We can provide you detailed project reports on the following topics. Please select the projects of your interests.
Each detailed project reports cover all the aspects of business, from analysing the market, confirming availability of various necessities such as plant & machinery, raw materials to forecasting the financial requirements. The scope of the report includes assessing market potential, negotiating with collaborators, investment decision making, corporate diversification planning etc. in a very planned manner by formulating detailed manufacturing techniques and forecasting financial aspects by estimating the ost of raw material, formulating the cash flow statement, projecting the balance sheet etc.
We also offer self-contained Pre-Investment and Pre-Feasibility Studies, Market Surveys and Studies, Preparation of Techno-Economic Feasibility Reports, Identification and Selection of Plant and Machinery, Manufacturing Process and or Equipment required, General Guidance, Technical and Commercial Counseling for setting up new industrial projects on the following topics. Many of the engineers, project consultant & industrial consultancy firms in India and worldwide use our project reports as one of the input in doing their analysis.


We can modify the project capacity and project cost as per your requirement.
We can also prepare project report on any subject as per your requirement.

Add multiple items to inquiry

Select the items and then press Add to inquiry button

Sort by :
A Business Plan for Wood Plastic Composite (WPC)
A Business Plan for Wood Plastic Composite (WPC)

Wood Plastic C... Read More

Capacity : Wood Plastic Composite (WPC): 10 Million Sq.Ft. per annum
Plant and Machinery cost: 406.00 Lakhs
Working Capital : 0.00
Rate of Return (ROR):27.00%
Break Even Point (BEP):61.00 %
TCI :0.00 Lakhs
Cost of Project : 790.00Lakhs
Add To Inquiry Basket
Start a Production Of Soda Ash  By Solvay Process
Start a Production Of Soda Ash By Solvay Process

Soda ash, or sodium carbonate, is a white, powdery chemical commonly used in the prod... Read More

Capacity : Soda Ash (Na2CO3): 200,000 MT Per Annum, Ammonium Chloride (NH4Cl): 200,000 MT Per Annum
Plant and Machinery cost: 105000.00 Lakhs
Working Capital : 0.00
Rate of Return (ROR):14.00%
Break Even Point (BEP):43.00 %
TCI :0.00 Lakhs
Cost of Project : 1265.00Lakhs
Add To Inquiry Basket
Setup Plant OF Hot Dip Galvanizing
Setup Plant OF Hot Dip Galvanizing

 

Hot ... Read More

Capacity : All Types of MS Structure 120 MT per day
Plant and Machinery cost: 619.00 Lakhs
Working Capital : 0.00
Rate of Return (ROR):25.00%
Break Even Point (BEP):42.00 %
TCI :0.00 Lakhs
Cost of Project : 2647.00Lakhs
Add To Inquiry Basket
A Business Plan for Potato Powder, Starch & Flakes
A Business Plan for Potato Powder, Starch & Flakes

Potato Powder, Starch & Flakes are a range of products derived from the tuber of ... Read More

Capacity : -
Plant and Machinery cost: 0.00 Lakhs
Working Capital : 0.00
Rate of Return (ROR):27.00%
Break Even Point (BEP):58.00 %
TCI :0.00 Lakhs
Cost of Project : 0.00Lakhs
Add To Inquiry Basket
Start a Business of Lithium Ion Battery (Battery Assembly)
Start a Business of Lithium Ion Battery (Battery Assembly)

A lithium-ion or Li-ion battery is a type of rec... Read More

Capacity : Lithium-Ion Battery 60,000 Nos per Annum
Plant and Machinery cost: 172.00 Lakhs
Working Capital : 0.00
Rate of Return (ROR):29.00%
Break Even Point (BEP):61.00 %
TCI :0.00 Lakhs
Cost of Project : 812.00Lakhs
Add To Inquiry Basket
Best Industry Business Plan Is Zeolite 4a! (Detergent Grade)
Best Industry Business Plan Is Zeolite 4a! (Detergent Grade)

The Product:... Read More

Capacity : 0
Plant and Machinery cost: 0.00 Lakhs
Working Capital : 0.00
Rate of Return (ROR):0.00%
Break Even Point (BEP):0.00 %
TCI :0.00 Lakhs
Cost of Project : 0.00Lakhs
Add To Inquiry Basket
Startup Most Growing and Demanding industry Business plant of Fiberglass Transparent LPG Cylinders
Startup Most Growing and Demanding industry Business plant of Fiberglass Transparent LPG Cylinders

Product: Read More

Capacity : 0
Plant and Machinery cost: 0.00 Lakhs
Working Capital : 0.00
Rate of Return (ROR):0.00%
Break Even Point (BEP):0.00 %
TCI :0.00 Lakhs
Cost of Project : 0.00Lakhs
Add To Inquiry Basket
Manufacturing of Gum Arabic (Gum Acacia)
Manufacturing of Gum Arabic (Gum Acacia)

Gum Arabic, also referred to as gum acacia, may be a natural gum harvested from the o... Read More

Capacity : Arabic Gum (Talha): 6.73 MT / Day
Plant and Machinery cost: 296.00 Lakhs
Working Capital : 0.00
Rate of Return (ROR):26.00%
Break Even Point (BEP):58.00 %
TCI :0.00 Lakhs
Cost of Project : 535.00Lakhs
Add To Inquiry Basket
Eco-Friendly Bamboo Based Products Manufacturing- Tissue Paper, Paper Bags & Plates
Eco-Friendly Bamboo Based Products Manufacturing- Tissue Paper, Paper Bags & Plates

 

Eco-Friendly Bamboo Ba... Read More

Capacity : 0
Plant and Machinery cost: 0.00 Lakhs
Working Capital : 0.00
Rate of Return (ROR):0.00%
Break Even Point (BEP):0.00 %
TCI :0.00 Lakhs
Cost of Project : 0.00Lakhs
Add To Inquiry Basket
Business Ideas in Production of Disposable IV Set
Business Ideas in Production of Disposable IV Set

 

