Reasons for Starting a Business in Rwanda:

The Rwandan economy is growing largely due to foreign investment and exports, mainly focused on manufacturing. Other sectors are growing as well but not at such high rates as manufacturing; these include telecommunications, construction and business services.


What are the Natural Resources in Rwanda?

Rwanda’s Lake Kivu was estimated to contain 60 billion m3 of natural gas that was in great demand by companies planning to construct gas-fired power stations. In 2010, natural gas was extracted by Kibuye Power 1 Ltd. from Lake Kivu. Rwanda Investment Group S.A. planned to provide a capacity of 3.6 MW to a gas-fired power station using the natural gas from Lake Kivu.

In 2010, Kivuwatt Ltd. also planned to construct a gas-fired power station and extract natural gas from Lake Kivu. Gold exploration activities were carried out by Trans Africa Resources Ltd. in the Gicumbi District. In 2010, the company estimated that this site had resources that amounted to 5.55 million Mt at a grade of 1.48 g per Mt gold. Mining is an important contributor to the country’s economy, generating about US$ 90 million in 2008.

Minerals extracted in Rwanda include tantalum, tin ore, tungsten, and gold. The minerals are mainly produced by private companies and artisanal miners. Cassiterite, tungsten, and tantalite are mined by at least 283 companies and artisanal miners.


What are the Business Opportunities in Rwanda?

1. One of the most lucrative businesses in Rwanda is agriculture. Like many other countries in Africa, Rwanda is rich in natural edible resources. The process of exporting unprocessed commodities such as coffee beans and raw cocoa annually has provided Africa, in general, with thousands of job opportunities, raking in billions of dollars in potential income.


2. Many farmers and entrepreneurs in Rwanda have created businesses that fill the gap in both local and international markets through the development of uniquely African product brands. These brands are processed so that they have the potential to become significant hit products on the market.

Some of these are 'Made in Africa' organic chocolate brands and chocolate bars made from cocoa beans, which are harvested and processed within the continent. These chocolate bars are then exported internationally, raising thousands of dollars from international investors.


3. Coffee beans. The world's largest coffee producer is found in Africa, no, it's not Starbucks. By investing in locally processed coffee beans, you help in the creation of more reliable product brands that can compete on the same level as foreign competitors.

This is one of Rwanda's key priorities and a significant contributor to its economy. The business of exports in Rwanda builds a number of profitable businesses while supporting national development. Your business can be managed from abroad with ease, making it perfect for the African diaspora.

With exports, you also get to provide services to your clientele, which may be located in the UK, US, Dubai, or the Americas. Furthermore, in Rwanda, there are many lucrative export businesses you can invest in, but the route that offers you a lot of opportunities is coffee.

In Sub-Saharan Africa, Rwanda is recognized as a major conference and convention hub, second to South Africa. Considering how small the nation is, such a position is imposing. It also means that for investors, conference tourism is another business opportunity they can venture into.


4. The growing demand for apartments and hotels in Rwanda stems from the rise in global business travel, corporate mobility, and an increase in international job assignments. As the rise of businesses and investment opportunities in Africa continues to attract global players across the globe, it is safe to say that the demand for sophisticated, massive and well-scaled apartment hotels will also rise, causing a boom in the real estate niche.

There are several Business Opportunities in Rwanda, and in Africa as a whole. The best thing to do, is research lucrative sectors, to find out how they work and the best investment methods to consider.


What Businesses are Successful in Namibia?

Before you can start your own business, it’s important to understand what type of business ventures are likely to be successful in your region. This information can help you better evaluate an idea for a new business and/or predict potential problems or challenges you may face.

The following businesses have been successful historically, based on location and economic conditions: Retail stores; Restaurants/bars; Entertainment (e.g., clubs, hotels); Travel services (e.g., guides, taxis) If you're looking to set up shop online, e-commerce is a great option for many entrepreneurs as well.

 

Business-Friendly Policies and Government Initiatives:

Starting up a business in Rwanda may seem like an easy feat, but without proper regulatory frameworks, you might have trouble getting your idea off the ground. Fortunately, Rwanda’s government is showing signs of improvement when it comes to business-friendly policies. While licensing and tax policies are still somewhat nascent, startups can seek support from several institutions.

In Rwanda’s government made it easier for businesses to register property. Among other reforms, they abolished capital gains taxes Rwanda’s government has made a concerted effort to encourage foreign investment and business development through new policies, laws, and tax incentives.

Rwanda is ranked as one of Africa’s fastest-growing economies; according to World Bank data, between 2010 and 2013, annual growth was 5.8 percent—well above East Africa’s regional average of 4.5 percent.

Rwanda Industrial Infrastructure:

Rwanda understands the importance of infrastructure in the development of a competitive private sector. To this end, the government continues to invest heavily in infrastructure. Almost a tenth of Rwanda’s annual budget is committed to transport and other infrastructure. To develop a vibrant private sector, Rwanda is investing in Roads, Rail, and water transport infrastructure with the intent of dramatically reducing the cost of transport to businesses and individuals.

Rwanda has been very successful in supporting structural change the movement of economic resources out of agriculture into more productive sectors (industry and services). However, aggregate productivity growth, one of the most important elements of having a successful business is having access to reliable infrastructure. In most parts of Africa, it’s rare for businesses and homes to have consistent access to reliable electricity, internet and phone service. This is especially true for those in rural areas. However, Rwanda has recently taken steps to create more consistent industrial infrastructure across its entire country. The Rwandan government launched an initiative called Vision 2020 that aims to make Rwanda one of Africa’s leading economies by 2020.

Part of that plan includes building out a national network of power lines that can deliver energy reliably across all regions. The government also plans on expanding fiber optic cables and other communication networks so that people living in rural areas will be able to connect with others around them and access information online. Finally, they want to expand their road system so transportation between cities is easier than ever before.

What are the steps for Starting a Business in Rwanda?

To start a business you must meet certain requirements and there are specific procedures you must follow. The following guide will provide detailed information on how to start your own business in Rwanda. Before you can register a company, you need to be. You also need to have lived in Rwanda for at least one year before registering a company here. If you do not meet these criteria, then an individual who meets them can act as your representative (this is called being authorized).

This person needs their own authorization letter from you stating that they have been given power of attorney over all matters related to starting up your business. The   steps to Starting a Business in Rwanda:  Register with relevant government agencies: If you want to start your own business, there are several steps that must be taken before officially launching your venture.

First, register with all relevant government agencies such as local tax offices and trade bureaus. In Rwanda, these include: Ministry of Trade (MOT) Ministry of Finance (MOF) National Bank of Rwanda (BNR) 2Obtain required permits and licenses: Once you’ve registered with government agencies, you’ll need to obtain any required permits or licenses from them—this will vary depending .

Market Size of Rwanda:

The Rwandan economy is characterized by remittances, agriculture, and coffee and tea exports. In 2010 coffee production was estimated at 28% of total export earnings. Other crops include beans, sorghum, potatoes, bananas, and cassava. Industrial activity centers on construction materials (lumber and bricks), food processing, metal fabrication for machinery and equipment, textiles, sugar refining, cement production and light manufacturing (bottles).

