We can provide you detailed project reports on the following topics. Please select the projects of your interests.
Each detailed project reports cover all the aspects of business, from analysing the market, confirming availability of various necessities such as plant & machinery, raw materials to forecasting the financial requirements. The scope of the report includes assessing market potential, negotiating with collaborators, investment decision making, corporate diversification planning etc. in a very planned manner by formulating detailed manufacturing techniques and forecasting financial aspects by estimating the ost of raw material, formulating the cash flow statement, projecting the balance sheet etc.
We also offer self-contained Pre-Investment and Pre-Feasibility Studies, Market Surveys and Studies, Preparation of Techno-Economic Feasibility Reports, Identification and Selection of Plant and Machinery, Manufacturing Process and or Equipment required, General Guidance, Technical and Commercial Counseling for setting up new industrial projects on the following topics. Many of the engineers, project consultant & industrial consultancy firms in India and worldwide use our project reports as one of the input in doing their analysis.


We can modify the project capacity and project cost as per your requirement.
We can also prepare project report on any subject as per your requirement.

Add multiple items to inquiry

Select the items and then press Add to inquiry button

Sort by :
Gold and Diamond Jewellery
Gold and Diamond Jewellery

Jewellery may be made from a wide range of materials. Gemstones and similar materials such as amber and coral, p... Read More

Capacity : Gold Jewellery:9.50 Kgs /day Gold Plus Diamond Jewellery :2.38 Kgs / day
Plant and Machinery cost: 270.00 Lakhs
Working Capital : 0.00
Rate of Return (ROR):34.00%
Break Even Point (BEP):54.00 %
TCI :0.00 Lakhs
Cost of Project : 2504.00Lakhs
Add To Inquiry Basket
Hand Sanitizer
Hand Sanitizer
Hand sanitizers that do not contain alcohol usually contain benzalkonium chloride instead. They kill bacteria by disrupting their membranes, but we st... Read More
Capacity : Hand Sanitizer (50 ml size Bolltes):10,000 Bottles/day
Plant and Machinery cost: 16.00 Lakhs
Working Capital : 0.00
Rate of Return (ROR):31.00%
Break Even Point (BEP):62.00 %
TCI :0.00 Lakhs
Cost of Project : 156.00Lakhs
Add To Inquiry Basket
Particle Board from Wheat/Rice Straw
Particle Board from Wheat/Rice Straw
Agricultural waste or residue is made up of organic compounds from organic sources such as rice straw, wheat straw, oil palm empty fruit bunch, sugar ... Read More
Capacity : Particle Board (Size 6x3x0.471') : 5,000,000.0 Sq.Mtrs. / Annum
Plant and Machinery cost: 335.00 Lakhs
Working Capital : 0.00
Rate of Return (ROR):28.00%
Break Even Point (BEP):57.00 %
TCI :0.00 Lakhs
Cost of Project : 930.00Lakhs
Add To Inquiry Basket
Manufacturing Opportunities in Disposable Nitrile Gloves
Manufacturing Opportunities in Disposable Nitrile Gloves

Manufacturing Opportunities in Disposable Nitrile Gloves. The Most Profitable Industry to Lau... Read More

Capacity : 0
Plant and Machinery cost: 0.00 Lakhs
Working Capital : 0.00
Rate of Return (ROR):0.00%
Break Even Point (BEP):0.00 %
TCI :0.00 Lakhs
Cost of Project : 0.00Lakhs
Add To Inquiry Basket
Condoms
Condoms

A condom is a thin, fitted tube. Condoms prevent pregnancies and STDs. They create a barrier that keeps semen an... Read More

Capacity : 500 Boxes per day
Plant and Machinery cost: 965.00 Lakhs
Working Capital : 0.00
Rate of Return (ROR):28.00%
Break Even Point (BEP):50.00 %
TCI :0.00 Lakhs
Cost of Project : 1963.00Lakhs
Add To Inquiry Basket
Caustic Soda from Limestone and Sodium Carbonate (Soda Ash)
Caustic Soda from Limestone and Sodium Carbonate (Soda Ash)

Sodium hydroxide, also known as lye and cau... Read More

Capacity : Caustic Soda from Limestone and Sodium Carbonate: 60 MT per day
Plant and Machinery cost: 171.00 Lakhs
Working Capital : 0.00
Rate of Return (ROR):29.00%
Break Even Point (BEP):67.00 %
TCI :0.00 Lakhs
Cost of Project : 827.00Lakhs
Add To Inquiry Basket
A Business Plan For Sanitary Napkins
A Business Plan For Sanitary Napkins

A sanitary napkin, also kno... Read More

Capacity : Sanitary Napkins 4,800 PKTS per day
Plant and Machinery cost: 26.00 Lakhs
Working Capital : 0.00
Rate of Return (ROR):27.00%
Break Even Point (BEP):67.00 %
TCI :0.00 Lakhs
Cost of Project : 84.00Lakhs
Add To Inquiry Basket
Start Manufacturing Of Blood Collection Tubes (Vacutainer)
Start Manufacturing Of Blood Collection Tubes (Vacutainer)

Blood collection tubes, also known as Vacutainer, are essential tools used in the med... Read More

Capacity : -
Plant and Machinery cost: 464.00 Lakhs
Working Capital : 0.00
Rate of Return (ROR):32.00%
Break Even Point (BEP):53.00 %
TCI :0.00 Lakhs
Cost of Project : 985.00Lakhs
Add To Inquiry Basket
Start Production Of Potato Flakes
Start Production Of Potato Flakes

Capacity : Potato Flakes 2 MT Per Day
Plant and Machinery cost: 178.00 Lakhs
Working Capital : 0.00
Rate of Return (ROR):25.00%
Break Even Point (BEP):45.00 %
TCI :0.00 Lakhs
Cost of Project : 563.00Lakhs
Add To Inquiry Basket
Setup Manufacturing Unit Of Bicycle Saddle & Pedals
Setup Manufacturing Unit Of Bicycle Saddle & Pedals

