We can provide you detailed project reports on the following topics. Please select the projects of your interests.
Each detailed project reports cover all the aspects of business, from analysing the market, confirming availability of various necessities such as plant & machinery, raw materials to forecasting the financial requirements. The scope of the report includes assessing market potential, negotiating with collaborators, investment decision making, corporate diversification planning etc. in a very planned manner by formulating detailed manufacturing techniques and forecasting financial aspects by estimating the ost of raw material, formulating the cash flow statement, projecting the balance sheet etc.
We also offer self-contained Pre-Investment and Pre-Feasibility Studies, Market Surveys and Studies, Preparation of Techno-Economic Feasibility Reports, Identification and Selection of Plant and Machinery, Manufacturing Process and or Equipment required, General Guidance, Technical and Commercial Counseling for setting up new industrial projects on the following topics. Many of the engineers, project consultant & industrial consultancy firms in India and worldwide use our project reports as one of the input in doing their analysis.


We can modify the project capacity and project cost as per your requirement.
We can also prepare project report on any subject as per your requirement.

Add multiple items to inquiry

Select the items and then press Add to inquiry button

Sort by :
EXPANDED POLYSTYRENE
EXPANDED POLYSTYRENE

Expanded polystyrene bead is a product of styrene polymer in presence of low volatile hydrocortisone in presence of blowing agent. Different shape ... Read More

Capacity : 30,000 MT/Annum
Plant and Machinery cost: 171.00 Lakhs
Working Capital : 0.00
Rate of Return (ROR):58.00%
Break Even Point (BEP):49.00 %
TCI :794.00 Lakhs
Cost of Project : 794.00Lakhs
Add To Inquiry Basket
AUTOMATIC BREAD AND BISCUITS PLANT
AUTOMATIC BREAD AND BISCUITS PLANT

Bread is most consumable wheat based... Read More

Capacity : (3000 Packets Bread, 200 Kg. Toasts, 100 Kg. Pastries, 200 Kg. Cakes, 600 Kg. Biscuits) Per Day
Plant and Machinery cost: 110.00 Lakhs
Working Capital : 0.00
Rate of Return (ROR):38.00%
Break Even Point (BEP):45.00 %
TCI :240.00 Lakhs
Cost of Project : 240.00Lakhs
Add To Inquiry Basket
FORMALDEHYDE FROM METHANOL
FORMALDEHYDE FROM METHANOL

Formaldehyde or formic Aldehyde, HCHO, the simplest of the aliphatic aldehydes, is a colourless gas. It is met with in commerce in the form of its ... Read More

Capacity : 15 MT/Day
Plant and Machinery cost: 72.00 Lakhs
Working Capital : 0.00
Rate of Return (ROR):50.00%
Break Even Point (BEP):40.00 %
TCI :339.00 Lakhs
Cost of Project : 339.00Lakhs
Add To Inquiry Basket
PP BAGS FOR CEMENT
PP BAGS FOR CEMENT

PP BAGS FOR CEMENT PP/HDPE oriented sacks are becoming popular through out the world. This is because they are chemically inert & are water re... Read More

Capacity : 120 Lakh Bags/Annum
Plant and Machinery cost: 230.00 Lakhs
Working Capital : 0.00
Rate of Return (ROR):39.00%
Break Even Point (BEP):52.00 %
TCI :425.00 Lakhs
Cost of Project : 425.00Lakhs
Add To Inquiry Basket
TITANIUM DIOXIDE (ANATASE GRADE)
TITANIUM DIOXIDE (ANATASE GRADE)

The year 1992 will mark the start of the third century since the discovery of Titanium, stated to be the ninth most plentiful element in the earths... Read More

Capacity : 150 MT/Day
Plant and Machinery cost: 2000.00 Lakhs
Working Capital : 0.00
Rate of Return (ROR):52.00%
Break Even Point (BEP):30.00 %
TCI :8500.00 Lakhs
Cost of Project : 8500.00Lakhs
Add To Inquiry Basket
MAYONNAISE
MAYONNAISE

There are few unorganized and private companies engaged in the manufacturing of Mayonnaise. It may be called the product is better substitute produ... Read More

Capacity : 300 MT Per Annum.
Plant and Machinery cost: 40.00 Lakhs
Working Capital : 0.00
Rate of Return (ROR):40.00%
Break Even Point (BEP):58.00 %
TCI :107.00 Lakhs
Cost of Project : 107.00Lakhs
Add To Inquiry Basket
TRANSFORMER OIL
TRANSFORMER OIL

