Why should Start a Business in Zambia?

Here are some of them Zambia has one of the fastest growing economies in Africa and has enjoyed high rates of economic growth for over ten years. According to UNDP’s Human Development Report, Zambia’s gross national income per capita increased from $39 (PPP) in 1980 to $700 (PPP) in making it one of Sub-Saharan Africa’s most rapidly developing countries.

The country is rich in Natural Resources including copper, cobalt, uranium and other precious metals. There are more than 2 million scale businesses in Zambia. Businesses play a vital role providing goods and services. These factors make Zambia an ideal place to start a business. The World Bank classifies a country as being upper middle income when it’s GNI per capita reaches US$1,045.

 

What are the Natural Resources in Zambia?

Mining accounts for 12.5% of GDP and copper is a major export. Other Natural Resources include coal, cobalt, iron ore, bauxite and tantalum. Agriculture is an important part of Zambia's economy. Major agricultural exports include maize and tobacco but other commodities such as sugar, sesame seeds and sunflower seeds are also produced to meet local consumption demand. Food imports amounted to 1.3% of total.

 

What are the Manufacturing Business Opportunities in Zambia?

There are various starting sectors which an individual can venture into upon moving in Zambia. These are: agriculture and forestry, mining and quarrying industry, manufacturing industry, water supply and sanitation, construction (which includes energy), transportation & storage industry and financial services.

Some of these industries have a number of industrial sub-sectors where you can find suitable manufacture businesses. Agriculture is Husbandry, Crop Production and Fisheries while Forestry is divided into Timber Production, Logging and Plywood.

Mining & Quarrying has four sub-sectors namely Copper Mining, Gold Mining, Iron Ore Mining and Limestone Quarrying. Manufacturing sector consists of seven sub-sectors namely Food Processing, Beverages, Textiles and Apparel, Wood Products, Paper Products and Printing.

The Water Supply & Sanitation sector has five sub-sectors namely Sewerage Services, Water Supply Services including Operation and Maintenance Services for Water Treatment Plants. Construction Industry is also made up of several sub-sectors such as Building Construction, Civil Engineering Construction and Infrastructure Construction.

Transportation & Storage Sector covers Air Transport Services, Rail Transport Services, Road Transport Services and Sea Transport Service. Financial services consist of Banking Sector, Insurance Sector and Securities Exchange Market.

 

What Businesses are Successful in Zambia?

There are some industries that struggle in many developing markets because of political or economic instability. The following is a list of successful businesses that are currently being run successfully in Zambia * Retail * Automotive * Agriculture * Mining * Forestry (timber). These industries were have been successful in Zambia.

 

Is Zambia good for business?

Start a business in Africa, there’s no better place than Zambia. The country is growing at an impressive rate—more than 5% per year—and its economy is relatively stable. Yet despite all of these positives, many investors are interested in Zambia.  Market that has tremendous potential for growth and development. According to projections from the World Bank, Zambia will have one of the highest growth rates in sub-Saharan Africa over the years.

 

Business-Friendly Policies and Government Initiatives of Zambia:

The Government of Zambia has adopted several policies and initiated numerous initiatives to encourage a conducive environment for conducting businesses. These include: trade liberalization reforms; a reduction in red tape; an increase of electricity generation capacity and distribution; privatization of state-owned enterprises; tax breaks for investors. There is no doubt that these developments have played a big role towards improving investor confidence.

President Edgar Lung continued policies such as creation of special economic zones (SEZs) and encouraging private sector participation in infrastructure development. It initiated major economic reforms to encourage private sector development, diversify economic activity and attract investment into strategic sectors such as mining, construction and manufacturing.

The country also lowered trade barriers to expand markets. These initiatives have helped attract large-scale investments into several industries like cement production, agricultural processing.

 

Zambia Industrial Infrastructure:

Industrial infrastructure of Zambia is developed and there are large-scale industries of mining (copper, coal and emeralds) and light manufacturing. The service sector comprises 50% of GDP but most employment is concentrated in subsistence agriculture. The country has a wide range of mineral resources including copper, cobalt, uranium and emeralds. There is hydropower development and tourism.

Agriculture accounts for about 30% of GDP. It is also main source of investor earnings through cotton, cashew nuts, sugarcane and tobacco. Rice production accounts for 12% of agricultural .Livestock production accounts for 10%. Exports were US$1 billion while imports were US$1.7 billion with trade deficit at US$0.7 billion.

Imports include machinery, petroleum products, chemicals and transport equipment. Export commodities include gold, timber, coffee and fish. International reserves stood at US$2 billion. The currency is Kwacha which was introduced in 2006 replacing Zambian kwacha (ZMK). Inflation rate stood at 6%.

Bank loans to private sector grew by 23% while annual growth rate of money supply was 9%.  The fiscal policy was expansionary. Government expenditure increased by 19% while tax revenue increased by 15%. Current account balance recorded a surplus of 2%.  Investment was $US 500 million.

 

What are the steps for Starting a Business in  Zambia?

Starting a Business in Zambia steps are mention below:

Check the company name for uniqueness.

The declaration of compliance (Companies Form 11) must be signed by a Commissioner of Oaths.

Obtain a tax ID number.

Register for Social Security.

Register for VAT.

Get an investment registration certificate

Open a bank account.

And get permit license for business.

 

Market size of Zambia:

Zambia is a politically stable, multi-party democracy, rich in Natural Resources. Estimated population of 17.2 million – 42 percent urban population. Positive economic growth for 14 years. Estimates indicate the economy grew by 4.1 percent in 2017, compared to 3.8 percent in 2016.  Among the key sectors, agriculture, tourism, manufacturing, mining, and electricity generation improved from a 2015-2016 slump. In the monetary sector, the Bank of Zambia (BOZ) continued its monetary easing resulting in more commercial bank liquidity. 

Inflation remained within the BOZ’s medium target range of 6-8. The economy enjoys liberalized prices on most items, a stable foreign exchange rate, and no currency controls. In 2017, Zambia’s main export partners was Switzerland which accounted for 44.2 percent of total exports (due more to the location of commodity traders, rather than actual exportation).  Others include: China (14 percent), Singapore, South Africa, and the Democratic Republic of Congo (DRC).  During the same period, Zambia’s main import partner was South Africa followed by DRC, China, Mauritius, and Kenya.

Zambia’s total imports from the United States were $83.9 million.  These consisted primarily of machinery, rubber, and vehicles. $66.1 million in Zambian exports went to the United States.  These consisted almost entirely of copper, cobalt, precious stones (primarily emeralds), and cotton. Zambia is a member of the Southern Africa Development Community (SADC) and the Common Market for Eastern and Southern Africa (COMESA).

 

Industrial Growth of Zambia:

Industrial output in Zambia is dominated by the food, beverages and tobacco sectors. These contributed 67.6 % of manufacturing GDP. The remaining sectors contributed less than 35 % of GDP. Mining, Copper mining and processing contribute over 85% to the country's exports, Agriculture.

Agriculture plays a vital role in the Zambian economy than the mining sector. Tourism is one of the primary and growing sectors in Zambia and Energy. Five factors that spurred industrial growth in the late 1800's are Abundant Natural Resources (coal, iron, oil); Abundant labor supply; Railroads; Labor saving technological advances (new patents) Business government policies.

