We can provide you detailed project reports on the following topics. Please select the projects of your interests.
Each detailed project reports cover all the aspects of business, from analysing the market, confirming availability of various necessities such as plant & machinery, raw materials to forecasting the financial requirements. The scope of the report includes assessing market potential, negotiating with collaborators, investment decision making, corporate diversification planning etc. in a very planned manner by formulating detailed manufacturing techniques and forecasting financial aspects by estimating the ost of raw material, formulating the cash flow statement, projecting the balance sheet etc.
We also offer self-contained Pre-Investment and Pre-Feasibility Studies, Market Surveys and Studies, Preparation of Techno-Economic Feasibility Reports, Identification and Selection of Plant and Machinery, Manufacturing Process and or Equipment required, General Guidance, Technical and Commercial Counseling for setting up new industrial projects on the following topics. Many of the engineers, project consultant & industrial consultancy firms in India and worldwide use our project reports as one of the input in doing their analysis.


We can modify the project capacity and project cost as per your requirement.
We can also prepare project report on any subject as per your requirement.

Add multiple items to inquiry

Select the items and then press Add to inquiry button

Sort by :
A Business Plan for Ferric Pyrophosphate
A Business Plan for Ferric Pyrophosphate

 

Ferric pyrophosph... Read More

Capacity : Ferric Pyrophosphate 600 MT Per Annum
Plant and Machinery cost: 48.00 Lakhs
Working Capital : 0.00
Rate of Return (ROR):31.00%
Break Even Point (BEP):73.00 %
TCI :0.00 Lakhs
Cost of Project : 133.00Lakhs
Add To Inquiry Basket
How to Start A Business of Auto Piston
How to Start A Business of Auto Piston

An Read More

Capacity : 0
Plant and Machinery cost: 0.00 Lakhs
Working Capital : 0.00
Rate of Return (ROR):0.00%
Break Even Point (BEP):0.00 %
TCI :0.00 Lakhs
Cost of Project : 0.00Lakhs
Add To Inquiry Basket
A Business Plan for Seaworthy Containers
A Business Plan for Seaworthy Containers

Seaworthy containers are a new type of shipping container that have been designed to withstand the condit... Read More

Capacity : Standard Seaworthy Container Size: 20Ft 2,400 Nos. Per Annum
Plant and Machinery cost: 907.00 Lakhs
Working Capital : 0.00
Rate of Return (ROR):28.00%
Break Even Point (BEP):43.00 %
TCI :0.00 Lakhs
Cost of Project : 2040.00Lakhs
Add To Inquiry Basket
Setup Extraction of Salt  From Sea Water  Plant
Setup Extraction of Salt From Sea Water Plant

 

Extraction of salt from sea water is a process by which salt is removed from the seawater. Salt... Read More

Capacity : Iodized Salt: 30,000 MT per annum, Industrial Salt: 30,000 MT per annum
Plant and Machinery cost: 1156.00 Lakhs
Working Capital : 0.00
Rate of Return (ROR):29.00%
Break Even Point (BEP):41.00 %
TCI :0.00 Lakhs
Cost of Project : 2776.00Lakhs
Add To Inquiry Basket
A business Plan For Surgical Sutures (Assembling)
A business Plan For Surgical Sutures (Assembling)

Surgical sutures are a vital part of the medical industry and are used in numerous medical procedures. Su... Read More

Capacity : Surgical Sutures: 450,000 Boxes per annum
Plant and Machinery cost: 169.00 Lakhs
Working Capital : 0.00
Rate of Return (ROR):27.00%
Break Even Point (BEP):63.00 %
TCI :0.00 Lakhs
Cost of Project : 877.00Lakhs
Add To Inquiry Basket
Starting up production of  Glycerol Monostearate
Starting up production of Glycerol Monostearate

Glycerol monostearate is an organic compound that is derived from glycerol and used as an emulsifier, thi... Read More

Capacity : Glycerol Monostearate: 900 MT Per Annum
Plant and Machinery cost: 93.00 Lakhs
Working Capital : 0.00
Rate of Return (ROR):29.00%
Break Even Point (BEP):64.00 %
TCI :0.00 Lakhs
Cost of Project : 320.00Lakhs
Add To Inquiry Basket
Startup A Business of Double and Single Wall Vacuum Steel Bottles Setup the Manufacturing Plant of Double and Single Wall Vacuum Steel Bottles
Startup A Business of Double and Single Wall Vacuum Steel Bottles Setup the Manufacturing Plant of Double and Single Wall Vacuum Steel Bottles

Because the double-walled design prevents condensation on the outside of the bottle... Read More

Capacity : 0
Plant and Machinery cost: 0.00 Lakhs
Working Capital : 0.00
Rate of Return (ROR):0.00%
Break Even Point (BEP):0.00 %
TCI :0.00 Lakhs
Cost of Project : 0.00Lakhs
Add To Inquiry Basket
Now Is The Time To Take Control Of Your Future And Start A Business
Now Is The Time To Take Control Of Your Future And Start A Business

 

Starting a busine... Read More

Capacity : 0
Plant and Machinery cost: 0.00 Lakhs
Working Capital : 0.00
Rate of Return (ROR):0.00%
Break Even Point (BEP):0.00 %
TCI :0.00 Lakhs
Cost of Project : 0.00Lakhs
Add To Inquiry Basket
Start Production of Potato Chips And  Extruded Snack Food  (Kurkure Type)
Start Production of Potato Chips And Extruded Snack Food (Kurkure Type)

Potato Chips a... Read More

Capacity : Potato Chips: 150,000 Kgs Per Annum Kurkure Type Snacks: 150,000 Kgs Per Annum
Plant and Machinery cost: 43.00 Lakhs
Working Capital : 0.00
Rate of Return (ROR):30.00%
Break Even Point (BEP):71.00 %
TCI :0.00 Lakhs
Cost of Project : 121.00Lakhs
Add To Inquiry Basket
Setup Cashew Nut Processing Plant
Setup Cashew Nut Processing Plant