Business Ideas in Production of Disposable I... Read More

Capacity : 0
Plant and Machinery cost: 0.00 Lakhs
Working Capital : 0.00
Rate of Return (ROR):0.00%
Break Even Point (BEP):0.00 %
TCI :0.00 Lakhs
Cost of Project : 0.00Lakhs
Add To Inquiry Basket
Production of Phenolic Formaldehyde Resin
Production of Phenolic Formaldehyde Resin

 

Phenol formaldehyde resins (PF) or Phenolic resins are artificial polymers o... Read More

Capacity : 1,000 kg/day
Plant and Machinery cost: 34.00 Lakhs
Working Capital : 0.00
Rate of Return (ROR):24.00%
Break Even Point (BEP):66.00 %
TCI :0.00 Lakhs
Cost of Project : 144.00Lakhs
Add To Inquiry Basket
Vitamin ‘C’ Manufacturing from Sorbitol
Vitamin ‘C’ Manufacturing from Sorbitol

 

Vitamin C is the simplest of the vitamins chemically, and as a result, it was one of the first to be extract... Read More

Capacity : 600 kg/day
Plant and Machinery cost: 371.00 Lakhs
Working Capital : 0.00
Rate of Return (ROR):24.00%
Break Even Point (BEP):50.00 %
TCI :0.00 Lakhs
Cost of Project : 717.00Lakhs
Add To Inquiry Basket
Start A Single Wall Steel Water Bottle Manufacturing Business
Start A Single Wall Steel Water Bottle Manufacturing Business

 

Water bottles come in a variety of shapes, colours, and sizes. A cord is attached to the stainless steel con... Read More

Capacity : 2,000 Nos/ day
Plant and Machinery cost: 138.00 Lakhs
Working Capital : 0.00
Rate of Return (ROR):29.00%
Break Even Point (BEP):64.00 %
TCI :0.00 Lakhs
Cost of Project : 439.00Lakhs
Add To Inquiry Basket
Weaving of Fiberglass Fabric for Composites (Using e Class Imported Yarns)
Weaving of Fiberglass Fabric for Composites (Using e Class Imported Yarns)

 

Introducti... Read More

Capacity : 0
Plant and Machinery cost: 0.00 Lakhs
Working Capital : 0.00
Rate of Return (ROR):0.00%
Break Even Point (BEP):0.00 %
TCI :0.00 Lakhs
Cost of Project : 0.00Lakhs
Add To Inquiry Basket
Business opportunities in Maize Processing Unit (Starch, Glucose, Germs, Fibres, Gluten & Steep Water)
Business opportunities in Maize Processing Unit (Starch, Glucose, Germs, Fibres, Gluten & Steep Water)

A wide variety of agro-climatic conditions Maize is known a... Read More

Capacity : Maize Starch: 30 MT per day Liquid Glucose: 30 MT per day Gluten: 4.50 MT per day Germs: 6 MT per d
Plant and Machinery cost: 3206.00 Lakhs
Working Capital : 0.00
Rate of Return (ROR):21.00%
Break Even Point (BEP):49.00 %
TCI :0.00 Lakhs
Cost of Project : 4496.00Lakhs
Add To Inquiry Basket
Emerging business opportunities in Production of Adhesive (Fevicol Type)
Emerging business opportunities in Production of Adhesive (Fevicol Type)

Cement, mucilage, glue, and paste are all terms that are fr... Read More

Capacity : 1.0 MT per Day
Plant and Machinery cost: 47.00 Lakhs
Working Capital : 0.00
Rate of Return (ROR):27.00%
Break Even Point (BEP):62.00 %
TCI :0.00 Lakhs
Cost of Project : 165.00Lakhs
Add To Inquiry Basket
Business Ideas and Investment Opportunities in Micronutrients Fertilizer Manufacturing Business
Business Ideas and Investment Opportunities in Micronutrients Fertilizer Manufacturing Business

 

Introducti... Read More

Capacity : 0
Plant and Machinery cost: 0.00 Lakhs
Working Capital : 0.00
Rate of Return (ROR):0.00%
Break Even Point (BEP):0.00 %
TCI :0.00 Lakhs
Cost of Project : 0.00Lakhs
Add To Inquiry Basket
Most Profitable Manufacturing Business of Phenolic Formaldehyde Resin PF Investment Opportunities in Resin Manufacturing Industry
Most Profitable Manufacturing Business of Phenolic Formaldehyde Resin PF Investment Opportunities in Resin Manufacturing Industry

 

Read More

Capacity : 0
Plant and Machinery cost: 0.00 Lakhs
Working Capital : 0.00
Rate of Return (ROR):0.00%
Break Even Point (BEP):0.00 %
TCI :0.00 Lakhs
Cost of Project : 0.00Lakhs
Add To Inquiry Basket
Best Manufacturing Business Ideas of Wine Production from Pineapple and Ginger
Best Manufacturing Business Ideas of Wine Production from Pineapple and Ginger

Introduction:

Read More

Capacity : 0
Plant and Machinery cost: 0.00 Lakhs
Working Capital : 0.00
Rate of Return (ROR):0.00%
Break Even Point (BEP):0.00 %
TCI :0.00 Lakhs
Cost of Project : 0.00Lakhs
Add To Inquiry Basket
Dal Mill, Split Pulses, Roasted Gram Split, Dal & Chana Manufacturing Plant A Profitable Business Idea to Start
Dal Mill, Split Pulses, Roasted Gram Split, Dal & Chana Manufacturing Plant A Profitable Business Idea to Start

 

Introducti... Read More

Capacity : 0
Plant and Machinery cost: 0.00 Lakhs
Working Capital : 0.00
Rate of Return (ROR):0.00%
Break Even Point (BEP):0.00 %
TCI :0.00 Lakhs
Cost of Project : 0.00Lakhs
Add To Inquiry Basket
Start a Production Unit of Ply Board from Poplar & Eucalyptus Wooden Logs Emerging Opportunities in Wood Industry
Start a Production Unit of Ply Board from Poplar & Eucalyptus Wooden Logs Emerging Opportunities in Wood Industry