A third of all households engage in subsistence farming. It’s estimated that there are approximately 800,000 broadband internet users in Rwanda. The majority of Rwandans live on less than $2 USD per day, making it extremely difficult for most people to afford goods and services beyond what is absolutely necessary The Rwandan economy is dominated by agriculture, which accounts for about three-quarters of GDP and employs 85% of its labor force.

Coffee, tea, pyrethrum (insecticide), and cotton are Rwanda's main cash crops. Tourism is an increasingly important sector and is encouraged by government tax incentives. According to official statistics tourism receipts doubled from US$17 million in 1995 to US$35 million in 1998.

 

Industrial Growth:

The Rwandan economy is one of Africa’s fastest growing, with growth averaging over 6% per year since 2005. The country has great potential for both service and industrial development. Industries that are currently booming include information technology (IT), agro processing, light manufacturing, tourism and energy. In Rwanda was ranked as the best place to do business in Africa by Forbes magazine.

Rwanda is also considered one of the most transparent countries on earth, ranking 20th out of 175 on Transparency International’s Corruption Perceptions Index This makes it an attractive prospect for foreign investment from companies who want to set up operations there but don’t want corruption issues to get in their way.

Despite these positive factors, however, starting a Business in Rwanda isn’t easy. There are many things you need to consider before you begin your journey.

 

 


We can provide you detailed project reports on the following topics. Please select the projects of your interests.
Each detailed project reports cover all the aspects of business, from analysing the market, confirming availability of various necessities such as plant & machinery, raw materials to forecasting the financial requirements. The scope of the report includes assessing market potential, negotiating with collaborators, investment decision making, corporate diversification planning etc. in a very planned manner by formulating detailed manufacturing techniques and forecasting financial aspects by estimating the ost of raw material, formulating the cash flow statement, projecting the balance sheet etc.
We also offer self-contained Pre-Investment and Pre-Feasibility Studies, Market Surveys and Studies, Preparation of Techno-Economic Feasibility Reports, Identification and Selection of Plant and Machinery, Manufacturing Process and or Equipment required, General Guidance, Technical and Commercial Counseling for setting up new industrial projects on the following topics. Many of the engineers, project consultant & industrial consultancy firms in India and worldwide use our project reports as one of the input in doing their analysis.


We can modify the project capacity and project cost as per your requirement.
We can also prepare project report on any subject as per your requirement.

Add multiple items to inquiry

Select the items and then press Add to inquiry button

Sort by :
Start a Production Of Compressed Biogas
Start a Production Of Compressed Biogas

Compressed bio gas (CBG) is a renewable energy source produced from organic material such as agricultural... Read More

Capacity : Compressed Bio Gas 6 MT Per Day Spent Slurry as Manure 60 MT Per Day
Plant and Machinery cost: 172.00 Lakhs
Working Capital : 0.00
Rate of Return (ROR):27.00%
Break Even Point (BEP):46.00 %
TCI :0.00 Lakhs
Cost of Project : 522.00Lakhs
Add To Inquiry Basket
Start Industry Of Craft Beer
Start Industry Of Craft Beer

Craft beer is a term used to describe a beer that has been made in a traditional and independent fashion. It is usually made in smaller batches wit... Read More

Capacity : Craft Beer (Bottles 650 ml Size) 3,847 Bottles per day Craft Beer (Al. Cans 500 ml Size) 5,000 Bot
Plant and Machinery cost: 780.00 Lakhs
Working Capital : 0.00
Rate of Return (ROR):27.00%
Break Even Point (BEP):49.00 %
TCI :0.00 Lakhs
Cost of Project : 2007.00Lakhs
Add To Inquiry Basket
Setup plant of  Acetate Tow  for Cigarette Filters
Setup plant of Acetate Tow for Cigarette Filters

Acetate tow is a type of material used in the cigarette industry to make filters. It is made of cellulose acet... Read More

Capacity : Acetate Tow 8 MT Per Day
Plant and Machinery cost: 542.00 Lakhs
Working Capital : 0.00
Rate of Return (ROR):29.00%
Break Even Point (BEP):50.00 %
TCI :0.00 Lakhs
Cost of Project : 1426.00Lakhs
Add To Inquiry Basket
Setup Plant  Of Titanium Dioxide From Rutile Ilmenite Ore
Setup Plant Of Titanium Dioxide From Rutile Ilmenite Ore

Titanium dioxide from rutil... Read More

Capacity : Titanium Dioxide 4 MT Per Day
Plant and Machinery cost: 390.00 Lakhs
Working Capital : 0.00
Rate of Return (ROR):27.00%
Break Even Point (BEP):62.00 %
TCI :0.00 Lakhs
Cost of Project : 1455.00Lakhs
Add To Inquiry Basket
Setup Plant Of  Lab Cultured Diamonds From Graphite
Setup Plant Of Lab Cultured Diamonds From Graphite

Lab-cultured diamonds are quickly becoming the new standard for luxury jewelry, offering many of the same qualities as trad... Read More

Capacity : Lab Cultured Diamonds (1 Carat) 30 Carat Per Day
Plant and Machinery cost: 200.00 Lakhs
Working Capital : 0.00
Rate of Return (ROR):25.00%
Break Even Point (BEP):57.00 %
TCI :0.00 Lakhs
Cost of Project : 361.00Lakhs
Add To Inquiry Basket
Start Lemon Processing Unit (Lemon Juice Powder, Lemon Peel Oil, Lemon Pectin)
Start Lemon Processing Unit (Lemon Juice Powder, Lemon Peel Oil, Lemon Pectin)

Lemon processing is the pro... Read More

Capacity : Lemon Juice Dry Powder 104 Kgs per day Lemon Peel Oil 40 Kgs per day Lemon Pectin 140 Kgs
Plant and Machinery cost: 163.00 Lakhs
Working Capital : 0.00
Rate of Return (ROR):25.00%
Break Even Point (BEP):54.00 %
TCI :0.00 Lakhs
Cost of Project : 314.00Lakhs
Add To Inquiry Basket
Solar PV (Photovoltaic) Glass Industry Manufacturing Business
Solar PV (Photovoltaic) Glass Industry Manufacturing Business

The global energy transition towards renewable sources is well underway, and solar po... Read More

Capacity : Solar PV (Photovoltaic) Glass 90,000 MT Per Annum
Plant and Machinery cost: 2800.00 Lakhs
Working Capital : 0.00
Rate of Return (ROR):28.00%
Break Even Point (BEP):69.00 %
TCI :0.00 Lakhs
Cost of Project : 4200.00Lakhs
Add To Inquiry Basket
A Business Plan For Pea Protein Isolate or Concentrate
A Business Plan For Pea Protein Isolate or Concentrate

Yellow peas are the source of the pea protein isolate and concentrate. These goods of... Read More