Bicycle saddles and pedals are two crucial components that di... Read More

Capacity : Saddle 7,000 Unit Per Day Pedals 10,000 Unit Per Day
Plant and Machinery cost: 208.00 Lakhs
Working Capital : 0.00
Rate of Return (ROR):31.00%
Break Even Point (BEP):54.00 %
TCI :0.00 Lakhs
Cost of Project : 575.00Lakhs
Add To Inquiry Basket
Opportunity in Sodium Sulfide Flakes Business From Sulfur and Caustic Soda
Opportunity in Sodium Sulfide Flakes Business From Sulfur and Caustic Soda

Sodium Sulfide Flakes, scie... Read More

Capacity : Sodium Sulfide Flakes 10,000 MT Per Annum
Plant and Machinery cost: 282.00 Lakhs
Working Capital : 0.00
Rate of Return (ROR):30.00%
Break Even Point (BEP):49.00 %
TCI :0.00 Lakhs
Cost of Project : 1426.00Lakhs
Add To Inquiry Basket
Business Plan for Lithium Ion Battery (Battery Assembly)
Business Plan for Lithium Ion Battery (Battery Assembly)

A lithium ion battery (Battery Assembly) is a rechargeable battery that is typically ... Read More

Capacity : -
Plant and Machinery cost: 172.00 Lakhs
Working Capital : 0.00
Rate of Return (ROR):29.00%
Break Even Point (BEP):61.00 %
TCI :0.00 Lakhs
Cost of Project : 812.00Lakhs
Add To Inquiry Basket
Start Manufacturing Business of Steel Containers (Cargo Containers)
Start Manufacturing Business of Steel Containers (Cargo Containers)


Read More

Capacity : Cargo Containers (Size 20 Feet) 34 Nos Per Day
Plant and Machinery cost: 272.00 Lakhs
Working Capital : 0.00
Rate of Return (ROR):29.00%
Break Even Point (BEP):51.00 %
TCI :0.00 Lakhs
Cost of Project : 1992.00Lakhs
Add To Inquiry Basket
Start Cutting and Grinding Disc Business
Start Cutting and Grinding Disc Business

 

Cutting and grind... Read More

Capacity : Cutting Disc Size: (115 mm x 1 mm) 2,000 Pcs Pr Day Grinding Disc (115 mm x 6 mm) 2,000 Pcs Pr Day
Plant and Machinery cost: 141.00 Lakhs
Working Capital : 0.00
Rate of Return (ROR):28.00%
Break Even Point (BEP):48.00 %
TCI :0.00 Lakhs
Cost of Project : 423.00Lakhs
Add To Inquiry Basket
Mink Blankets Production
Mink Blankets Production

 

Mink blankets, de... Read More

Capacity : -
Plant and Machinery cost: 2700.00 Lakhs
Working Capital : 0.00
Rate of Return (ROR):27.00%
Break Even Point (BEP):42.00 %
TCI :0.00 Lakhs
Cost of Project : 6000.00Lakhs
Add To Inquiry Basket
A Business Plan for Micronutrient Fortified Energy Dense Food (Rice Based)
A Business Plan for Micronutrient Fortified Energy Dense Food (Rice Based)

 

Micronutrient For... Read More

Capacity : Micronutrient Fortified Energy Dense Food 100 MT Per Day
Plant and Machinery cost: 1300.00 Lakhs
Working Capital : 0.00
Rate of Return (ROR):28.00%
Break Even Point (BEP):57.00 %
TCI :0.00 Lakhs
Cost of Project : 3500.00Lakhs
Add To Inquiry Basket
Start Business of Caustic Soda (Solids, Liquids, Flakes & Pearls)
Start Business of Caustic Soda (Solids, Liquids, Flakes & Pearls)


Read More

Capacity : -
Plant and Machinery cost: 29000.00 Lakhs
Working Capital : 0.00
Rate of Return (ROR):25.00%
Break Even Point (BEP):33.00 %
TCI :0.00 Lakhs
Cost of Project : 56500.00Lakhs
Add To Inquiry Basket
Start Crumb Rubber Powder Business from Waste Tyre (with Shredding Process)
Start Crumb Rubber Powder Business from Waste Tyre (with Shredding Process)

Crumb Rubber Powder represents a finely milled material produ... Read More

Capacity : Crumb Rubber Powder 10 MT Per Day By Product Steel Wire 2 MT Per Day
Plant and Machinery cost: 97.00 Lakhs
Working Capital : 0.00
Rate of Return (ROR):26.00%
Break Even Point (BEP):56.00 %
TCI :0.00 Lakhs
Cost of Project : 303.00Lakhs
Add To Inquiry Basket
Pan Masala Sada, Meetha & Zarda Manufacturing Business Plan
Pan Masala Sada, Meetha & Zarda Manufacturing Business Plan

Pan Masala is a balanced mixture of betel leaf with lime, areca nut, clove, cardamom, mint, tobacco, essence and other... Read More

Capacity : Sada Pan Masala (10 gms Size each Pouch) : 165 Kgs / Day Meetha Pan Masala (4 gms Size each Pouch):
Plant and Machinery cost: 21.00 Lakhs
Working Capital : 0.00
Rate of Return (ROR):30.00%
Break Even Point (BEP):72.00 %
TCI :0.00 Lakhs
Cost of Project : 64.00Lakhs
Add To Inquiry Basket
Business Plan for Rewinding of Burnt Electric Motors
Business Plan for Rewinding of Burnt Electric Motors

Electric motors are relatively simple mechanical devices, given the sheer number of various motors and winding pattern... Read More

Capacity : Rewinding Brunt Electric Motors: 10 Nos./ Day
Plant and Machinery cost: 885.00 Lakhs
Working Capital : 0.00
Rate of Return (ROR):27.00%
Break Even Point (BEP):53.00 %
TCI :0.00 Lakhs
Cost of Project : 1320.00Lakhs
Add To Inquiry Basket
Plastic Waste Recycling Plant – Business Plan
Plastic Waste Recycling Plant – Business Plan

