We can provide you detailed project reports on the following topics. Please select the projects of your interests.
Each detailed project reports cover all the aspects of business, from analysing the market, confirming availability of various necessities such as plant & machinery, raw materials to forecasting the financial requirements. The scope of the report includes assessing market potential, negotiating with collaborators, investment decision making, corporate diversification planning etc. in a very planned manner by formulating detailed manufacturing techniques and forecasting financial aspects by estimating the ost of raw material, formulating the cash flow statement, projecting the balance sheet etc.
We also offer self-contained Pre-Investment and Pre-Feasibility Studies, Market Surveys and Studies, Preparation of Techno-Economic Feasibility Reports, Identification and Selection of Plant and Machinery, Manufacturing Process and or Equipment required, General Guidance, Technical and Commercial Counseling for setting up new industrial projects on the following topics. Many of the engineers, project consultant & industrial consultancy firms in India and worldwide use our project reports as one of the input in doing their analysis.


We can modify the project capacity and project cost as per your requirement.
We can also prepare project report on any subject as per your requirement.

Add multiple items to inquiry

Select the items and then press Add to inquiry button

Sort by :
E-Rickshaw
E-Rickshaw

Electric Rickshaw, in short, also called as E-Rickshaw. This kind of transport vehicle are famous in many countries, t... Read More

Capacity : 1,200 Nos per Annum
Plant and Machinery cost: 29.00 Lakhs
Working Capital : 0.00
Rate of Return (ROR):24.00%
Break Even Point (BEP):56.00 %
TCI :0.00 Lakhs
Cost of Project : 324.00Lakhs
Add To Inquiry Basket
E-Rickshaw (Electric tuk-tuks) Manufacturing Business
E-Rickshaw (Electric tuk-tuks) Manufacturing Business

E-Rickshaw (Electric tuk-tuks) Manufacturing Business. How to Start Electric Vehicle ... Read More

Capacity : 0
Plant and Machinery cost: 0.00 Lakhs
Working Capital : 0.00
Rate of Return (ROR):0.00%
Break Even Point (BEP):0.00 %
TCI :0.00 Lakhs
Cost of Project : 0.00Lakhs
Add To Inquiry Basket
Disposable Plastic Syringes
Disposable Plastic Syringes

Disposable Syringes are made of plastic material and are used in the field of medical and veterinary science. Due to their availability in steriliz... Read More

Capacity : Disposable Plastic Syringes 2 ml Size : 350 Boxes/day Disposable Plastic Syringes 5 ml Size : 350 Bo
Plant and Machinery cost: 151.00 Lakhs
Working Capital : 0.00
Rate of Return (ROR):26.00%
Break Even Point (BEP):63.00 %
TCI :0.00 Lakhs
Cost of Project : 343.00Lakhs
Add To Inquiry Basket
Disposable Plastic Syringes
Disposable Plastic Syringes

Disposable Syringes made of plastic ... Read More

Capacity : Disposable Plastic Syringes (2 ml Size):40000 Pcs/Day•Disposable Plastic Syringes (5 ml Size):40000
Plant and Machinery cost: 490.00 Lakhs
Working Capital : 0.00
Rate of Return (ROR):15.24%
Break Even Point (BEP):61.07 %
TCI :757.00 Lakhs
Cost of Project : 757.00Lakhs
Add To Inquiry Basket
SOLAR PANEL
SOLAR PANEL

Solar Panels are in general Silicon ... Read More

Capacity : Solar PV Module (240 watt) : 350 Nos/day (25 MW)
Plant and Machinery cost: 278.00 Lakhs
Working Capital : 0.00
Rate of Return (ROR):29.00%
Break Even Point (BEP):58.00 %
TCI :852.00 Lakhs
Cost of Project : 852.00Lakhs
Add To Inquiry Basket
Biodegradable Disposable Cups and Plates using Sugarcane Bagasse
Biodegradable Disposable Cups and Plates using Sugarcane Bagasse

Agricultural wastes constitute one of the main alternative raw materials for the pulp and paper industry. Wheat straw, bagasse, reed, and rice stra... Read More

Capacity : Disposable Paper Cups :7.5 MT/Day Disposable Paper Plates:7.5 MT/Day
Plant and Machinery cost: 32.00 Lakhs
Working Capital : 0.00
Rate of Return (ROR):28.18%
Break Even Point (BEP):56.37 %
TCI :314.00 Lakhs
Cost of Project : 314.00Lakhs
Add To Inquiry Basket
Packaged Drinking Water
Packaged Drinking Water
As the name implies, the mineral water is the purified water fortified with requisite amounts of minerals. It is either obtained from natural resource... Read More
Capacity : 3000000 Ltrs. /Annum
Plant and Machinery cost: 24.00 Lakhs
Working Capital : 0.00
Rate of Return (ROR):24.00%
Break Even Point (BEP):62.00 %
TCI :112.00 Lakhs
Cost of Project : 112.00Lakhs
Add To Inquiry Basket
PAPER NAPKINS, FACIAL TISSUE, TOILET ROLLS, KITCHEN ROLL & HANDKERCHIEF
PAPER NAPKINS, FACIAL TISSUE, TOILET ROLLS, KITCHEN ROLL & HANDKERCHIEF

Paper is one of the necessities of civilization and it is almost impossible to imagine the continuance of a world without the printed books and new... Read More

Capacity :
Plant and Machinery cost: 88.00 Lakhs
Working Capital : 0.00
Rate of Return (ROR):32.00%
Break Even Point (BEP):39.00 %
TCI :595.00 Lakhs
Cost of Project : 595.00Lakhs
Add To Inquiry Basket
Packaged Drinking Water With PET Bottles
Packaged Drinking Water With PET Bottles
Water is the necessity of our daily life, it’s so important for us that we need clean, safe and sanitary water every day, and usually there’s a mo... Read More
Capacity : 40000 Ltrs./Day
Plant and Machinery cost: 59.00 Lakhs
Working Capital : 0.00
Rate of Return (ROR):29.00%
Break Even Point (BEP):63.00 %
TCI :171.00 Lakhs
Cost of Project : 171.00Lakhs
Add To Inquiry Basket
PACKAGED DRINKING WATER
PACKAGED DRINKING WATER