Cashew nut pro... Read More

Capacity : Cashew Nut Processing: 4,794 Kgs Per Day
Plant and Machinery cost: 600.00 Lakhs
Working Capital : 0.00
Rate of Return (ROR):23.00%
Break Even Point (BEP):76.00 %
TCI :0.00 Lakhs
Cost of Project : 1100.00Lakhs
Add To Inquiry Basket
Start a Business of Particle Board  From Rice Husk
Start a Business of Particle Board From Rice Husk

Particle board, also known ... Read More

Capacity : Particle Board (Size 4ftx8ftx16 inch.): 150,000 Nos. Per Annum
Plant and Machinery cost: 200.00 Lakhs
Working Capital : 0.00
Rate of Return (ROR):30.00%
Break Even Point (BEP):70.00 %
TCI :0.00 Lakhs
Cost of Project : 1100.00Lakhs
Add To Inquiry Basket
A Business Plan for Wood Plastic Composite (WPC)
A Business Plan for Wood Plastic Composite (WPC)

Wood Plastic C... Read More

Capacity : Wood Plastic Composite (WPC): 10 Million Sq.Ft. per annum
Plant and Machinery cost: 406.00 Lakhs
Working Capital : 0.00
Rate of Return (ROR):27.00%
Break Even Point (BEP):61.00 %
TCI :0.00 Lakhs
Cost of Project : 790.00Lakhs
Add To Inquiry Basket
Start a Production Of Soda Ash  By Solvay Process
Start a Production Of Soda Ash By Solvay Process

Soda ash, or sodium carbonate, is a white, powdery chemical commonly used in the prod... Read More

Capacity : Soda Ash (Na2CO3): 200,000 MT Per Annum, Ammonium Chloride (NH4Cl): 200,000 MT Per Annum
Plant and Machinery cost: 105000.00 Lakhs
Working Capital : 0.00
Rate of Return (ROR):14.00%
Break Even Point (BEP):43.00 %
TCI :0.00 Lakhs
Cost of Project : 1265.00Lakhs
Add To Inquiry Basket
Setup Plant OF Hot Dip Galvanizing
Setup Plant OF Hot Dip Galvanizing

 

Hot ... Read More

Capacity : All Types of MS Structure 120 MT per day
Plant and Machinery cost: 619.00 Lakhs
Working Capital : 0.00
Rate of Return (ROR):25.00%
Break Even Point (BEP):42.00 %
TCI :0.00 Lakhs
Cost of Project : 2647.00Lakhs
Add To Inquiry Basket
A Business Plan for Potato Powder, Starch & Flakes
A Business Plan for Potato Powder, Starch & Flakes

Potato Powder, Starch & Flakes are a range of products derived from the tuber of ... Read More

Capacity : -
Plant and Machinery cost: 0.00 Lakhs
Working Capital : 0.00
Rate of Return (ROR):27.00%
Break Even Point (BEP):58.00 %
TCI :0.00 Lakhs
Cost of Project : 0.00Lakhs
Add To Inquiry Basket
Start a Business of Lithium Ion Battery (Battery Assembly)
Start a Business of Lithium Ion Battery (Battery Assembly)

A lithium-ion or Li-ion battery is a type of rec... Read More

Capacity : Lithium-Ion Battery 60,000 Nos per Annum
Plant and Machinery cost: 172.00 Lakhs
Working Capital : 0.00
Rate of Return (ROR):29.00%
Break Even Point (BEP):61.00 %
TCI :0.00 Lakhs
Cost of Project : 812.00Lakhs
Add To Inquiry Basket
Best Industry Business Plan Is Zeolite 4a! (Detergent Grade)
Best Industry Business Plan Is Zeolite 4a! (Detergent Grade)

The Product:... Read More

Capacity : 0
Plant and Machinery cost: 0.00 Lakhs
Working Capital : 0.00
Rate of Return (ROR):0.00%
Break Even Point (BEP):0.00 %
TCI :0.00 Lakhs
Cost of Project : 0.00Lakhs
Add To Inquiry Basket
Startup Most Growing and Demanding industry Business plant of Fiberglass Transparent LPG Cylinders
Startup Most Growing and Demanding industry Business plant of Fiberglass Transparent LPG Cylinders

Product: Read More

Capacity : 0
Plant and Machinery cost: 0.00 Lakhs
Working Capital : 0.00
Rate of Return (ROR):0.00%
Break Even Point (BEP):0.00 %
TCI :0.00 Lakhs
Cost of Project : 0.00Lakhs
Add To Inquiry Basket
Start a Production Of Compressed Biogas
Start a Production Of Compressed Biogas

Compressed bio gas (CBG) is a renewable energy source produced from organic material such as agricultural... Read More

Capacity : Compressed Bio Gas 6 MT Per Day Spent Slurry as Manure 60 MT Per Day
Plant and Machinery cost: 172.00 Lakhs
Working Capital : 0.00
Rate of Return (ROR):27.00%
Break Even Point (BEP):46.00 %
TCI :0.00 Lakhs
Cost of Project : 522.00Lakhs
Add To Inquiry Basket
Start Industry Of Craft Beer
Start Industry Of Craft Beer

Craft beer is a term used to describe a beer that has been made in a traditional and independent fashion. It is usually made in smaller batches wit... Read More

Capacity : Craft Beer (Bottles 650 ml Size) 3,847 Bottles per day Craft Beer (Al. Cans 500 ml Size) 5,000 Bot
Plant and Machinery cost: 780.00 Lakhs
Working Capital : 0.00
Rate of Return (ROR):27.00%
Break Even Point (BEP):49.00 %
TCI :0.00 Lakhs
Cost of Project : 2007.00Lakhs
Add To Inquiry Basket
Setup plant of  Acetate Tow  for Cigarette Filters
Setup plant of Acetate Tow for Cigarette Filters

Acetate tow is a type of material used in the cigarette industry to make filters. It is made of cellulose acet... Read More