 

Waste is now a global problem, and one that must be addressed in order to so... Read More

Capacity : Recycled PP Granules : 578 Kgs / Day Recycled LDPE Granules: 720 Kgs / Day Recycled HDPE Granules: 7
Plant and Machinery cost: 144.00 Lakhs
Working Capital : 0.00
Rate of Return (ROR):26.00%
Break Even Point (BEP):68.00 %
TCI :0.00 Lakhs
Cost of Project : 380.00Lakhs
Add To Inquiry Basket
Start a Toothpaste Manufacturing Business
Start a Toothpaste Manufacturing Business

Toothpaste may be a paste or gel to be used with a toothbrush to maintain and improve oral health ... Read More

Capacity : White Toothpaste 50 gms Size: 96,000 Tubes / Day White Toothpaste 240 gms Size: 16,800 Tubes / Day S
Plant and Machinery cost: 308.00 Lakhs
Working Capital : 0.00
Rate of Return (ROR):36.00%
Break Even Point (BEP):34.00 %
TCI :0.00 Lakhs
Cost of Project : 6936.00Lakhs
Add To Inquiry Basket
Composite Materials-Carbon Fibre Composites & Glass Fibre Composites
Composite Materials-Carbon Fibre Composites & Glass Fibre Composites

A material is composed of a minimum of two materials, which combine to offer proper... Read More

Capacity : Carbon Fibre Composite Laminate M2 width 1500 mm : 833.3 Sq. Mt. / Day Glass Fibre Composite Laminat
Plant and Machinery cost: 115.00 Lakhs
Working Capital : 0.00
Rate of Return (ROR):29.00%
Break Even Point (BEP):67.00 %
TCI :0.00 Lakhs
Cost of Project : 452.00Lakhs
Add To Inquiry Basket
Manufacturing Business Plans
Manufacturing Business Plans

Manufacturing Business Plans of HDPE and PP Bags, Disposable... Read More

Capacity : 0
Plant and Machinery cost: 0.00 Lakhs
Working Capital : 0.00
Rate of Return (ROR):0.00%
Break Even Point (BEP):0.00 %
TCI :0.00 Lakhs
Cost of Project : 0.00Lakhs
Add To Inquiry Basket
Business Plans for Production
Business Plans for Production

Business Plans for Production of Disposable Nitrile Examinat... Read More

Capacity : 0
Plant and Machinery cost: 0.00 Lakhs
Working Capital : 0.00
Rate of Return (ROR):0.00%
Break Even Point (BEP):0.00 %
TCI :0.00 Lakhs
Cost of Project : 0.00Lakhs
Add To Inquiry Basket
Production of Cellulose (Cellulosic) Fibers
Production of Cellulose (Cellulosic) Fibers

Production of Cellulose (Cellulosic) Fibers. Growing Industry to Start a Busine... Read More

Capacity : 0
Plant and Machinery cost: 0.00 Lakhs
Working Capital : 0.00
Rate of Return (ROR):0.00%
Break Even Point (BEP):0.00 %
TCI :0.00 Lakhs
Cost of Project : 0.00Lakhs
Add To Inquiry Basket
Investment Opportunities in DCDA (Dicyandiamide)
Investment Opportunities in DCDA (Dicyandiamide)

Dicyandiamide is a strongly alkaline and water-soluble white crystalline compound with the scientific name of cyan guanidine. The chemical is the d... Read More

Capacity : Dicyandiamide (DCDA): 10 MT / Day
Plant and Machinery cost: 50.00 Lakhs
Working Capital : 0.00
Rate of Return (ROR):29.00%
Break Even Point (BEP):61.00 %
TCI :0.00 Lakhs
Cost of Project : 373.00Lakhs
Add To Inquiry Basket
How to Start Disposable Plastic Syringes (General Medical Devices) Manufacturing Business
How to Start Disposable Plastic Syringes (General Medical Devices) Manufacturing Business

Disposable Syringes are made of plastic material and are used in the field of medical and veterinary science. Due to their availability in steriliz... Read More

Capacity : Disposable Plastic Syringes 2 ml Size: 2,000 Boxes/ Day (Each Box = 100 Pcs.) Disposable Plastic Syr
Plant and Machinery cost: 1100.00 Lakhs
Working Capital : 0.00
Rate of Return (ROR):15.00%
Break Even Point (BEP):47.00 %
TCI :0.00 Lakhs
Cost of Project : 2006.00Lakhs
Add To Inquiry Basket
Manufacturing of Humic Acid
Manufacturing of Humic Acid

 

Humic acid is a principal component of Humic subst... Read More

Capacity : Humic Acid: 20 MT / Day
Plant and Machinery cost: 169.00 Lakhs
Working Capital : 0.00
Rate of Return (ROR):26.00%
Break Even Point (BEP):50.00 %
TCI :0.00 Lakhs
Cost of Project : 726.00Lakhs
Add To Inquiry Basket
Disposable Plastic Syringes with Needles Manufacturing Business
Disposable Plastic Syringes with Needles Manufacturing Business

Disposable Syringes are made of plastic material and are used in the field of medical and veterinary science. Due to t... Read More

Capacity : Disposable Plastic Syringes with Needle 1 ml Size) : 18,000 Nos / Day Disposable Plastic Syringes
Plant and Machinery cost: 108.00 Lakhs
Working Capital : 0.00
Rate of Return (ROR):31.00%
Break Even Point (BEP):44.00 %
TCI :0.00 Lakhs
Cost of Project : 498.00Lakhs
Add To Inquiry Basket
Synthetic Camphor (Kapoor-Kapur) Powder Business Plan
Synthetic Camphor (Kapoor-Kapur) Powder Business Plan

Camphor is a waxy, flammable, white or transparent solid with a strong aroma. It is a torpedoed with the chemical form... Read More