These are mineral oils and are used to dissipate the heat generated in electric transformers, switches, circuit breakers and motor starters etc. Th... Read More

Capacity : 100KLS/Day
Plant and Machinery cost: 1104.00 Lakhs
Working Capital : 0.00
Rate of Return (ROR):45.00%
Break Even Point (BEP):30.00 %
TCI :3031.00 Lakhs
Cost of Project : 3031.00Lakhs
Add To Inquiry Basket
CEMENT WATER PROOFING COMPOUND
CEMENT WATER PROOFING COMPOUND

Water resistance or proofing is an important factor in health and comfort of building occupants. Water proof construction implies the use of a memb... Read More

Capacity : 100 Kg./Day
Plant and Machinery cost: 2.00 Lakhs
Working Capital : 0.00
Rate of Return (ROR):41.00%
Break Even Point (BEP):39.00 %
TCI :11.00 Lakhs
Cost of Project : 11.00Lakhs
Add To Inquiry Basket
BOPP PRESSURE SENSITIVE SELF ADHESIVE TAPE
BOPP PRESSURE SENSITIVE SELF ADHESIVE TAPE

BOPP adhesive tape, which is quite a recent development in the field of modern packing. It is a pressure sensitive self adhesive tape. BOPP film is... Read More

Capacity : 6000 sq. mt./Day
Plant and Machinery cost: 20.00 Lakhs
Working Capital : 0.00
Rate of Return (ROR):48.00%
Break Even Point (BEP):43.00 %
TCI :86.00 Lakhs
Cost of Project : 86.00Lakhs
Add To Inquiry Basket
API Tube
API Tube

Piping may represent as much as 25% of the cost of a chemical process plant. The economics depends heavily on the pipe size and fabrication techniq... Read More

Capacity : 300000 Nos./Day
Plant and Machinery cost: 54.00 Lakhs
Working Capital : 0.00
Rate of Return (ROR):46.00%
Break Even Point (BEP):57.00 %
TCI :195.00 Lakhs
Cost of Project : 195.00Lakhs
Add To Inquiry Basket
MOSQUITO REPELLENT CANDLE
MOSQUITO REPELLENT CANDLE

The concept of mosquito repellent candle is a new one which serve the purpose of enlightment as well as mosquito repellency. It is more efficiently... Read More

Capacity : 500 kg/Day
Plant and Machinery cost: 0.00 Lakhs
Working Capital : 0.00
Rate of Return (ROR):0.00%
Break Even Point (BEP):0.00 %
TCI :0.00 Lakhs
Cost of Project : 0.00Lakhs
Add To Inquiry Basket
Rubberised Cork Sheet
Rubberised Cork Sheet

Cork is one of the few naturally grown closed-cell foams that has never been duplicated with synthetic material. The cork oak is unique in that the... Read More

Capacity : 500 kgs/Day
Plant and Machinery cost: 20.00 Lakhs
Working Capital : 0.00
Rate of Return (ROR):31.00%
Break Even Point (BEP):54.00 %
TCI :53.00 Lakhs
Cost of Project : 53.00Lakhs
Add To Inquiry Basket
Particle Board
Particle Board

Particle boards are substitute of solid wood and plywood. Due to the growing deforestation, the natural wood is becoming more and more scare. Parti... Read More

Capacity : 160 Nos./ Day
Plant and Machinery cost: 0.00 Lakhs
Working Capital : 0.00
Rate of Return (ROR):52.89%
Break Even Point (BEP):49.59 %
TCI :0.00 Lakhs
Cost of Project : 0.00Lakhs
Add To Inquiry Basket
Development of Sustainable Industrial Park
Development of Sustainable Industrial Park

An industrial park (also known as an industrial estate or a trading estate) is a desi... Read More

Capacity : 0
Plant and Machinery cost: 0.00 Lakhs
Working Capital : 0.00
Rate of Return (ROR):0.00%
Break Even Point (BEP):0.00 %
TCI :0.00 Lakhs
Cost of Project : 0.00Lakhs
Add To Inquiry Basket
Business Plan of Toothpaste
Business Plan of Toothpaste

Toothpaste may be a paste or gel to be used with a toothbrush to take care of and improve oral health and aesthetics. Since their introduction seve... Read More