Capacity : Acetate Tow 8 MT Per Day
Plant and Machinery cost: 542.00 Lakhs
Working Capital : 0.00
Rate of Return (ROR):29.00%
Break Even Point (BEP):50.00 %
TCI :0.00 Lakhs
Cost of Project : 1426.00Lakhs
Add To Inquiry Basket
Setup Plant  Of Titanium Dioxide From Rutile Ilmenite Ore
Setup Plant Of Titanium Dioxide From Rutile Ilmenite Ore

Titanium dioxide from rutil... Read More

Capacity : Titanium Dioxide 4 MT Per Day
Plant and Machinery cost: 390.00 Lakhs
Working Capital : 0.00
Rate of Return (ROR):27.00%
Break Even Point (BEP):62.00 %
TCI :0.00 Lakhs
Cost of Project : 1455.00Lakhs
Add To Inquiry Basket
Setup Plant Of  Lab Cultured Diamonds From Graphite
Setup Plant Of Lab Cultured Diamonds From Graphite

Lab-cultured diamonds are quickly becoming the new standard for luxury jewelry, offering many of the same qualities as trad... Read More

Capacity : Lab Cultured Diamonds (1 Carat) 30 Carat Per Day
Plant and Machinery cost: 200.00 Lakhs
Working Capital : 0.00
Rate of Return (ROR):25.00%
Break Even Point (BEP):57.00 %
TCI :0.00 Lakhs
Cost of Project : 361.00Lakhs
Add To Inquiry Basket
Start Lemon Processing Unit (Lemon Juice Powder, Lemon Peel Oil, Lemon Pectin)
Start Lemon Processing Unit (Lemon Juice Powder, Lemon Peel Oil, Lemon Pectin)

Lemon processing is the pro... Read More

Capacity : Lemon Juice Dry Powder 104 Kgs per day Lemon Peel Oil 40 Kgs per day Lemon Pectin 140 Kgs
Plant and Machinery cost: 163.00 Lakhs
Working Capital : 0.00
Rate of Return (ROR):25.00%
Break Even Point (BEP):54.00 %
TCI :0.00 Lakhs
Cost of Project : 314.00Lakhs
Add To Inquiry Basket
Solar PV (Photovoltaic) Glass Industry Manufacturing Business
Solar PV (Photovoltaic) Glass Industry Manufacturing Business

The global energy transition towards renewable sources is well underway, and solar po... Read More

Capacity : Solar PV (Photovoltaic) Glass 90,000 MT Per Annum
Plant and Machinery cost: 2800.00 Lakhs
Working Capital : 0.00
Rate of Return (ROR):28.00%
Break Even Point (BEP):69.00 %
TCI :0.00 Lakhs
Cost of Project : 4200.00Lakhs
Add To Inquiry Basket
A Business Plan For Pea Protein Isolate or Concentrate
A Business Plan For Pea Protein Isolate or Concentrate

Yellow peas are the source of the pea protein isolate and concentrate. These goods of... Read More

Capacity : Pea Protein Isolate 2 MT Per Day Spent Pea for Cattle Feed by Product 8 MT Per Day
Plant and Machinery cost: 118.00 Lakhs
Working Capital : 0.00
Rate of Return (ROR):27.00%
Break Even Point (BEP):54.00 %
TCI :0.00 Lakhs
Cost of Project : 614.00Lakhs
Add To Inquiry Basket
Setup Plant  Of  Acrylate Resins and Emulsions
Setup Plant Of Acrylate Resins and Emulsions

An important class of materials that have acquired extensive application in numerous ... Read More

Capacity : Acrylate Resins 10,000 MT Per Annum Acrylate Emulsions 10,000 MT Per Annum
Plant and Machinery cost: 500.00 Lakhs
Working Capital : 0.00
Rate of Return (ROR):30.00%
Break Even Point (BEP):54.00 %
TCI :0.00 Lakhs
Cost of Project : 2291.00Lakhs
Add To Inquiry Basket
Start Latex Rubber Thread Manufacturing Business
Start Latex Rubber Thread Manufacturing Business

A sort of elastic material created from either natural rubber... Read More

Capacity : Latex Rubber Thread 200 Kg. Per Day
Plant and Machinery cost: 145.00 Lakhs
Working Capital : 0.00
Rate of Return (ROR):26.00%
Break Even Point (BEP):53.00 %
TCI :0.00 Lakhs
Cost of Project : 412.00Lakhs
Add To Inquiry Basket
Start Cosmetic Unit (Serum, Cream, Shampoo & Lipstick) Manufacturing Business
Start Cosmetic Unit (Serum, Cream, Shampoo & Lipstick) Manufacturing Business

Serum, cream, shampoo, and lipstick are frequently seen in cosmetic units, which are ... Read More

Capacity : -
Plant and Machinery cost: 46.00 Lakhs
Working Capital : 0.00
Rate of Return (ROR):36.00%
Break Even Point (BEP):37.00 %
TCI :0.00 Lakhs
Cost of Project : 1617.00Lakhs
Add To Inquiry Basket
Pioneering Pea Protein Building a Successful Business Venture
Pioneering Pea Protein Building a Successful Business Venture

Healthy protein powder called pea healthy protein isolate/con... Read More

Capacity : 0
Plant and Machinery cost: 0.00 Lakhs
Working Capital : 0.00
Rate of Return (ROR):0.00%
Break Even Point (BEP):0.00 %
TCI :0.00 Lakhs
Cost of Project : 0.00Lakhs
Add To Inquiry Basket
Start Production Of Silica  From Rice Husk Ash
Start Production Of Silica From Rice Husk Ash

Silica is a mineral compound composed of silicon and oxygen, and is one of the most a... Read More

Capacity : -
Plant and Machinery cost: 2995.00 Lakhs
Working Capital : 0.00
Rate of Return (ROR):28.00%
Break Even Point (BEP):50.00 %
TCI :0.00 Lakhs
Cost of Project : 4716.00Lakhs
Add To Inquiry Basket
A Business Plan for IV Fluid (BFS Technology)
A Business Plan for IV Fluid (BFS Technology)

 