Introduction

Read More

Capacity : 0
Plant and Machinery cost: 0.00 Lakhs
Working Capital : 0.00
Rate of Return (ROR):0.00%
Break Even Point (BEP):0.00 %
TCI :0.00 Lakhs
Cost of Project : 0.00Lakhs
Add To Inquiry Basket
How to Manufacture the English Willow Cricket Bats Business Plan and Investment Opportunity for Startups
How to Manufacture the English Willow Cricket Bats Business Plan and Investment Opportunity for Startups

Introduction... Read More

Capacity : 0
Plant and Machinery cost: 0.00 Lakhs
Working Capital : 0.00
Rate of Return (ROR):0.00%
Break Even Point (BEP):0.00 %
TCI :0.00 Lakhs
Cost of Project : 0.00Lakhs
Add To Inquiry Basket
Best Profitable Manufacturing and Processing Ideas of Poly Tetra Fluoro Ethylene PTFE Business
Best Profitable Manufacturing and Processing Ideas of Poly Tetra Fluoro Ethylene PTFE Business

 

Read More

Capacity : 0
Plant and Machinery cost: 0.00 Lakhs
Working Capital : 0.00
Rate of Return (ROR):0.00%
Break Even Point (BEP):0.00 %
TCI :0.00 Lakhs
Cost of Project : 0.00Lakhs
Add To Inquiry Basket
How to set up a Chocolate Confectionery Plant (Milk Chocolate, Dark Chocolate, White Chocolate, Orange and Tangy Flavour Toffee, Citric Flavoured Candies & Chocolate Wafers)
How to set up a Chocolate Confectionery Plant (Milk Chocolate, Dark Chocolate, White Chocolate, Orange and Tangy Flavour Toffee, Citric Flavoured Candies & Chocolate Wafers)

 

Chocolate is a co... Read More

Capacity : Milk Chocolate:1,600 Kgs Per Day Dark Chocolate:1,600 Kgs Per Day White Chocolate:1,600 Kgs Per Day
Plant and Machinery cost: 249.00 Lakhs
Working Capital : 0.00
Rate of Return (ROR):29.00%
Break Even Point (BEP):54.00 %
TCI :0.00 Lakhs
Cost of Project : 671.00Lakhs
Add To Inquiry Basket
Set up a Unit of Carbon Black Manufacturing Business
Set up a Unit of Carbon Black Manufacturing Business

 

Under regulated c... Read More

Capacity : 167 MT per day
Plant and Machinery cost: 2563.00 Lakhs
Working Capital : 0.00
Rate of Return (ROR):49.00%
Break Even Point (BEP):25.00 %
TCI :0.00 Lakhs
Cost of Project : 8249.00Lakhs
Add To Inquiry Basket
Profitable Business Idea for Set up a Production Plant of Packaged Drinking Water with PET Bottles
Profitable Business Idea for Set up a Production Plant of Packaged Drinking Water with PET Bottles

 

Introduct... Read More

Capacity : 0
Plant and Machinery cost: 0.00 Lakhs
Working Capital : 0.00
Rate of Return (ROR):0.00%
Break Even Point (BEP):0.00 %
TCI :0.00 Lakhs
Cost of Project : 0.00Lakhs
Add To Inquiry Basket
Start a Production Unit of Solar Photovoltaic (PV) Cell Solar Power in India is a Fast Developing Industry
Start a Production Unit of Solar Photovoltaic (PV) Cell Solar Power in India is a Fast Developing Industry

Introduction:... Read More

Capacity : 0
Plant and Machinery cost: 0.00 Lakhs
Working Capital : 0.00
Rate of Return (ROR):0.00%
Break Even Point (BEP):0.00 %
TCI :0.00 Lakhs
Cost of Project : 0.00Lakhs
Add To Inquiry Basket
Business Opportunities in Chemical Industry Manufacturing Business Startup of Silica Gel Crystal and Beads
Business Opportunities in Chemical Industry Manufacturing Business Startup of Silica Gel Crystal and Beads

Introduction:... Read More

Capacity : 0
Plant and Machinery cost: 0.00 Lakhs
Working Capital : 0.00
Rate of Return (ROR):0.00%
Break Even Point (BEP):0.00 %
TCI :0.00 Lakhs
Cost of Project : 0.00Lakhs
Add To Inquiry Basket
Set up an Manufacturing Unit of Chocolate and Confectionery Plant (Milk Chocolate, Dark Chocolate, White Chocolate, Orange & Tangy Flavour Toffee, Citric Flavoured Candies & Chocolate Wafers)
Set up an Manufacturing Unit of Chocolate and Confectionery Plant (Milk Chocolate, Dark Chocolate, White Chocolate, Orange & Tangy Flavour Toffee, Citric Flavoured Candies & Chocolate Wafers)

Chocolate is a general term... Read More

Capacity : 0
Plant and Machinery cost: 0.00 Lakhs
Working Capital : 0.00
Rate of Return (ROR):0.00%
Break Even Point (BEP):0.00 %
TCI :0.00 Lakhs
Cost of Project : 0.00Lakhs
Add To Inquiry Basket
How to Manufacture Carbon Black A Profitable Business Idea You Can Start
How to Manufacture Carbon Black A Profitable Business Idea You Can Start

Carbon black is made up of ... Read More

Capacity : 0
Plant and Machinery cost: 0.00 Lakhs
Working Capital : 0.00
Rate of Return (ROR):0.00%
Break Even Point (BEP):0.00 %
TCI :0.00 Lakhs
Cost of Project : 0.00Lakhs
Add To Inquiry Basket
Start Manufacturing of PP Woven Fabric
Start Manufacturing of PP Woven Fabric

Polypropylene, which is also known as PP for short name, is one kind of thermoplastic... Read More

Capacity : PP Woven Fabric 12 MT per day
Plant and Machinery cost: 943.00 Lakhs
Working Capital : 0.00
Rate of Return (ROR):27.00%
Break Even Point (BEP):52.00 %
TCI :0.00 Lakhs
Cost of Project : 1637.00Lakhs
Add To Inquiry Basket
Business Opportunities in Production of Dicyandiamide  (DCDA)
Business Opportunities in Production of Dicyandiamide (DCDA)

 