Capacity : Toothpaste 35 gms Tubes: 28,572 Tubes / Day Toothpaste 70 gms Tubes: 14,286 Tubes / Day Toothpaste 1
Plant and Machinery cost: 173.00 Lakhs
Working Capital : 0.00
Rate of Return (ROR):22.00%
Break Even Point (BEP):44.00 %
TCI :0.00 Lakhs
Cost of Project : 2185.00Lakhs
Add To Inquiry Basket
8 Most Profitable Manufacturing Business Ideas
8 Most Profitable Manufacturing Business Ideas

8 Most Profitable Manufacturing Business Ideas for Cashew N... Read More

Capacity : 0
Plant and Machinery cost: 0.00 Lakhs
Working Capital : 0.00
Rate of Return (ROR):0.00%
Break Even Point (BEP):0.00 %
TCI :0.00 Lakhs
Cost of Project : 0.00Lakhs
Add To Inquiry Basket
Business Plan-Composite Materials Manufacturing
Business Plan-Composite Materials Manufacturing

Business Plan-Composite Materials Manufacturing- Carbon Fibre Composites & Glass Fib... Read More

Capacity : 0
Plant and Machinery cost: 0.00 Lakhs
Working Capital : 0.00
Rate of Return (ROR):0.00%
Break Even Point (BEP):0.00 %
TCI :0.00 Lakhs
Cost of Project : 0.00Lakhs
Add To Inquiry Basket
Production of Jute Fabric and Gunny Bags
Production of Jute Fabric and Gunny Bags
Jute is a natural vegetable fibre made from the outer stem and skin of the jute plant. Also known as 'the golden fibre' due to its shiny golden colour... Read More
Capacity : -
Plant and Machinery cost: 0.00 Lakhs
Working Capital : 1.00
Rate of Return (ROR):1.00%
Break Even Point (BEP):1.00 %
TCI :0.00 Lakhs
Cost of Project : 0.00Lakhs
Add To Inquiry Basket
Fitness Equipments (Elliptical Cross Trainers, Treadmill and Exercise Bikes)
Fitness Equipments (Elliptical Cross Trainers, Treadmill and Exercise Bikes)

Fitness/Exercise equipment is any apparatus or device used during physical activity to enhance the strength or conditioning effects of that exercis... Read More

Capacity : Elliptical Trainers: 21000 Nos. / Annum•Treadmill: 21000 Nos. / Annum•Exercise Bikes: 21000 Nos.
Plant and Machinery cost: 65.00 Lakhs
Working Capital : 0.00
Rate of Return (ROR):27.00%
Break Even Point (BEP):65.00 %
TCI :298.00 Lakhs
Cost of Project : 298.00Lakhs
Add To Inquiry Basket
Carbon Fibers Composites
Carbon Fibers Composites

Carbon fiber is composed of carbon atoms bonded together to form a long chain. The fibers are extremely stiff, strong, and light, and are used in m... Read More

Capacity : 1 MT/Day.
Plant and Machinery cost: 70.00 Lakhs
Working Capital : 0.00
Rate of Return (ROR):31.00%
Break Even Point (BEP):60.00 %
TCI :544.00 Lakhs
Cost of Project : 544.00Lakhs
Add To Inquiry Basket
COMPACT FLUORESCENT LAMPS (CFL)
COMPACT FLUORESCENT LAMPS (CFL)

Fluorescent lamps are low-pressure mercury electric–discharge lamps in which a phosphor coating... Read More

Capacity : 60 Lakhs Pcs/Annum
Plant and Machinery cost: 446.00 Lakhs
Working Capital : 0.00
Rate of Return (ROR):44.00%
Break Even Point (BEP):60.00 %
TCI :727.00 Lakhs
Cost of Project : 727.00Lakhs
Add To Inquiry Basket
Transmission Tower & Tele Communication Tower with Galvanizing Plant
Transmission Tower & Tele Communication Tower with Galvanizing Plant

The purpose of a transmission line tower is to support conductors carrying electrical power and one or two ground wires at suitable distances above... Read More

Capacity : 24,000 MT /Year
Plant and Machinery cost: 149.00 Lakhs
Working Capital : 0.00
Rate of Return (ROR):46.00%
Break Even Point (BEP):53.00 %
TCI :716.00 Lakhs
Cost of Project : 716.00Lakhs
Add To Inquiry Basket
Aromatic Perfumery Compound
Aromatic Perfumery Compound

A perfume can be defined as a blend of odorous materials of natural and synthetic origin which gives a pleasant odour impression. The art of perfum... Read More