 

 


We can provide you detailed project reports on the following topics. Please select the projects of your interests.
Each detailed project reports cover all the aspects of business, from analysing the market, confirming availability of various necessities such as plant & machinery, raw materials to forecasting the financial requirements. The scope of the report includes assessing market potential, negotiating with collaborators, investment decision making, corporate diversification planning etc. in a very planned manner by formulating detailed manufacturing techniques and forecasting financial aspects by estimating the ost of raw material, formulating the cash flow statement, projecting the balance sheet etc.
We also offer self-contained Pre-Investment and Pre-Feasibility Studies, Market Surveys and Studies, Preparation of Techno-Economic Feasibility Reports, Identification and Selection of Plant and Machinery, Manufacturing Process and or Equipment required, General Guidance, Technical and Commercial Counseling for setting up new industrial projects on the following topics. Many of the engineers, project consultant & industrial consultancy firms in India and worldwide use our project reports as one of the input in doing their analysis.


We can modify the project capacity and project cost as per your requirement.
We can also prepare project report on any subject as per your requirement.

Add multiple items to inquiry

Select the items and then press Add to inquiry button

Sort by :
Automatic Packaged Drinking Water
Automatic Packaged Drinking Water

It is needless to mention that water, a compound of Hydrogen and Oxygen is a precious natural gift which is very essential for survival of mankind ... Read More

Capacity : Packaged Drinking Water (1 Ltr. Size):120000
Plant and Machinery cost: 65.00 Lakhs
Working Capital : 0.00
Rate of Return (ROR):28.00%
Break Even Point (BEP):60.00 %
TCI :268.00 Lakhs
Cost of Project : 268.00Lakhs
Add To Inquiry Basket
Bicycle Manufacturing
Bicycle Manufacturing

A bicycle, is a human-powered, pedal-driven, single-track vehicle, having two wheels attached to a frame, one behind the other. A bicycle rider is ... Read More

Capacity : Bicycles (Different Sizes):2000 Nos./Day
Plant and Machinery cost: 270.00 Lakhs
Working Capital : 0.00
Rate of Return (ROR):26.39%
Break Even Point (BEP):31.24 %
TCI :3972.00 Lakhs
Cost of Project : 3972.00Lakhs
Add To Inquiry Basket
Plastic Waste Recycling Plant
Plastic Waste Recycling Plant

Waste is now a global problem, and one that must be addressed in order to solve the world's resource and energy challenges. Plastics are made from ... Read More

Capacity : Plastic Granules 4500 Kgs/Day
Plant and Machinery cost: 43.00 Lakhs
Working Capital : 0.00
Rate of Return (ROR):26.00%
Break Even Point (BEP):64.52 %
TCI :219.00 Lakhs
Cost of Project : 219.00Lakhs
Add To Inquiry Basket
Iron Ore Mining (E O U)
Iron Ore Mining (E O U)

An ‘Ore’ may be defined as the aggregate of minerals from which a desired constituent mineral can be extracte... Read More

Capacity : Iron Ore: 800 MT/Day
Plant and Machinery cost: 779.00 Lakhs
Working Capital : 0.00
Rate of Return (ROR):28.00%
Break Even Point (BEP):43.00 %
TCI :2485.00 Lakhs
Cost of Project : 2485.00Lakhs
Add To Inquiry Basket
E–Waste Recycling Plant
E–Waste Recycling Plant

E-waste is a popular, informal name for electronic products nearing the end of their "useful life." Computers, televisions, VCRs, stereos, copiers,... Read More

Capacity : Monitors:10 Nos./Day•Plastic Granules: 4,600.00 Kgs/Day •Copper Wire Scraps:20 Kgs/Day •Glass from C
Plant and Machinery cost: 233.00 Lakhs
Working Capital : 0.00
Rate of Return (ROR):8.00%
Break Even Point (BEP):59.00 %
TCI :613.00 Lakhs
Cost of Project : 613.00Lakhs
Add To Inquiry Basket
Laundry Unit
Laundry Unit

There is cleaning requirement everywhere. Cleanliness is the source of beauty and also the placement of God. Laundry unit is one of the unit by whi... Read More

Capacity : Washing & Iron: 700.0 Pcs/ day
Plant and Machinery cost: 48.00 Lakhs
Working Capital : 0.00
Rate of Return (ROR):21.00%
Break Even Point (BEP):51.00 %
TCI :145.00 Lakhs
Cost of Project : 145.00Lakhs
Add To Inquiry Basket
E–Waste Recycling Plant
E–Waste Recycling Plant

Electronic wastes, "e-waste", "e-scrap", or "Waste Electrical and Electronic Equipment" ("WEEE") is a description of surplus, obsolete, broken or d... Read More

Capacity : Monitor : 3000 Pcs. /annum,Plastic Dana: 1559 MT/annum,Copper Wire Scraps: 7.5 MT/annum,Glass from
Plant and Machinery cost: 233.00 Lakhs
Working Capital : 0.00
Rate of Return (ROR):28.00%
Break Even Point (BEP):46.00 %
TCI :526.00 Lakhs
Cost of Project : 526.00Lakhs
Add To Inquiry Basket
Vacuum Distillation of Crude Coal Tar(SPECIFICALLY CREOSOTE OIL)
Vacuum Distillation of Crude Coal Tar(SPECIFICALLY CREOSOTE OIL)

Vacuum distillation is the distillation process of separating liquids boiling above 150°C at 1 atm from Nonvolatile impurities. Another ... Read More

Capacity : Creosote Oil 1875 MT/Annum,Phenolic or Carbolic Oil 300 MT/Annum,Naphthalic Oil 900 MT/Annum,Wash Oi
Plant and Machinery cost: 149.00 Lakhs
Working Capital : 0.00
Rate of Return (ROR):26.00%
Break Even Point (BEP):33.00 %
TCI :323.00 Lakhs
Cost of Project : 323.00Lakhs
Add To Inquiry Basket
Active Pharma Ingredients(API)
Active Pharma Ingredients(API)
An active ingredient (AI) is the substance in a pharmaceutical drug or a pesticide that is biologically active. The similar terms active pharmaceutic... Read More
Capacity : Cephalexin Monohydrate: 500 Kgs/Day, Ampicillin Trihydrate: 500 Kgs/Day,Ibuprofen: 500 Kgs/Day
Plant and Machinery cost: 448.00 Lakhs
Working Capital : 0.00
Rate of Return (ROR):46.00%
Break Even Point (BEP):44.00 %
TCI :958.00 Lakhs
Cost of Project : 958.00Lakhs
Add To Inquiry Basket
Cast Iron Earth Pipes with Flanges
Cast Iron Earth Pipes with Flanges

Most of the old Cast Iron pipes are cast vertically but this type has been largely superseded by spun iron type manufactured up to a diameter of 90... Read More

Capacity : 2000 NOS./Day
Plant and Machinery cost: 371.00 Lakhs
Working Capital : 0.00
Rate of Return (ROR):24.00%
Break Even Point (BEP):45.00 %
TCI :1572.00 Lakhs
Cost of Project : 1572.00Lakhs
Add To Inquiry Basket
MANGANESE SULPHATE
MANGANESE SULPHATE