Capacity : Pea Protein Isolate 2 MT Per Day Spent Pea for Cattle Feed by Product 8 MT Per Day
Plant and Machinery cost: 118.00 Lakhs
Working Capital : 0.00
Rate of Return (ROR):27.00%
Break Even Point (BEP):54.00 %
TCI :0.00 Lakhs
Cost of Project : 614.00Lakhs
Add To Inquiry Basket
Setup Plant  Of  Acrylate Resins and Emulsions
Setup Plant Of Acrylate Resins and Emulsions

An important class of materials that have acquired extensive application in numerous ... Read More

Capacity : Acrylate Resins 10,000 MT Per Annum Acrylate Emulsions 10,000 MT Per Annum
Plant and Machinery cost: 500.00 Lakhs
Working Capital : 0.00
Rate of Return (ROR):30.00%
Break Even Point (BEP):54.00 %
TCI :0.00 Lakhs
Cost of Project : 2291.00Lakhs
Add To Inquiry Basket
Start Latex Rubber Thread Manufacturing Business
Start Latex Rubber Thread Manufacturing Business

A sort of elastic material created from either natural rubber... Read More

Capacity : Latex Rubber Thread 200 Kg. Per Day
Plant and Machinery cost: 145.00 Lakhs
Working Capital : 0.00
Rate of Return (ROR):26.00%
Break Even Point (BEP):53.00 %
TCI :0.00 Lakhs
Cost of Project : 412.00Lakhs
Add To Inquiry Basket
Start Cosmetic Unit (Serum, Cream, Shampoo & Lipstick) Manufacturing Business
Start Cosmetic Unit (Serum, Cream, Shampoo & Lipstick) Manufacturing Business

Serum, cream, shampoo, and lipstick are frequently seen in cosmetic units, which are ... Read More

Capacity : -
Plant and Machinery cost: 46.00 Lakhs
Working Capital : 0.00
Rate of Return (ROR):36.00%
Break Even Point (BEP):37.00 %
TCI :0.00 Lakhs
Cost of Project : 1617.00Lakhs
Add To Inquiry Basket
Pioneering Pea Protein Building a Successful Business Venture
Pioneering Pea Protein Building a Successful Business Venture

Healthy protein powder called pea healthy protein isolate/con... Read More

Capacity : 0
Plant and Machinery cost: 0.00 Lakhs
Working Capital : 0.00
Rate of Return (ROR):0.00%
Break Even Point (BEP):0.00 %
TCI :0.00 Lakhs
Cost of Project : 0.00Lakhs
Add To Inquiry Basket
Start Production Of Silica  From Rice Husk Ash
Start Production Of Silica From Rice Husk Ash

Silica is a mineral compound composed of silicon and oxygen, and is one of the most a... Read More

Capacity : -
Plant and Machinery cost: 2995.00 Lakhs
Working Capital : 0.00
Rate of Return (ROR):28.00%
Break Even Point (BEP):50.00 %
TCI :0.00 Lakhs
Cost of Project : 4716.00Lakhs
Add To Inquiry Basket
A Business Plan for IV Fluid (BFS Technology)
A Business Plan for IV Fluid (BFS Technology)

 

IV fluids, also k... Read More

Capacity : IV Fluids (500 ml Size Pack) 78,000 Packs Per Day
Plant and Machinery cost: 744.00 Lakhs
Working Capital : 0.00
Rate of Return (ROR):27.00%
Break Even Point (BEP):51.00 %
TCI :0.00 Lakhs
Cost of Project : 1263.00Lakhs
Add To Inquiry Basket
Start Industry of Liquor from Mahua (Wine and Hard Liquor)
Start Industry of Liquor from Mahua (Wine and Hard Liquor)

Mahua is a tropical tree native to the Indian subcontinent and Southeast Asia. It is ... Read More

Capacity : Wine (750 ml Size) 4,000,000 Bottles per annum Whiskey (375 ml Size) 4,000,000 Bottles per annum B
Plant and Machinery cost: 782.00 Lakhs
Working Capital : 0.00
Rate of Return (ROR):28.00%
Break Even Point (BEP):56.00 %
TCI :0.00 Lakhs
Cost of Project : 1880.00Lakhs
Add To Inquiry Basket
Setup Pharmaceutical Unit (Ciprofloxacin Tablets, Co-Trimoxazole Tablets, Diclofenac Sodium Tablets, Paracetamol Tablets, Metronidazole Tablets, Doxycycline Tablets, Fluconazole Capsules, Propranolol Capsules, Ciprofloxacin Injectables) Plant
Setup Pharmaceutical Unit (Ciprofloxacin Tablets, Co-Trimoxazole Tablets, Diclofenac Sodium Tablets, Paracetamol Tablets, Metronidazole Tablets, Doxycycline Tablets, Fluconazole Capsules, Propranolol Capsules, Ciprofloxacin Injectables) Plant

 

Pharmaceutical unit tablets and capsules are c... Read More

Capacity : -
Plant and Machinery cost: 179.00 Lakhs
Working Capital : 0.00
Rate of Return (ROR):37.00%
Break Even Point (BEP):29.00 %
TCI :0.00 Lakhs
Cost of Project : 35774.00Lakhs
Add To Inquiry Basket
Start Industry with Serum, Cream, and Shampoo | Turning Your Passion for Cosmetics into a Thriving Business with Serum, Cream, and Shampoo
Start Industry with Serum, Cream, and Shampoo | Turning Your Passion for Cosmetics into a Thriving Business with Serum, Cream, and Shampoo

Why The Beauty Indu... Read More

Capacity : 0
Plant and Machinery cost: 0.00 Lakhs
Working Capital : 0.00
Rate of Return (ROR):0.00%
Break Even Point (BEP):0.00 %
TCI :0.00 Lakhs
Cost of Project : 0.00Lakhs
Add To Inquiry Basket
Setup Unit Of Cement Plant with Power Generation
Setup Unit Of Cement Plant with Power Generation

Cement is a crucial binding agent that is use... Read More

Capacity : Cement Plant 40,000 Bags per Day
Plant and Machinery cost: 16500.00 Lakhs
Working Capital : 0.00
Rate of Return (ROR):26.00%
Break Even Point (BEP):44.00 %
TCI :0.00 Lakhs
Cost of Project : 25200.00Lakhs
Add To Inquiry Basket
A Business Plan for Sterile Water for Injection
A Business Plan for Sterile Water for Injection

Sterile water refers to water that is completely free from any living organisms, such... Read More

Capacity : Sterial Water for Injection 500 ml Size Pack 20,000 Sachets Per Day
Plant and Machinery cost: 572.00 Lakhs
Working Capital : 0.00
Rate of Return (ROR):30.00%
Break Even Point (BEP):66.00 %
TCI :0.00 Lakhs
Cost of Project : 1234.00Lakhs
Add To Inquiry Basket
Setup Plant Of Lead From Galena
Setup Plant Of Lead From Galena

Lead is a heavy metal that is commonly found in the earth's crust. Its abundance, low... Read More