Capacity : 10 kg/Day
Plant and Machinery cost: 6.00 Lakhs
Working Capital : 0.00
Rate of Return (ROR):30.00%
Break Even Point (BEP):52.00 %
TCI :51.00 Lakhs
Cost of Project : 51.00Lakhs
Add To Inquiry Basket
Dyeing on Rayon in Hanks Form & Cone Form
Dyeing on Rayon in Hanks Form & Cone Form

These dyes are so powerful that very small amounts, comparatively, are needed to colour a large amount of material. The dyestuff should never be sh... Read More

Capacity : 1500 MT/Annum
Plant and Machinery cost: 23.00 Lakhs
Working Capital : 8.00
Rate of Return (ROR):31.00%
Break Even Point (BEP):48.00 %
TCI :0.00 Lakhs
Cost of Project : 0.00Lakhs
Add To Inquiry Basket
WIRE DRAWING LUBRICANTS
WIRE DRAWING LUBRICANTS

Lubricants are the products used for the lubrication of sliding or rolling elements. Product similar to these with respect to composition, manufact... Read More

Capacity : 600 Kg./day
Plant and Machinery cost: 21.00 Lakhs
Working Capital : 0.00
Rate of Return (ROR):48.00%
Break Even Point (BEP):36.00 %
TCI :125.00 Lakhs
Cost of Project : 125.00Lakhs
Add To Inquiry Basket
FISH OIL (Production and Refining) with Fish Meal
FISH OIL (Production and Refining) with Fish Meal

Fish is used as a source of food either in raw or dry state. It has protein which is amino acids. Another means of utilization of fish is the manuf... Read More

Capacity : 1 MT/day Fish Oil. 2.3 MT/day Fish Meal.
Plant and Machinery cost: 63.00 Lakhs
Working Capital : 0.00
Rate of Return (ROR):48.00%
Break Even Point (BEP):34.00 %
TCI :219.00 Lakhs
Cost of Project : 219.00Lakhs
Add To Inquiry Basket
Management Institute
Management Institute

-

Read More
Capacity : 300 MBA Students
Plant and Machinery cost: 51.00 Lakhs
Working Capital : 0.00
Rate of Return (ROR):34.00%
Break Even Point (BEP):46.00 %
TCI :606.00 Lakhs
Cost of Project : 606.00Lakhs
Add To Inquiry Basket
Oxygen Gas Lancing Pipes, Ceramic Coated Pipes, Oxygen Lancing Tube Used in Steel Plants, Furnace and Foundries
Oxygen Gas Lancing Pipes, Ceramic Coated Pipes, Oxygen Lancing Tube Used in Steel Plants, Furnace and Foundries

Manufacturing of steel tubes & pipes a Mechanical Engineering is mostly produced in large scale. ERW steel tubes are chiefly used in bicycles, ... Read More

Capacity : 3600 MT / Annum
Plant and Machinery cost: 115.00 Lakhs
Working Capital : 0.00
Rate of Return (ROR):43.00%
Break Even Point (BEP):57.00 %
TCI :234.00 Lakhs
Cost of Project : 234.00Lakhs
Add To Inquiry Basket
Fatty Acid Based on Sunflower Acid Oil
Fatty Acid Based on Sunflower Acid Oil

Fatty acid is the generic name for an important group of organic acids, which occur in nature mostly in the form of fats, oils and waxes. Fats and ... Read More

Capacity : 3000 MT/Annum
Plant and Machinery cost: 51.00 Lakhs
Working Capital : 0.00
Rate of Return (ROR):43.00%
Break Even Point (BEP):41.00 %
TCI :238.00 Lakhs
Cost of Project : 238.00Lakhs
Add To Inquiry Basket
Calcium Carbonate (Activated & Precipitated)
Calcium Carbonate (Activated & Precipitated)

Calcium Carbonate occurs naturally as the principal constituent of limestone, marble and chalk powdered calcium carbonate is produced by two method... Read More

Capacity : 1200 MT Activated + 4500 MT Precipitated Calcium Carbonate / Annum
Plant and Machinery cost: 124.00 Lakhs
Working Capital : 0.00
Rate of Return (ROR):36.00%
Break Even Point (BEP):50.00 %
TCI :376.00 Lakhs
Cost of Project : 376.00Lakhs
Add To Inquiry Basket
Detergent Powder
Detergent Powder

Synthetic detergents as an effective substitute to washing soaps have become increasingly popular in the country in the last 25 years. With more an... Read More

Capacity : 1000 Kgs. / day
Plant and Machinery cost: 6.00 Lakhs
Working Capital : 0.00
Rate of Return (ROR):48.00%
Break Even Point (BEP):46.00 %
TCI :22.00 Lakhs
Cost of Project : 22.00Lakhs
Add To Inquiry Basket
Solar Pump
Solar Pump