Manganese sulphate is commercially one of the most important compounds. It is an important mineral based chemical industry. The main constituent of... Read More

Capacity : 600 MT/Annum (Manganese Sulphate)
Plant and Machinery cost: 35.00 Lakhs
Working Capital : 0.00
Rate of Return (ROR):47.00%
Break Even Point (BEP):41.00 %
TCI :135.00 Lakhs
Cost of Project : 135.00Lakhs
Add To Inquiry Basket
TYRES AND TUBES FOR BICYCLE AND RICKSHAW
TYRES AND TUBES FOR BICYCLE AND RICKSHAW

Tyres and Tubes are the backbone of the bicycle and rickshaw. Bicycle and rickshaw continues to be the principal mode of transport for the low and ... Read More

Capacity : 300000 Nos. Tyres & 300000 Nos. Tubes
Plant and Machinery cost: 158.00 Lakhs
Working Capital : 0.00
Rate of Return (ROR):42.00%
Break Even Point (BEP):53.00 %
TCI :351.00 Lakhs
Cost of Project : 351.00Lakhs
Add To Inquiry Basket
PACKAGED DRINKING WATER AND PET BOTTLES
PACKAGED DRINKING WATER AND PET BOTTLES

Bottled Water means water intended for human consumption and which is sealed in bottles and other containers with no added ingredients except that ... Read More

Capacity : 6,00,00,000 Bottles/Annum
Plant and Machinery cost: 217.00 Lakhs
Working Capital : 0.00
Rate of Return (ROR):45.00%
Break Even Point (BEP):60.00 %
TCI :455.00 Lakhs
Cost of Project : 455.00Lakhs
Add To Inquiry Basket
DISPOSABLE PLASTIC CUPS, PLATES AND GLASSES
DISPOSABLE PLASTIC CUPS, PLATES AND GLASSES

The plastic industry in India plays a very important and key role in industrialization. Disposable cups, glasses, plates are used in daily life now... Read More

Capacity : 150 Lakhs Pcs/Annum Cups, 300 Lakhs Pcs/Annum Glass, 150 Lakhs Pcs/Annum Plates
Plant and Machinery cost: 34.00 Lakhs
Working Capital : 0.00
Rate of Return (ROR):42.00%
Break Even Point (BEP):48.00 %
TCI :104.00 Lakhs
Cost of Project : 104.00Lakhs
Add To Inquiry Basket
E Waste Recycling plant (Electronic waste, e-waste, e-scrap, or Waste Electrical and Electronic Equipment (WEEE))
E Waste Recycling plant (Electronic waste, e-waste, e-scrap, or Waste Electrical and Electronic Equipment (WEEE))

E-waste is a popular informal name for electronic product nearing the end of their useful life. Computers, televisions, VCR, stereos, copier, and f... Read More

Capacity : Monitor -10 Pcs/Day, Plastic Dana “ 5.33 M.T/Day,Copper Wire Scrap-9 Kg/day, Glass Scrap from C.R.
Plant and Machinery cost: 51.00 Lakhs
Working Capital : 0.00
Rate of Return (ROR):47.00%
Break Even Point (BEP):40.00 %
TCI :196.00 Lakhs
Cost of Project : 196.00Lakhs
Add To Inquiry Basket
Oxygen and Nitrogen Gas Plant
Oxygen and Nitrogen Gas Plant

Oxygen and nitrogen are the most important industrial gases finding its application in large quantities in metal fabrication and cutting industries... Read More

Capacity : 1200 Cubic Meter/Day
Plant and Machinery cost: 21.00 Lakhs
Working Capital : 0.00
Rate of Return (ROR):40.00%
Break Even Point (BEP):52.00 %
TCI :68.00 Lakhs
Cost of Project : 68.00Lakhs
Add To Inquiry Basket
Good Future Prospects for E-WASTE RECYCLING PLANT (Electronic waste, e-waste, e-scrap, or Waste Electrical and Electronic Equipment (WEEE))
Good Future Prospects for E-WASTE RECYCLING PLANT (Electronic waste, e-waste, e-scrap, or Waste Electrical and Electronic Equipment (WEEE))

Electronic waste, e-waste, e-scrap, or Waste Electrical and Electronic Equipment (WEEE) is a loose category of surplus, obsolete, broken, or discar... Read More

Capacity : Monitor -10 Pcs/Day, Plastic Granules – 5.33 M.T/Day, Copper Wire Scrap-9 Kg/day, Glass Scrap
Plant and Machinery cost: 51.00 Lakhs
Working Capital : 0.00
Rate of Return (ROR):47.00%
Break Even Point (BEP):40.00 %
TCI :196.00 Lakhs
Cost of Project : 196.00Lakhs
Add To Inquiry Basket
DRY CLEANING AND LAUNDRY UNIT
DRY CLEANING AND LAUNDRY UNIT
Cleaning requirement is everywhere in the world. Cleanliness is the source of beauty. Dry cleaning and laundry are the best units where dirty clothes ... Read More
Capacity : 210 Pcs. Dry Cleaning/Day, 300 Pcs. Washing & Iron /Day
Plant and Machinery cost: 8.00 Lakhs
Working Capital : 0.00
Rate of Return (ROR):45.00%
Break Even Point (BEP):46.00 %
TCI :38.00 Lakhs
Cost of Project : 38.00Lakhs
Add To Inquiry Basket
SPONGE IRON PLANT
SPONGE IRON PLANT

Sponge iron is the product created when iron ore is reduced to metallic iron, usually with some kind of carbon (charcoal, etc), at temperatures bel... Read More

Capacity : 135000 MT / Annum
Plant and Machinery cost: 7175.00 Lakhs
Working Capital : 0.00
Rate of Return (ROR):42.00%
Break Even Point (BEP):25.00 %
TCI :8923.00 Lakhs
Cost of Project : 8923.00Lakhs
Add To Inquiry Basket
IRON ORE PELLETIZATION PLANT
IRON ORE PELLETIZATION PLANT

Iron ore pellets are used in blast / electric furnaces for producing sponge iron and steels. Market by high productivity, lower fuel consumption an... Read More

Capacity : 1008000 MT/Annum
Plant and Machinery cost: 13800.00 Lakhs
Working Capital : 0.00
Rate of Return (ROR):46.00%
Break Even Point (BEP):55.00 %
TCI :22400.00 Lakhs
Cost of Project : 22400.00Lakhs
Add To Inquiry Basket
SYNTHETIC IRON OXIDE (Red, Yellow and other Oxides of Iron)
SYNTHETIC IRON OXIDE (Red, Yellow and other Oxides of Iron)

Iron oxides are extensively used in the preparation of paints. There are two main stains yellow and red. Both these varieties are available in synt... Read More

Capacity : 5 MT/ Day
Plant and Machinery cost: 80.00 Lakhs
Working Capital : 0.00
Rate of Return (ROR):42.00%
Break Even Point (BEP):42.00 %
TCI :400.00 Lakhs
Cost of Project : 400.00Lakhs
Add To Inquiry Basket
Concentrated Manganese Ore
Concentrated Manganese Ore