Dicyandiamide is ... Read More

Capacity : Dicyandiamide (DCDA) 5 MT Per Day
Plant and Machinery cost: 45.00 Lakhs
Working Capital : 0.00
Rate of Return (ROR):29.00%
Break Even Point (BEP):57.00 %
TCI :0.00 Lakhs
Cost of Project : 270.00Lakhs
Add To Inquiry Basket
Emerging Business of Shrimp Processing  (EOU)
Emerging Business of Shrimp Processing (EOU)

 

Shrimp are decapo... Read More

Capacity : Shrimp Processing (per Pack 1 Kg Size) 19,500 Kgs Per Day
Plant and Machinery cost: 202.00 Lakhs
Working Capital : 0.00
Rate of Return (ROR):30.00%
Break Even Point (BEP):57.00 %
TCI :0.00 Lakhs
Cost of Project : 1465.00Lakhs
Add To Inquiry Basket
Investment Opportunities in Business of IV Fluids (BFS Technology)
Investment Opportunities in Business of IV Fluids (BFS Technology)

 

Intravenous fluid... Read More

Capacity : IV Fluids (500 ml Size Bottle) 50,000 Bottles per day
Plant and Machinery cost: 3449.00 Lakhs
Working Capital : 0.00
Rate of Return (ROR):20.00%
Break Even Point (BEP):41.00 %
TCI :0.00 Lakhs
Cost of Project : 4089.00Lakhs
Add To Inquiry Basket
Start Business of A-2 Cow Milk Processing (Milk, Butter, Ghee & Paneer)
Start Business of A-2 Cow Milk Processing (Milk, Butter, Ghee & Paneer)

Milk is the most important source of protein and is consumed by people all over the w... Read More

Capacity : A-2 Milk (1 Ltr Tetra Pack) 2,250 Kgs per day Butter (100 & 500 gms Pack) 46 Kgs per day Paneer (4 P
Plant and Machinery cost: 19.00 Lakhs
Working Capital : 0.00
Rate of Return (ROR):25.00%
Break Even Point (BEP):58.00 %
TCI :0.00 Lakhs
Cost of Project : 484.00Lakhs
Add To Inquiry Basket
Start Production of  Paracetamol (BP,IP,USP Grade)
Start Production of Paracetamol (BP,IP,USP Grade)

Read More

Capacity : Paracetamol Powder (IP/BP Grade 50 MT Per Day Acetic Acid (31% Conc.) By Product 72 MT Per Day
Plant and Machinery cost: 962.00 Lakhs
Working Capital : 0.00
Rate of Return (ROR):32.00%
Break Even Point (BEP):52.00 %
TCI :0.00 Lakhs
Cost of Project : 2887.00Lakhs
Add To Inquiry Basket
Industrial and Pharmaceutical Grade Starch from Cassava, Maize and Tacca Roots
Industrial and Pharmaceutical Grade Starch from Cassava, Maize and Tacca Roots

 

Cassava, sorghum,... Read More

Capacity : Industrial Grade Starch 37.5 MT Per Day Pharmaceutical Grade Starch 12.5 MT Per Day
Plant and Machinery cost: 257.00 Lakhs
Working Capital : 0.00
Rate of Return (ROR):28.00%
Break Even Point (BEP):76.00 %
TCI :0.00 Lakhs
Cost of Project : 1255.00Lakhs
Add To Inquiry Basket
Production of  Copper Wire Drawing & Enamelling
Production of Copper Wire Drawing & Enamelling

 

Copper is one of ... Read More

Capacity : Copper Wire (0.914 to 0.376 mm) 350 Kgs per day Enamelled Copper Wire (0.914 to 0.376 mm) 350 Kgs pe
Plant and Machinery cost: 432.00 Lakhs
Working Capital : 0.00
Rate of Return (ROR):28.00%
Break Even Point (BEP):46.00 %
TCI :0.00 Lakhs
Cost of Project : 1233.00Lakhs
Add To Inquiry Basket
Profitable Industry of Bamboo Sticks
Profitable Industry of Bamboo Sticks

 

Bamboo is a tribe... Read More

Capacity : Bamboo Sticks 4 MT Per Day
Plant and Machinery cost: 443.00 Lakhs
Working Capital : 0.00
Rate of Return (ROR):26.00%
Break Even Point (BEP):45.00 %
TCI :0.00 Lakhs
Cost of Project : 791.00Lakhs
Add To Inquiry Basket
Profit Making Manufacturing Business of Alloy Wheels for 2 Wheeler Motorcycle, Bikes Best Business in Automobile Sector
Profit Making Manufacturing Business of Alloy Wheels for 2 Wheeler Motorcycle, Bikes Best Business in Automobile Sector

 

Allo... Read More

Capacity : 0
Plant and Machinery cost: 0.00 Lakhs
Working Capital : 0.00
Rate of Return (ROR):0.00%
Break Even Point (BEP):0.00 %
TCI :0.00 Lakhs
Cost of Project : 0.00Lakhs
Add To Inquiry Basket
Start Lucrative Manufacturing Business of Milk Powder (Baby Milk for 0 to 5 year, Milk Powder for Coffee and Tea)
Start Lucrative Manufacturing Business of Milk Powder (Baby Milk for 0 to 5 year, Milk Powder for Coffee and Tea)

Milk... Read More

Capacity : 0
Plant and Machinery cost: 0.00 Lakhs
Working Capital : 0.00
Rate of Return (ROR):0.00%
Break Even Point (BEP):0.00 %
TCI :0.00 Lakhs
Cost of Project : 0.00Lakhs
Add To Inquiry Basket
Production Business of Eco Friendly Bamboo Toothbrush Most Profitable Business Ideas in Bamboo Industry
Production Business of Eco Friendly Bamboo Toothbrush Most Profitable Business Ideas in Bamboo Industry

Bamboo toothbrushes Read More

Capacity : 0
Plant and Machinery cost: 0.00 Lakhs
Working Capital : 0.00
Rate of Return (ROR):0.00%
Break Even Point (BEP):0.00 %
TCI :0.00 Lakhs
Cost of Project : 0.00Lakhs
Add To Inquiry Basket
Profitable Business Industry of  Electric Motors
Profitable Business Industry of Electric Motors