The energy consumption per capita throughout the world is rapidly increasing. Solar energy is considered to be unlimited source of energy. Energy i... Read More

Capacity : 12 Nos. / day
Plant and Machinery cost: 17.00 Lakhs
Working Capital : 0.00
Rate of Return (ROR):47.00%
Break Even Point (BEP):28.00 %
TCI :288.00 Lakhs
Cost of Project : 288.00Lakhs
Add To Inquiry Basket
Power Cable
Power Cable

Electrical power cables used for transmission and distribution purposes consist of conductors stranded from plain high conductively annealed copper... Read More

Capacity : 2050 MT Aluminium Power Cable/Annum 350 MT Copper Power Cable/Annum
Plant and Machinery cost: 80.00 Lakhs
Working Capital : 0.00
Rate of Return (ROR):45.00%
Break Even Point (BEP):60.00 %
TCI :305.00 Lakhs
Cost of Project : 305.00Lakhs
Add To Inquiry Basket
Chocolate
Chocolate

The covering of chocolates was originally carried out solely by hand the process being known as hand dipping. Each piece or centre was handled indi... Read More

Capacity : 600 Kg./day
Plant and Machinery cost: 27.00 Lakhs
Working Capital : 0.00
Rate of Return (ROR):53.00%
Break Even Point (BEP):38.00 %
TCI :131.00 Lakhs
Cost of Project : 131.00Lakhs
Add To Inquiry Basket
Ball Point Pen Refills
Ball Point Pen Refills

In modern time ball pen refills are being produced from plastic materials and is having bright future in specially India. Ball pen refill is stocke... Read More

Capacity : 10,000 Nos./day
Plant and Machinery cost: 4.00 Lakhs
Working Capital : 30.00
Rate of Return (ROR):43.00%
Break Even Point (BEP):47.00 %
TCI :30.00 Lakhs
Cost of Project : 30.00Lakhs
Add To Inquiry Basket
Packaged Drinking Water
Packaged Drinking Water

Bisleri, which pioneered the packaged drinking water business in India, catering to consumers need to have hygienic drinking water while on the mov... Read More

Capacity : 30,000 Thousand Nos./Annum or 1,00,000 Bottles /day
Plant and Machinery cost: 105.00 Lakhs
Working Capital : 0.00
Rate of Return (ROR):44.00%
Break Even Point (BEP):63.00 %
TCI :282.00 Lakhs
Cost of Project : 282.00Lakhs
Add To Inquiry Basket
MILD STEEL INGOTS FROM IRON ORE
MILD STEEL INGOTS FROM IRON ORE

Castings of suitable shape and size intended for subsequent hot working are termed as ingots. Ingot iron has very low carbon in steel. This is gene... Read More

Capacity : 60,000 MT / Annum
Plant and Machinery cost: 4012.00 Lakhs
Working Capital : 0.00
Rate of Return (ROR):43.00%
Break Even Point (BEP):30.00 %
TCI :6454.00 Lakhs
Cost of Project : 6454.00Lakhs
Add To Inquiry Basket
GYPSUM PLASTER BOARDS
GYPSUM PLASTER BOARDS

For a building being constructed the one and only thing which is to be considered is its strength of bearing load of both environmental artificial.... Read More

Capacity : 3000 MT / Annum
Plant and Machinery cost: 48.00 Lakhs
Working Capital : 0.00
Rate of Return (ROR):41.00%
Break Even Point (BEP):54.00 %
TCI :235.00 Lakhs
Cost of Project : 235.00Lakhs
Add To Inquiry Basket
IRON ORE PELLETIZATION PLANT
IRON ORE PELLETIZATION PLANT

Iron ore pellets are used in blast furnaces for producing sponge iron & steels. Marked by high productivity lower fuel consumption and improved... Read More

Capacity : 6000 MT / Annum
Plant and Machinery cost: 187.00 Lakhs
Working Capital : 0.00
Rate of Return (ROR):44.00%
Break Even Point (BEP):46.00 %
TCI :479.00 Lakhs
Cost of Project : 479.00Lakhs
Add To Inquiry Basket
CHARCOAL POWDER FROM RICE HUSK
CHARCOAL POWDER FROM RICE HUSK

Charcoal is produced in kilns and retorts. The thermal decomposition of wood in a kiln with a controlled air supply produces charcoal. The gaseous ... Read More