India holds a leading position as a source of manganese ore. The output of this mineral being the third largest in the world. The ore occurs in var... Read More

Capacity : 7500 MT/Annum
Plant and Machinery cost: 127.00 Lakhs
Working Capital : 0.00
Rate of Return (ROR):42.00%
Break Even Point (BEP):40.00 %
TCI :656.00 Lakhs
Cost of Project : 656.00Lakhs
Add To Inquiry Basket
TRADING OF IRON ORES
TRADING OF IRON ORES

Steel is considered to be the strongest material in that price. Day to day life and growth of industry and infrastructure in any country totally de... Read More

Capacity : 5000 MT/Day
Plant and Machinery cost: 156.00 Lakhs
Working Capital : 0.00
Rate of Return (ROR):52.00%
Break Even Point (BEP):21.00 %
TCI :2396.00 Lakhs
Cost of Project : 2396.00Lakhs
Add To Inquiry Basket
Bicycle Plant
Bicycle Plant

As a machine, the bicycle is found to deliver about 75 watts, travelling at 18 kmph on a sustained basis, although on a very short term basis power... Read More

Capacity : 7000 Nos. / Day
Plant and Machinery cost: 5718.00 Lakhs
Working Capital : 0.00
Rate of Return (ROR):41.00%
Break Even Point (BEP):47.00 %
TCI :7861.00 Lakhs
Cost of Project : 7861.00Lakhs
Add To Inquiry Basket
PIG IRON
PIG IRON

Today we find iron and steels of so many types and their products so wide spread all around, that it is hard to think if the world could progress a... Read More

Capacity : 10 Lakhs MT/Day
Plant and Machinery cost: 3800.00 Lakhs
Working Capital : 0.00
Rate of Return (ROR):48.00%
Break Even Point (BEP):29.00 %
TCI :38800.00 Lakhs
Cost of Project : 38800.00Lakhs
Add To Inquiry Basket
Synthetic Iron Oxide
Synthetic Iron Oxide

Synthetic iron oxides possess good tinting strength and excellent hiding powder. It is also light fast, resistant to alkalies and is available in y... Read More

Capacity : 5.00 MT/day
Plant and Machinery cost: 61.00 Lakhs
Working Capital : 0.00
Rate of Return (ROR):45.00%
Break Even Point (BEP):40.00 %
TCI :286.00 Lakhs
Cost of Project : 286.00Lakhs
Add To Inquiry Basket
Coal Washing Unit
Coal Washing Unit

Coal washing unit is one of the most important unit for upgradation of coal in sense of fed value by reducing of ash contents in the coal. It is ba... Read More

Capacity : 11700 MT/Day
Plant and Machinery cost: 3200.00 Lakhs
Working Capital : 891.00
Rate of Return (ROR):6.36%
Break Even Point (BEP):0.00 %
TCI :7241.00 Lakhs
Cost of Project : 7241.00Lakhs
Add To Inquiry Basket
Solar Panel Assembling & Solar Power Inverter on Grid, Off Grid WithSolar Pump Controller
Solar Panel Assembling & Solar Power Inverter on Grid, Off Grid WithSolar Pump Controller

A solar cell, sometimes called a photovoltaic cell, is a device that converts light energy into electrical energy.Solar panels generate free power ... Read More

Capacity : Poly Crystaline Solar PV Modules Cap10 Watt: 1,200,000 Nos/Annum Poly Crystaline Solar PV Module Cap
Plant and Machinery cost: 1225.00 Lakhs
Working Capital : 0.00
Rate of Return (ROR):26.00%
Break Even Point (BEP):56.00 %
TCI :1674.00 Lakhs
Cost of Project : 1674.00Lakhs
Add To Inquiry Basket
Bicycle Manufacturing
Bicycle Manufacturing

A bicycle, is a human-powered, pedal-driven, single-track vehicle, having two wheels attached to a frame, one behind the other. A bicycle rider is ... Read More

Capacity : Bicycles (Different Sizes):2000 Nos./Day
Plant and Machinery cost: 270.00 Lakhs
Working Capital : 0.00
Rate of Return (ROR):26.39%
Break Even Point (BEP):31.24 %
TCI :3972.00 Lakhs
Cost of Project : 3972.00Lakhs
Add To Inquiry Basket
Iron Powder
Iron Powder

Iron is probably one of the most important, being used on the largest scale of any metal. Its Production in the blast furnace is well documented. W... Read More

Capacity : 3000 MT/Day
Plant and Machinery cost: 266.00 Lakhs
Working Capital : 0.00
Rate of Return (ROR):26.00%
Break Even Point (BEP):43.00 %
TCI :882.00 Lakhs
Cost of Project : 882.00Lakhs
Add To Inquiry Basket
Bicycle Tubes
Bicycle Tubes

Bicycle tubes are the backbone of the bicycle industries. Few numbers of companies in organized sector are engaged in the quality grade cycles tyre... Read More

Capacity : Bicycle Tubes: 10,000 Nos. /Day
Plant and Machinery cost: 118.00 Lakhs
Working Capital : 0.00
Rate of Return (ROR):26.00%
Break Even Point (BEP):45.00 %
TCI :622.00 Lakhs
Cost of Project : 622.00Lakhs
Add To Inquiry Basket
E–Waste Recycling Plant
E–Waste Recycling Plant

E-waste is a popular, informal name for electronic products nearing the end of their useful life. While there is no generally accepted definition o... Read More

Capacity : 2164500 kgs. /annum
Plant and Machinery cost: 233.00 Lakhs
Working Capital : 0.00
Rate of Return (ROR):22.91%
Break Even Point (BEP):49.81 %
TCI :500.00 Lakhs
Cost of Project : 500.00Lakhs
Add To Inquiry Basket
Amino Acid Metal Chelates for Agriculture Use (Zinc, Ferrous, Copper, Manganese, Magnesium, Calcium)
Amino Acid Metal Chelates for Agriculture Use (Zinc, Ferrous, Copper, Manganese, Magnesium, Calcium)
Amino acid chelates consists of a metal ion comprising iron, zinc, manganese, magnesium, copper, calcium and mixtures thereof. These cheltaes are mos... Read More
Capacity :
Plant and Machinery cost: 161.00 Lakhs
Working Capital : 0.00
Rate of Return (ROR):41.00%
Break Even Point (BEP):47.00 %
TCI :502.00 Lakhs
Cost of Project : 502.00Lakhs
Add To Inquiry Basket
Ferroalloys (Ferrosilicon, Ferromanganese & Silicomanganese)
Ferroalloys (Ferrosilicon, Ferromanganese & Silicomanganese)

Ferromanganese are alloys composed of iron and one or two more metals like Mn, Si, Ti, W etc. The ferro alloys have usually lower melting points th... Read More

Capacity : Ferrosilicon:59.0 MT/Day.,Ferromanganese:167.0 MT/Day.,Silicomanganese:130.5 MT/Day.
Plant and Machinery cost: 2493.00 Lakhs
Working Capital : 0.00
Rate of Return (ROR):28.00%
Break Even Point (BEP):41.00 %
TCI :4280.00 Lakhs
Cost of Project : 4280.00Lakhs
Add To Inquiry Basket
Low Carbon Ferromanganese (Medium Grade)
Low Carbon Ferromanganese (Medium Grade)