Capacity : Lead Ingot 30 MT Per Day
Plant and Machinery cost: 487.00 Lakhs
Working Capital : 0.00
Rate of Return (ROR):28.00%
Break Even Point (BEP):52.00 %
TCI :0.00 Lakhs
Cost of Project : 2231.00Lakhs
Add To Inquiry Basket
A Business Plan Blood Collection Tubes, Urine and Stool Containers
A Business Plan Blood Collection Tubes, Urine and Stool Containers


Read More

Capacity : -
Plant and Machinery cost: 1214.00 Lakhs
Working Capital : 0.00
Rate of Return (ROR):28.00%
Break Even Point (BEP):48.00 %
TCI :0.00 Lakhs
Cost of Project : 2294.00Lakhs
Add To Inquiry Basket
A Business Plan for Paracetamol
A Business Plan for Paracetamol

Paracetamol is a popular over-the-counter pain reliever and f... Read More

Capacity : Paracetamol Powder 7 MT Per Day
Plant and Machinery cost: 274.00 Lakhs
Working Capital : 0.00
Rate of Return (ROR):27.00%
Break Even Point (BEP):64.00 %
TCI :0.00 Lakhs
Cost of Project : 779.00Lakhs
Add To Inquiry Basket
Start Manufacturing Business  Of  Baby & Adult Diaper and Sanitary Napkins
Start Manufacturing Business Of Baby & Adult Diaper and Sanitary Napkins

Baby & Adult Diapers an... Read More

Capacity : Baby Diapers (4 Pcs.) 84,000 Pkts Per Day Adult Diapers (4 Pcs.) 18,000 Pkts Per Day Sanitary
Plant and Machinery cost: 2356.00 Lakhs
Working Capital : 0.00
Rate of Return (ROR):29.00%
Break Even Point (BEP):41.00 %
TCI :0.00 Lakhs
Cost of Project : 4201.00Lakhs
Add To Inquiry Basket
Start Tissue Paper Manufacturing Business
Start Tissue Paper Manufacturing Business

Tissue paper is a lightweig... Read More

Capacity : Tissue Paper 20 MT Per Day
Plant and Machinery cost: 497.00 Lakhs
Working Capital : 0.00
Rate of Return (ROR):27.00%
Break Even Point (BEP):59.00 %
TCI :0.00 Lakhs
Cost of Project : 2101.00Lakhs
Add To Inquiry Basket
Launching a  Solar Panel Production Business
Launching a Solar Panel Production Business

 

Solar panels are ... Read More

Capacity : Solar Panel 500 MW per annum
Plant and Machinery cost: 810.00 Lakhs
Working Capital : 0.00
Rate of Return (ROR):32.00%
Break Even Point (BEP):56.00 %
TCI :0.00 Lakhs
Cost of Project : 5353.00Lakhs
Add To Inquiry Basket
Biodegradable Disposable Cups and Plates (Tableware) Manufacturing Using Sugarcane Bagasse Business
Biodegradable Disposable Cups and Plates (Tableware) Manufacturing Using Sugarcane Bagasse Business

Bagasse is the fibrous residue that remains after sugarcane o... Read More

Capacity : -
Plant and Machinery cost: 1941.00 Lakhs
Working Capital : 0.00
Rate of Return (ROR):27.00%
Break Even Point (BEP):46.00 %
TCI :0.00 Lakhs
Cost of Project : 2774.00Lakhs
Add To Inquiry Basket
Setup Curcumin Extraction Plant
Setup Curcumin Extraction Plant

Curcumin extraction refers to the process of isolating and ex... Read More

Capacity : Curcumin Powder 100 Kgs per day Turmeric Oil 47 Kgs per day Deoiled Turmeric 1,853 Kgs
Plant and Machinery cost: 216.00 Lakhs
Working Capital : 0.00
Rate of Return (ROR):28.00%
Break Even Point (BEP):64.00 %
TCI :0.00 Lakhs
Cost of Project : 491.00Lakhs
Add To Inquiry Basket
Setup Active Pharmaceutical Ingredients Acetaminophen, Metformin Hydrochloride, Azithromycin Dihydrate Unit
Setup Active Pharmaceutical Ingredients Acetaminophen, Metformin Hydrochloride, Azithromycin Dihydrate Unit

 

Active Pharmaceut... Read More

Capacity : Paracetamol 10,000 Kgs Per Day Azithromycin 10,000 Kgs Per Day Metformin 10,000 Kgs
Plant and Machinery cost: 1111.00 Lakhs
Working Capital : 0.00
Rate of Return (ROR):33.00%
Break Even Point (BEP):55.00 %
TCI :0.00 Lakhs
Cost of Project : 5246.00Lakhs
Add To Inquiry Basket
Gold Salt
Gold Salt

Gold salts are ionic chemical compounds of gold. The term, "gold salts" is a misnomer, and is ... Read More

Capacity : 0
Plant and Machinery cost: 0.00 Lakhs
Working Capital : 0.00
Rate of Return (ROR):0.00%
Break Even Point (BEP):0.00 %
TCI :0.00 Lakhs
Cost of Project : 0.00Lakhs
Add To Inquiry Basket
A Business Plan For Sanitary Napkins
A Business Plan For Sanitary Napkins

A sanitary napkin, also kno... Read More

Capacity : Sanitary Napkins 4,800 PKTS per day
Plant and Machinery cost: 26.00 Lakhs
Working Capital : 0.00
Rate of Return (ROR):27.00%
Break Even Point (BEP):67.00 %
TCI :0.00 Lakhs
Cost of Project : 84.00Lakhs
Add To Inquiry Basket
Start Manufacturing Of Blood Collection Tubes (Vacutainer)
Start Manufacturing Of Blood Collection Tubes (Vacutainer)

Blood collection tubes, also known as Vacutainer, are essential tools used in the med... Read More

Capacity : -
Plant and Machinery cost: 464.00 Lakhs
Working Capital : 0.00
Rate of Return (ROR):32.00%
Break Even Point (BEP):53.00 %
TCI :0.00 Lakhs
Cost of Project : 985.00Lakhs
Add To Inquiry Basket
Start Production Of Potato Flakes
Start Production Of Potato Flakes

Capacity : Potato Flakes 2 MT Per Day
Plant and Machinery cost: 178.00 Lakhs
Working Capital : 0.00
Rate of Return (ROR):25.00%
Break Even Point (BEP):45.00 %
TCI :0.00 Lakhs
Cost of Project : 563.00Lakhs
Add To Inquiry Basket
Setup Manufacturing Unit Of Bicycle Saddle & Pedals
Setup Manufacturing Unit Of Bicycle Saddle & Pedals

Bicycle saddles and pedals are two crucial components that di... Read More

Capacity : Saddle 7,000 Unit Per Day Pedals 10,000 Unit Per Day
Plant and Machinery cost: 208.00 Lakhs
Working Capital : 0.00
Rate of Return (ROR):31.00%
Break Even Point (BEP):54.00 %
TCI :0.00 Lakhs
Cost of Project : 575.00Lakhs
Add To Inquiry Basket
Opportunity in Sodium Sulfide Flakes Business From Sulfur and Caustic Soda
Opportunity in Sodium Sulfide Flakes Business From Sulfur and Caustic Soda