Bottled Water means water intended for human consumption and which is sealed in bottles and other containers with no added ingredients except that ... Read More

Capacity : 3000000 Bottles/Annum
Plant and Machinery cost: 39.00 Lakhs
Working Capital : 0.00
Rate of Return (ROR):41.00%
Break Even Point (BEP):52.00 %
TCI :108.00 Lakhs
Cost of Project : 108.00Lakhs
Add To Inquiry Basket
DISPOSABLE SYRINGES
DISPOSABLE SYRINGES

Disposable needle is widely used by ... Read More

Capacity : Disposable Plastic Syringes 2 ml Size : 300,000 Boxes/Annum Disposable Plastic Syringes 5 ml Size :
Plant and Machinery cost: 636.00 Lakhs
Working Capital : 0.00
Rate of Return (ROR):46.00%
Break Even Point (BEP):42.00 %
TCI :837.00 Lakhs
Cost of Project : 837.00Lakhs
Add To Inquiry Basket
PACKAGED DRINKING WATER
PACKAGED DRINKING WATER

Bottled Water means water intended for human consumption and which is sealed in bottles and other containers with no added ingredients except that ... Read More

Capacity : 0
Plant and Machinery cost: 25.00 Lakhs
Working Capital : 0.00
Rate of Return (ROR):44.00%
Break Even Point (BEP):54.00 %
TCI :100.00 Lakhs
Cost of Project : 100.00Lakhs
Add To Inquiry Basket
WOODEN FURNITURE
WOODEN FURNITURE

Wooden furniture is used for articles of daily use in dwelling house, place of business, public buildings and includes items such as chairs, tables... Read More

Capacity : 7500 Pcs./Annum
Plant and Machinery cost: 13.00 Lakhs
Working Capital : 0.00
Rate of Return (ROR):46.00%
Break Even Point (BEP):38.00 %
TCI :118.00 Lakhs
Cost of Project : 118.00Lakhs
Add To Inquiry Basket
PAPER NAPKINS, TOILET ROLL & FACIAL PAPER FROM TISSUE PAPER ROLLS
PAPER NAPKINS, TOILET ROLL & FACIAL PAPER FROM TISSUE PAPER ROLLS

Hygiene is an essential component of healthy living, integral to achieving health and preventing disease. Not just selecting the right food choices... Read More

Capacity : 3000 MT/Annum, 6 MT Paper Napkins, 2 MT Toilet Rolls, 2 MT Facial Paper
Plant and Machinery cost: 41.00 Lakhs
Working Capital : 0.00
Rate of Return (ROR):49.00%
Break Even Point (BEP):25.00 %
TCI :923.00 Lakhs
Cost of Project : 923.00Lakhs
Add To Inquiry Basket
Rickshaw Cycle Tyre & Tubes
Rickshaw Cycle Tyre & Tubes

Rickshaw/Cycle Tyre & Tubes

Bicycle and rickshaw tyres & tubes are the bac... Read More

Capacity : Rickshaw & Cycle Tyres : 1,500.00 Nos./Day,Rickshaw & Cycle Tubes: 1,500.00 Nos./Day
Plant and Machinery cost: 128.00 Lakhs
Working Capital : 0.00
Rate of Return (ROR):26.00%
Break Even Point (BEP):72.00 %
TCI :570.00 Lakhs
Cost of Project : 570.00Lakhs
Add To Inquiry Basket
Packaged Drinking Water & Pet Bottle
Packaged Drinking Water & Pet Bottle

-

Read More
Capacity : 7000 Ltrs Packaged Drinking/day, 7000 Nos. Pet Bottles/day
Plant and Machinery cost: 60.00 Lakhs
Working Capital : 0.00
Rate of Return (ROR):42.00%
Break Even Point (BEP):48.00 %
TCI :135.00 Lakhs
Cost of Project : 135.00Lakhs
Add To Inquiry Basket
Pharmaceutical Tablets, Capsules, Liquid Oral, Ointment, Powder and Injection
Pharmaceutical Tablets, Capsules, Liquid Oral, Ointment, Powder and Injection

The Pharmaceutical Industry in general is well managed in sound economic principles and has excellent techniques of production, technological backi... Read More

Capacity : 0
Plant and Machinery cost: 43.00 Lakhs
Working Capital : 0.00
Rate of Return (ROR):43.00%
Break Even Point (BEP):54.00 %
TCI :125.00 Lakhs
Cost of Project : 125.00Lakhs
Add To Inquiry Basket
Disposable Plastic Syringes and Needles Manufacturing
Disposable Plastic Syringes and Needles Manufacturing

With the development of pharmaceutica... Read More

Capacity : 0
Plant and Machinery cost: 0.00 Lakhs
Working Capital : 0.00
Rate of Return (ROR):0.00%
Break Even Point (BEP):0.00 %
TCI :0.00 Lakhs
Cost of Project : 0.00Lakhs
Add To Inquiry Basket
Disposable Plastic Syringes
Disposable Plastic Syringes

The disposable plastic syringe ... Read More

Capacity : 0
Plant and Machinery cost: 0.00 Lakhs
Working Capital : 0.00
Rate of Return (ROR):0.00%
Break Even Point (BEP):0.00 %
TCI :0.00 Lakhs
Cost of Project : 0.00Lakhs
Add To Inquiry Basket
Oxygen and Nitrogen Gas Plant
Oxygen and Nitrogen Gas Plant

Oxygen (CO2, gas at 00/1 matm., 1.429g./l, crit. Pressure, 49.7 Matm.) is a colorless, odourless, and tasteless gas, somewhat heavier than air. It ... Read More