In igneous rocks, which comprise 95% of the earth's crust the average percentage concentration of manganous oxide is 0.124. This is small in compar... Read More

Capacity : 10 MT/Day.
Plant and Machinery cost: 256.00 Lakhs
Working Capital : 0.00
Rate of Return (ROR):26.00%
Break Even Point (BEP):65.00 %
TCI :691.00 Lakhs
Cost of Project : 691.00Lakhs
Add To Inquiry Basket
Packaged Drinking Water
Packaged Drinking Water

Water is the necessity of our daily life, it’s so important for us that we need clean, safe and sanitary water every day, and us... Read More

Capacity : 210 Lakhs Nos. /annum
Plant and Machinery cost: 719.00 Lakhs
Working Capital : 0.00
Rate of Return (ROR):25.00%
Break Even Point (BEP):56.00 %
TCI :1736.00 Lakhs
Cost of Project : 1736.00Lakhs
Add To Inquiry Basket
E Waste Recycling Plant
E Waste Recycling Plant

E waste is a popular, informal name for electronic products nearing the end of their useful life. Computers, televisions, VCRs, stereos, copiers, a... Read More

Capacity : 5 MT/Day
Plant and Machinery cost: 60.00 Lakhs
Working Capital : 0.00
Rate of Return (ROR):15.00%
Break Even Point (BEP):43.00 %
TCI :241.00 Lakhs
Cost of Project : 241.00Lakhs
Add To Inquiry Basket
Packaged Drinking Water with PET Bottles
Packaged Drinking Water with PET Bottles
Profile Water forms an essential part of every human being. Since it is a human necessity it makes best sense to do business in. As a normal human b... Read More
Capacity :
Plant and Machinery cost: 131.00 Lakhs
Working Capital : 0.00
Rate of Return (ROR):40.00%
Break Even Point (BEP):58.00 %
TCI :350.00 Lakhs
Cost of Project : 350.00Lakhs
Add To Inquiry Basket
ELECTROLYTIC MANGANESE DIOXIDE
ELECTROLYTIC MANGANESE DIOXIDE

EMD is a complex composite of various crystals of manganese and oxygen that is produced through electro-winning. It is used primarily as the active... Read More

Capacity : Electrolytic Manganese Dioxide 5 MT Per Day
Plant and Machinery cost: 89.00 Lakhs
Working Capital : 0.00
Rate of Return (ROR):27.00%
Break Even Point (BEP):57.00 %
TCI :0.00 Lakhs
Cost of Project : 576.00Lakhs
Add To Inquiry Basket
Curcumin(Turmeric) The Indian solid gold
Curcumin(Turmeric) The Indian solid gold

PRODUCT PROFILE Curcumin is the principal curcuminoid of the popular Indian spice turmeric, which is a member of the ginger family. It is the main ... Read More

Capacity : 23400 Kg/Annum, Curcumin 23400 kg/Annum, Turmeric oil 550 MT/ Annum, De-oiled turmeric powder
Plant and Machinery cost: 122.00 Lakhs
Working Capital : 0.00
Rate of Return (ROR):54.00%
Break Even Point (BEP):51.00 %
TCI :289.00 Lakhs
Cost of Project : 289.00Lakhs
Add To Inquiry Basket
WOODEN TOOTHPICK
WOODEN TOOTHPICK

A toothpick is a small stick of wood, plastic, bamboo, metal, bone or other substance used to remove detritus from the teeth, usually after a meal.... Read More

Capacity : 0
Plant and Machinery cost: 6.00 Lakhs
Working Capital : 0.00
Rate of Return (ROR):42.00%
Break Even Point (BEP):62.00 %
TCI :22.00 Lakhs
Cost of Project : 22.00Lakhs
Add To Inquiry Basket
FERROALLOYS-FERROMANGANESE, SILICOMANGANESE, FERROSILICON BASED ON ALUMINOTHERMIC PROCESS
FERROALLOYS-FERROMANGANESE, SILICOMANGANESE, FERROSILICON BASED ON ALUMINOTHERMIC PROCESS

The primary objective of the study is to review the technological status of ferroalloys industry in the country in the area of bulk production of s... Read More

Capacity : 12 MT/Day, Ferro Manganese –6 MT/Day, Silico Manganese 3 MT/Day, Ferro Silicon 3 MT/Day
Plant and Machinery cost: 75.00 Lakhs
Working Capital : 0.00
Rate of Return (ROR):36.00%
Break Even Point (BEP):79.00 %
TCI :242.00 Lakhs
Cost of Project : 242.00Lakhs
Add To Inquiry Basket
HIGH CARBON FERROMANGANESE
HIGH CARBON FERROMANGANESE

Ferroalloys are alloys with iron employed to add chemical elements into molten metal, usually during steelmaking. Ferroalloys impart distinctive qu... Read More

Capacity : 15000 MT/Annum
Plant and Machinery cost: 1032.00 Lakhs
Working Capital : 0.00
Rate of Return (ROR):42.00%
Break Even Point (BEP):67.00 %
TCI :2319.00 Lakhs
Cost of Project : 2319.00Lakhs
Add To Inquiry Basket
E-WASTE RECYCLING PLANT
E-WASTE RECYCLING PLANT

Electronic waste, e-waste, e-scrap, or Waste Electrical and Electronic Equipment (WEEE) is a loose category of surplus, obsolete, broken, or discar... Read More

Capacity : -
Plant and Machinery cost: 51.00 Lakhs
Working Capital : 0.00
Rate of Return (ROR):47.00%
Break Even Point (BEP):40.00 %
TCI :196.00 Lakhs
Cost of Project : 196.00Lakhs
Add To Inquiry Basket
FERROALLOYS - FERROMANGANESE, SILICOMANGANESE, FERROSILICON BASED ON ALUMINOTHERMIC PROCESS
FERROALLOYS - FERROMANGANESE, SILICOMANGANESE, FERROSILICON BASED ON ALUMINOTHERMIC PROCESS

The ferroalloys are classified as bulk ferro alloys & noble ferro alloys. Bulk ferro alloys include ferro chrome/charge chrome ferro manganese,... Read More

Capacity : 1800 MT/Annum Ferro Manganese, 900 MT/Annum Silico Manganese, 900 MT/Annum Ferro Silicon
Plant and Machinery cost: 87.00 Lakhs
Working Capital : 0.00
Rate of Return (ROR):40.00%
Break Even Point (BEP):74.00 %
TCI :283.00 Lakhs
Cost of Project : 283.00Lakhs
Add To Inquiry Basket
Sponge Iron Plant
Sponge Iron Plant

-

Read More
Capacity : 50 MT/Day
Plant and Machinery cost: 1300.00 Lakhs
Working Capital : 0.00
Rate of Return (ROR):41.00%
Break Even Point (BEP):45.00 %
TCI :1800.00 Lakhs
Cost of Project : 1800.00Lakhs
Add To Inquiry Basket
Growing Prospects for Packaged Drinking Water Industry
Growing Prospects for Packaged Drinking Water Industry