Capacity : Synthetic Camphor Powder : 8 MT / Day
Plant and Machinery cost: 315.00 Lakhs
Working Capital : 0.00
Rate of Return (ROR):28.00%
Break Even Point (BEP):52.00 %
TCI :0.00 Lakhs
Cost of Project : 1152.00Lakhs
Add To Inquiry Basket
Manufacturing Business Plan-Dehydrated Onion
Manufacturing Business Plan-Dehydrated Onion

Onion is one of the most important commercial vegetable crops grown in India. Both immature and mature bulbs are used ... Read More

Capacity : Dehydrated Onion Sliced/Chopped: 50 MT / Day Cattle Feed as By Product: 35 MT / Day
Plant and Machinery cost: 2976.00 Lakhs
Working Capital : 0.00
Rate of Return (ROR):27.00%
Break Even Point (BEP):43.00 %
TCI :0.00 Lakhs
Cost of Project : 5116.00Lakhs
Add To Inquiry Basket
Production of Biodegradable Tableware from Corn Starch
Production of Biodegradable Tableware from Corn Starch

Production of Biodegradable Tableware from Corn Star... Read More

Capacity : 0
Plant and Machinery cost: 0.00 Lakhs
Working Capital : 0.00
Rate of Return (ROR):0.00%
Break Even Point (BEP):0.00 %
TCI :0.00 Lakhs
Cost of Project : 0.00Lakhs
Add To Inquiry Basket
Production of Rice Husk Based Biodegradable Cutlery
Production of Rice Husk Based Biodegradable Cutlery

Production of Rice Husk Based Biodegradable Cutlery. Highly... Read More

Capacity : 0
Plant and Machinery cost: 0.00 Lakhs
Working Capital : 0.00
Rate of Return (ROR):0.00%
Break Even Point (BEP):0.00 %
TCI :0.00 Lakhs
Cost of Project : 0.00Lakhs
Add To Inquiry Basket
Production of Refined Oil (Cotton Seed, Ground Nut & Sunflower Oil)
Production of Refined Oil (Cotton Seed, Ground Nut & Sunflower Oil)

Production of Refined Oil (Cotton Seed, Ground Nut & Sunflower Oil). Awesome Startup... Read More

Capacity : 0
Plant and Machinery cost: 0.00 Lakhs
Working Capital : 0.00
Rate of Return (ROR):0.00%
Break Even Point (BEP):0.00 %
TCI :0.00 Lakhs
Cost of Project : 0.00Lakhs
Add To Inquiry Basket
PSA Oxygen Plant
PSA Oxygen Plant

 

PSA p... Read More

Capacity : 30 to 36 cylinders per day
Plant and Machinery cost: 45.00 Lakhs
Working Capital : 0.00
Rate of Return (ROR):0.00%
Break Even Point (BEP):0.00 %
TCI :0.00 Lakhs
Cost of Project : 0.00Lakhs
Add To Inquiry Basket
PSA Oxygen Gas Plant
PSA Oxygen Gas Plant

PSA plants take... Read More

Capacity : 180 to 200 cylinders per day
Plant and Machinery cost: 99.00 Lakhs
Working Capital : 0.00
Rate of Return (ROR):0.00%
Break Even Point (BEP):0.00 %
TCI :0.00 Lakhs
Cost of Project : 0.00Lakhs
Add To Inquiry Basket
Production Business of Razor Blade for Safety Razor and Disposable Safety Razor
Production Business of Razor Blade for Safety Razor and Disposable Safety Razor

 

The double-edged ... Read More

Capacity : Disposable Safety Razors: 864,000 Units per Day Razor Blade: 172,800 Units per Day Steel Scrap: 500
Plant and Machinery cost: 467.00 Lakhs
Working Capital : 0.00
Rate of Return (ROR):34.51%
Break Even Point (BEP):43.43 %
TCI :0.00 Lakhs
Cost of Project : 2285.00Lakhs
Add To Inquiry Basket
Investing into Business of Ductile Iron Pipe FittingsInvesting into Business of Ductile Iron Pipe Fittings
Investing into Business of Ductile Iron Pipe FittingsInvesting into Business of Ductile Iron Pipe Fittings

 

Casting Read More

Capacity : 12 MT per Day
Plant and Machinery cost: 311.00 Lakhs
Working Capital : 0.00
Rate of Return (ROR):33.83%
Break Even Point (BEP):55.20 %
TCI :0.00 Lakhs
Cost of Project : 1135.00Lakhs
Add To Inquiry Basket
Business of Disposable Safety Razors
Business of Disposable Safety Razors

 

The double-edged ... Read More

Capacity : Razor Blade for Safety Razors Pack of 5 pcs each: 57,600 Units per Day Steel Scrap: 500 Units per Da
Plant and Machinery cost: 393.00 Lakhs
Working Capital : 0.00
Rate of Return (ROR):57.75%
Break Even Point (BEP):28.02 %
TCI :0.00 Lakhs
Cost of Project : 815.00Lakhs
Add To Inquiry Basket
Emerging Business of Ductile Iron Pipe Fittings Highly Demandable Industry of DI Pipe Fittings
Emerging Business of Ductile Iron Pipe Fittings Highly Demandable Industry of DI Pipe Fittings

Pipe fittings, also known a... Read More

Capacity : 0
Plant and Machinery cost: 0.00 Lakhs
Working Capital : 0.00
Rate of Return (ROR):0.00%
Break Even Point (BEP):0.00 %
TCI :0.00 Lakhs
Cost of Project : 0.00Lakhs
Add To Inquiry Basket
Extraction of Essential Oil from Lemon Grass
Extraction of Essential Oil from Lemon Grass

Oil of lemongrass is one of the most important essential Oils. Large quantities are used for the extraction of citr... Read More

Capacity : Lemon Grass Oil (10 ml Size Pack) 1,334 Ltrs per Day
Plant and Machinery cost: 43.00 Lakhs
Working Capital : 0.00
Rate of Return (ROR):34.60%
Break Even Point (BEP):69.69 %
TCI :0.00 Lakhs
Cost of Project : 607.00Lakhs
Add To Inquiry Basket
Production of Bicarbonate Cartridge Acid Concentrate Hot Disinfectant Cold Disinfectant
Production of Bicarbonate Cartridge Acid Concentrate Hot Disinfectant Cold Disinfectant