Capacity : 1440 Cubie Meter/Day
Plant and Machinery cost: 50.00 Lakhs
Working Capital : 18.00
Rate of Return (ROR):18.19%
Break Even Point (BEP):75.00 %
TCI :101.00 Lakhs
Cost of Project : 101.00Lakhs
Add To Inquiry Basket
Tyre Retreading And Repairing Facility For Heavy Vehicles
Tyre Retreading And Repairing Facility For Heavy Vehicles

Automobile tyres are quite costly in India, and are manufactured only by big manufacturers. Retreading is replacement of worn, cut or loose treads ... Read More

Capacity : 100 Tyres Retreads/Day & 2Nos. Heavy Vehicles Repairing/Day
Plant and Machinery cost: 25.00 Lakhs
Working Capital : 18.00
Rate of Return (ROR):89.00%
Break Even Point (BEP):28.00 %
TCI :71.00 Lakhs
Cost of Project : 71.00Lakhs
Add To Inquiry Basket
Paper Napkins, Toilet Rolls & Facial Tissue
Paper Napkins, Toilet Rolls & Facial Tissue

Paper is one of the necessities of civilization and it is almost impossible to imagine the continuance of a world with out a printed books and news... Read More

Capacity : 1000 Kgs/Day
Plant and Machinery cost: 6.00 Lakhs
Working Capital : 38.00
Rate of Return (ROR):96.61%
Break Even Point (BEP):25.40 %
TCI :53.00 Lakhs
Cost of Project : 53.00Lakhs
Add To Inquiry Basket
Start Manufacturing Business Of L-Glutamic Acid And Monosodium Glutamate
Start Manufacturing Business Of L-Glutamic Acid And Monosodium Glutamate

 

L-Glutamic acid a... Read More

Capacity : L-Glutamic Acid 50 MT Per Day Monosodium Glutamate 15 MT Per Day
Plant and Machinery cost: 867.00 Lakhs
Working Capital : 0.00
Rate of Return (ROR):28.00%
Break Even Point (BEP):51.00 %
TCI :0.00 Lakhs
Cost of Project : 2590.00Lakhs
Add To Inquiry Basket
Business Plan For Sanitary Napkins
Business Plan For Sanitary Napkins

Feminine napkins, generally called sanitary napkins or menstruation pads, are absorbe... Read More

Capacity : Sanitary Napkins 1,440,000 Pkts Per Annum
Plant and Machinery cost: 26.00 Lakhs
Working Capital : 0.00
Rate of Return (ROR):27.00%
Break Even Point (BEP):66.00 %
TCI :0.00 Lakhs
Cost of Project : 84.00Lakhs
Add To Inquiry Basket
Start Production of Expandable & High Purity Graphite
Start Production of Expandable & High Purity Graphite

Expandable Graphite refers to a form of graphite that has bee... Read More

Capacity : Expandable Graphite 10 MT Per Day High Purity Graphite 10 MT Per Day
Plant and Machinery cost: 206.00 Lakhs
Working Capital : 0.00
Rate of Return (ROR):27.00%
Break Even Point (BEP):49.00 %
TCI :0.00 Lakhs
Cost of Project : 1598.00Lakhs
Add To Inquiry Basket
Start  Waste Lubricating Oil Recycling Plant
Start Waste Lubricating Oil Recycling Plant

Waste Lubricating Oil Recyc... Read More

Capacity : Recycled Lubricating Oil 18,000 KLs per Annum Spent Clay as by product 1,890 KLs per Annum
Plant and Machinery cost: 355.00 Lakhs
Working Capital : 0.00
Rate of Return (ROR):26.00%
Break Even Point (BEP):32.00 %
TCI :0.00 Lakhs
Cost of Project : 3101.00Lakhs
Add To Inquiry Basket
Start Manufacturing Of Carbon Composite Bicycle
Start Manufacturing Of Carbon Composite Bicycle

Carbon composite bicycles a... Read More

Capacity : Carbon Composite Bicycle 12 Nos per Day
Plant and Machinery cost: 413.00 Lakhs
Working Capital : 0.00
Rate of Return (ROR):27.00%
Break Even Point (BEP):60.00 %
TCI :0.00 Lakhs
Cost of Project : 594.00Lakhs
Add To Inquiry Basket
Start Manufacturing Of Latex Toy Balloons
Start Manufacturing Of Latex Toy Balloons

Latex toy balloons are flexible, inflatable objects made prim... Read More

Capacity : Latex Toy Balloons 20,000 PKTS per Day
Plant and Machinery cost: 373.00 Lakhs
Working Capital : 0.00
Rate of Return (ROR):28.00%
Break Even Point (BEP):60.00 %
TCI :0.00 Lakhs
Cost of Project : 883.00Lakhs
Add To Inquiry Basket
Setup Plant Of Craft Beer
Setup Plant Of Craft Beer

 

Craft beer is a t... Read More

Capacity : -
Plant and Machinery cost: 1519.00 Lakhs
Working Capital : 0.00
Rate of Return (ROR):30.00%
Break Even Point (BEP):42.00 %
TCI :0.00 Lakhs
Cost of Project : 4060.00Lakhs
Add To Inquiry Basket
Start Production Of Ammonium Nitrate
Start Production Of Ammonium Nitrate

 

Are you an entrepreneur looking for... Read More

Capacity : Ammonium Nitrate 2 MT per Day
Plant and Machinery cost: 53.00 Lakhs
Working Capital : 0.00
Rate of Return (ROR):26.00%
Break Even Point (BEP):51.00 %
TCI :0.00 Lakhs
Cost of Project : 215.00Lakhs
Add To Inquiry Basket
Start Silicon Wafers Business From Electronic Grade Silicon Ingots (Using Metallurgical Grade Silicon)
Start Silicon Wafers Business From Electronic Grade Silicon Ingots (Using Metallurgical Grade Silicon)

 

Silicon wafers are crucial componen... Read More

Capacity : Silicon Wafers 20 MT Per Day
Plant and Machinery cost: 2505.00 Lakhs
Working Capital : 0.00
Rate of Return (ROR):28.00%
Break Even Point (BEP):54.00 %
TCI :0.00 Lakhs
Cost of Project : 4235.00Lakhs
Add To Inquiry Basket
A Business Plan For Recycling of Lithium Ion Battery
A Business Plan For Recycling of Lithium Ion Battery