Sodium Sulfide Flakes, scie... Read More

Capacity : Sodium Sulfide Flakes 10,000 MT Per Annum
Plant and Machinery cost: 282.00 Lakhs
Working Capital : 0.00
Rate of Return (ROR):30.00%
Break Even Point (BEP):49.00 %
TCI :0.00 Lakhs
Cost of Project : 1426.00Lakhs
Add To Inquiry Basket
Business Plan for Lithium Ion Battery (Battery Assembly)
Business Plan for Lithium Ion Battery (Battery Assembly)

A lithium ion battery (Battery Assembly) is a rechargeable battery that is typically ... Read More

Capacity : -
Plant and Machinery cost: 172.00 Lakhs
Working Capital : 0.00
Rate of Return (ROR):29.00%
Break Even Point (BEP):61.00 %
TCI :0.00 Lakhs
Cost of Project : 812.00Lakhs
Add To Inquiry Basket
Start Manufacturing Business of Steel Containers (Cargo Containers)
Start Manufacturing Business of Steel Containers (Cargo Containers)


Read More

Capacity : Cargo Containers (Size 20 Feet) 34 Nos Per Day
Plant and Machinery cost: 272.00 Lakhs
Working Capital : 0.00
Rate of Return (ROR):29.00%
Break Even Point (BEP):51.00 %
TCI :0.00 Lakhs
Cost of Project : 1992.00Lakhs
Add To Inquiry Basket
Start Cutting and Grinding Disc Business
Start Cutting and Grinding Disc Business

 

Cutting and grind... Read More

Capacity : Cutting Disc Size: (115 mm x 1 mm) 2,000 Pcs Pr Day Grinding Disc (115 mm x 6 mm) 2,000 Pcs Pr Day
Plant and Machinery cost: 141.00 Lakhs
Working Capital : 0.00
Rate of Return (ROR):28.00%
Break Even Point (BEP):48.00 %
TCI :0.00 Lakhs
Cost of Project : 423.00Lakhs
Add To Inquiry Basket
Mink Blankets Production
Mink Blankets Production

 

Mink blankets, de... Read More

Capacity : -
Plant and Machinery cost: 2700.00 Lakhs
Working Capital : 0.00
Rate of Return (ROR):27.00%
Break Even Point (BEP):42.00 %
TCI :0.00 Lakhs
Cost of Project : 6000.00Lakhs
Add To Inquiry Basket
A Business Plan for Micronutrient Fortified Energy Dense Food (Rice Based)
A Business Plan for Micronutrient Fortified Energy Dense Food (Rice Based)

 

Micronutrient For... Read More

Capacity : Micronutrient Fortified Energy Dense Food 100 MT Per Day
Plant and Machinery cost: 1300.00 Lakhs
Working Capital : 0.00
Rate of Return (ROR):28.00%
Break Even Point (BEP):57.00 %
TCI :0.00 Lakhs
Cost of Project : 3500.00Lakhs
Add To Inquiry Basket
Start Business of Caustic Soda (Solids, Liquids, Flakes & Pearls)
Start Business of Caustic Soda (Solids, Liquids, Flakes & Pearls)


Read More

Capacity : -
Plant and Machinery cost: 29000.00 Lakhs
Working Capital : 0.00
Rate of Return (ROR):25.00%
Break Even Point (BEP):33.00 %
TCI :0.00 Lakhs
Cost of Project : 56500.00Lakhs
Add To Inquiry Basket
Start Crumb Rubber Powder Business from Waste Tyre (with Shredding Process)
Start Crumb Rubber Powder Business from Waste Tyre (with Shredding Process)

Crumb Rubber Powder represents a finely milled material produ... Read More

Capacity : Crumb Rubber Powder 10 MT Per Day By Product Steel Wire 2 MT Per Day
Plant and Machinery cost: 97.00 Lakhs
Working Capital : 0.00
Rate of Return (ROR):26.00%
Break Even Point (BEP):56.00 %
TCI :0.00 Lakhs
Cost of Project : 303.00Lakhs
Add To Inquiry Basket
Ferrochrome Manufacturing Business
Ferrochrome Manufacturing Business

 

Ferrochrome is an alloy that combines chromium wit... Read More

Capacity : Ferrochrome 135 MT Per Day
Plant and Machinery cost: 26900.00 Lakhs
Working Capital : 0.00
Rate of Return (ROR):10.00%
Break Even Point (BEP):46.00 %
TCI :0.00 Lakhs
Cost of Project : 40400.00Lakhs
Add To Inquiry Basket
Start a Business Of LPG Cylinders
Start a Business Of LPG Cylinders

LPG cylinders are pressurized containers and transport lique... Read More

Capacity : LPG Cylinders (14.20 Kgs Size) 3,334.0 Nos. per day LPG Cylinders (19 Kgs Size) 3,334.0 Nos. per day
Plant and Machinery cost: 911.00 Lakhs
Working Capital : 0.00
Rate of Return (ROR):32.00%
Break Even Point (BEP):46.00 %
TCI :0.00 Lakhs
Cost of Project : 3475.00Lakhs
Add To Inquiry Basket
Start Banana Wine Production Business
Start Banana Wine Production Business

Wine has been popular for centuries, and this fermented beve... Read More

Capacity : Banana Wine (750 ml size Bollte) 2,960 Bottles per day
Plant and Machinery cost: 530.00 Lakhs
Working Capital : 0.00
Rate of Return (ROR):25.00%
Break Even Point (BEP):47.00 %
TCI :0.00 Lakhs
Cost of Project : 1189.00Lakhs
Add To Inquiry Basket
Activated Carbon From Rice Husk Saw Dust & Coconut Shell Manufacturing Business Plan
Activated Carbon From Rice Husk Saw Dust & Coconut Shell Manufacturing Business Plan

 

Activated carbon is a type of carbon that has been... Read More

Capacity : Activated Carbon 2,000 Kg Per Day
Plant and Machinery cost: 334.00 Lakhs
Working Capital : 0.00
Rate of Return (ROR):25.00%
Break Even Point (BEP):41.00 %
TCI :0.00 Lakhs
Cost of Project : 606.00Lakhs
Add To Inquiry Basket
Set Up Activated Carbon From Rice Husk, Saw Dust & Coconut Shell Manufacturing Business Plan
Set Up Activated Carbon From Rice Husk, Saw Dust & Coconut Shell Manufacturing Business Plan

Activated carbon is a type of carbon that has been treated w... Read More

Capacity : Activated Carbon 2,000 Kg Per Day
Plant and Machinery cost: 334.00 Lakhs
Working Capital : 0.00
Rate of Return (ROR):25.00%
Break Even Point (BEP):41.00 %
TCI :0.00 Lakhs
Cost of Project : 606.00Lakhs
Add To Inquiry Basket
Set Up Business of Flat Glass Manufacturing Most Profitable Idea for Flat Glass Production Business
Set Up Business of Flat Glass Manufacturing Most Profitable Idea for Flat Glass Production Business