 

Bicarbonate Cartri... Read More

Capacity : Bicarbonate Cartridge 720g 166.7 Nos. per day Bicarbonate Cartridge 650g 500.0 Nos. per day Acid Co
Plant and Machinery cost: 53.00 Lakhs
Working Capital : 0.00
Rate of Return (ROR):25.28%
Break Even Point (BEP):35.25 %
TCI :0.00 Lakhs
Cost of Project : 1153.00Lakhs
Add To Inquiry Basket
Profitable Industry of Surgical Methylated Spirit Denatured Alcohol Surgical Spirit
Profitable Industry of Surgical Methylated Spirit Denatured Alcohol Surgical Spirit

 

Methylated spirits... Read More

Capacity : Surgical Methylated Spirit 1 Ltr Size Bottle 4,000.0 Nos. Per Day Surgical Methylated Spirit 5 Ltr S
Plant and Machinery cost: 79.00 Lakhs
Working Capital : 0.00
Rate of Return (ROR):27.53%
Break Even Point (BEP):54.72 %
TCI :0.00 Lakhs
Cost of Project : 265.00Lakhs
Add To Inquiry Basket
Manufacturing of Rubber Powder from Waste Tyres
Manufacturing of Rubber Powder from Waste Tyres

 

Rubber is polymer ... Read More

Capacity : Rubber Powder 5.0 MT per day By Product Steel Wire 1.4 MT per day
Plant and Machinery cost: 46.00 Lakhs
Working Capital : 0.00
Rate of Return (ROR):26.98%
Break Even Point (BEP):61.44 %
TCI :0.00 Lakhs
Cost of Project : 191.00Lakhs
Add To Inquiry Basket
Start extraction of Cashew Nut Shell Oil and Cardanol
Start extraction of Cashew Nut Shell Oil and Cardanol

 

Cashew (Botanical ... Read More

Capacity : Cashew Nut Shell Oil 11.0 MT per day Cardanol 5.5 MT per day De-Oiled Cashew Nut Shell Cake (bye Pro
Plant and Machinery cost: 323.00 Lakhs
Working Capital : 0.00
Rate of Return (ROR):26.72%
Break Even Point (BEP):52.53 %
TCI :0.00 Lakhs
Cost of Project : 752.00Lakhs
Add To Inquiry Basket
Setup a Manufacturing Plant of  Disposable Plastic Syringes with Needles
Setup a Manufacturing Plant of Disposable Plastic Syringes with Needles

 

Disposable Syringes are made of plas... Read More

Capacity : Disposable Plastic Syringes with Needles 1 ml Size each Packed in Polypack: 50,000.0 Nos. per day D
Plant and Machinery cost: 524.00 Lakhs
Working Capital : 0.00
Rate of Return (ROR):30.78%
Break Even Point (BEP):35.60 %
TCI :0.00 Lakhs
Cost of Project : 345.00Lakhs
Add To Inquiry Basket
Profitable Business of Disposable Safety Razors Investment Opportunities in Men Grooming Products Industry
Profitable Business of Disposable Safety Razors Investment Opportunities in Men Grooming Products Industry

 

Disposable safety razors have a design that is very s... Read More

Capacity : 0
Plant and Machinery cost: 0.00 Lakhs
Working Capital : 0.00
Rate of Return (ROR):0.00%
Break Even Point (BEP):0.00 %
TCI :0.00 Lakhs
Cost of Project : 0.00Lakhs
Add To Inquiry Basket
Investment Opportunities in Production of Dual Feed Distillery Ethanol as Bio Fuel Set up an Ethanol Production Plant
Investment Opportunities in Production of Dual Feed Distillery Ethanol as Bio Fuel Set up an Ethanol Production Plant

Ethanol is a colourless, pu... Read More

Capacity : 0
Plant and Machinery cost: 0.00 Lakhs
Working Capital : 0.00
Rate of Return (ROR):0.00%
Break Even Point (BEP):0.00 %
TCI :0.00 Lakhs
Cost of Project : 0.00Lakhs
Add To Inquiry Basket
Magnesium Stearate
Magnesium Stearate

 

Magnesium stearat... Read More

Capacity : Magnesium Stearate 10.0 MT Per Day
Plant and Machinery cost: 301.00 Lakhs
Working Capital : 0.00
Rate of Return (ROR):44.00%
Break Even Point (BEP):28.00 %
TCI :0.00 Lakhs
Cost of Project : 515.00Lakhs
Add To Inquiry Basket
Production of Bromelain Enzyme from Pineapple Stems Money Making Business Idea
Production of Bromelain Enzyme from Pineapple Stems Money Making Business Idea

Bromelain is a combination ... Read More

Capacity : 0
Plant and Machinery cost: 0.00 Lakhs
Working Capital : 0.00
Rate of Return (ROR):0.00%
Break Even Point (BEP):0.00 %
TCI :0.00 Lakhs
Cost of Project : 0.00Lakhs
Add To Inquiry Basket
Ferrochrome Manufacturing Business
Ferrochrome Manufacturing Business

 

Ferrochrome is an alloy that combines chromium wit... Read More

Capacity : Ferrochrome 135 MT Per Day
Plant and Machinery cost: 26900.00 Lakhs
Working Capital : 0.00
Rate of Return (ROR):10.00%
Break Even Point (BEP):46.00 %
TCI :0.00 Lakhs
Cost of Project : 40400.00Lakhs
Add To Inquiry Basket
Start a Business Of LPG Cylinders
Start a Business Of LPG Cylinders

LPG cylinders are pressurized containers and transport lique... Read More

Capacity : LPG Cylinders (14.20 Kgs Size) 3,334.0 Nos. per day LPG Cylinders (19 Kgs Size) 3,334.0 Nos. per day
Plant and Machinery cost: 911.00 Lakhs
Working Capital : 0.00
Rate of Return (ROR):32.00%
Break Even Point (BEP):46.00 %
TCI :0.00 Lakhs
Cost of Project : 3475.00Lakhs
Add To Inquiry Basket
Start Banana Wine Production Business
Start Banana Wine Production Business