Water everywhere, not a CLEAN drop to drink! Who would have thought that there will be a day when sanitation of available water would be more of a... Read More

Capacity : 30,000 Thousand Nos./Annum or 1,00,000 Bottles /day
Plant and Machinery cost: 105.00 Lakhs
Working Capital : 0.00
Rate of Return (ROR):44.00%
Break Even Point (BEP):63.00 %
TCI :282.00 Lakhs
Cost of Project : 282.00Lakhs
Add To Inquiry Basket
MANGANESE SULPHATE
MANGANESE SULPHATE
Manganese sulphate is commercially one of the most important compounds. It is an important mineral based chemical industry. The main constituent of t... Read More
Capacity : 2.00 MT / Day
Plant and Machinery cost: 31.00 Lakhs
Working Capital : 0.00
Rate of Return (ROR):42.00%
Break Even Point (BEP):41.00 %
TCI :126.00 Lakhs
Cost of Project : 126.00Lakhs
Add To Inquiry Basket
IRON POWDER FROM MILL SCALE SCRAP
IRON POWDER FROM MILL SCALE SCRAP

Iron powder is used to produce particles in desired range for use in powder metallurgy and metallic pigments. Powder iron made electrolytically mak... Read More

Capacity : 2 MT / Day
Plant and Machinery cost: 23.00 Lakhs
Working Capital : 0.00
Rate of Return (ROR):46.00%
Break Even Point (BEP):46.00 %
TCI :176.00 Lakhs
Cost of Project : 176.00Lakhs
Add To Inquiry Basket
Bio coal Briquettes from Agricultural Cellulosic Waste
Bio coal Briquettes from Agricultural Cellulosic Waste
Bio coal briquette is an ideal and best ready substitute to coal, fire wood, lignite etc. and easily replaces these conventional fuels for heating,... Read More
Capacity : 16 Ton / Day
Plant and Machinery cost: 23.00 Lakhs
Working Capital : 0.00
Rate of Return (ROR):30.00%
Break Even Point (BEP):53.00 %
TCI :89.00 Lakhs
Cost of Project : 89.00Lakhs
Add To Inquiry Basket
VACUUM DISTILLATION OF CRUDE COAL TAR SPECIFICALLY CREOSOTE OIL
VACUUM DISTILLATION OF CRUDE COAL TAR SPECIFICALLY CREOSOTE OIL

For vacuum distillation of crude coal tar, the crude coal tar is produced from coke ovens of steel plant, 50% of this crude coal tar is pitch. The ... Read More

Capacity : 7500 MT / Annum
Plant and Machinery cost: 137.00 Lakhs
Working Capital : 0.00
Rate of Return (ROR):43.00%
Break Even Point (BEP):57.00 %
TCI :320.00 Lakhs
Cost of Project : 320.00Lakhs
Add To Inquiry Basket
MEDICAL DISPOSABLES: Disposable Syringes (Self Destructive) with Needles, Catheters and Mask
MEDICAL DISPOSABLES: Disposable Syringes (Self Destructive) with Needles, Catheters and Mask

Disposable needle is widely used by ... Read More

Capacity : 0
Plant and Machinery cost: 147.00 Lakhs
Working Capital : 0.00
Rate of Return (ROR):43.00%
Break Even Point (BEP):47.00 %
TCI :426.00 Lakhs
Cost of Project : 426.00Lakhs
Add To Inquiry Basket
BENEFICIATION OF CHROMIUM, NICKEL AND MANGANESE ORE
BENEFICIATION OF CHROMIUM, NICKEL AND MANGANESE ORE

Chromium is the 21st most abundant metal in the Earths crust. The only commercial ore of chromium is the chromite. Most chromite ores are rich enou... Read More

Capacity : 30,000 MT/ Annum each ores
Plant and Machinery cost: 896.00 Lakhs
Working Capital : 0.00
Rate of Return (ROR):45.00%
Break Even Point (BEP):49.00 %
TCI :3528.00 Lakhs
Cost of Project : 3528.00Lakhs
Add To Inquiry Basket
DUCTILE IRON FITTINGS
DUCTILE IRON FITTINGS

There are various processes by which metal can be shaped such as forging, extrusions, pressing, welding, rolling and costing. Among the various pro... Read More

Capacity : 18000 MT / Annum
Plant and Machinery cost: 173.00 Lakhs
Working Capital : 0.00
Rate of Return (ROR):45.00%
Break Even Point (BEP):64.00 %
TCI :499.00 Lakhs
Cost of Project : 499.00Lakhs
Add To Inquiry Basket
Charcoal From Coconut Shell
Charcoal From Coconut Shell

Charcoal and purity of any substances has now become a basic requirement of any chemical substance. So many products obtained by processing are dir... Read More

Capacity : 5 Tons/day
Plant and Machinery cost: 21.00 Lakhs
Working Capital : 0.00
Rate of Return (ROR):45.00%
Break Even Point (BEP):45.00 %
TCI :107.00 Lakhs
Cost of Project : 107.00Lakhs
Add To Inquiry Basket
SG Iron (Ductile Iron) and Alloy Steel Casting
SG Iron (Ductile Iron) and Alloy Steel Casting

S. G. Iron (Ductile Iron) and Alloy Steel Casting

There are various processes by w... Read More

Capacity : 18,000 MT/Annum
Plant and Machinery cost: 168.00 Lakhs
Working Capital : 0.00
Rate of Return (ROR):43.00%
Break Even Point (BEP):66.00 %
TCI :483.00 Lakhs
Cost of Project : 483.00Lakhs
Add To Inquiry Basket
Pentane (Low Boiling Hydrocarbon Varied Application)
Pentane (Low Boiling Hydrocarbon Varied Application)

To make a product suitable for sale, the various contaminants and undesirable constituents contained in the raw gas must be removed. The first step... Read More

Capacity : Pentane 6462 MT/Annum, Isopentane 5538 MT/Annum, Powder in Megawatt 540 MW/Annum, Residual Natural G
Plant and Machinery cost: 7800.00 Lakhs
Working Capital : 0.00
Rate of Return (ROR):42.00%
Break Even Point (BEP):43.00 %
TCI :15400.00 Lakhs
Cost of Project : 15400.00Lakhs
Add To Inquiry Basket
Activated Charcoal From Wood
Activated Charcoal From Wood

Activated wood charcoal is a very important chemical widely employed by certain gases and vapours in purification in catalytic chemical reactions a... Read More

Capacity : 15MT/Day
Plant and Machinery cost: 80.00 Lakhs
Working Capital : 113.00
Rate of Return (ROR):24.13%
Break Even Point (BEP):62.30 %
TCI :262.00 Lakhs
Cost of Project : 262.00Lakhs
Add To Inquiry Basket
Manganese from Ferromanganese Alloy Slag Content
Manganese from Ferromanganese Alloy Slag Content

Manganese from Ferromanganese  Alloy Slag Content 30% Read More

Capacity : 5 MT/Day
Plant and Machinery cost: 50.00 Lakhs
Working Capital : 109.00
Rate of Return (ROR):47.43%
Break Even Point (BEP):68.36 %
TCI :226.00 Lakhs
Cost of Project : 226.00Lakhs
Add To Inquiry Basket
Low Carbon Ferromanganese
Low Carbon Ferromanganese