Capacity : 50 MT/day
Plant and Machinery cost: 190.00 Lakhs
Working Capital : 0.00
Rate of Return (ROR):53.00%
Break Even Point (BEP):33.00 %
TCI :845.00 Lakhs
Cost of Project : 845.00Lakhs
Add To Inquiry Basket
PACKAGED DRINKING WATER
PACKAGED DRINKING WATER

Water quality and quantity are interdependent, interacting elements of water system. The term water quality refers to the level of suitability of w... Read More

Capacity : 10000 Ltrs./day
Plant and Machinery cost: 60.00 Lakhs
Working Capital : 0.00
Rate of Return (ROR):43.00%
Break Even Point (BEP):40.00 %
TCI :180.00 Lakhs
Cost of Project : 180.00Lakhs
Add To Inquiry Basket
CRANE HOOKS AND OTHER FORGED PRODUCTS(SUSPENSION PART, SUSPENSION SHAFT, SAFETY LATCH)
CRANE HOOKS AND OTHER FORGED PRODUCTS(SUSPENSION PART, SUSPENSION SHAFT, SAFETY LATCH)

A lifting hook comprising a suspension part fitted with a suspension shaft, which supports a hook part provided with a slot. A safety latch is pivo... Read More

Capacity : 5 MT/day
Plant and Machinery cost: 57.00 Lakhs
Working Capital : 0.00
Rate of Return (ROR):48.00%
Break Even Point (BEP):33.00 %
TCI :352.00 Lakhs
Cost of Project : 352.00Lakhs
Add To Inquiry Basket
FIRE CLAY BRICKS
FIRE CLAY BRICKS

Natural fireclays were the raw materials for the first refractories. Their usefulness in this respect is founded on the high proportion of clay min... Read More

Capacity : 15000 MT / Annum
Plant and Machinery cost: 145.00 Lakhs
Working Capital : 0.00
Rate of Return (ROR):46.00%
Break Even Point (BEP):36.00 %
TCI :370.00 Lakhs
Cost of Project : 370.00Lakhs
Add To Inquiry Basket
BAKERS YEAST
BAKERS YEAST

There are two types of yeast as compressed yeast and dry yeast. It is convenient to use dry yeast powder for bakeries because it is handling is sim... Read More

Capacity : 5 MT/day
Plant and Machinery cost: 292.00 Lakhs
Working Capital : 0.00
Rate of Return (ROR):45.00%
Break Even Point (BEP):47.00 %
TCI :535.00 Lakhs
Cost of Project : 535.00Lakhs
Add To Inquiry Basket
Carbon Composite Fiber
Carbon Composite Fiber

Carbon Composite fibre is produced from the raw material used PAN, pitch etc. Quality of composite carbon fibre produced from PAN is much better th... Read More

Capacity : 500 Kgs/day
Plant and Machinery cost: 238.00 Lakhs
Working Capital : 0.00
Rate of Return (ROR):36.00%
Break Even Point (BEP):40.00 %
TCI :520.00 Lakhs
Cost of Project : 520.00Lakhs
Add To Inquiry Basket
Poultry Farming with Hatchery
Poultry Farming with Hatchery

The production of poultry in the United States and generally throughout the world is carried out by a highly specialized, efficient poultry industr... Read More

Capacity : 5000 layers/Annum; 1000 Birds/Week
Plant and Machinery cost: 3.00 Lakhs
Working Capital : 0.00
Rate of Return (ROR):44.00%
Break Even Point (BEP):44.00 %
TCI :41.00 Lakhs
Cost of Project : 41.00Lakhs
Add To Inquiry Basket
Yellow Dextrin
Yellow Dextrin

Dextrin is a starch derivative. It is also known as water soluble carbohydrate produced by heat and acid depolymerization. It is made by heating, w... Read More

Capacity : 750 MT/Annum
Plant and Machinery cost: 34.00 Lakhs
Working Capital : 0.00
Rate of Return (ROR):36.00%
Break Even Point (BEP):42.00 %
TCI :98.00 Lakhs
Cost of Project : 98.00Lakhs
Add To Inquiry Basket
Longitudinal Submerged Arc Welded [L-SAW] Pipes
Longitudinal Submerged Arc Welded [L-SAW] Pipes

Pipes are the transporting tools used for carrying and transporting liquids like crude and refined petroleum oils, water, chemical and gases. With ... Read More