Wine has been popular for centuries, and this fermented beve... Read More

Capacity : Banana Wine (750 ml size Bollte) 2,960 Bottles per day
Plant and Machinery cost: 530.00 Lakhs
Working Capital : 0.00
Rate of Return (ROR):25.00%
Break Even Point (BEP):47.00 %
TCI :0.00 Lakhs
Cost of Project : 1189.00Lakhs
Add To Inquiry Basket
Activated Carbon From Rice Husk Saw Dust & Coconut Shell Manufacturing Business Plan
Activated Carbon From Rice Husk Saw Dust & Coconut Shell Manufacturing Business Plan

 

Activated carbon is a type of carbon that has been... Read More

Capacity : Activated Carbon 2,000 Kg Per Day
Plant and Machinery cost: 334.00 Lakhs
Working Capital : 0.00
Rate of Return (ROR):25.00%
Break Even Point (BEP):41.00 %
TCI :0.00 Lakhs
Cost of Project : 606.00Lakhs
Add To Inquiry Basket
Set Up Activated Carbon From Rice Husk, Saw Dust & Coconut Shell Manufacturing Business Plan
Set Up Activated Carbon From Rice Husk, Saw Dust & Coconut Shell Manufacturing Business Plan

Activated carbon is a type of carbon that has been treated w... Read More

Capacity : Activated Carbon 2,000 Kg Per Day
Plant and Machinery cost: 334.00 Lakhs
Working Capital : 0.00
Rate of Return (ROR):25.00%
Break Even Point (BEP):41.00 %
TCI :0.00 Lakhs
Cost of Project : 606.00Lakhs
Add To Inquiry Basket
Set Up Business of Flat Glass Manufacturing Most Profitable Idea for Flat Glass Production Business
Set Up Business of Flat Glass Manufacturing Most Profitable Idea for Flat Glass Production Business

A flat glass Read More

Capacity : 0
Plant and Machinery cost: 0.00 Lakhs
Working Capital : 0.00
Rate of Return (ROR):0.00%
Break Even Point (BEP):0.00 %
TCI :0.00 Lakhs
Cost of Project : 0.00Lakhs
Add To Inquiry Basket
Set Up Business of Double Wall Corrugated Pipes Manufacturing Most Profitable Idea for Double Wall Corrugated Pipes Manufacturing Business
Set Up Business of Double Wall Corrugated Pipes Manufacturing Most Profitable Idea for Double Wall Corrugated Pipes Manufacturing Business

A type of pipe utilized in numerous applications is Read More

Capacity : 0
Plant and Machinery cost: 0.00 Lakhs
Working Capital : 0.00
Rate of Return (ROR):0.00%
Break Even Point (BEP):0.00 %
TCI :0.00 Lakhs
Cost of Project : 0.00Lakhs
Add To Inquiry Basket
A Business Plan for Bio-Degradable Plastic Polymer from Corn
A Business Plan for Bio-Degradable Plastic Polymer from Corn

Corn is a popular source for materials that can be recycled into bio-degradable plast... Read More

Capacity : 10,000 MT Per Annum
Plant and Machinery cost: 6058.00 Lakhs
Working Capital : 0.00
Rate of Return (ROR):28.00%
Break Even Point (BEP):38.00 %
TCI :0.00 Lakhs
Cost of Project : 8100.00Lakhs
Add To Inquiry Basket
Sulphur Powder Manufacturing Business
Sulphur Powder Manufacturing Business

 

Sulphur powder, o... Read More

Capacity : 20,000 MT Per Annum
Plant and Machinery cost: 1225.00 Lakhs
Working Capital : 0.00
Rate of Return (ROR):24.00%
Break Even Point (BEP):40.00 %
TCI :0.00 Lakhs
Cost of Project : 4318.00Lakhs
Add To Inquiry Basket
NameCapacityRate of return (ROR):Cost of project
Gold and Diamond Jeweller... Gold Jewellery:9.50 Kgs /day Gold Plus Diamond Jewellery :2.38 Kgs / day 34.00 2504.00
Hand Sanitizer Hand Sanitizer (50 ml size Bolltes):10,000 Bottles/day 31.00 156.00
Particle Board from Wheat... Particle Board (Size 6x3x0.471') : 5,000,000.0 Sq.Mtrs. / Annum 28.00 930.00
Manufacturing Opportuniti... 0 0.00 0.00
Condoms 500 Boxes per day 28.00 1963.00
Caustic Soda from Limesto... Caustic Soda from Limestone and Sodium Carbonate: 60 MT per day 29.00 827.00
A Business Plan For Sanit... Sanitary Napkins 4,800 PKTS per day 27.00 84.00
Start Manufacturing Of Bl... - 32.00 985.00
Start Production Of Potat... Potato Flakes 2 MT Per Day 25.00 563.00
Setup Manufacturing Unit ... Saddle 7,000 Unit Per Day Pedals 10,000 Unit Per Day 31.00 575.00
Opportunity in Sodium Sul... Sodium Sulfide Flakes 10,000 MT Per Annum 30.00 1426.00
Business Plan for Lithium... - 29.00 812.00
Start Manufacturing Busin... Cargo Containers (Size 20 Feet) 34 Nos Per Day 29.00 1992.00
Start Cutting and Grindin... Cutting Disc Size: (115 mm x 1 mm) 2,000 Pcs Pr Day Grinding Disc (115 mm x 6 mm) 2,000 Pcs Pr Day 28.00 423.00
Mink Blankets Production - 27.00 6000.00
A Business Plan for Micro... Micronutrient Fortified Energy Dense Food 100 MT Per Day 28.00 3500.00
Start Business of Caustic... - 25.00 56500.00
Start Crumb Rubber Powder... Crumb Rubber Powder 10 MT Per Day By Product Steel Wire 2 MT Per Day 26.00 303.00
Pan Masala Sada, Meetha &... Sada Pan Masala (10 gms Size each Pouch) : 165 Kgs / Day Meetha Pan Masala (4 gms Size each Pouch): 30.00 64.00
Business Plan for Rewindi... Rewinding Brunt Electric Motors: 10 Nos./ Day 27.00 1320.00
Plastic Waste Recycling P... Recycled PP Granules : 578 Kgs / Day Recycled LDPE Granules: 720 Kgs / Day Recycled HDPE Granules: 7 26.00 380.00
Start a Toothpaste Manufa... White Toothpaste 50 gms Size: 96,000 Tubes / Day White Toothpaste 240 gms Size: 16,800 Tubes / Day S 36.00 6936.00
Composite Materials-Carbo... Carbon Fibre Composite Laminate M2 width 1500 mm : 833.3 Sq. Mt. / Day Glass Fibre Composite Laminat 29.00 452.00
Manufacturing Business Pl... 0 0.00 0.00
Business Plans for Produc... 0 0.00 0.00
Production of Cellulose (... 0 0.00 0.00
Investment Opportunities ... Dicyandiamide (DCDA): 10 MT / Day 29.00 373.00
How to Start Disposable P... Disposable Plastic Syringes 2 ml Size: 2,000 Boxes/ Day (Each Box = 100 Pcs.) Disposable Plastic Syr 15.00 2006.00
Manufacturing of Humic Ac... Humic Acid: 20 MT / Day 26.00 726.00
Disposable Plastic Syring... Disposable Plastic Syringes with Needle 1 ml Size) : 18,000 Nos / Day Disposable Plastic Syringes 31.00 498.00
12345678910...
« Back1 2 3 4 5Next »

