black Pe... 0 0.00 0.00
3 Star Hotel with 2 Banqu... Air conditioned Deluxe Rooms:32 Units per day Conference Hall, Meeting Rooms & Business Lounge:0.5 25.00 1014.00
Workshop for Motors of Lo... Repair & Maintenance Motors (100 KW):2 Units per day On Site Annual Maintenance Contract (AMC):0.8 U 30.00 76.00
PVC Wires and Cables PVC Coated Copper Wires (100 Mtrs Rolls):33,784 Nos. per annum PVC Coated Aluminium Wires (100 Mtrs 32.00 1568.00
12345678910...

Showing 181 - 240 of 2573 Product(s)

Subject of your Interest

Information

  • One Lac / Lakh / Lakhs is equivalent to one hundred thousand (100,000)
  • One Crore is equivalent to ten million (10,000,000)
  • T.C.I is Total Capital Investment
  • We can modify the project capacity and project cost as per your requirement.
  • We can also prepare project report on any subject as per your requirement.
  • Caution: The project's cost, capacity and return are subject to change without any notice. Future projects may have different values of project cost, capacity or return.

ABOUT NPCS

 

NIIR PROJECT CONSULTANCY SERVICES (NPCS) is a reliable name in the industrial world for offering integrated technical consultancy services. NPCS is manned by engineers, planners, specialists, financial experts, economic analysts and design specialists with extensive experience in the related industries.

Our various services are: Detailed Project Report,  Business Plan for Manufacturing Plant, Start-up Ideas, Business Ideas for Entrepreneurs, Start up Business Opportunities, entrepreneurship projects, Successful Business Plan, Industry Trends, Market Research, Manufacturing Process, Machinery, Raw Materials, project report, Cost and Revenue, Pre-feasibility study for Profitable Manufacturing Business, Project Identification, Project Feasibility and Market Study, Identification of Profitable Industrial Project Opportunities, Business Opportunities, Investment Opportunities for Most Profitable Business in India, Manufacturing Business Ideas, Preparation of Project Profile, Pre-Investment and Pre-Feasibility Study, Market Research Study, Preparation of Techno-Economic Feasibility Report, Identification and Section of Plant, Process, Equipment, General Guidance, Startup Help, Technical and Commercial Counseling for setting up new industrial project and Most Profitable Small Scale Business.

NPCS also publishes varies process technology, technical, reference, self employment and startup books, directory, business and industry database, bankable detailed project report, market research report on various industries, small scale industry and profit making business. Besides being used by manufacturers, industrialists and entrepreneurs, our publications are also used by professionals including project engineers, information services bureau, consultants and project consultancy firms as one of the input in their research.

Our Detailed Project report aims at providing all the critical data required by any entrepreneur vying to venture into Project. While expanding a current business or while venturing into new business, entrepreneurs are often faced with the dilemma of zeroing in on a suitable product/line.

 


And before diversifying/venturing into any product, wish to study the following aspects of the identified product:


• Good Present/Future Demand
• Export-Import Market Potential
• Raw Material & Manpower Availability
• Project Costs and Payback Period


We at NPCS, through our reliable expertise in the project consultancy and market research field, Provides exhaustive information about the project, which satisfies all the above mentioned requirements and has high growth potential in the markets. And through our report we aim to help you make sound and informed business decision.

 

The report contains all the data which will help an entrepreneur find answers to questions like:

• Why I should invest in this project?
• What will drive the growth of the product?
• What are the costs involved?
• What will be the market potential?


The report first focuses on enhancing the basic knowledge of the entrepreneur about the main product, by elucidating details like product definition, its uses and applications, industry segmentation as well as an overall overview of the industry sector in India. The report then helps an entrepreneur identify the target customer group of its product. It further helps in making sound investment decision by listing and then elaborating on factors that will contribute to the growth of product consumption in India and also talks about the foreign trade of the product along with the list of top importing and top exporting countries. Report includes graphical representation and forecasts of key data discussed in the above mentioned segment. It further explicates the growth potential of the product.

The report includes other market data like key players in the Industry segment along with their contact information and recent developments. It includes crucial information like raw material requirements, list of machinery and manufacturing process for the plant. Core project financials like plant capacity, costs involved in setting up of project, working capital requirements, projected revenue and profit are further listed in the report.


Reasons for buying the report:

• This report helps you to identify a profitable project for investing or diversifying into by throwing light to crucial areas like industry size, demand of the product and reasons for investing in the product.

• This report provides vital information on the product like its definition, characteristics and segmentation.

• This report helps you market and place the product correctly by identifying the target customer group of the product.

• This report helps you understand the viability of the project by disclosing details like raw materials required, manufacturing process, project costs and snapshot of other project financials.

• The report provides forecasts of key parameters which helps to anticipate the industry performance and make sound business decision.

 

Our Approach:


• Our research reports broadly cover Indian markets, present analysis, outlook and forecast.

• The market forecasts are developed on the basis of secondary research and are cross-validated through interactions with the industry players. 

• We use reliable sources of information and databases.  And information from such sources is processed by us and included in the report.