 

An e... Read More

Capacity : 5 KW Three Phase Induction Motors120 Nos Per Day 10 KW Three Phase Induction Motors 20 Nos Per Day 1
Plant and Machinery cost: 467.00 Lakhs
Working Capital : 0.00
Rate of Return (ROR):26.00%
Break Even Point (BEP):41.00 %
TCI :0.00 Lakhs
Cost of Project : 3949.00Lakhs
Add To Inquiry Basket
Investment Opportunities in Carbonated Health Drinks
Investment Opportunities in Carbonated Health Drinks

 

Carb... Read More

Capacity : Carbonated Health Drinks Size 250 ml 8,000 Packs Per Day Carbonated Health Drinks Size 330 ml 4,000
Plant and Machinery cost: 49.00 Lakhs
Working Capital : 0.00
Rate of Return (ROR):31.00%
Break Even Point (BEP):59.00 %
TCI :0.00 Lakhs
Cost of Project : 299.00Lakhs
Add To Inquiry Basket
Business Industry of  Stone Plastic Composite (SPC) Flooring Tiles
Business Industry of Stone Plastic Composite (SPC) Flooring Tiles

 

Stone plastic com... Read More

Capacity : Stone Plastic Composite (SPC) Flooring Tiles 3,000 Sq,mtr Per Day
Plant and Machinery cost: 408.00 Lakhs
Working Capital : 0.00
Rate of Return (ROR):28.00%
Break Even Point (BEP):65.00 %
TCI :0.00 Lakhs
Cost of Project : 1011.00Lakhs
Add To Inquiry Basket
Investment Opportunities in Waste Lubricating Oil  Recycling Plant
Investment Opportunities in Waste Lubricating Oil Recycling Plant

 

Waste oil is made... Read More

Capacity : Used Lubricating Oil 20,000 Ltrs per day Spent Clay as by product 2,105 Ltrs per day
Plant and Machinery cost: 127.00 Lakhs
Working Capital : 0.00
Rate of Return (ROR):27.00%
Break Even Point (BEP):50.00 %
TCI :0.00 Lakhs
Cost of Project : 753.00Lakhs
Add To Inquiry Basket
Automated Vehicle Scrapping  and Recycling Unit
Automated Vehicle Scrapping and Recycling Unit

 

The disassembly o... Read More

Capacity : 1000 Vehicles per Month
Plant and Machinery cost: 497.00 Lakhs
Working Capital : 0.00
Rate of Return (ROR):29.00%
Break Even Point (BEP):40.00 %
TCI :0.00 Lakhs
Cost of Project : 2090.00Lakhs
Add To Inquiry Basket
Azodicarbonamide Using Urea and Hydrazine Hydrate
Azodicarbonamide Using Urea and Hydrazine Hydrate

 

The chemical comp... Read More

Capacity : Azodicarbonamide Powder 40 MT Per Day Ammonia 10.6 MT Per Day Hydrochloric Acid (38% Conc.) 20.1 MT
Plant and Machinery cost: 1951.00 Lakhs
Working Capital : 0.00
Rate of Return (ROR):25.00%
Break Even Point (BEP):50.00 %
TCI :0.00 Lakhs
Cost of Project : 3109.00Lakhs
Add To Inquiry Basket
Rising Demand of  Rice Husk based Biodegradable Cutlery
Rising Demand of Rice Husk based Biodegradable Cutlery

 

People have been ... Read More

Capacity : Biodegradable Cutlery (Per Set 6 Pcs. Flatware) 1,852 Sets per day
Plant and Machinery cost: 29.00 Lakhs
Working Capital : 0.00
Rate of Return (ROR):26.00%
Break Even Point (BEP):67.00 %
TCI :0.00 Lakhs
Cost of Project : 135.00Lakhs
Add To Inquiry Basket
Profitable Business of Magnesium Sulphate
Profitable Business of Magnesium Sulphate

Magnesium sulphate is an inorganic salt with the formula MgSO4 Read More

Capacity : 72 MT Per Day
Plant and Machinery cost: 256.00 Lakhs
Working Capital : 0.00
Rate of Return (ROR):29.00%
Break Even Point (BEP):58.00 %
TCI :0.00 Lakhs
Cost of Project : 900.00Lakhs
Add To Inquiry Basket
Business Industry of Grain Processing (Grading, Cleaning & Packaging of Rice & Pulses)
Business Industry of Grain Processing (Grading, Cleaning & Packaging of Rice & Pulses)

Grain processing, as exempli... Read More

Capacity : Moong Dal 1 MT Per Day Masur Dal 1 MT Per Day Toor Dal 1.5 MT Per Day Chana Dal 1 MT Per Day Kabul
Plant and Machinery cost: 63.00 Lakhs
Working Capital : 0.00
Rate of Return (ROR):31.00%
Break Even Point (BEP):58.00 %
TCI :0.00 Lakhs
Cost of Project : 165.00Lakhs
Add To Inquiry Basket
Setting up a Multispeciality Hospital (200 Bedded)
Setting up a Multispeciality Hospital (200 Bedded)

A hospital is a health care institution providing patient treatment with specialized m... Read More

Capacity : 200 Bedded Hospital
Plant and Machinery cost: 14000.00 Lakhs
Working Capital : 0.00
Rate of Return (ROR):27.00%
Break Even Point (BEP):50.00 %
TCI :0.00 Lakhs
Cost of Project : 21248.00Lakhs
Add To Inquiry Basket
Start Manufacturing of Aluminium Ingots from Aluminium Scrap
Start Manufacturing of Aluminium Ingots from Aluminium Scrap

Aluminum, is a light weight,... Read More

Capacity : Aluminium Alloy Ingots14 MT per day Aluminium Scrap 0.23 MT per day
Plant and Machinery cost: 700.00 Lakhs
Working Capital : 0.00
Rate of Return (ROR):0.00%
Break Even Point (BEP):0.00 %
TCI :0.00 Lakhs
Cost of Project : 3315.00Lakhs
Add To Inquiry Basket
Calcium Sennosides from Senna Leaves Production Business Plan
Calcium Sennosides from Senna Leaves Production Business Plan