Recycling of lithium-ion batteries refers to the process of recovering valuable mater... Read More

Capacity : -
Plant and Machinery cost: 189.00 Lakhs
Working Capital : 0.00
Rate of Return (ROR):28.00%
Break Even Point (BEP):52.00 %
TCI :0.00 Lakhs
Cost of Project : 468.00Lakhs
Add To Inquiry Basket
Setup Plant of Extraction from Tobacco Waste
Setup Plant of Extraction from Tobacco Waste

Nicotine is a chemical compound that is naturally present in the leaves of the tobacco plant. It is a powerful sti... Read More

Capacity : -
Plant and Machinery cost: 289.00 Lakhs
Working Capital : 0.00
Rate of Return (ROR):35.00%
Break Even Point (BEP):32.00 %
TCI :0.00 Lakhs
Cost of Project : 0.00Lakhs
Add To Inquiry Basket
A Business Plan for Ferro Alloys (Low Carbon Ferrochrome (LCFC), Ferro Molybdenum (FeMo), Ferro Vanadium (FeV), Ferro Titanium (FeTi))
A Business Plan for Ferro Alloys (Low Carbon Ferrochrome (LCFC), Ferro Molybdenum (FeMo), Ferro Vanadium (FeV), Ferro Titanium (FeTi))

Low Carbon Ferrochrome (LCFC), Ferro Molybdenum (FeMo), Ferro Vanadium (FeV), and Fer... Read More

Capacity : -
Plant and Machinery cost: 1783.00 Lakhs
Working Capital : 0.00
Rate of Return (ROR):30.00%
Break Even Point (BEP):71.00 %
TCI :0.00 Lakhs
Cost of Project : 9775.00Lakhs
Add To Inquiry Basket
Setup Egg Powder Industry
Setup Egg Powder Industry

Egg powder is essentially a... Read More

Capacity : Egg Powder 2,400 Kgs Per Day
Plant and Machinery cost: 489.00 Lakhs
Working Capital : 0.00
Rate of Return (ROR):29.00%
Break Even Point (BEP):52.00 %
TCI :0.00 Lakhs
Cost of Project : 930.00Lakhs
Add To Inquiry Basket
Start Manufacturing Business of Laundry Soap Bars
Start Manufacturing Business of Laundry Soap Bars

Laundry soap bars are a con... Read More

Capacity : Laundry Soap 1,000 Kgs Per Day (1 Kgs Pack 10 Pcs. each 100gms Size)
Plant and Machinery cost: 27.00 Lakhs
Working Capital : 0.00
Rate of Return (ROR):27.00%
Break Even Point (BEP):72.00 %
TCI :0.00 Lakhs
Cost of Project : 65.00Lakhs
Add To Inquiry Basket
Start Business of Solar Panel
Start Business of Solar Panel

 

Solar panels are the bac... Read More

Capacity : Solar Panel 19,980 KW Per Annum
Plant and Machinery cost: 160.00 Lakhs
Working Capital : 0.00
Rate of Return (ROR):30.00%
Break Even Point (BEP):57.00 %
TCI :0.00 Lakhs
Cost of Project : 581.00Lakhs
Add To Inquiry Basket
A Business Plan for Calcium Gluconate
A Business Plan for Calcium Gluconate

Calcium Gluconate is a chemical compound that serves as a crucial supplement for thos... Read More

Capacity : Calcium Gluonate 20 MT Per Day
Plant and Machinery cost: 293.00 Lakhs
Working Capital : 0.00
Rate of Return (ROR):30.00%
Break Even Point (BEP):38.00 %
TCI :0.00 Lakhs
Cost of Project : 1130.00Lakhs
Add To Inquiry Basket
Set up an E-Waste Recycling Plant Waste Electrical & Electronic Equipment WEEE
Set up an E-Waste Recycling Plant Waste Electrical & Electronic Equipment WEEE

 

Electronic wastes,... Read More

Capacity : Plastic 1.60 MT per day Ferrous Material 1.00 MT per day Aluminium 0.70 MT per day Glass 1.00 MT per
Plant and Machinery cost: 86.00 Lakhs
Working Capital : 0.00
Rate of Return (ROR):27.47%
Break Even Point (BEP):60.15 %
TCI :0.00 Lakhs
Cost of Project : 314.00Lakhs
Add To Inquiry Basket
Start Profitable Industry of Lithium Ion Battery (Battery Assembly)
Start Profitable Industry of Lithium Ion Battery (Battery Assembly)

 

Lithium batteries ... Read More

Capacity : 48 Volt, 60 AH Lithium-Ion Battery Pack: 5.0 Nos per day 48 Volt, 80 AH Lithium-Ion Battery Pack:
Plant and Machinery cost: 72.00 Lakhs
Working Capital : 0.00
Rate of Return (ROR):29.95%
Break Even Point (BEP):70.65 %
TCI :0.00 Lakhs
Cost of Project : 293.00Lakhs
Add To Inquiry Basket
Production of Sodium Hypochlorite
Production of Sodium Hypochlorite

 

Read More

Capacity : 0
Plant and Machinery cost: 0.00 Lakhs
Working Capital : 0.00
Rate of Return (ROR):0.00%
Break Even Point (BEP):0.00 %
TCI :0.00 Lakhs
Cost of Project : 0.00Lakhs
Add To Inquiry Basket
India High Silica Quartz Grit Market
India High Silica Quartz Grit Market

High silica quartz is a type of quartz that contains at least 97% SiO2. It is one of the most abundant minerals on Ear... Read More

Capacity : 0
Plant and Machinery cost: 0.00 Lakhs
Working Capital : 0.00
Rate of Return (ROR):0.00%
Break Even Point (BEP):0.00 %
TCI :0.00 Lakhs
Cost of Project : 0.00Lakhs
Add To Inquiry Basket
Set Up Ready to Eat Food (Retort Packaging) Vegetable Pulao, Dal Makhani, Palak, Rajma, Potato Peas and Muutter Mushroom)
Set Up Ready to Eat Food (Retort Packaging) Vegetable Pulao, Dal Makhani, Palak, Rajma, Potato Peas and Muutter Mushroom)