A flat glass Read More

Capacity : 0
Plant and Machinery cost: 0.00 Lakhs
Working Capital : 0.00
Rate of Return (ROR):0.00%
Break Even Point (BEP):0.00 %
TCI :0.00 Lakhs
Cost of Project : 0.00Lakhs
Add To Inquiry Basket
Set Up Business of Double Wall Corrugated Pipes Manufacturing Most Profitable Idea for Double Wall Corrugated Pipes Manufacturing Business
Set Up Business of Double Wall Corrugated Pipes Manufacturing Most Profitable Idea for Double Wall Corrugated Pipes Manufacturing Business

A type of pipe utilized in numerous applications is Read More

Capacity : 0
Plant and Machinery cost: 0.00 Lakhs
Working Capital : 0.00
Rate of Return (ROR):0.00%
Break Even Point (BEP):0.00 %
TCI :0.00 Lakhs
Cost of Project : 0.00Lakhs
Add To Inquiry Basket
A Business Plan for Bio-Degradable Plastic Polymer from Corn
A Business Plan for Bio-Degradable Plastic Polymer from Corn

Corn is a popular source for materials that can be recycled into bio-degradable plast... Read More

Capacity : 10,000 MT Per Annum
Plant and Machinery cost: 6058.00 Lakhs
Working Capital : 0.00
Rate of Return (ROR):28.00%
Break Even Point (BEP):38.00 %
TCI :0.00 Lakhs
Cost of Project : 8100.00Lakhs
Add To Inquiry Basket
Sulphur Powder Manufacturing Business
Sulphur Powder Manufacturing Business

 

Sulphur powder, o... Read More

Capacity : 20,000 MT Per Annum
Plant and Machinery cost: 1225.00 Lakhs
Working Capital : 0.00
Rate of Return (ROR):24.00%
Break Even Point (BEP):40.00 %
TCI :0.00 Lakhs
Cost of Project : 4318.00Lakhs
Add To Inquiry Basket
Manufacturing Business Ginger Oil & Ginger Powder
Manufacturing Business Ginger Oil & Ginger Powder

 

Ginger oil, also ... Read More

Capacity : 60,000 Kg. Per Annum , 1,44,000 Kg. Per Annum
Plant and Machinery cost: 381.00 Lakhs
Working Capital : 0.00
Rate of Return (ROR):28.00%
Break Even Point (BEP):66.00 %
TCI :0.00 Lakhs
Cost of Project : 528.00Lakhs
Add To Inquiry Basket
Start a Business of Manufacturing Steel Epoxy Putty Stick
Start a Business of Manufacturing Steel Epoxy Putty Stick

In the 1960s, MIT researche... Read More

Capacity : 1,500 Dz. Per Annum
Plant and Machinery cost: 2.00 Lakhs
Working Capital : 0.00
Rate of Return (ROR):35.00%
Break Even Point (BEP):35.00 %
TCI :0.00 Lakhs
Cost of Project : 34.00Lakhs
Add To Inquiry Basket
Start Activated Carbon from Rice Husk, Saw Dust & Coconut Shell Processing Business Profitable & Potential Business Idea of Activated Carbon from Rice Husk, Saw Dust & Coconut Shell
Start Activated Carbon from Rice Husk, Saw Dust & Coconut Shell Processing Business Profitable & Potential Business Idea of Activated Carbon from Rice Husk, Saw Dust & Coconut Shell

Popular air purifiers conta... Read More

Capacity : 0
Plant and Machinery cost: 0.00 Lakhs
Working Capital : 0.00
Rate of Return (ROR):0.00%
Break Even Point (BEP):0.00 %
TCI :0.00 Lakhs
Cost of Project : 0.00Lakhs
Add To Inquiry Basket
Most Demandable Business Idea for Mini Steel Plant (Billets and TMT Bar) Start Production of Steel Billets and TMT Bar
Most Demandable Business Idea for Mini Steel Plant (Billets and TMT Bar) Start Production of Steel Billets and TMT Bar

One of the most widely used metals in the world, Read More

Capacity : 0
Plant and Machinery cost: 0.00 Lakhs
Working Capital : 0.00
Rate of Return (ROR):0.00%
Break Even Point (BEP):0.00 %
TCI :0.00 Lakhs
Cost of Project : 0.00Lakhs
Add To Inquiry Basket
Cumin, Turmeric, Chilly & Coriander Trading or Exporter
Cumin, Turmeric, Chilly & Coriander Trading or Exporter

In the food industry, Read More

Capacity : 0
Plant and Machinery cost: 0.00 Lakhs
Working Capital : 0.00
Rate of Return (ROR):0.00%
Break Even Point (BEP):0.00 %
TCI :0.00 Lakhs
Cost of Project : 0.00Lakhs
Add To Inquiry Basket
Start Production Of Wire Nails
Start Production Of Wire Nails

 

Wire nails are a ... Read More

Capacity : Wire Nails: 48,000 MT Per Annum, Wire Scraps: 4,500 MT Per Annum
Plant and Machinery cost: 939.00 Lakhs
Working Capital : 0.00
Rate of Return (ROR):30.00%
Break Even Point (BEP):70.00 %
TCI :0.00 Lakhs
Cost of Project : 1736.00Lakhs
Add To Inquiry Basket
Auto Brake Pad  and  Auto Brake Shoe Production Business
Auto Brake Pad and Auto Brake Shoe Production Business

 

Auto Brake Pads a... Read More

Capacity : Auto Brake Pads 3,600,000 Nos. Per Annum Auto Brake Shoes 720,000 Nos. Per Annum
Plant and Machinery cost: 279.00 Lakhs
Working Capital : 0.00
Rate of Return (ROR):27.00%
Break Even Point (BEP):45.00 %
TCI :0.00 Lakhs
Cost of Project : 1422.00Lakhs
Add To Inquiry Basket
Business Plan for Production of Double and Single Wall Vacuum Steel Bottles
Business Plan for Production of Double and Single Wall Vacuum Steel Bottles

 

Double-wall vacuu... Read More

Capacity : Double Wall Vacuum Steel Bottles 600,000 Bottles Per Annum Single Wall Vacuum Steel Bottles 600,0
Plant and Machinery cost: 963.00 Lakhs
Working Capital : 0.00
Rate of Return (ROR):28.00%
Break Even Point (BEP):52.00 %
TCI :0.00 Lakhs
Cost of Project : 1619.00Lakhs
Add To Inquiry Basket
A Business Plan for Ferric Pyrophosphate
A Business Plan for Ferric Pyrophosphate

 

Ferric pyrophosph... Read More

Capacity : Ferric Pyrophosphate 600 MT Per Annum
Plant and Machinery cost: 48.00 Lakhs
Working Capital : 0.00
Rate of Return (ROR):31.00%
Break Even Point (BEP):73.00 %
TCI :0.00 Lakhs
Cost of Project : 133.00Lakhs
Add To Inquiry Basket
How to Start A Business of Auto Piston
How to Start A Business of Auto Piston