Calcium Sennoside are the m... Read More

Capacity : 400 Kgs per Day
Plant and Machinery cost: 291.00 Lakhs
Working Capital : 0.00
Rate of Return (ROR):28.00%
Break Even Point (BEP):59.00 %
TCI :0.00 Lakhs
Cost of Project : 607.00Lakhs
Add To Inquiry Basket
30 Bedded Hospital Business Plan
30 Bedded Hospital Business Plan

A hospital is supposed to treat patients suffering from various ailments. Doctors with their dedicated spirit serve the nation at large by providin... Read More

Capacity : Special Ward Patients : 2 Patients / Day General Ward Patients: 16 Patients / Day Double Bedded Pati
Plant and Machinery cost: 347.00 Lakhs
Working Capital : 0.00
Rate of Return (ROR):20.00%
Break Even Point (BEP):55.00 %
TCI :0.00 Lakhs
Cost of Project : 604.00Lakhs
Add To Inquiry Basket
Construction Opportunities in Geotextiles for Roadways
Construction Opportunities in Geotextiles for Roadways

Geotextiles were used in roadway construction to stabilize roadways and their edges. These early geotextiles were made from natural fibres, fabrics... Read More

Capacity : Geotextiles for Road & Construction: 2,934 Kgs / Day
Plant and Machinery cost: 326.00 Lakhs
Working Capital : 0.00
Rate of Return (ROR):28.00%
Break Even Point (BEP):57.00 %
TCI :0.00 Lakhs
Cost of Project : 665.00Lakhs
Add To Inquiry Basket
Disposable Nitrile Examination Gloves - Medical Grade, Powder Free, Disposable, Non Sterile, Food Safe, Textured
Disposable Nitrile Examination Gloves - Medical Grade, Powder Free, Disposable, Non Sterile, Food Safe, Textured

Nitrile gloves are a kind of disposable gloves made up of rubber, this suggests there's no risk of latex allergies. Th... Read More

Capacity : Disposable Nitrile Gloves (Powder Free): 500,000 Pcs. / Day
Plant and Machinery cost: 1321.00 Lakhs
Working Capital : 0.00
Rate of Return (ROR):30.00%
Break Even Point (BEP):45.00 %
TCI :0.00 Lakhs
Cost of Project : 2890.00Lakhs
Add To Inquiry Basket
Active Pharma Ingredients (API) Manufacturing (Azithromycin, Cefixime, Telmisartan, Diclofenac sodium, Aceclofenac)
Active Pharma Ingredients (API) Manufacturing (Azithromycin, Cefixime, Telmisartan, Diclofenac sodium, Aceclofenac)

Active pharmaceutical ingredients are the active substances that are utilized in the manufacture of a drug and have a ... Read More

Capacity : Azithromycin: 500 Kgs / Day Cefixime: 500 Kgs / Day Telmisartan: 50 Kgs / Day Diclofenac Sodium: 500
Plant and Machinery cost: 155.00 Lakhs
Working Capital : 0.00
Rate of Return (ROR):31.00%
Break Even Point (BEP):61.00 %
TCI :0.00 Lakhs
Cost of Project : 729.00Lakhs
Add To Inquiry Basket
Castor Oil from Castor Seeds Manufacturing Business
Castor Oil from Castor Seeds Manufacturing Business

The castor oil plant, Ricin us common is, may be a species of flowering plant within the spurge family, Euphorbiaceous... Read More

Capacity : Castor Oil: 5 MT / Day Castor De-Oiled Cake: 7.2 MT / Day
Plant and Machinery cost: 106.00 Lakhs
Working Capital : 0.00
Rate of Return (ROR):29.00%
Break Even Point (BEP):64.00 %
TCI :0.00 Lakhs
Cost of Project : 374.00Lakhs
Add To Inquiry Basket
Surgical & N95 Mask Manufacturing Business Plan
Surgical & N95 Mask Manufacturing Business Plan

A surgical mask, also referred to as a procedure mask, medical mask or just as a face mask, is meant to be worn by health professionals during surg... Read More

Capacity : Surgical Face Masks (each Pkts = 25 Pcs.): 576 Pkts / Day N95 Face Masks (each Pkts = 5 Pcs.): 2,880
Plant and Machinery cost: 359.00 Lakhs
Working Capital : 0.00
Rate of Return (ROR):28.00%
Break Even Point (BEP):40.00 %
TCI :0.00 Lakhs
Cost of Project : 717.00Lakhs
Add To Inquiry Basket
NameCapacityRate of return (ROR):Cost of project
A Business Plan For Sanit... Sanitary Napkins 4,800 PKTS per day 27.00 84.00
Start Manufacturing Of Bl... - 32.00 985.00
Start Production Of Potat... Potato Flakes 2 MT Per Day 25.00 563.00
Setup Manufacturing Unit ... Saddle 7,000 Unit Per Day Pedals 10,000 Unit Per Day 31.00 575.00
Opportunity in Sodium Sul... Sodium Sulfide Flakes 10,000 MT Per Annum 30.00 1426.00
Business Plan for Lithium... - 29.00 812.00
Start Manufacturing Busin... Cargo Containers (Size 20 Feet) 34 Nos Per Day 29.00 1992.00
Start Cutting and Grindin... Cutting Disc Size: (115 mm x 1 mm) 2,000 Pcs Pr Day Grinding Disc (115 mm x 6 mm) 2,000 Pcs Pr Day 28.00 423.00
Mink Blankets Production - 27.00 6000.00
A Business Plan for Micro... Micronutrient Fortified Energy Dense Food 100 MT Per Day 28.00 3500.00
Start Business of Caustic... - 25.00 56500.00
Start Crumb Rubber Powder... Crumb Rubber Powder 10 MT Per Day By Product Steel Wire 2 MT Per Day 26.00 303.00
Manufacturing of Disposa... 0 0.00 0.00
Liquid Hand Wash 0 0.00 0.00
Start a Production Of Com... Compressed Bio Gas 6 MT Per Day Spent Slurry as Manure 60 MT Per Day 27.00 522.00
Start Industry Of Craft B... Craft Beer (Bottles 650 ml Size) 3,847 Bottles per day Craft Beer (Al. Cans 500 ml Size) 5,000 Bot 27.00 2007.00
Setup plant of Acetate T... Acetate Tow 8 MT Per Day 29.00 1426.00
Setup Plant Of Titanium ... Titanium Dioxide 4 MT Per Day 27.00 1455.00
Setup Plant Of Lab Cultu... Lab Cultured Diamonds (1 Carat) 30 Carat Per Day 25.00 361.00
Start Lemon Processing Un... Lemon Juice Dry Powder 104 Kgs per day Lemon Peel Oil 40 Kgs per day Lemon Pectin 140 Kgs 25.00 314.00
Solar PV (Photovoltaic) G... Solar PV (Photovoltaic) Glass 90,000 MT Per Annum 28.00 4200.00
A Business Plan For Pea P... Pea Protein Isolate 2 MT Per Day Spent Pea for Cattle Feed by Product 8 MT Per Day 27.00 614.00
Setup Plant Of Acrylate... Acrylate Resins 10,000 MT Per Annum Acrylate Emulsions 10,000 MT Per Annum 30.00 2291.00
Start Latex Rubber Thread... Latex Rubber Thread 200 Kg. Per Day 26.00 412.00
Start Cosmetic Unit (Seru... - 36.00 1617.00
Pioneering Pea Protein Bu... 0 0.00 0.00
Start Production Of Silic... - 28.00 4716.00
A Business Plan for IV Fl... IV Fluids (500 ml Size Pack) 78,000 Packs Per Day 27.00 1263.00
Start Industry of Liquor ... Wine (750 ml Size) 4,000,000 Bottles per annum Whiskey (375 ml Size) 4,000,000 Bottles per annum B 28.00 1880.00
Setup Pharmaceutical Unit... - 37.00 35774.00
12345678910...