RTE food includes wide range of products viz. vegetarian/non- vegetarian, basic food/delectable desserts, south ... Read More

Capacity : 0
Plant and Machinery cost: 331.00 Lakhs
Working Capital : 0.00
Rate of Return (ROR):27.00%
Break Even Point (BEP):63.00 %
TCI :0.00 Lakhs
Cost of Project : 718.00Lakhs
Add To Inquiry Basket
A Business Plan For Packaged Drinking Water From Deep Sea Water
A Business Plan For Packaged Drinking Water From Deep Sea Water

 

Packaged drinking water means water derived from s... Read More

Capacity : Packaged Drinking Water 80,000 Bottles per day
Plant and Machinery cost: 179.00 Lakhs
Working Capital : 0.00
Rate of Return (ROR):29.00%
Break Even Point (BEP):47.00 %
TCI :0.00 Lakhs
Cost of Project : 1204.00Lakhs
Add To Inquiry Basket
Start a Business of Double Wall Corrugated Pipes
Start a Business of Double Wall Corrugated Pipes

Double wall corrugated (DWC) pipes are made from high-densit... Read More

Capacity : Double Wall Corrugated Pipes 20 MT Per Day
Plant and Machinery cost: 449.00 Lakhs
Working Capital : 0.00
Rate of Return (ROR):27.00%
Break Even Point (BEP):49.00 %
TCI :0.00 Lakhs
Cost of Project : 1271.00Lakhs
Add To Inquiry Basket
Set A Paint Rollers Manufacturing Business
Set A Paint Rollers Manufacturing Business

Paint rollers are one of the best ways to get a professional... Read More

Capacity : Paint Roller 8,000 Pcs Per Day
Plant and Machinery cost: 34.00 Lakhs
Working Capital : 0.00
Rate of Return (ROR):30.00%
Break Even Point (BEP):61.00 %
TCI :0.00 Lakhs
Cost of Project : 227.00Lakhs
Add To Inquiry Basket
A Business Plan for Biodegradable Disposable Cups and Plates (Tableware) Using Sugarcane Bagasse
A Business Plan for Biodegradable Disposable Cups and Plates (Tableware) Using Sugarcane Bagasse

 

Bagasse is primarily found in countries that produ... Read More

Capacity : Biodegradable Disposable Cups 555.5 Th. Pcs Per Day Biodegradable Disposable Plates 312.5 Th. Pcs Pe
Plant and Machinery cost: 1924.00 Lakhs
Working Capital : 0.00
Rate of Return (ROR):27.00%
Break Even Point (BEP):46.00 %
TCI :0.00 Lakhs
Cost of Project : 2789.00Lakhs
Add To Inquiry Basket
Fatty Alcohol Manufacturing Business Plan
Fatty Alcohol Manufacturing Business Plan

Fatty alcohols, also known as aliphatic alcohols, are slight... Read More

Capacity : Fatty Alcohol 40 MT Per Day By Product (RBD) Palm Oil 45 MT Per Day
Plant and Machinery cost: 800.00 Lakhs
Working Capital : 0.00
Rate of Return (ROR):27.00%
Break Even Point (BEP):46.00 %
TCI :0.00 Lakhs
Cost of Project : 5600.00Lakhs
Add To Inquiry Basket
Activated Carbon From Rice Husk Saw Dust & Coconut Shell Manufacturing Business Plan
Activated Carbon From Rice Husk Saw Dust & Coconut Shell Manufacturing Business Plan

 

Activated carbon is a type of carbon that has been... Read More

Capacity : Activated Carbon 2,000 Kg Per Day
Plant and Machinery cost: 334.00 Lakhs
Working Capital : 0.00
Rate of Return (ROR):25.00%
Break Even Point (BEP):41.00 %
TCI :0.00 Lakhs
Cost of Project : 606.00Lakhs
Add To Inquiry Basket
Start a Production Business of Rubber Granules from Waste Tyre  Time to Start Your Own Production Business of Rubber Granules from Waste Tyre
Start a Production Business of Rubber Granules from Waste Tyre Time to Start Your Own Production Business of Rubber Granules from Waste Tyre

Read More

Capacity : 0
Plant and Machinery cost: 0.00 Lakhs
Working Capital : 0.00
Rate of Return (ROR):0.00%
Break Even Point (BEP):0.00 %
TCI :0.00 Lakhs
Cost of Project : 0.00Lakhs
Add To Inquiry Basket
Manufacturing Business of Low Relaxation Pre Stressed Concrete Steel Strand (LRPC) Most Profitable and High Demandable Business of Low Relaxation Pre-Stressed Concrete Steel Strand (LRPC)
Manufacturing Business of Low Relaxation Pre Stressed Concrete Steel Strand (LRPC) Most Profitable and High Demandable Business of Low Relaxation Pre-Stressed Concrete Steel Strand (LRPC)

A high-grade, low-relaxation, 7-strand steel cord known as pre-stressed concrete strand (PC strand) is used to reinfor... Read More

Capacity : 0
Plant and Machinery cost: 0.00 Lakhs
Working Capital : 0.00
Rate of Return (ROR):0.00%
Break Even Point (BEP):0.00 %
TCI :0.00 Lakhs
Cost of Project : 0.00Lakhs
Add To Inquiry Basket
Manufacturing Business of uPVC and CPVC Pipes
Manufacturing Business of uPVC and CPVC Pipes

PVC material is used to cre... Read More

Capacity : 0
Plant and Machinery cost: 0.00 Lakhs
Working Capital : 0.00
Rate of Return (ROR):0.00%
Break Even Point (BEP):0.00 %
TCI :0.00 Lakhs
Cost of Project : 0.00Lakhs
Add To Inquiry Basket
Start Now Own Banana Wine Production Business Banana Products Manufacturing Business Ideas
Start Now Own Banana Wine Production Business Banana Products Manufacturing Business Ideas