IV fluids, also k... Read More

Capacity : IV Fluids (500 ml Size Pack) 78,000 Packs Per Day
Plant and Machinery cost: 744.00 Lakhs
Working Capital : 0.00
Rate of Return (ROR):27.00%
Break Even Point (BEP):51.00 %
TCI :0.00 Lakhs
Cost of Project : 1263.00Lakhs
Add To Inquiry Basket
Start Industry of Liquor from Mahua (Wine and Hard Liquor)
Start Industry of Liquor from Mahua (Wine and Hard Liquor)

Mahua is a tropical tree native to the Indian subcontinent and Southeast Asia. It is ... Read More

Capacity : Wine (750 ml Size) 4,000,000 Bottles per annum Whiskey (375 ml Size) 4,000,000 Bottles per annum B
Plant and Machinery cost: 782.00 Lakhs
Working Capital : 0.00
Rate of Return (ROR):28.00%
Break Even Point (BEP):56.00 %
TCI :0.00 Lakhs
Cost of Project : 1880.00Lakhs
Add To Inquiry Basket
Setup Pharmaceutical Unit (Ciprofloxacin Tablets, Co-Trimoxazole Tablets, Diclofenac Sodium Tablets, Paracetamol Tablets, Metronidazole Tablets, Doxycycline Tablets, Fluconazole Capsules, Propranolol Capsules, Ciprofloxacin Injectables) Plant
Setup Pharmaceutical Unit (Ciprofloxacin Tablets, Co-Trimoxazole Tablets, Diclofenac Sodium Tablets, Paracetamol Tablets, Metronidazole Tablets, Doxycycline Tablets, Fluconazole Capsules, Propranolol Capsules, Ciprofloxacin Injectables) Plant

 

Pharmaceutical unit tablets and capsules are c... Read More

Capacity : -
Plant and Machinery cost: 179.00 Lakhs
Working Capital : 0.00
Rate of Return (ROR):37.00%
Break Even Point (BEP):29.00 %
TCI :0.00 Lakhs
Cost of Project : 35774.00Lakhs
Add To Inquiry Basket
Start Industry with Serum, Cream, and Shampoo | Turning Your Passion for Cosmetics into a Thriving Business with Serum, Cream, and Shampoo
Start Industry with Serum, Cream, and Shampoo | Turning Your Passion for Cosmetics into a Thriving Business with Serum, Cream, and Shampoo

Why The Beauty Indu... Read More

Capacity : 0
Plant and Machinery cost: 0.00 Lakhs
Working Capital : 0.00
Rate of Return (ROR):0.00%
Break Even Point (BEP):0.00 %
TCI :0.00 Lakhs
Cost of Project : 0.00Lakhs
Add To Inquiry Basket
Setup Unit Of Cement Plant with Power Generation
Setup Unit Of Cement Plant with Power Generation

Cement is a crucial binding agent that is use... Read More

Capacity : Cement Plant 40,000 Bags per Day
Plant and Machinery cost: 16500.00 Lakhs
Working Capital : 0.00
Rate of Return (ROR):26.00%
Break Even Point (BEP):44.00 %
TCI :0.00 Lakhs
Cost of Project : 25200.00Lakhs
Add To Inquiry Basket
A Business Plan for Sterile Water for Injection
A Business Plan for Sterile Water for Injection

Sterile water refers to water that is completely free from any living organisms, such... Read More

Capacity : Sterial Water for Injection 500 ml Size Pack 20,000 Sachets Per Day
Plant and Machinery cost: 572.00 Lakhs
Working Capital : 0.00
Rate of Return (ROR):30.00%
Break Even Point (BEP):66.00 %
TCI :0.00 Lakhs
Cost of Project : 1234.00Lakhs
Add To Inquiry Basket
Setup Plant Of Lead From Galena
Setup Plant Of Lead From Galena

Lead is a heavy metal that is commonly found in the earth's crust. Its abundance, low... Read More

Capacity : Lead Ingot 30 MT Per Day
Plant and Machinery cost: 487.00 Lakhs
Working Capital : 0.00
Rate of Return (ROR):28.00%
Break Even Point (BEP):52.00 %
TCI :0.00 Lakhs
Cost of Project : 2231.00Lakhs
Add To Inquiry Basket
A Business Plan Blood Collection Tubes, Urine and Stool Containers
A Business Plan Blood Collection Tubes, Urine and Stool Containers


Read More

Capacity : -
Plant and Machinery cost: 1214.00 Lakhs
Working Capital : 0.00
Rate of Return (ROR):28.00%
Break Even Point (BEP):48.00 %
TCI :0.00 Lakhs
Cost of Project : 2294.00Lakhs
Add To Inquiry Basket
A Business Plan for Paracetamol
A Business Plan for Paracetamol

Paracetamol is a popular over-the-counter pain reliever and f... Read More

Capacity : Paracetamol Powder 7 MT Per Day
Plant and Machinery cost: 274.00 Lakhs
Working Capital : 0.00
Rate of Return (ROR):27.00%
Break Even Point (BEP):64.00 %
TCI :0.00 Lakhs
Cost of Project : 779.00Lakhs
Add To Inquiry Basket
Start Manufacturing Business  Of  Baby & Adult Diaper and Sanitary Napkins
Start Manufacturing Business Of Baby & Adult Diaper and Sanitary Napkins

Baby & Adult Diapers an... Read More

Capacity : Baby Diapers (4 Pcs.) 84,000 Pkts Per Day Adult Diapers (4 Pcs.) 18,000 Pkts Per Day Sanitary
Plant and Machinery cost: 2356.00 Lakhs
Working Capital : 0.00
Rate of Return (ROR):29.00%
Break Even Point (BEP):41.00 %
TCI :0.00 Lakhs
Cost of Project : 4201.00Lakhs
Add To Inquiry Basket
Start Tissue Paper Manufacturing Business
Start Tissue Paper Manufacturing Business

Tissue paper is a lightweig... Read More

Capacity : Tissue Paper 20 MT Per Day
Plant and Machinery cost: 497.00 Lakhs
Working Capital : 0.00
Rate of Return (ROR):27.00%
Break Even Point (BEP):59.00 %
TCI :0.00 Lakhs
Cost of Project : 2101.00Lakhs
Add To Inquiry Basket
Launching a  Solar Panel Production Business
Launching a Solar Panel Production Business