Manganese ores, containing more than 35 % manganese are suitable for the manufacture of high or low grade ferro-manganese. Low carbon ferro mangane... Read More

Capacity : 50 MT/Day
Plant and Machinery cost: 104.00 Lakhs
Working Capital : 885.00
Rate of Return (ROR):66.12%
Break Even Point (BEP):40.99 %
TCI :1129.00 Lakhs
Cost of Project : 1129.00Lakhs
Add To Inquiry Basket
NameCapacityRate of return (ROR):Cost of project
Gold and Diamond Jeweller... Gold Jewellery:9.50 Kgs /day Gold Plus Diamond Jewellery :2.38 Kgs / day 34.00 2504.00
Bioplastic Products Manuf... 0 0.00 0.00
Manufacturing of Pig Iron... 0 0.00 0.00
Recycling of Lithium Ion ... Copper 1.4 MT Per Day Aluminium 0.8 MT Per Day Graphite 1.8 MT Per Day Carbon Black 0.3 MT Per Day L 27.00 422.00
Set up Lithium Ion Batter... 0 0.00 0.00
AAC Blocks from Silica Sa... 0 0.00 0.00
Pre Feasibility Report on... Liquor 750 ml Size: 667 Bottles/Day Liquor 375 ml Size:1,334 Bottles/Day Liquor 180 ml: 2,778 Bottle 33.00 500.00
Start Flexographic Ink fo... R Non-Absorbent Substrate Flexographic Ink: 160 Kgs/Day | R Absorbent Substrate: 160 Kgs/Day 27.00 64.00
Start Automated Vehicle S... Spare Parts:375 Units/Day •Waste Oil:450 Units/Day•Waste Tyre:2250 Units/Day•Engines:50 Units/Day•St 32.00 5100.00
Lithium Ion Battery Recyc... 0 0.00 0.00
Want to start a Calcium P... 0 0.00 0.00
3-Chloropivaloyl Chloride... 3-Chloropivaloyl Chloride: 4 MT Per Day | Hydrochoric Acid (30%)- by product: 3 MT Per Day 27.00 686.00
Start Quartz Slabs Manufa... 250 Nos. per day 27.00 3200.00
Project Profile on Sodium... 4500 MT Per Annum 27.00 214.00
Rice Husk based Biodegrad... Biodegradable Cutlery (Per Set 6 Pcs. Flatware): 1,852 Sets Per Day 27.00 222.00
Lithium Ion Battery LiFeP... Lithium Ion (LiFePO4) Battery Back of Power 4.8 KWH (No. of Cells 800) for Three Wheeler: 26 Nos/Day 29.00 970.00
Ferric Pyrophosphate Prod... 600 MT Per Annum 29.00 133.00
Set Up Production Unit of... 300 MT Per Annum 28.00 70.00
Start Production Business... 10 MT per day 45.00 1300.00
Production of Malic Acid ... 0 0.00 0.00
Ferric Pyrophosphate: Sta... 0 0.00 0.00
Flat Glass Manufacturing ... 4000 Sq.Mtrs. per day 24.00 18700.00
Start Production Business... Rubber Granules 5 MT per Day By Product Steel Wire 0.5 MT per Day 28.00 20700000.00
Manufacturing of Aluminiu... Aluminium Alloy Ingots 12 MT per day Aluminium Scrap 0.20 MT per day 26.00 1100.00
Nicotine Sulphate from To... Nicotine Sulphate 3.6 MT per Day Waste Tobacco 28.3 MT per Day 28.00 141600000.00
Natural Tanning Powder P... 600 MT per Annum 28.00 27000000.00
You Should Read SYour Own... 0 0.00 0.00
Set Up Automated Vehicle ... 0 26.00 1455.00
Manufacturing Business Pl... Zinc Ingots (Purity 98%) 6 MT Per Day 29.00 863.00
Automated Vehicle Scrappi... 1000 Vehicles per Month 29.00 2090.00
12345678910...

Showing 181 - 240 of 670 Product(s)

Subject of your Interest

Information

  • One Lac / Lakh / Lakhs is equivalent to one hundred thousand (100,000)
  • One Crore is equivalent to ten million (10,000,000)
  • T.C.I is Total Capital Investment
  • We can modify the project capacity and project cost as per your requirement.
  • We can also prepare project report on any subject as per your requirement.
  • Caution: The project's cost, capacity and return are subject to change without any notice. Future projects may have different values of project cost, capacity or return.

ABOUT NPCS

 

NIIR PROJECT CONSULTANCY SERVICES (NPCS) is a reliable name in the industrial world for offering integrated technical consultancy services. NPCS is manned by engineers, planners, specialists, financial experts, economic analysts and design specialists with extensive experience in the related industries.

Our various services are: Detailed Project Report,  Business Plan for Manufacturing Plant, Start-up Ideas, Business Ideas for Entrepreneurs, Start up Business Opportunities, entrepreneurship projects, Successful Business Plan, Industry Trends, Market Research, Manufacturing Process, Machinery, Raw Materials, project report, Cost and Revenue, Pre-feasibility study for Profitable Manufacturing Business, Project Identification, Project Feasibility and Market Study, Identification of Profitable Industrial Project Opportunities, Business Opportunities, Investment Opportunities for Most Profitable Business in India, Manufacturing Business Ideas, Preparation of Project Profile, Pre-Investment and Pre-Feasibility Study, Market Research Study, Preparation of Techno-Economic Feasibility Report, Identification and Section of Plant, Process, Equipment, General Guidance, Startup Help, Technical and Commercial Counseling for setting up new industrial project and Most Profitable Small Scale Business.

NPCS also publishes varies process technology, technical, reference, self employment and startup books, directory, business and industry database, bankable detailed project report, market research report on various industries, small scale industry and profit making business. Besides being used by manufacturers, industrialists and entrepreneurs, our publications are also used by professionals including project engineers, information services bureau, consultants and project consultancy firms as one of the input in their research.

Our Detailed Project report aims at providing all the critical data required by any entrepreneur vying to venture into Project. While expanding a current business or while venturing into new business, entrepreneurs are often faced with the dilemma of zeroing in on a suitable product/line.

 


And before diversifying/venturing into any product, wish to study the following aspects of the identified product:


• Good Present/Future Demand
• Export-Import Market Potential
• Raw Material & Manpower Availability
• Project Costs and Payback Period


We at NPCS, through our reliable expertise in the project consultancy and market research field, Provides exhaustive information about the project, which satisfies all the above mentioned requirements and has high growth potential in the markets. And through our report we aim to help you make sound and informed business decision.

 

The report contains all the data which will help an entrepreneur find answers to questions like:

• Why I should invest in this project?
• What will drive the growth of the product?
• What are the costs involved?
• What will be the market potential?