Capacity : 300000 MT/Annum
Plant and Machinery cost: 12300.00 Lakhs
Working Capital : 0.00
Rate of Return (ROR):41.00%
Break Even Point (BEP):51.00 %
TCI :18700.00 Lakhs
Cost of Project : 18700.00Lakhs
Add To Inquiry Basket
Granite Block Cutting
Granite Block Cutting

Like marble and other natural stones, granite has been used extensively in the construction of forts, temples and other buildings. Granite is also ... Read More

Capacity : 45000 MT Granite Blocks /Annum
Plant and Machinery cost: 477.00 Lakhs
Working Capital : 0.00
Rate of Return (ROR):36.00%
Break Even Point (BEP):72.00 %
TCI :1519.00 Lakhs
Cost of Project : 1750.00Lakhs
Add To Inquiry Basket
Calcium Propionate
Calcium Propionate

Calcium propionate is a food preservative which largely used in the bread industry as mould inhibitor. It is manufactured with other food preservat... Read More

Capacity : 150 MT/Annum
Plant and Machinery cost: 26.00 Lakhs
Working Capital : 0.00
Rate of Return (ROR):41.00%
Break Even Point (BEP):45.00 %
TCI :80.00 Lakhs
Cost of Project : 80.00Lakhs
Add To Inquiry Basket
Pig Farming
Pig Farming

Pig rearing can be paying if sufficient attention in given to the selection of good quality stock and to the proper management of herd. If pigs are... Read More

Capacity : 1500 Pigs/Day
Plant and Machinery cost: 2.00 Lakhs
Working Capital : 0.00
Rate of Return (ROR):53.00%
Break Even Point (BEP):44.00 %
TCI :32.00 Lakhs
Cost of Project : 32.00Lakhs
Add To Inquiry Basket
Cardamom Oil
Cardamom Oil

Cardamom oil is an essential spice oil. It has very good flavour and large end use in the pharmaceutical industry, cosmetic industry, food industri... Read More

Capacity : 20 Kg/Day
Plant and Machinery cost: 6.00 Lakhs
Working Capital : 0.00
Rate of Return (ROR):57.00%
Break Even Point (BEP):29.00 %
TCI :111.00 Lakhs
Cost of Project : 111.00Lakhs
Add To Inquiry Basket
Asbestos Cement Corrugated Sheet
Asbestos Cement Corrugated Sheet

The asbestos sheet was first manufactured in 1914 in Japan. Since then improvement have been repeatedly made in the quality, shape and manufacturin... Read More

Capacity : 1000 NOS./day
Plant and Machinery cost: 81.00 Lakhs
Working Capital : 0.00
Rate of Return (ROR):38.00%
Break Even Point (BEP):43.00 %
TCI :291.00 Lakhs
Cost of Project : 291.00Lakhs
Add To Inquiry Basket
Ayurvedic Pharmacy
Ayurvedic Pharmacy

The contribution of thousands of medical luminances has been completed in the ayurvedic system to make it as one of the most wide as well as perfec... Read More

Capacity : 25 days/month
Plant and Machinery cost: 22.00 Lakhs
Working Capital : 0.00
Rate of Return (ROR):51.00%
Break Even Point (BEP):30.00 %
TCI :171.00 Lakhs
Cost of Project : 171.00Lakhs
Add To Inquiry Basket
Paracetamol
Paracetamol

The development in pharmaceutical industry is very rapid and continuous research work throughout the world has resulted in a number of new medicine... Read More

Capacity : 500.00 KGS./day
Plant and Machinery cost: 0.00 Lakhs
Working Capital : 0.00
Rate of Return (ROR):0.00%
Break Even Point (BEP):0.00 %
TCI :0.00 Lakhs
Cost of Project : 0.00Lakhs
Add To Inquiry Basket
Nylon Coating on Zinc Wire (Wire “O“ Wire)
Nylon Coating on Zinc Wire (Wire “O“ Wire)

Polyamides are a group of thermoplastic polymers containing amid groups in the main chain. They are popularly known as Nylons, which is the trade ... Read More

Capacity : 20000 Meters/day
Plant and Machinery cost: 45.00 Lakhs
Working Capital : 0.00
Rate of Return (ROR):38.00%
Break Even Point (BEP):48.00 %
TCI :211.00 Lakhs
Cost of Project : 211.00Lakhs
Add To Inquiry Basket
U-Bolts and Centre Bolts for Leaf Springs
U-Bolts and Centre Bolts for Leaf Springs

Bolts in various dimensions and head-shapes are available. Bolts can be supplied unfinished, semi-finished and fully finished conditions. U-bolts a... Read More