A sort of alcoholic beverage created from bananas is called Read More

Capacity : 0
Plant and Machinery cost: 0.00 Lakhs
Working Capital : 0.00
Rate of Return (ROR):0.00%
Break Even Point (BEP):0.00 %
TCI :0.00 Lakhs
Cost of Project : 0.00Lakhs
Add To Inquiry Basket
Manufacturing Business Of Triacetin
Manufacturing Business Of Triacetin

 

Triacetin, also k... Read More

Capacity : 5,000 MT Per Annum
Plant and Machinery cost: 2206.00 Lakhs
Working Capital : 0.00
Rate of Return (ROR):27.00%
Break Even Point (BEP):62.00 %
TCI :0.00 Lakhs
Cost of Project : 3524.00Lakhs
Add To Inquiry Basket
Set Up E-Waste Recycling Plant
Set Up E-Waste Recycling Plant

 

If you haven&rsqu... Read More

Capacity : 1,41,000 Kgs per annum 1,05,900 Kgs per annum 88,200 Kgs per annum 18,000 Kgs per annum 5.760
Plant and Machinery cost: 107.00 Lakhs
Working Capital : 0.00
Rate of Return (ROR):27.00%
Break Even Point (BEP):58.00 %
TCI :0.00 Lakhs
Cost of Project : 336.00Lakhs
Add To Inquiry Basket
The Most Amazing and Easy Business Plan of Creamy Peanut Butter Manufacture Start Now Creamy Peanut Butter Production
The Most Amazing and Easy Business Plan of Creamy Peanut Butter Manufacture Start Now Creamy Peanut Butter Production

The Read More

Capacity : 0
Plant and Machinery cost: 0.00 Lakhs
Working Capital : 0.00
Rate of Return (ROR):0.00%
Break Even Point (BEP):0.00 %
TCI :0.00 Lakhs
Cost of Project : 0.00Lakhs
Add To Inquiry Basket
Moringa Leaf Powder business Start Now Agriculture Based Moringa Leaves Powder Business Opportunity
Moringa Leaf Powder business Start Now Agriculture Based Moringa Leaves Powder Business Opportunity

The Read More

Capacity : 0
Plant and Machinery cost: 0.00 Lakhs
Working Capital : 0.00
Rate of Return (ROR):0.00%
Break Even Point (BEP):0.00 %
TCI :0.00 Lakhs
Cost of Project : 0.00Lakhs
Add To Inquiry Basket
Business Plan Of ISO Freight Containers Manufacturing
Business Plan Of ISO Freight Containers Manufacturing

The industry standard for shipping is ISO Read More

Capacity : 0
Plant and Machinery cost: 0.00 Lakhs
Working Capital : 0.00
Rate of Return (ROR):0.00%
Break Even Point (BEP):0.00 %
TCI :0.00 Lakhs
Cost of Project : 0.00Lakhs
Add To Inquiry Basket
Beneficial Business Idea for Ginger Oil & Ginger Powder Start Today Great Business Opportunity of Ginger Oil & Ginger Powder
Beneficial Business Idea for Ginger Oil & Ginger Powder Start Today Great Business Opportunity of Ginger Oil & Ginger Powder

Although ... Read More

Capacity : 0
Plant and Machinery cost: 0.00 Lakhs
Working Capital : 0.00
Rate of Return (ROR):0.00%
Break Even Point (BEP):0.00 %
TCI :0.00 Lakhs
Cost of Project : 0.00Lakhs
Add To Inquiry Basket
Setting up Aluminium Cans for Beverages (Two Pieces) Business
Setting up Aluminium Cans for Beverages (Two Pieces) Business

 

Aluminium cans are one of the most popular con... Read More

Capacity : Aluminium Cans for Beverages Each 330 ml Size: 3,450 Lakh Pcs per Annum
Plant and Machinery cost: 2605.00 Lakhs
Working Capital : 0.00
Rate of Return (ROR):28.00%
Break Even Point (BEP):40.00 %
TCI :0.00 Lakhs
Cost of Project : 7760.00Lakhs
Add To Inquiry Basket
NameCapacityRate of return (ROR):Cost of project
E-Rickshaw 1,200 Nos per Annum 24.00 324.00
E-Rickshaw (Electric tuk-... 0 0.00 0.00
Disposable Plastic Syring... Disposable Plastic Syringes 2 ml Size : 350 Boxes/day Disposable Plastic Syringes 5 ml Size : 350 Bo 26.00 343.00
Disposable Plastic Syring... Disposable Plastic Syringes (2 ml Size):40000 Pcs/Day•Disposable Plastic Syringes (5 ml Size):40000 15.24 757.00
SOLAR PANEL Solar PV Module (240 watt) : 350 Nos/day (25 MW) 29.00 852.00
Biodegradable Disposable ... Disposable Paper Cups :7.5 MT/Day Disposable Paper Plates:7.5 MT/Day 28.18 314.00
Packaged Drinking Water 3000000 Ltrs. /Annum 24.00 112.00
PAPER NAPKINS, FACIAL TIS... 32.00 595.00
Packaged Drinking Water W... 40000 Ltrs./Day 29.00 171.00
PACKAGED DRINKING WATER 3000000 Bottles/Annum 41.00 108.00
DISPOSABLE SYRINGES Disposable Plastic Syringes 2 ml Size : 300,000 Boxes/Annum Disposable Plastic Syringes 5 ml Size : 46.00 837.00
PACKAGED DRINKING WATER 0 44.00 100.00
WOODEN FURNITURE 7500 Pcs./Annum 46.00 118.00
PAPER NAPKINS, TOILET ROL... 3000 MT/Annum, 6 MT Paper Napkins, 2 MT Toilet Rolls, 2 MT Facial Paper 49.00 923.00
Rickshaw Cycle Tyre & Tub... Rickshaw & Cycle Tyres : 1,500.00 Nos./Day,Rickshaw & Cycle Tubes: 1,500.00 Nos./Day 26.00 570.00
Packaged Drinking Water &... 7000 Ltrs Packaged Drinking/day, 7000 Nos. Pet Bottles/day 42.00 135.00
Pharmaceutical Tablets, C... 0 43.00 125.00
Disposable Plastic Syring... 0 0.00 0.00
Disposable Plastic Syring... 0 0.00 0.00
Oxygen and Nitrogen Gas P... 1440 Cubie Meter/Day 18.19 101.00
Tyre Retreading And Repai... 100 Tyres Retreads/Day & 2Nos. Heavy Vehicles Repairing/Day 89.00 71.00
Paper Napkins, Toilet Rol... 1000 Kgs/Day 96.61 53.00
Start Manufacturing Busin... L-Glutamic Acid 50 MT Per Day Monosodium Glutamate 15 MT Per Day 28.00 2590.00
Business Plan For Sanitar... Sanitary Napkins 1,440,000 Pkts Per Annum 27.00 84.00
Start Production of Expan... Expandable Graphite 10 MT Per Day High Purity Graphite 10 MT Per Day 27.00 1598.00
Start Waste Lubricating ... Recycled Lubricating Oil 18,000 KLs per Annum Spent Clay as by product 1,890 KLs per Annum 26.00 3101.00
Start Manufacturing Of Ca... Carbon Composite Bicycle 12 Nos per Day 27.00 594.00
Start Manufacturing Of La... Latex Toy Balloons 20,000 PKTS per Day 28.00 883.00
Setup Plant Of Craft Beer - 30.00 4060.00
Start Production Of Ammon... Ammonium Nitrate 2 MT per Day 26.00 215.00
12345678910...
« Back1 2 3 4 5Next »