 

Our Market Survey cum Detailed Techno Economic Feasibility Report Contains following information:

 

 

Ø  Introduction

·         Project Introduction

·         Project Objective and Strategy

·         Concise History of the Product

·         Properties

·         BIS (Bureau of Indian Standards) Provision & Specification

·         Uses & Applications

 

Ø  Market Study and Assessment

·         Current Indian Market Scenario

·         Present Market Demand and Supply

·         Estimated Future Market Demand and Forecast

·         Statistics of Import & Export

·         Names & Addresses of Existing Units (Present Players)

·         Market Opportunity

 

Ø  Raw Material

·         List of Raw Materials

·         Properties of Raw Materials

·         Prescribed Quality of Raw Materials

·         List of Suppliers and Manufacturers

 

Ø  Personnel (Manpower) Requirements

·         Requirement of Staff & Labor (Skilled and Unskilled) Managerial, Technical, Office Staff and Marketing Personnel

 

Ø  Plant and Machinery

·         List of Plant & Machinery

·         Miscellaneous Items

·         Appliances & Equipments

·         Laboratory Equipments & Accessories

·         Electrification

·         Electric Load & Water

·         Maintenance Cost

·         Sources of Plant & Machinery (Suppliers and Manufacturers)

 

Ø  Manufacturing Process and Formulations

·         Detailed Process of Manufacture with Formulation

·         Packaging Required

·         Process Flow Sheet Diagram

 

Ø  Infrastructure and Utilities

·         Project Location

·         Requirement of Land Area

·         Rates of the Land

·         Built Up Area

·         Construction Schedule

·         Plant Layout and Requirement of Utilities

 

Project at a Glance

Along with financial details as under:

 

  •     Assumptions for Profitability workings

  •    Plant Economics

  •    Production Schedule

  •    Land & Building

            Factory Land & Building

            Site Development Expenses

  •    Plant & Machinery

             Indigenous Machineries

            Other Machineries (Miscellaneous, Laboratory etc.)

  •    Other Fixed Assets

            Furniture & Fixtures

            Pre-operative and Preliminary Expenses

            Technical Knowhow

            Provision of Contingencies

  •   Working Capital Requirement Per Month

             Raw Material

            Packing Material

            Lab & ETP Chemical Cost

           Consumable Store

  •   Overheads Required Per Month And Per Annum

         Utilities & Overheads (Power, Water and Fuel Expenses etc.)

             Royalty and Other Charges

            Selling and Distribution Expenses

  •    Salary and Wages

  •    Turnover Per Annum

  •   Share Capital

            Equity Capital

            Preference Share Capital

 

  •    Annexure 1:: Cost of Project and Means of Finance

  •    Annexure 2::  Profitability and Net Cash Accruals

                Revenue/Income/Realisation

                Expenses/Cost of Products/Services/Items

                Gross Profit

                Financial Charges     

                Total Cost of Sales

                Net Profit After Taxes

                Net Cash Accruals

  •   Annexure 3 :: Assessment of Working Capital requirements

                Current Assets

                Gross Working. Capital

                Current Liabilities

                Net Working Capital

                Working Note for Calculation of Work-in-process

  •    Annexure 4 :: Sources and Disposition of Funds

  •    Annexure 5 :: Projected Balance Sheets

                ROI (Average of Fixed Assets)

                RONW (Average of Share Capital)

                ROI (Average of Total Assets)

  •    Annexure 6 :: Profitability ratios

                D.S.C.R

                Earnings Per Share (EPS)

               

             Debt Equity Ratio

        Annexure 7   :: Break-Even Analysis

                Variable Cost & Expenses

                Semi-Var./Semi-Fixed Exp.

                Profit Volume Ratio (PVR)

                Fixed Expenses / Cost 

                B.E.P

  •   Annexure 8 to 11:: Sensitivity Analysis-Price/Volume

            Resultant N.P.B.T

            Resultant D.S.C.R

   Resultant PV Ratio

   Resultant DER

  Resultant ROI

          Resultant BEP

  •    Annexure 12 :: Shareholding Pattern and Stake Status

        Equity Capital

        Preference Share Capital

  •   Annexure 13 :: Quantitative Details-Output/Sales/Stocks

        Determined Capacity P.A of Products/Services

        Achievable Efficiency/Yield % of Products/Services/Items 

        Net Usable Load/Capacity of Products/Services/Items   

       Expected Sales/ Revenue/ Income of Products/ Services/ Items   

  •    Annexure 14 :: Product wise domestic Sales Realisation

  •    Annexure 15 :: Total Raw Material Cost

  •    Annexure 16 :: Raw Material Cost per unit

  •    Annexure 17 :: Total Lab & ETP Chemical Cost

  •    Annexure 18  :: Consumables, Store etc.,

  •    Annexure 19  :: Packing Material Cost

  •    Annexure 20  :: Packing Material Cost Per Unit

  •    Annexure 21 :: Employees Expenses

  •    Annexure 22 :: Fuel Expenses

  •    Annexure 23 :: Power/Electricity Expenses

  •    Annexure 24 :: Royalty & Other Charges

  •    Annexure 25 :: Repairs & Maintenance Exp.

  •    Annexure 26 :: Other Mfg. Expenses

  •    Annexure 27 :: Administration Expenses

  •    Annexure 28 :: Selling Expenses

  •    Annexure 29 :: Depreciation Charges – as per Books (Total)

  •   Annexure 30   :: Depreciation Charges – as per Books (P & M)

  •   Annexure 31   :: Depreciation Charges - As per IT Act WDV (Total)

  •   Annexure 32   :: Depreciation Charges - As per IT Act WDV (P & M)

  •   Annexure 33   :: Interest and Repayment - Term Loans

  •   Annexure 34   :: Tax on Profits

  •   Annexure 35   ::Projected Pay-Back Period And IRR