Showing 121 - 180 of 1628 Product(s)

Subject of your Interest

Information

  • One Lac / Lakh / Lakhs is equivalent to one hundred thousand (100,000)
  • One Crore is equivalent to ten million (10,000,000)
  • T.C.I is Total Capital Investment
  • We can modify the project capacity and project cost as per your requirement.
  • We can also prepare project report on any subject as per your requirement.
  • Caution: The project's cost, capacity and return are subject to change without any notice. Future projects may have different values of project cost, capacity or return.

ABOUT NPCS

 

NIIR PROJECT CONSULTANCY SERVICES (NPCS) is a reliable name in the industrial world for offering integrated technical consultancy services. NPCS is manned by engineers, planners, specialists, financial experts, economic analysts and design specialists with extensive experience in the related industries.

Our various services are: Detailed Project Report,  Business Plan for Manufacturing Plant, Start-up Ideas, Business Ideas for Entrepreneurs, Start up Business Opportunities, entrepreneurship projects, Successful Business Plan, Industry Trends, Market Research, Manufacturing Process, Machinery, Raw Materials, project report, Cost and Revenue, Pre-feasibility study for Profitable Manufacturing Business, Project Identification, Project Feasibility and Market Study, Identification of Profitable Industrial Project Opportunities, Business Opportunities, Investment Opportunities for Most Profitable Business in India, Manufacturing Business Ideas, Preparation of Project Profile, Pre-Investment and Pre-Feasibility Study, Market Research Study, Preparation of Techno-Economic Feasibility Report, Identification and Section of Plant, Process, Equipment, General Guidance, Startup Help, Technical and Commercial Counseling for setting up new industrial project and Most Profitable Small Scale Business.

NPCS also publishes varies process technology, technical, reference, self employment and startup books, directory, business and industry database, bankable detailed project report, market research report on various industries, small scale industry and profit making business. Besides being used by manufacturers, industrialists and entrepreneurs, our publications are also used by professionals including project engineers, information services bureau, consultants and project consultancy firms as one of the input in their research.

Our Detailed Project report aims at providing all the critical data required by any entrepreneur vying to venture into Project. While expanding a current business or while venturing into new business, entrepreneurs are often faced with the dilemma of zeroing in on a suitable product/line.

 


And before diversifying/venturing into any product, wish to study the following aspects of the identified product:


• Good Present/Future Demand
• Export-Import Market Potential
• Raw Material & Manpower Availability
• Project Costs and Payback Period


We at NPCS, through our reliable expertise in the project consultancy and market research field, Provides exhaustive information about the project, which satisfies all the above mentioned requirements and has high growth potential in the markets. And through our report we aim to help you make sound and informed business decision.

 

The report contains all the data which will help an entrepreneur find answers to questions like:

• Why I should invest in this project?
• What will drive the growth of the product?
• What are the costs involved?
• What will be the market potential?


The report first focuses on enhancing the basic knowledge of the entrepreneur about the main product, by elucidating details like product definition, its uses and applications, industry segmentation as well as an overall overview of the industry sector in India. The report then helps an entrepreneur identify the target customer group of its product. It further helps in making sound investment decision by listing and then elaborating on factors that will contribute to the growth of product consumption in India and also talks about the foreign trade of the product along with the list of top importing and top exporting countries. Report includes graphical representation and forecasts of key data discussed in the above mentioned segment. It further explicates the growth potential of the product.

The report includes other market data like key players in the Industry segment along with their contact information and recent developments. It includes crucial information like raw material requirements, list of machinery and manufacturing process for the plant. Core project financials like plant capacity, costs involved in setting up of project, working capital requirements, projected revenue and profit are further listed in the report.


Reasons for buying the report:

• This report helps you to identify a profitable project for investing or diversifying into by throwing light to crucial areas like industry size, demand of the product and reasons for investing in the product.

• This report provides vital information on the product like its definition, characteristics and segmentation.

• This report helps you market and place the product correctly by identifying the target customer group of the product.

• This report helps you understand the viability of the project by disclosing details like raw materials required, manufacturing process, project costs and snapshot of other project financials.

• The report provides forecasts of key parameters which helps to anticipate the industry performance and make sound business decision.