 

Solar panels are ... Read More

Capacity : Solar Panel 500 MW per annum
Plant and Machinery cost: 810.00 Lakhs
Working Capital : 0.00
Rate of Return (ROR):32.00%
Break Even Point (BEP):56.00 %
TCI :0.00 Lakhs
Cost of Project : 5353.00Lakhs
Add To Inquiry Basket
Biodegradable Disposable Cups and Plates (Tableware) Manufacturing Using Sugarcane Bagasse Business
Biodegradable Disposable Cups and Plates (Tableware) Manufacturing Using Sugarcane Bagasse Business

Bagasse is the fibrous residue that remains after sugarcane o... Read More

Capacity : -
Plant and Machinery cost: 1941.00 Lakhs
Working Capital : 0.00
Rate of Return (ROR):27.00%
Break Even Point (BEP):46.00 %
TCI :0.00 Lakhs
Cost of Project : 2774.00Lakhs
Add To Inquiry Basket
Setup Curcumin Extraction Plant
Setup Curcumin Extraction Plant

Curcumin extraction refers to the process of isolating and ex... Read More

Capacity : Curcumin Powder 100 Kgs per day Turmeric Oil 47 Kgs per day Deoiled Turmeric 1,853 Kgs
Plant and Machinery cost: 216.00 Lakhs
Working Capital : 0.00
Rate of Return (ROR):28.00%
Break Even Point (BEP):64.00 %
TCI :0.00 Lakhs
Cost of Project : 491.00Lakhs
Add To Inquiry Basket
Setup Active Pharmaceutical Ingredients Acetaminophen, Metformin Hydrochloride, Azithromycin Dihydrate Unit
Setup Active Pharmaceutical Ingredients Acetaminophen, Metformin Hydrochloride, Azithromycin Dihydrate Unit

 

Active Pharmaceut... Read More

Capacity : Paracetamol 10,000 Kgs Per Day Azithromycin 10,000 Kgs Per Day Metformin 10,000 Kgs
Plant and Machinery cost: 1111.00 Lakhs
Working Capital : 0.00
Rate of Return (ROR):33.00%
Break Even Point (BEP):55.00 %
TCI :0.00 Lakhs
Cost of Project : 5246.00Lakhs
Add To Inquiry Basket
Start Manufacturing of PP Woven Fabric
Start Manufacturing of PP Woven Fabric

Polypropylene, which is also known as PP for short name, is one kind of thermoplastic... Read More

Capacity : PP Woven Fabric 12 MT per day
Plant and Machinery cost: 943.00 Lakhs
Working Capital : 0.00
Rate of Return (ROR):27.00%
Break Even Point (BEP):52.00 %
TCI :0.00 Lakhs
Cost of Project : 1637.00Lakhs
Add To Inquiry Basket
Business Opportunities in Production of Dicyandiamide  (DCDA)
Business Opportunities in Production of Dicyandiamide (DCDA)

 

Dicyandiamide is ... Read More

Capacity : Dicyandiamide (DCDA) 5 MT Per Day
Plant and Machinery cost: 45.00 Lakhs
Working Capital : 0.00
Rate of Return (ROR):29.00%
Break Even Point (BEP):57.00 %
TCI :0.00 Lakhs
Cost of Project : 270.00Lakhs
Add To Inquiry Basket
Emerging Business of Shrimp Processing  (EOU)
Emerging Business of Shrimp Processing (EOU)

 

Shrimp are decapo... Read More

Capacity : Shrimp Processing (per Pack 1 Kg Size) 19,500 Kgs Per Day
Plant and Machinery cost: 202.00 Lakhs
Working Capital : 0.00
Rate of Return (ROR):30.00%
Break Even Point (BEP):57.00 %
TCI :0.00 Lakhs
Cost of Project : 1465.00Lakhs
Add To Inquiry Basket
Investment Opportunities in Business of IV Fluids (BFS Technology)
Investment Opportunities in Business of IV Fluids (BFS Technology)

 

Intravenous fluid... Read More

Capacity : IV Fluids (500 ml Size Bottle) 50,000 Bottles per day
Plant and Machinery cost: 3449.00 Lakhs
Working Capital : 0.00
Rate of Return (ROR):20.00%
Break Even Point (BEP):41.00 %
TCI :0.00 Lakhs
Cost of Project : 4089.00Lakhs
Add To Inquiry Basket
Start Business of A-2 Cow Milk Processing (Milk, Butter, Ghee & Paneer)
Start Business of A-2 Cow Milk Processing (Milk, Butter, Ghee & Paneer)

Milk is the most important source of protein and is consumed by people all over the w... Read More

Capacity : A-2 Milk (1 Ltr Tetra Pack) 2,250 Kgs per day Butter (100 & 500 gms Pack) 46 Kgs per day Paneer (4 P
Plant and Machinery cost: 19.00 Lakhs
Working Capital : 0.00
Rate of Return (ROR):25.00%
Break Even Point (BEP):58.00 %
TCI :0.00 Lakhs
Cost of Project : 484.00Lakhs
Add To Inquiry Basket
Start Production of  Paracetamol (BP,IP,USP Grade)
Start Production of Paracetamol (BP,IP,USP Grade)

Read More

Capacity : Paracetamol Powder (IP/BP Grade 50 MT Per Day Acetic Acid (31% Conc.) By Product 72 MT Per Day
Plant and Machinery cost: 962.00 Lakhs
Working Capital : 0.00
Rate of Return (ROR):32.00%
Break Even Point (BEP):52.00 %
TCI :0.00 Lakhs
Cost of Project : 2887.00Lakhs
Add To Inquiry Basket
Industrial and Pharmaceutical Grade Starch from Cassava, Maize and Tacca Roots
Industrial and Pharmaceutical Grade Starch from Cassava, Maize and Tacca Roots

 