Showing 1 - 60 of 548 Product(s)

Subject of your Interest

Information

  • One Lac / Lakh / Lakhs is equivalent to one hundred thousand (100,000)
  • One Crore is equivalent to ten million (10,000,000)
  • T.C.I is Total Capital Investment
  • We can modify the project capacity and project cost as per your requirement.
  • We can also prepare project report on any subject as per your requirement.
  • Caution: The project's cost, capacity and return are subject to change without any notice. Future projects may have different values of project cost, capacity or return.

ABOUT NPCS

 

NIIR PROJECT CONSULTANCY SERVICES (NPCS) is a reliable name in the industrial world for offering integrated technical consultancy services. NPCS is manned by engineers, planners, specialists, financial experts, economic analysts and design specialists with extensive experience in the related industries.

Our various services are: Detailed Project Report,  Business Plan for Manufacturing Plant, Start-up Ideas, Business Ideas for Entrepreneurs, Start up Business Opportunities, entrepreneurship projects, Successful Business Plan, Industry Trends, Market Research, Manufacturing Process, Machinery, Raw Materials, project report, Cost and Revenue, Pre-feasibility study for Profitable Manufacturing Business, Project Identification, Project Feasibility and Market Study, Identification of Profitable Industrial Project Opportunities, Business Opportunities, Investment Opportunities for Most Profitable Business in India, Manufacturing Business Ideas, Preparation of Project Profile, Pre-Investment and Pre-Feasibility Study, Market Research Study, Preparation of Techno-Economic Feasibility Report, Identification and Section of Plant, Process, Equipment, General Guidance, Startup Help, Technical and Commercial Counseling for setting up new industrial project and Most Profitable Small Scale Business.

NPCS also publishes varies process technology, technical, reference, self employment and startup books, directory, business and industry database, bankable detailed project report, market research report on various industries, small scale industry and profit making business. Besides being used by manufacturers, industrialists and entrepreneurs, our publications are also used by professionals including project engineers, information services bureau, consultants and project consultancy firms as one of the input in their research.

Our Detailed Project report aims at providing all the critical data required by any entrepreneur vying to venture into Project. While expanding a current business or while venturing into new business, entrepreneurs are often faced with the dilemma of zeroing in on a suitable product/line.

 


And before diversifying/venturing into any product, wish to study the following aspects of the identified product:


• Good Present/Future Demand
• Export-Import Market Potential
• Raw Material & Manpower Availability
• Project Costs and Payback Period


We at NPCS, through our reliable expertise in the project consultancy and market research field, Provides exhaustive information about the project, which satisfies all the above mentioned requirements and has high growth potential in the markets. And through our report we aim to help you make sound and informed business decision.

 

The report contains all the data which will help an entrepreneur find answers to questions like:

• Why I should invest in this project?
• What will drive the growth of the product?
• What are the costs involved?
• What will be the market potential?


The report first focuses on enhancing the basic knowledge of the entrepreneur about the main product, by elucidating details like product definition, its uses and applications, industry segmentation as well as an overall overview of the industry sector in India. The report then helps an entrepreneur identify the target customer group of its product. It further helps in making sound investment decision by listing and then elaborating on factors that will contribute to the growth of product consumption in India and also talks about the foreign trade of the product along with the list of top importing and top exporting countries. Report includes graphical representation and forecasts of key data discussed in the above mentioned segment. It further explicates the growth potential of the product.

The report includes other market data like key players in the Industry segment along with their contact information and recent developments. It includes crucial information like raw material requirements, list of machinery and manufacturing process for the plant. Core project financials like plant capacity, costs involved in setting up of project, working capital requirements, projected revenue and profit are further listed in the report.


Reasons for buying the report:

• This report helps you to identify a profitable project for investing or diversifying into by throwing light to crucial areas like industry size, demand of the product and reasons for investing in the product.

• This report provides vital information on the product like its definition, characteristics and segmentation.

• This report helps you market and place the product correctly by identifying the target customer group of the product.

• This report helps you understand the viability of the project by disclosing details like raw materials required, manufacturing process, project costs and snapshot of other project financials.

• The report provides forecasts of key parameters which helps to anticipate the industry performance and make sound business decision.

 

Our Approach:


• Our research reports broadly cover Indian markets, present analysis, outlook and forecast.