Showing 1 - 60 of 1628 Product(s)

Subject of your Interest

Information

  • One Lac / Lakh / Lakhs is equivalent to one hundred thousand (100,000)
  • One Crore is equivalent to ten million (10,000,000)
  • T.C.I is Total Capital Investment
  • We can modify the project capacity and project cost as per your requirement.
  • We can also prepare project report on any subject as per your requirement.
  • Caution: The project's cost, capacity and return are subject to change without any notice. Future projects may have different values of project cost, capacity or return.

ABOUT NPCS

 

NIIR PROJECT CONSULTANCY SERVICES (NPCS) is a reliable name in the industrial world for offering integrated technical consultancy services. NPCS is manned by engineers, planners, specialists, financial experts, economic analysts and design specialists with extensive experience in the related industries.

Our various services are: Detailed Project Report,  Business Plan for Manufacturing Plant, Start-up Ideas, Business Ideas for Entrepreneurs, Start up Business Opportunities, entrepreneurship projects, Successful Business Plan, Industry Trends, Market Research, Manufacturing Process, Machinery, Raw Materials, project report, Cost and Revenue, Pre-feasibility study for Profitable Manufacturing Business, Project Identification, Project Feasibility and Market Study, Identification of Profitable Industrial Project Opportunities, Business Opportunities, Investment Opportunities for Most Profitable Business in India, Manufacturing Business Ideas, Preparation of Project Profile, Pre-Investment and Pre-Feasibility Study, Market Research Study, Preparation of Techno-Economic Feasibility Report, Identification and Section of Plant, Process, Equipment, General Guidance, Startup Help, Technical and Commercial Counseling for setting up new industrial project and Most Profitable Small Scale Business.

NPCS also publishes varies process technology, technical, reference, self employment and startup books, directory, business and industry database, bankable detailed project report, market research report on various industries, small scale industry and profit making business. Besides being used by manufacturers, industrialists and entrepreneurs, our publications are also used by professionals including project engineers, information services bureau, consultants and project consultancy firms as one of the input in their research.

Our Detailed Project report aims at providing all the critical data required by any entrepreneur vying to venture into Project. While expanding a current business or while venturing into new business, entrepreneurs are often faced with the dilemma of zeroing in on a suitable product/line.

 


And before diversifying/venturing into any product, wish to study the following aspects of the identified product:


• Good Present/Future Demand
• Export-Import Market Potential
• Raw Material & Manpower Availability
• Project Costs and Payback Period


We at NPCS, through our reliable expertise in the project consultancy and market research field, Provides exhaustive information about the project, which satisfies all the above mentioned requirements and has high growth potential in the markets. And through our report we aim to help you make sound and informed business decision.

 

The report contains all the data which will help an entrepreneur find answers to questions like:

• Why I should invest in this project?
• What will drive the growth of the product?
• What are the costs involved?
• What will be the market potential?


The report first focuses on enhancing the basic knowledge of the entrepreneur about the main product, by elucidating details like product definition, its uses and applications, industry segmentation as well as an overall overview of the industry sector in India. The report then helps an entrepreneur identify the target customer group of its product. It further helps in making sound investment decision by listing and then elaborating on factors that will contribute to the growth of product consumption in India and also talks about the foreign trade of the product along with the list of top importing and top exporting countries. Report includes graphical representation and forecasts of key data discussed in the above mentioned segment. It further explicates the growth potential of the product.

The report includes other market data like key players in the Industry segment along with their contact information and recent developments. It includes crucial information like raw material requirements, list of machinery and manufacturing process for the plant. Core project financials like plant capacity, costs involved in setting up of project, working capital requirements, projected revenue and profit are further listed in the report.


Reasons for buying the report:

• This report helps you to identify a profitable project for investing or diversifying into by throwing light to crucial areas like industry size, demand of the product and reasons for investing in the product.

• This report provides vital information on the product like its definition, characteristics and segmentation.

• This report helps you market and place the product correctly by identifying the target customer group of the product.

• This report helps you understand the viability of the project by disclosing details like raw materials required, manufacturing process, project costs and snapshot of other project financials.

• The report provides forecasts of key parameters which helps to anticipate the industry performance and make sound business decision.

 

Our Approach:


• Our research reports broadly cover Indian markets, present analysis, outlook and forecast.