Cassava, sorghum,... Read More

Capacity : Industrial Grade Starch 37.5 MT Per Day Pharmaceutical Grade Starch 12.5 MT Per Day
Plant and Machinery cost: 257.00 Lakhs
Working Capital : 0.00
Rate of Return (ROR):28.00%
Break Even Point (BEP):76.00 %
TCI :0.00 Lakhs
Cost of Project : 1255.00Lakhs
Add To Inquiry Basket
Production of  Copper Wire Drawing & Enamelling
Production of Copper Wire Drawing & Enamelling

 

Copper is one of ... Read More

Capacity : Copper Wire (0.914 to 0.376 mm) 350 Kgs per day Enamelled Copper Wire (0.914 to 0.376 mm) 350 Kgs pe
Plant and Machinery cost: 432.00 Lakhs
Working Capital : 0.00
Rate of Return (ROR):28.00%
Break Even Point (BEP):46.00 %
TCI :0.00 Lakhs
Cost of Project : 1233.00Lakhs
Add To Inquiry Basket
Profitable Industry of Bamboo Sticks
Profitable Industry of Bamboo Sticks

 

Bamboo is a tribe... Read More

Capacity : Bamboo Sticks 4 MT Per Day
Plant and Machinery cost: 443.00 Lakhs
Working Capital : 0.00
Rate of Return (ROR):26.00%
Break Even Point (BEP):45.00 %
TCI :0.00 Lakhs
Cost of Project : 791.00Lakhs
Add To Inquiry Basket
Profit Making Manufacturing Business of Alloy Wheels for 2 Wheeler Motorcycle, Bikes Best Business in Automobile Sector
Profit Making Manufacturing Business of Alloy Wheels for 2 Wheeler Motorcycle, Bikes Best Business in Automobile Sector

 

Allo... Read More

Capacity : 0
Plant and Machinery cost: 0.00 Lakhs
Working Capital : 0.00
Rate of Return (ROR):0.00%
Break Even Point (BEP):0.00 %
TCI :0.00 Lakhs
Cost of Project : 0.00Lakhs
Add To Inquiry Basket
Start Lucrative Manufacturing Business of Milk Powder (Baby Milk for 0 to 5 year, Milk Powder for Coffee and Tea)
Start Lucrative Manufacturing Business of Milk Powder (Baby Milk for 0 to 5 year, Milk Powder for Coffee and Tea)

Milk... Read More

Capacity : 0
Plant and Machinery cost: 0.00 Lakhs
Working Capital : 0.00
Rate of Return (ROR):0.00%
Break Even Point (BEP):0.00 %
TCI :0.00 Lakhs
Cost of Project : 0.00Lakhs
Add To Inquiry Basket
Production Business of Eco Friendly Bamboo Toothbrush Most Profitable Business Ideas in Bamboo Industry
Production Business of Eco Friendly Bamboo Toothbrush Most Profitable Business Ideas in Bamboo Industry

Bamboo toothbrushes Read More

Capacity : 0
Plant and Machinery cost: 0.00 Lakhs
Working Capital : 0.00
Rate of Return (ROR):0.00%
Break Even Point (BEP):0.00 %
TCI :0.00 Lakhs
Cost of Project : 0.00Lakhs
Add To Inquiry Basket
Profitable Business Industry of  Electric Motors
Profitable Business Industry of Electric Motors

 

An e... Read More

Capacity : 5 KW Three Phase Induction Motors120 Nos Per Day 10 KW Three Phase Induction Motors 20 Nos Per Day 1
Plant and Machinery cost: 467.00 Lakhs
Working Capital : 0.00
Rate of Return (ROR):26.00%
Break Even Point (BEP):41.00 %
TCI :0.00 Lakhs
Cost of Project : 3949.00Lakhs
Add To Inquiry Basket
Investment Opportunities in Carbonated Health Drinks
Investment Opportunities in Carbonated Health Drinks

 

Carb... Read More

Capacity : Carbonated Health Drinks Size 250 ml 8,000 Packs Per Day Carbonated Health Drinks Size 330 ml 4,000
Plant and Machinery cost: 49.00 Lakhs
Working Capital : 0.00
Rate of Return (ROR):31.00%
Break Even Point (BEP):59.00 %
TCI :0.00 Lakhs
Cost of Project : 299.00Lakhs
Add To Inquiry Basket
NameCapacityRate of return (ROR):Cost of project
PSA Oxygen Gas Plant 180 to 200 cylinders per day 0.00 0.00
Production Business of Ra... Disposable Safety Razors: 864,000 Units per Day Razor Blade: 172,800 Units per Day Steel Scrap: 500 34.51 2285.00
Investing into Business o... 12 MT per Day 33.83 1135.00
Business of Disposable Sa... Razor Blade for Safety Razors Pack of 5 pcs each: 57,600 Units per Day Steel Scrap: 500 Units per Da 57.75 815.00
Emerging Business of Duct... 0 0.00 0.00
Extraction of Essential O... Lemon Grass Oil (10 ml Size Pack) 1,334 Ltrs per Day 34.60 607.00
Production of Bicarbonate... Bicarbonate Cartridge 720g 166.7 Nos. per day Bicarbonate Cartridge 650g 500.0 Nos. per day Acid Co 25.28 1153.00
Profitable Industry of Su... Surgical Methylated Spirit 1 Ltr Size Bottle 4,000.0 Nos. Per Day Surgical Methylated Spirit 5 Ltr S 27.53 265.00
Manufacturing of Rubber P... Rubber Powder 5.0 MT per day By Product Steel Wire 1.4 MT per day 26.98 191.00
Start extraction of Cashe... Cashew Nut Shell Oil 11.0 MT per day Cardanol 5.5 MT per day De-Oiled Cashew Nut Shell Cake (bye Pro 26.72 752.00
Setup a Manufacturing Pla... Disposable Plastic Syringes with Needles 1 ml Size each Packed in Polypack: 50,000.0 Nos. per day D 30.78 345.00
Profitable Business of Di... 0 0.00 0.00
Investment Opportunities ... 0 0.00 0.00
Magnesium Stearate Magnesium Stearate 10.0 MT Per Day 44.00 515.00
Production of Bromelain E... 0 0.00 0.00
Pan Masala Sada, Meetha &... Sada Pan Masala (10 gms Size each Pouch) : 165 Kgs / Day Meetha Pan Masala (4 gms Size each Pouch): 30.00 64.00
Business Plan for Rewindi... Rewinding Brunt Electric Motors: 10 Nos./ Day 27.00 1320.00
Plastic Waste Recycling P... Recycled PP Granules : 578 Kgs / Day Recycled LDPE Granules: 720 Kgs / Day Recycled HDPE Granules: 7 26.00 380.00
Start a Toothpaste Manufa... White Toothpaste 50 gms Size: 96,000 Tubes / Day White Toothpaste 240 gms Size: 16,800 Tubes / Day S 36.00 6936.00
Composite Materials-Carbo... Carbon Fibre Composite Laminate M2 width 1500 mm : 833.3 Sq. Mt. / Day Glass Fibre Composite Laminat 29.00 452.00
Manufacturing Business Pl... 0 0.00 0.00
Business Plans for Produc... 0 0.00 0.00
Production of Cellulose (... 0 0.00 0.00
Investment Opportunities ... Dicyandiamide (DCDA): 10 MT / Day 29.00 373.00
How to Start Disposable P... Disposable Plastic Syringes 2 ml Size: 2,000 Boxes/ Day (Each Box = 100 Pcs.) Disposable Plastic Syr 15.00 2006.00
Manufacturing of Humic Ac... Humic Acid: 20 MT / Day 26.00 726.00
Disposable Plastic Syring... Disposable Plastic Syringes with Needle 1 ml Size) : 18,000 Nos / Day Disposable Plastic Syringes 31.00 498.00
Synthetic Camphor (Kapoor... Synthetic Camphor Powder : 8 MT / Day 28.00 1152.00
Manufacturing Business Pl... Dehydrated Onion Sliced/Chopped: 50 MT / Day Cattle Feed as By Product: 35 MT / Day 27.00 5116.00
Production of Biodegradab... 0 0.00 0.00
12345678910...