The report first focuses on enhancing the basic knowledge of the entrepreneur about the main product, by elucidating details like product definition, its uses and applications, industry segmentation as well as an overall overview of the industry sector in India. The report then helps an entrepreneur identify the target customer group of its product. It further helps in making sound investment decision by listing and then elaborating on factors that will contribute to the growth of product consumption in India and also talks about the foreign trade of the product along with the list of top importing and top exporting countries. Report includes graphical representation and forecasts of key data discussed in the above mentioned segment. It further explicates the growth potential of the product.

The report includes other market data like key players in the Industry segment along with their contact information and recent developments. It includes crucial information like raw material requirements, list of machinery and manufacturing process for the plant. Core project financials like plant capacity, costs involved in setting up of project, working capital requirements, projected revenue and profit are further listed in the report.


Reasons for buying the report:

• This report helps you to identify a profitable project for investing or diversifying into by throwing light to crucial areas like industry size, demand of the product and reasons for investing in the product.

• This report provides vital information on the product like its definition, characteristics and segmentation.

• This report helps you market and place the product correctly by identifying the target customer group of the product.

• This report helps you understand the viability of the project by disclosing details like raw materials required, manufacturing process, project costs and snapshot of other project financials.

• The report provides forecasts of key parameters which helps to anticipate the industry performance and make sound business decision.

 

Our Approach:


• Our research reports broadly cover Indian markets, present analysis, outlook and forecast.

• The market forecasts are developed on the basis of secondary research and are cross-validated through interactions with the industry players. 

• We use reliable sources of information and databases.  And information from such sources is processed by us and included in the report.

 

Our Market Survey cum Detailed Techno Economic Feasibility Report Contains following information:

 

 

Ø  Introduction

·         Project Introduction

·         Project Objective and Strategy

·         Concise History of the Product

·         Properties

·         BIS (Bureau of Indian Standards) Provision & Specification

·         Uses & Applications

 

Ø  Market Study and Assessment

·         Current Indian Market Scenario

·         Present Market Demand and Supply

·         Estimated Future Market Demand and Forecast

·         Statistics of Import & Export

·         Names & Addresses of Existing Units (Present Players)

·         Market Opportunity

 

Ø  Raw Material

·         List of Raw Materials

·         Properties of Raw Materials

·         Prescribed Quality of Raw Materials

·         List of Suppliers and Manufacturers

 

Ø  Personnel (Manpower) Requirements

·         Requirement of Staff & Labor (Skilled and Unskilled) Managerial, Technical, Office Staff and Marketing Personnel

 

Ø  Plant and Machinery

·         List of Plant & Machinery

·         Miscellaneous Items

·         Appliances & Equipments

·         Laboratory Equipments & Accessories

·         Electrification

·         Electric Load & Water

·         Maintenance Cost

·         Sources of Plant & Machinery (Suppliers and Manufacturers)

 

Ø  Manufacturing Process and Formulations

·         Detailed Process of Manufacture with Formulation

·         Packaging Required

·         Process Flow Sheet Diagram

 

Ø  Infrastructure and Utilities

·         Project Location

·         Requirement of Land Area

·         Rates of the Land

·         Built Up Area

·         Construction Schedule

·         Plant Layout and Requirement of Utilities

 

Project at a Glance

Along with financial details as under:

 

  •     Assumptions for Profitability workings

  •    Plant Economics

  •    Production Schedule

  •    Land & Building

            Factory Land & Building

            Site Development Expenses

  •    Plant & Machinery

             Indigenous Machineries

            Other Machineries (Miscellaneous, Laboratory etc.)

  •    Other Fixed Assets

            Furniture & Fixtures

            Pre-operative and Preliminary Expenses

            Technical Knowhow

            Provision of Contingencies

  •   Working Capital Requirement Per Month

             Raw Material

            Packing Material

            Lab & ETP Chemical Cost

           Consumable Store

  •   Overheads Required Per Month And Per Annum

         Utilities & Overheads (Power, Water and Fuel Expenses etc.)

             Royalty and Other Charges

            Selling and Distribution Expenses

  •    Salary and Wages

  •    Turnover Per Annum

  •   Share Capital

            Equity Capital

            Preference Share Capital

 

  •    Annexure 1:: Cost of Project and Means of Finance

  •    Annexure 2::  Profitability and Net Cash Accruals

                Revenue/Income/Realisation

                Expenses/Cost of Products/Services/Items

                Gross Profit

                Financial Charges     

                Total Cost of Sales

                Net Profit After Taxes

                Net Cash Accruals

  •   Annexure 3 :: Assessment of Working Capital requirements

                Current Assets

                Gross Working. Capital

                Current Liabilities

                Net Working Capital

                Working Note for Calculation of Work-in-process

  •    Annexure 4 :: Sources and Disposition of Funds

  •    Annexure 5 :: Projected Balance Sheets

                ROI (Average of Fixed Assets)

                RONW (Average of Share Capital)

                ROI (Average of Total Assets)

  •    Annexure 6 :: Profitability ratios

                D.S.C.R

                Earnings Per Share (EPS)

               

             Debt Equity Ratio

        Annexure 7   :: Break-Even Analysis

                Variable Cost & Expenses

                Semi-Var./Semi-Fixed Exp.

                Profit Volume Ratio (PVR)

                Fixed Expenses / Cost 

                B.E.P

  •   Annexure 8 to 11:: Sensitivity Analysis-Price/Volume

            Resultant N.P.B.T

            Resultant D.S.C.R

   Resultant PV Ratio

   Resultant DER

  Resultant ROI

          Resultant BEP

  •    Annexure 12 :: Shareholding Pattern and Stake Status

        Equity Capital

        Preference Share Capital

  •   Annexure 13 :: Quantitative Details-Output/Sales/Stocks

        Determined Capacity P.A of Products/Services

        Achievable Efficiency/Yield % of Products/Services/Items 

        Net Usable Load/Capacity of Products/Services/Items   

       Expected Sales/ Revenue/ Income of Products/ Services/ Items   

  •    Annexure 14 :: Product wise domestic Sales Realisation

  •    Annexure 15 :: Total Raw Material Cost

  •    Annexure 16 :: Raw Material Cost per unit

  •    Annexure 17 :: Total Lab & ETP Chemical Cost

  •    Annexure 18  :: Consumables, Store etc.,

  •    Annexure 19  :: Packing Material Cost

  •    Annexure 20  :: Packing Material Cost Per Unit

  •    Annexure 21 :: Employees Expenses

  •    Annexure 22 :: Fuel Expenses

  •    Annexure 23 :: Power/Electricity Expenses

  •    Annexure 24 :: Royalty & Other Charges

  •    Annexure 25 :: Repairs & Maintenance Exp.

  •    Annexure 26 :: Other Mfg. Expenses

  •    Annexure 27 :: Administration Expenses

  •    Annexure 28 :: Selling Expenses

  •    Annexure 29 :: Depreciation Charges – as per Books (Total)

  •   Annexure 30   :: Depreciation Charges – as per Books (P & M)

  •   Annexure 31   :: Depreciation Charges - As per IT Act WDV (Total)

  •   Annexure 32   :: Depreciation Charges - As per IT Act WDV (P & M)

  •   Annexure 33   :: Interest and Repayment - Term Loans

  •   Annexure 34   :: Tax on Profits

  •   Annexure 35   ::Projected Pay-Back Period And IRR