An Read More

Capacity : 0
Plant and Machinery cost: 0.00 Lakhs
Working Capital : 0.00
Rate of Return (ROR):0.00%
Break Even Point (BEP):0.00 %
TCI :0.00 Lakhs
Cost of Project : 0.00Lakhs
Add To Inquiry Basket
NameCapacityRate of return (ROR):Cost of project
Start a Production Of Com... Compressed Bio Gas 6 MT Per Day Spent Slurry as Manure 60 MT Per Day 27.00 522.00
Start Industry Of Craft B... Craft Beer (Bottles 650 ml Size) 3,847 Bottles per day Craft Beer (Al. Cans 500 ml Size) 5,000 Bot 27.00 2007.00
Setup plant of Acetate T... Acetate Tow 8 MT Per Day 29.00 1426.00
Setup Plant Of Titanium ... Titanium Dioxide 4 MT Per Day 27.00 1455.00
Setup Plant Of Lab Cultu... Lab Cultured Diamonds (1 Carat) 30 Carat Per Day 25.00 361.00
Start Lemon Processing Un... Lemon Juice Dry Powder 104 Kgs per day Lemon Peel Oil 40 Kgs per day Lemon Pectin 140 Kgs 25.00 314.00
Solar PV (Photovoltaic) G... Solar PV (Photovoltaic) Glass 90,000 MT Per Annum 28.00 4200.00
A Business Plan For Pea P... Pea Protein Isolate 2 MT Per Day Spent Pea for Cattle Feed by Product 8 MT Per Day 27.00 614.00
Setup Plant Of Acrylate... Acrylate Resins 10,000 MT Per Annum Acrylate Emulsions 10,000 MT Per Annum 30.00 2291.00
Start Latex Rubber Thread... Latex Rubber Thread 200 Kg. Per Day 26.00 412.00
Start Cosmetic Unit (Seru... - 36.00 1617.00
Pioneering Pea Protein Bu... 0 0.00 0.00
Start Production Of Silic... - 28.00 4716.00
A Business Plan for IV Fl... IV Fluids (500 ml Size Pack) 78,000 Packs Per Day 27.00 1263.00
Start Industry of Liquor ... Wine (750 ml Size) 4,000,000 Bottles per annum Whiskey (375 ml Size) 4,000,000 Bottles per annum B 28.00 1880.00
Setup Pharmaceutical Unit... - 37.00 35774.00
Start Industry with Serum... 0 0.00 0.00
Setup Unit Of Cement Plan... Cement Plant 40,000 Bags per Day 26.00 25200.00
A Business Plan for Steri... Sterial Water for Injection 500 ml Size Pack 20,000 Sachets Per Day 30.00 1234.00
Setup Plant Of Lead From ... Lead Ingot 30 MT Per Day 28.00 2231.00
A Business Plan Blood Col... - 28.00 2294.00
A Business Plan for Parac... Paracetamol Powder 7 MT Per Day 27.00 779.00
Start Manufacturing Busin... Baby Diapers (4 Pcs.) 84,000 Pkts Per Day Adult Diapers (4 Pcs.) 18,000 Pkts Per Day Sanitary 29.00 4201.00
Start Tissue Paper Manufa... Tissue Paper 20 MT Per Day 27.00 2101.00
Launching a Solar Panel ... Solar Panel 500 MW per annum 32.00 5353.00
Biodegradable Disposable ... - 27.00 2774.00
Setup Curcumin Extraction... Curcumin Powder 100 Kgs per day Turmeric Oil 47 Kgs per day Deoiled Turmeric 1,853 Kgs 28.00 491.00
Setup Active Pharmaceutic... Paracetamol 10,000 Kgs Per Day Azithromycin 10,000 Kgs Per Day Metformin 10,000 Kgs 33.00 5246.00
Gold Salt 0 0.00 0.00
A Business Plan For Sanit... Sanitary Napkins 4,800 PKTS per day 27.00 84.00
12345678910...
« Back1 2 3 4 5Next »

Showing 1 - 60 of 575 Product(s)

Subject of your Interest

Information

  • One Lac / Lakh / Lakhs is equivalent to one hundred thousand (100,000)
  • One Crore is equivalent to ten million (10,000,000)
  • T.C.I is Total Capital Investment
  • We can modify the project capacity and project cost as per your requirement.
  • We can also prepare project report on any subject as per your requirement.
  • Caution: The project's cost, capacity and return are subject to change without any notice. Future projects may have different values of project cost, capacity or return.

ABOUT NPCS

 

NIIR PROJECT CONSULTANCY SERVICES (NPCS) is a reliable name in the industrial world for offering integrated technical consultancy services. NPCS is manned by engineers, planners, specialists, financial experts, economic analysts and design specialists with extensive experience in the related industries.

Our various services are: Detailed Project Report,  Business Plan for Manufacturing Plant, Start-up Ideas, Business Ideas for Entrepreneurs, Start up Business Opportunities, entrepreneurship projects, Successful Business Plan, Industry Trends, Market Research, Manufacturing Process, Machinery, Raw Materials, project report, Cost and Revenue, Pre-feasibility study for Profitable Manufacturing Business, Project Identification, Project Feasibility and Market Study, Identification of Profitable Industrial Project Opportunities, Business Opportunities, Investment Opportunities for Most Profitable Business in India, Manufacturing Business Ideas, Preparation of Project Profile, Pre-Investment and Pre-Feasibility Study, Market Research Study, Preparation of Techno-Economic Feasibility Report, Identification and Section of Plant, Process, Equipment, General Guidance, Startup Help, Technical and Commercial Counseling for setting up new industrial project and Most Profitable Small Scale Business.

NPCS also publishes varies process technology, technical, reference, self employment and startup books, directory, business and industry database, bankable detailed project report, market research report on various industries, small scale industry and profit making business. Besides being used by manufacturers, industrialists and entrepreneurs, our publications are also used by professionals including project engineers, information services bureau, consultants and project consultancy firms as one of the input in their research.

Our Detailed Project report aims at providing all the critical data required by any entrepreneur vying to venture into Project. While expanding a current business or while venturing into new business, entrepreneurs are often faced with the dilemma of zeroing in on a suitable product/line.

 


And before diversifying/venturing into any product, wish to study the following aspects of the identified product:


• Good Present/Future Demand
• Export-Import Market Potential
• Raw Material & Manpower Availability
• Project Costs and Payback Period


We at NPCS, through our reliable expertise in the project consultancy and market research field, Provides exhaustive information about the project, which satisfies all the above mentioned requirements and has high growth potential in the markets. And through our report we aim to help you make sound and informed business decision.

 

The report contains all the data which will help an entrepreneur find answers to questions like:

• Why I should invest in this project?
• What will drive the growth of the product?
• What are the costs involved?
• What will be the market potential?


The report first focuses on enhancing the basic knowledge of the entrepreneur about the main product, by elucidating details like product definition, its uses and applications, industry segmentation as well as an overall overview of the industry sector in India. The report then helps an entrepreneur identify the target customer group of its product. It further helps in making sound investment decision by listing and then elaborating on factors that will contribute to the growth of product consumption in India and also talks about the foreign trade of the product along with the list of top importing and top exporting countries. Report includes graphical representation and forecasts of key data discussed in the above mentioned segment. It further explicates the growth potential of the product.