Showing 61 - 120 of 1677 Product(s)

Subject of your Interest

Information

  • One Lac / Lakh / Lakhs is equivalent to one hundred thousand (100,000)
  • One Crore is equivalent to ten million (10,000,000)
  • T.C.I is Total Capital Investment
  • We can modify the project capacity and project cost as per your requirement.
  • We can also prepare project report on any subject as per your requirement.
  • Caution: The project's cost, capacity and return are subject to change without any notice. Future projects may have different values of project cost, capacity or return.

ABOUT NPCS

 

NIIR PROJECT CONSULTANCY SERVICES (NPCS) is a reliable name in the industrial world for offering integrated technical consultancy services. NPCS is manned by engineers, planners, specialists, financial experts, economic analysts and design specialists with extensive experience in the related industries.

Our various services are: Detailed Project Report,  Business Plan for Manufacturing Plant, Start-up Ideas, Business Ideas for Entrepreneurs, Start up Business Opportunities, entrepreneurship projects, Successful Business Plan, Industry Trends, Market Research, Manufacturing Process, Machinery, Raw Materials, project report, Cost and Revenue, Pre-feasibility study for Profitable Manufacturing Business, Project Identification, Project Feasibility and Market Study, Identification of Profitable Industrial Project Opportunities, Business Opportunities, Investment Opportunities for Most Profitable Business in India, Manufacturing Business Ideas, Preparation of Project Profile, Pre-Investment and Pre-Feasibility Study, Market Research Study, Preparation of Techno-Economic Feasibility Report, Identification and Section of Plant, Process, Equipment, General Guidance, Startup Help, Technical and Commercial Counseling for setting up new industrial project and Most Profitable Small Scale Business.

NPCS also publishes varies process technology, technical, reference, self employment and startup books, directory, business and industry database, bankable detailed project report, market research report on various industries, small scale industry and profit making business. Besides being used by manufacturers, industrialists and entrepreneurs, our publications are also used by professionals including project engineers, information services bureau, consultants and project consultancy firms as one of the input in their research.

Our Detailed Project report aims at providing all the critical data required by any entrepreneur vying to venture into Project. While expanding a current business or while venturing into new business, entrepreneurs are often faced with the dilemma of zeroing in on a suitable product/line.

 


And before diversifying/venturing into any product, wish to study the following aspects of the identified product:


• Good Present/Future Demand
• Export-Import Market Potential
• Raw Material & Manpower Availability
• Project Costs and Payback Period


We at NPCS, through our reliable expertise in the project consultancy and market research field, Provides exhaustive information about the project, which satisfies all the above mentioned requirements and has high growth potential in the markets. And through our report we aim to help you make sound and informed business decision.

 

The report contains all the data which will help an entrepreneur find answers to questions like:

• Why I should invest in this project?
• What will drive the growth of the product?
• What are the costs involved?
• What will be the market potential?


The report first focuses on enhancing the basic knowledge of the entrepreneur about the main product, by elucidating details like product definition, its uses and applications, industry segmentation as well as an overall overview of the industry sector in India. The report then helps an entrepreneur identify the target customer group of its product. It further helps in making sound investment decision by listing and then elaborating on factors that will contribute to the growth of product consumption in India and also talks about the foreign trade of the product along with the list of top importing and top exporting countries. Report includes graphical representation and forecasts of key data discussed in the above mentioned segment. It further explicates the growth potential of the product.

The report includes other market data like key players in the Industry segment along with their contact information and recent developments. It includes crucial information like raw material requirements, list of machinery and manufacturing process for the plant. Core project financials like plant capacity, costs involved in setting up of project, working capital requirements, projected revenue and profit are further listed in the report.


Reasons for buying the report:

• This report helps you to identify a profitable project for investing or diversifying into by throwing light to crucial areas like industry size, demand of the product and reasons for investing in the product.

• This report provides vital information on the product like its definition, characteristics and segmentation.

• This report helps you market and place the product correctly by identifying the target customer group of the product.

• This report helps you understand the viability of the project by disclosing details like raw materials required, manufacturing process, project costs and snapshot of other project financials.

• The report provides forecasts of key parameters which helps to anticipate the industry performance and make sound business decision.