• The market forecasts are developed on the basis of secondary research and are cross-validated through interactions with the industry players. 

• We use reliable sources of information and databases.  And information from such sources is processed by us and included in the report.

 

Our Market Survey cum Detailed Techno Economic Feasibility Report Contains following information:

 

 

Ø  Introduction

·         Project Introduction

·         Project Objective and Strategy

·         Concise History of the Product

·         Properties

·         BIS (Bureau of Indian Standards) Provision & Specification

·         Uses & Applications

 

Ø  Market Study and Assessment

·         Current Indian Market Scenario

·         Present Market Demand and Supply

·         Estimated Future Market Demand and Forecast

·         Statistics of Import & Export

·         Names & Addresses of Existing Units (Present Players)

·         Market Opportunity

 

Ø  Raw Material

·         List of Raw Materials

·         Properties of Raw Materials

·         Prescribed Quality of Raw Materials

·         List of Suppliers and Manufacturers

 

Ø  Personnel (Manpower) Requirements

·         Requirement of Staff & Labor (Skilled and Unskilled) Managerial, Technical, Office Staff and Marketing Personnel

 

Ø  Plant and Machinery

·         List of Plant & Machinery

·         Miscellaneous Items

·         Appliances & Equipments

·         Laboratory Equipments & Accessories

·         Electrification

·         Electric Load & Water

·         Maintenance Cost

·         Sources of Plant & Machinery (Suppliers and Manufacturers)

 

Ø  Manufacturing Process and Formulations

·         Detailed Process of Manufacture with Formulation

·         Packaging Required

·         Process Flow Sheet Diagram

 

Ø  Infrastructure and Utilities

·         Project Location

·         Requirement of Land Area

·         Rates of the Land

·         Built Up Area

·         Construction Schedule

·         Plant Layout and Requirement of Utilities

 

Project at a Glance

Along with financial details as under:

 

  •     Assumptions for Profitability workings

  •    Plant Economics

  •    Production Schedule

  •    Land & Building

            Factory Land & Building

            Site Development Expenses

  •    Plant & Machinery

             Indigenous Machineries

            Other Machineries (Miscellaneous, Laboratory etc.)

  •    Other Fixed Assets

            Furniture & Fixtures

            Pre-operative and Preliminary Expenses

            Technical Knowhow

            Provision of Contingencies

  •   Working Capital Requirement Per Month

             Raw Material

            Packing Material

            Lab & ETP Chemical Cost

           Consumable Store

  •   Overheads Required Per Month And Per Annum

         Utilities & Overheads (Power, Water and Fuel Expenses etc.)

             Royalty and Other Charges

            Selling and Distribution Expenses

  •    Salary and Wages

  •    Turnover Per Annum

  •   Share Capital

            Equity Capital

            Preference Share Capital

 

  •    Annexure 1:: Cost of Project and Means of Finance

  •    Annexure 2::  Profitability and Net Cash Accruals

                Revenue/Income/Realisation

                Expenses/Cost of Products/Services/Items

                Gross Profit

                Financial Charges     

                Total Cost of Sales

                Net Profit After Taxes

                Net Cash Accruals

  •   Annexure 3 :: Assessment of Working Capital requirements

                Current Assets

                Gross Working. Capital

                Current Liabilities

                Net Working Capital

                Working Note for Calculation of Work-in-process

  •    Annexure 4 :: Sources and Disposition of Funds

  •    Annexure 5 :: Projected Balance Sheets

                ROI (Average of Fixed Assets)

                RONW (Average of Share Capital)

                ROI (Average of Total Assets)

  •    Annexure 6 :: Profitability ratios

                D.S.C.R

                Earnings Per Share (EPS)

               

             Debt Equity Ratio

        Annexure 7   :: Break-Even Analysis

                Variable Cost & Expenses

                Semi-Var./Semi-Fixed Exp.

                Profit Volume Ratio (PVR)

                Fixed Expenses / Cost 

                B.E.P

  •   Annexure 8 to 11:: Sensitivity Analysis-Price/Volume

            Resultant N.P.B.T

            Resultant D.S.C.R

   Resultant PV Ratio

   Resultant DER

  Resultant ROI

          Resultant BEP

  •    Annexure 12 :: Shareholding Pattern and Stake Status

        Equity Capital

        Preference Share Capital

  •   Annexure 13 :: Quantitative Details-Output/Sales/Stocks

        Determined Capacity P.A of Products/Services

        Achievable Efficiency/Yield % of Products/Services/Items 

        Net Usable Load/Capacity of Products/Services/Items   

       Expected Sales/ Revenue/ Income of Products/ Services/ Items   

  •    Annexure 14 :: Product wise domestic Sales Realisation

  •    Annexure 15 :: Total Raw Material Cost

  •    Annexure 16 :: Raw Material Cost per unit

  •    Annexure 17 :: Total Lab & ETP Chemical Cost

  •    Annexure 18  :: Consumables, Store etc.,

  •    Annexure 19  :: Packing Material Cost

  •    Annexure 20  :: Packing Material Cost Per Unit

  •    Annexure 21 :: Employees Expenses

  •    Annexure 22 :: Fuel Expenses

  •    Annexure 23 :: Power/Electricity Expenses

  •    Annexure 24 :: Royalty & Other Charges

  •    Annexure 25 :: Repairs & Maintenance Exp.

  •    Annexure 26 :: Other Mfg. Expenses

  •    Annexure 27 :: Administration Expenses

  •    Annexure 28 :: Selling Expenses

  •    Annexure 29 :: Depreciation Charges – as per Books (Total)

  •   Annexure 30   :: Depreciation Charges – as per Books (P & M)

  •   Annexure 31   :: Depreciation Charges - As per IT Act WDV (Total)

  •   Annexure 32   :: Depreciation Charges - As per IT Act WDV (P & M)

  •   Annexure 33   :: Interest and Repayment - Term Loans

  •   Annexure 34   :: Tax on Profits

  •   Annexure 35   ::Projected Pay-Back Period And IRR