The report includes other market data like key players in the Industry segment along with their contact information and recent developments. It includes crucial information like raw material requirements, list of machinery and manufacturing process for the plant. Core project financials like plant capacity, costs involved in setting up of project, working capital requirements, projected revenue and profit are further listed in the report.


Reasons for buying the report:

• This report helps you to identify a profitable project for investing or diversifying into by throwing light to crucial areas like industry size, demand of the product and reasons for investing in the product.

• This report provides vital information on the product like its definition, characteristics and segmentation.

• This report helps you market and place the product correctly by identifying the target customer group of the product.

• This report helps you understand the viability of the project by disclosing details like raw materials required, manufacturing process, project costs and snapshot of other project financials.

• The report provides forecasts of key parameters which helps to anticipate the industry performance and make sound business decision.

 

Our Approach:


• Our research reports broadly cover Indian markets, present analysis, outlook and forecast.

• The market forecasts are developed on the basis of secondary research and are cross-validated through interactions with the industry players. 

• We use reliable sources of information and databases.  And information from such sources is processed by us and included in the report.

 

Our Market Survey cum Detailed Techno Economic Feasibility Report Contains following information:

 

 

Ø  Introduction

·         Project Introduction

·         Project Objective and Strategy

·         Concise History of the Product

·         Properties

·         BIS (Bureau of Indian Standards) Provision & Specification

·         Uses & Applications

 

Ø  Market Study and Assessment

·         Current Indian Market Scenario

·         Present Market Demand and Supply

·         Estimated Future Market Demand and Forecast

·         Statistics of Import & Export

·         Names & Addresses of Existing Units (Present Players)

·         Market Opportunity

 

Ø  Raw Material

·         List of Raw Materials

·         Properties of Raw Materials

·         Prescribed Quality of Raw Materials

·         List of Suppliers and Manufacturers

 

Ø  Personnel (Manpower) Requirements

·         Requirement of Staff & Labor (Skilled and Unskilled) Managerial, Technical, Office Staff and Marketing Personnel

 

Ø  Plant and Machinery

·         List of Plant & Machinery

·         Miscellaneous Items

·         Appliances & Equipments

·         Laboratory Equipments & Accessories

·         Electrification

·         Electric Load & Water

·         Maintenance Cost

·         Sources of Plant & Machinery (Suppliers and Manufacturers)

 

Ø  Manufacturing Process and Formulations

·         Detailed Process of Manufacture with Formulation

·         Packaging Required

·         Process Flow Sheet Diagram

 

Ø  Infrastructure and Utilities

·         Project Location

·         Requirement of Land Area

·         Rates of the Land

·         Built Up Area

·         Construction Schedule

·         Plant Layout and Requirement of Utilities

 

Project at a Glance

Along with financial details as under:

 

  •     Assumptions for Profitability workings

  •    Plant Economics

  •    Production Schedule

  •    Land & Building

            Factory Land & Building

            Site Development Expenses

  •    Plant & Machinery

             Indigenous Machineries

            Other Machineries (Miscellaneous, Laboratory etc.)

  •    Other Fixed Assets

            Furniture & Fixtures

            Pre-operative and Preliminary Expenses

            Technical Knowhow

            Provision of Contingencies

  •   Working Capital Requirement Per Month

             Raw Material

            Packing Material

            Lab & ETP Chemical Cost

           Consumable Store

  •   Overheads Required Per Month And Per Annum

         Utilities & Overheads (Power, Water and Fuel Expenses etc.)

             Royalty and Other Charges

            Selling and Distribution Expenses

  •    Salary and Wages

  •    Turnover Per Annum

  •   Share Capital

            Equity Capital

            Preference Share Capital

 

  •    Annexure 1:: Cost of Project and Means of Finance

  •    Annexure 2::  Profitability and Net Cash Accruals

                Revenue/Income/Realisation

                Expenses/Cost of Products/Services/Items

                Gross Profit

                Financial Charges     

                Total Cost of Sales

                Net Profit After Taxes

                Net Cash Accruals

  •   Annexure 3 :: Assessment of Working Capital requirements

                Current Assets

                Gross Working. Capital

                Current Liabilities

                Net Working Capital

                Working Note for Calculation of Work-in-process

  •    Annexure 4 :: Sources and Disposition of Funds

  •    Annexure 5 :: Projected Balance Sheets

                ROI (Average of Fixed Assets)

                RONW (Average of Share Capital)

                ROI (Average of Total Assets)

  •    Annexure 6 :: Profitability ratios

                D.S.C.R

                Earnings Per Share (EPS)

               

             Debt Equity Ratio

        Annexure 7   :: Break-Even Analysis

                Variable Cost & Expenses

                Semi-Var./Semi-Fixed Exp.

                Profit Volume Ratio (PVR)

                Fixed Expenses / Cost 

                B.E.P

  •   Annexure 8 to 11:: Sensitivity Analysis-Price/Volume

            Resultant N.P.B.T

            Resultant D.S.C.R

   Resultant PV Ratio

   Resultant DER

  Resultant ROI

          Resultant BEP

  •    Annexure 12 :: Shareholding Pattern and Stake Status

        Equity Capital

        Preference Share Capital

  •   Annexure 13 :: Quantitative Details-Output/Sales/Stocks

        Determined Capacity P.A of Products/Services

        Achievable Efficiency/Yield % of Products/Services/Items 

        Net Usable Load/Capacity of Products/Services/Items   

       Expected Sales/ Revenue/ Income of Products/ Services/ Items   

  •    Annexure 14 :: Product wise domestic Sales Realisation

  •    Annexure 15 :: Total Raw Material Cost

  •    Annexure 16 :: Raw Material Cost per unit

  •    Annexure 17 :: Total Lab & ETP Chemical Cost

  •    Annexure 18  :: Consumables, Store etc.,

  •    Annexure 19  :: Packing Material Cost

  •    Annexure 20  :: Packing Material Cost Per Unit

  •    Annexure 21 :: Employees Expenses

  •    Annexure 22 :: Fuel Expenses

  •    Annexure 23 :: Power/Electricity Expenses

  •    Annexure 24 :: Royalty & Other Charges

  •    Annexure 25 :: Repairs & Maintenance Exp.

  •    Annexure 26 :: Other Mfg. Expenses

  •    Annexure 27 :: Administration Expenses

  •    Annexure 28 :: Selling Expenses

  •    Annexure 29 :: Depreciation Charges – as per Books (Total)

  •   Annexure 30   :: Depreciation Charges – as per Books (P & M)

  •   Annexure 31   :: Depreciation Charges - As per IT Act WDV (Total)

  •   Annexure 32   :: Depreciation Charges - As per IT Act WDV (P & M)

  •   Annexure 33   :: Interest and Repayment - Term Loans

  •   Annexure 34   :: Tax on Profits

  •   Annexure 35   ::Projected Pay-Back Period And IRR