 

Our Approach:


• Our research reports broadly cover Indian markets, present analysis, outlook and forecast.

• The market forecasts are developed on the basis of secondary research and are cross-validated through interactions with the industry players. 

• We use reliable sources of information and databases.  And information from such sources is processed by us and included in the report.

 

Our Market Survey cum Detailed Techno Economic Feasibility Report Contains following information:

 

 

Ø  Introduction

·         Project Introduction

·         Project Objective and Strategy

·         Concise History of the Product

·         Properties

·         BIS (Bureau of Indian Standards) Provision & Specification

·         Uses & Applications

 

Ø  Market Study and Assessment

·         Current Indian Market Scenario

·         Present Market Demand and Supply

·         Estimated Future Market Demand and Forecast

·         Statistics of Import & Export

·         Names & Addresses of Existing Units (Present Players)

·         Market Opportunity

 

Ø  Raw Material

·         List of Raw Materials

·         Properties of Raw Materials

·         Prescribed Quality of Raw Materials

·         List of Suppliers and Manufacturers

 

Ø  Personnel (Manpower) Requirements

·         Requirement of Staff & Labor (Skilled and Unskilled) Managerial, Technical, Office Staff and Marketing Personnel

 

Ø  Plant and Machinery

·         List of Plant & Machinery

·         Miscellaneous Items

·         Appliances & Equipments

·         Laboratory Equipments & Accessories

·         Electrification

·         Electric Load & Water

·         Maintenance Cost

·         Sources of Plant & Machinery (Suppliers and Manufacturers)

 

Ø  Manufacturing Process and Formulations

·         Detailed Process of Manufacture with Formulation

·         Packaging Required

·         Process Flow Sheet Diagram

 

Ø  Infrastructure and Utilities

·         Project Location

·         Requirement of Land Area

·         Rates of the Land

·         Built Up Area

·         Construction Schedule

·         Plant Layout and Requirement of Utilities

 

Project at a Glance

Along with financial details as under:

 

  •     Assumptions for Profitability workings

  •    Plant Economics

  •    Production Schedule

  •    Land & Building

            Factory Land & Building

            Site Development Expenses

  •    Plant & Machinery

             Indigenous Machineries

            Other Machineries (Miscellaneous, Laboratory etc.)

  •    Other Fixed Assets

            Furniture & Fixtures

            Pre-operative and Preliminary Expenses

            Technical Knowhow

            Provision of Contingencies

  •   Working Capital Requirement Per Month

             Raw Material

            Packing Material

            Lab & ETP Chemical Cost

           Consumable Store

  •   Overheads Required Per Month And Per Annum

         Utilities & Overheads (Power, Water and Fuel Expenses etc.)

             Royalty and Other Charges

            Selling and Distribution Expenses

  •    Salary and Wages

  •    Turnover Per Annum

  •   Share Capital

            Equity Capital

            Preference Share Capital

 

  •    Annexure 1:: Cost of Project and Means of Finance

  •    Annexure 2::  Profitability and Net Cash Accruals

                Revenue/Income/Realisation

                Expenses/Cost of Products/Services/Items

                Gross Profit

                Financial Charges     

                Total Cost of Sales

                Net Profit After Taxes

                Net Cash Accruals

  •   Annexure 3 :: Assessment of Working Capital requirements

                Current Assets

                Gross Working. Capital

                Current Liabilities

                Net Working Capital

                Working Note for Calculation of Work-in-process

  •    Annexure 4 :: Sources and Disposition of Funds

  •    Annexure 5 :: Projected Balance Sheets

                ROI (Average of Fixed Assets)

                RONW (Average of Share Capital)

                ROI (Average of Total Assets)

  •    Annexure 6 :: Profitability ratios

                D.S.C.R

                Earnings Per Share (EPS)

               

             Debt Equity Ratio

        Annexure 7   :: Break-Even Analysis

                Variable Cost & Expenses

                Semi-Var./Semi-Fixed Exp.

                Profit Volume Ratio (PVR)

                Fixed Expenses / Cost 

                B.E.P

  •   Annexure 8 to 11:: Sensitivity Analysis-Price/Volume

            Resultant N.P.B.T

            Resultant D.S.C.R

   Resultant PV Ratio

   Resultant DER

  Resultant ROI

          Resultant BEP

  •    Annexure 12 :: Shareholding Pattern and Stake Status

        Equity Capital

        Preference Share Capital

  •   Annexure 13 :: Quantitative Details-Output/Sales/Stocks

        Determined Capacity P.A of Products/Services

        Achievable Efficiency/Yield % of Products/Services/Items 

        Net Usable Load/Capacity of Products/Services/Items   

       Expected Sales/ Revenue/ Income of Products/ Services/ Items   

  •    Annexure 14 :: Product wise domestic Sales Realisation

  •    Annexure 15 :: Total Raw Material Cost

  •    Annexure 16 :: Raw Material Cost per unit

  •    Annexure 17 :: Total Lab & ETP Chemical Cost

  •    Annexure 18  :: Consumables, Store etc.,

  •    Annexure 19  :: Packing Material Cost

  •    Annexure 20  :: Packing Material Cost Per Unit

  •    Annexure 21 :: Employees Expenses

  •    Annexure 22 :: Fuel Expenses

  •    Annexure 23 :: Power/Electricity Expenses

  •    Annexure 24 :: Royalty & Other Charges

  •    Annexure 25 :: Repairs & Maintenance Exp.

  •    Annexure 26 :: Other Mfg. Expenses

  •    Annexure 27 :: Administration Expenses

  •    Annexure 28 :: Selling Expenses

  •    Annexure 29 :: Depreciation Charges – as per Books (Total)

  •   Annexure 30   :: Depreciation Charges – as per Books (P & M)

  •   Annexure 31   :: Depreciation Charges - As per IT Act WDV (Total)

  •   Annexure 32   :: Depreciation Charges - As per IT Act WDV (P & M)

  •   Annexure 33   :: Interest and Repayment - Term Loans

  •   Annexure 34   :: Tax on Profits

  •   Annexure 35   ::Projected Pay-Back Period And IRR