• The market forecasts are developed on the basis of secondary research and are cross-validated through interactions with the industry players. 

• We use reliable sources of information and databases.  And information from such sources is processed by us and included in the report.

 

Our Market Survey cum Detailed Techno Economic Feasibility Report Contains following information:

 

 

Ø  Introduction

·         Project Introduction

·         Project Objective and Strategy

·         Concise History of the Product

·         Properties

·         BIS (Bureau of Indian Standards) Provision & Specification

·         Uses & Applications

 

Ø  Market Study and Assessment

·         Current Indian Market Scenario

·         Present Market Demand and Supply

·         Estimated Future Market Demand and Forecast

·         Statistics of Import & Export

·         Names & Addresses of Existing Units (Present Players)

·         Market Opportunity

 

Ø  Raw Material

·         List of Raw Materials

·         Properties of Raw Materials

·         Prescribed Quality of Raw Materials

·         List of Suppliers and Manufacturers

 

Ø  Personnel (Manpower) Requirements

·         Requirement of Staff & Labor (Skilled and Unskilled) Managerial, Technical, Office Staff and Marketing Personnel

 

Ø  Plant and Machinery

·         List of Plant & Machinery

·         Miscellaneous Items

·         Appliances & Equipments

·         Laboratory Equipments & Accessories

·         Electrification

·         Electric Load & Water

·         Maintenance Cost

·         Sources of Plant & Machinery (Suppliers and Manufacturers)

 

Ø  Manufacturing Process and Formulations

·         Detailed Process of Manufacture with Formulation

·         Packaging Required

·         Process Flow Sheet Diagram

 

Ø  Infrastructure and Utilities

·         Project Location

·         Requirement of Land Area

·         Rates of the Land

·         Built Up Area

·         Construction Schedule

·         Plant Layout and Requirement of Utilities

 

Project at a Glance

Along with financial details as under:

 

  •     Assumptions for Profitability workings

  •    Plant Economics

  •    Production Schedule

  •    Land & Building

            Factory Land & Building

            Site Development Expenses

  •    Plant & Machinery

             Indigenous Machineries

            Other Machineries (Miscellaneous, Laboratory etc.)

  •    Other Fixed Assets

            Furniture & Fixtures

            Pre-operative and Preliminary Expenses

            Technical Knowhow

            Provision of Contingencies

  •   Working Capital Requirement Per Month

             Raw Material

            Packing Material

            Lab & ETP Chemical Cost

           Consumable Store

  •   Overheads Required Per Month And Per Annum

         Utilities & Overheads (Power, Water and Fuel Expenses etc.)

             Royalty and Other Charges

            Selling and Distribution Expenses

  •    Salary and Wages

  •    Turnover Per Annum

  •   Share Capital

            Equity Capital

            Preference Share Capital

 

  •    Annexure 1:: Cost of Project and Means of Finance

  •    Annexure 2::  Profitability and Net Cash Accruals

                Revenue/Income/Realisation

                Expenses/Cost of Products/Services/Items

                Gross Profit

                Financial Charges     

                Total Cost of Sales

                Net Profit After Taxes

                Net Cash Accruals

  •   Annexure 3 :: Assessment of Working Capital requirements

                Current Assets

                Gross Working. Capital

                Current Liabilities

                Net Working Capital

                Working Note for Calculation of Work-in-process

  •    Annexure 4 :: Sources and Disposition of Funds

  •    Annexure 5 :: Projected Balance Sheets

                ROI (Average of Fixed Assets)

                RONW (Average of Share Capital)

                ROI (Average of Total Assets)

  •    Annexure 6 :: Profitability ratios

                D.S.C.R

                Earnings Per Share (EPS)

               

             Debt Equity Ratio

        Annexure 7   :: Break-Even Analysis

                Variable Cost & Expenses

                Semi-Var./Semi-Fixed Exp.

                Profit Volume Ratio (PVR)

                Fixed Expenses / Cost 

                B.E.P

  •   Annexure 8 to 11:: Sensitivity Analysis-Price/Volume

            Resultant N.P.B.T

            Resultant D.S.C.R

   Resultant PV Ratio

   Resultant DER

  Resultant ROI

          Resultant BEP

  •    Annexure 12 :: Shareholding Pattern and Stake Status

        Equity Capital

        Preference Share Capital

  •   Annexure 13 :: Quantitative Details-Output/Sales/Stocks

        Determined Capacity P.A of Products/Services

        Achievable Efficiency/Yield % of Products/Services/Items 

        Net Usable Load/Capacity of Products/Services/Items   

       Expected Sales/ Revenue/ Income of Products/ Services/ Items   

  •    Annexure 14 :: Product wise domestic Sales Realisation

  •    Annexure 15 :: Total Raw Material Cost

  •    Annexure 16 :: Raw Material Cost per unit

  •    Annexure 17 :: Total Lab & ETP Chemical Cost

  •    Annexure 18  :: Consumables, Store etc.,

  •    Annexure 19  :: Packing Material Cost

  •    Annexure 20  :: Packing Material Cost Per Unit

  •    Annexure 21 :: Employees Expenses

  •    Annexure 22 :: Fuel Expenses

  •    Annexure 23 :: Power/Electricity Expenses

  •    Annexure 24 :: Royalty & Other Charges

  •    Annexure 25 :: Repairs & Maintenance Exp.

  •    Annexure 26 :: Other Mfg. Expenses

  •    Annexure 27 :: Administration Expenses

  •    Annexure 28 :: Selling Expenses

  •    Annexure 29 :: Depreciation Charges – as per Books (Total)

  •   Annexure 30   :: Depreciation Charges – as per Books (P & M)

  •   Annexure 31   :: Depreciation Charges - As per IT Act WDV (Total)

  •   Annexure 32   :: Depreciation Charges - As per IT Act WDV (P & M)

  •   Annexure 33   :: Interest and Repayment - Term Loans

  •   Annexure 34   :: Tax on Profits

  •   Annexure 35   ::Projected Pay-Back Period And IRR