 

Our Approach:


• Our research reports broadly cover Indian markets, present analysis, outlook and forecast.

• The market forecasts are developed on the basis of secondary research and are cross-validated through interactions with the industry players. 

• We use reliable sources of information and databases.  And information from such sources is processed by us and included in the report.

 

Our Market Survey cum Detailed Techno Economic Feasibility Report Contains following information:

 

 

Ø  Introduction

·         Project Introduction

·         Project Objective and Strategy

·         Concise History of the Product

·         Properties

·         BIS (Bureau of Indian Standards) Provision & Specification

·         Uses & Applications

 

Ø  Market Study and Assessment

·         Current Indian Market Scenario

·         Present Market Demand and Supply

·         Estimated Future Market Demand and Forecast

·         Statistics of Import & Export

·         Names & Addresses of Existing Units (Present Players)

·         Market Opportunity

 

Ø  Raw Material

·         List of Raw Materials

·         Properties of Raw Materials

·         Prescribed Quality of Raw Materials

·         List of Suppliers and Manufacturers

 

Ø  Personnel (Manpower) Requirements

·         Requirement of Staff & Labor (Skilled and Unskilled) Managerial, Technical, Office Staff and Marketing Personnel

 

Ø  Plant and Machinery

·         List of Plant & Machinery

·         Miscellaneous Items

·         Appliances & Equipments

·         Laboratory Equipments & Accessories

·         Electrification

·         Electric Load & Water

·         Maintenance Cost

·         Sources of Plant & Machinery (Suppliers and Manufacturers)

 

Ø  Manufacturing Process and Formulations

·         Detailed Process of Manufacture with Formulation

·         Packaging Required

·         Process Flow Sheet Diagram

 

Ø  Infrastructure and Utilities

·         Project Location

·         Requirement of Land Area

·         Rates of the Land

·         Built Up Area

·         Construction Schedule

·         Plant Layout and Requirement of Utilities

 

Project at a Glance

Along with financial details as under:

 

  •     Assumptions for Profitability workings

  •    Plant Economics

  •    Production Schedule

  •    Land & Building

            Factory Land & Building

            Site Development Expenses

  •    Plant & Machinery

             Indigenous Machineries

            Other Machineries (Miscellaneous, Laboratory etc.)

  •    Other Fixed Assets

            Furniture & Fixtures

            Pre-operative and Preliminary Expenses

            Technical Knowhow

            Provision of Contingencies

  •   Working Capital Requirement Per Month

             Raw Material

            Packing Material

            Lab & ETP Chemical Cost

           Consumable Store

  •   Overheads Required Per Month And Per Annum

         Utilities & Overheads (Power, Water and Fuel Expenses etc.)

             Royalty and Other Charges

            Selling and Distribution Expenses

  •    Salary and Wages

  •    Turnover Per Annum

  •   Share Capital

            Equity Capital

            Preference Share Capital

 

  •    Annexure 1:: Cost of Project and Means of Finance

  •    Annexure 2::  Profitability and Net Cash Accruals

                Revenue/Income/Realisation

                Expenses/Cost of Products/Services/Items

                Gross Profit

                Financial Charges     

                Total Cost of Sales

                Net Profit After Taxes

                Net Cash Accruals

  •   Annexure 3 :: Assessment of Working Capital requirements

                Current Assets

                Gross Working. Capital

                Current Liabilities

                Net Working Capital

                Working Note for Calculation of Work-in-process

  •    Annexure 4 :: Sources and Disposition of Funds

  •    Annexure 5 :: Projected Balance Sheets

                ROI (Average of Fixed Assets)

                RONW (Average of Share Capital)

                ROI (Average of Total Assets)

  •    Annexure 6 :: Profitability ratios

                D.S.C.R

                Earnings Per Share (EPS)

               

             Debt Equity Ratio

        Annexure 7   :: Break-Even Analysis

                Variable Cost & Expenses

                Semi-Var./Semi-Fixed Exp.

                Profit Volume Ratio (PVR)

                Fixed Expenses / Cost 

                B.E.P

  •   Annexure 8 to 11:: Sensitivity Analysis-Price/Volume

            Resultant N.P.B.T

            Resultant D.S.C.R

   Resultant PV Ratio

   Resultant DER

  Resultant ROI

          Resultant BEP

  •    Annexure 12 :: Shareholding Pattern and Stake Status

        Equity Capital

        Preference Share Capital

  •   Annexure 13 :: Quantitative Details-Output/Sales/Stocks

        Determined Capacity P.A of Products/Services

        Achievable Efficiency/Yield % of Products/Services/Items 

        Net Usable Load/Capacity of Products/Services/Items   

       Expected Sales/ Revenue/ Income of Products/ Services/ Items   

  •    Annexure 14 :: Product wise domestic Sales Realisation

  •    Annexure 15 :: Total Raw Material Cost

  •    Annexure 16 :: Raw Material Cost per unit

  •    Annexure 17 :: Total Lab & ETP Chemical Cost

  •    Annexure 18  :: Consumables, Store etc.,

  •    Annexure 19  :: Packing Material Cost

  •    Annexure 20  :: Packing Material Cost Per Unit

  •    Annexure 21 :: Employees Expenses

  •    Annexure 22 :: Fuel Expenses

  •    Annexure 23 :: Power/Electricity Expenses

  •    Annexure 24 :: Royalty & Other Charges

  •    Annexure 25 :: Repairs & Maintenance Exp.

  •    Annexure 26 :: Other Mfg. Expenses

  •    Annexure 27 :: Administration Expenses

  •    Annexure 28 :: Selling Expenses

  •    Annexure 29 :: Depreciation Charges – as per Books (Total)

  •   Annexure 30   :: Depreciation Charges – as per Books (P & M)

  •   Annexure 31   :: Depreciation Charges - As per IT Act WDV (Total)

  •   Annexure 32   :: Depreciation Charges - As per IT Act WDV (P & M)

  •   Annexure 33   :: Interest and Repayment - Term Loans

  •   Annexure 34   :: Tax on Profits

  •   Annexure 35   ::Projected Pay-Back Period And IRR