Capacity : 5.00 MT./day
Plant and Machinery cost: 152.00 Lakhs
Working Capital : 0.00
Rate of Return (ROR):38.00%
Break Even Point (BEP):48.00 %
TCI :436.00 Lakhs
Cost of Project : 436.00Lakhs
Add To Inquiry Basket
CERAMIC TABLE WARE HOTEL WARE STONE WARE BONE CHINA
CERAMIC TABLE WARE HOTEL WARE STONE WARE BONE CHINA

Crockery in fact is a very vast term, which includes a number of items all used in our homes. Wares and containers made from glass are also covered... Read More

Capacity : 1000 Sets/Day
Plant and Machinery cost: 78.00 Lakhs
Working Capital : 0.00
Rate of Return (ROR):53.00%
Break Even Point (BEP):42.00 %
TCI :211.00 Lakhs
Cost of Project : 211.00Lakhs
Add To Inquiry Basket
RUBBER AUTO PARTS
RUBBER AUTO PARTS

Rubber Auto Parts are amongst the important automobile ancillary industries. They are used in various parts of the automobiles. The rubber auto par... Read More

Capacity : 334 Kgs./Day
Plant and Machinery cost: 12.00 Lakhs
Working Capital : 0.00
Rate of Return (ROR):46.00%
Break Even Point (BEP):45.00 %
TCI :67.00 Lakhs
Cost of Project : 67.00Lakhs
Add To Inquiry Basket
APPLE CHIPS
APPLE CHIPS

Apple is one of the delicious fruits. It contains vitamins, minerals, enzyme, fruit juice etc. Apples can be preserved in the form of apple chips b... Read More

Capacity : 5 MT/Day
Plant and Machinery cost: 253.00 Lakhs
Working Capital : 0.00
Rate of Return (ROR):47.00%
Break Even Point (BEP):33.00 %
TCI :656.00 Lakhs
Cost of Project : 656.00Lakhs
Add To Inquiry Basket
NameCapacityRate of return (ROR):Cost of project
Jute Garments Jute Garments Substitute Of Woollen, Garments 1000 Pcs/Day (Wt. 500 Gms ) 41.00 294.00
Admixtures for Concrete 500 kg. Air Entraining Admix, 500 kg. Accelerating Admixture, 500 kg. Retarding Admixture, 500 kg. W 51.00 162.00
Drum Stick Powder 50.00 KGS./day 37.00 18.00
Ethyl Acetate 15.00 MT/day 67.00 664.00
Plastic Carry Bags (HM-HD... 8.00 MT/day 45.00 686.00
Alumina to Aluminium and ... Aluminium Bar 40000 MT, Aluminium Profiles 20000( Per Annum) 38.00 0.00
Rubber Reclamation 2.00 MT/day 51.00 98.00
Wire Nail & Wire Drawing ... 1.00 MT/day 45.00 47.00
Fruit Juice in Aseptic Pa... 300000.00 NOS PACK/day (EACH PACK 200 ML) 57.00 1413.00
Bolt and Nuts 5.00 MT/day 26.00 700.00
PAINT ADDITIVES (ANTI SET... Hydrogenated Castor Oil, Butyl Acrylate, Aluminium Plamitate each 300 MT/Annum 30.00 173.00
Rice and Corn Flakes 5 Tones/Day 35.00 324.00
Plastic Collapsible Tubes... 72000 Nos./Day 29.00 124.00
Setup plant of Acetate T... Acetate Tow 8 MT Per Day 29.00 1426.00
Manufacturing Business Pl... 0 0.00 0.00
Business Plans for Produc... 0 0.00 0.00
PVC Flex Banner (Frontlit... 5400000 MT/annum 26.00 454.00
EMU BIRDS (Farming, Breed... Meat 20,000 Kgs., EMU Chick 5000 Nos., EMU Oil 4000 Kgs., Eggs 20,000 Nos. /Annum 40.00 759.00
COMPRESSED BIOGAS 1200 MT/Annum 43.00 447.00
MEDICAL DISPOSABLES: Disp... 0 43.00 426.00
HEAVY LIQUID PARAFFIN 150 K Ltr/day H.L.P. & 140 K Ltr/day Isoparaffin 40.00 972.00
PAN MASALA, MEETHA, SADA,... 700 Kg./day 50.00 189.00
BENEFICIATION OF CHROMIUM... 30,000 MT/ Annum each ores 45.00 3528.00
KHAKRA-READY TO EAT (RTE)... 500 Kgs. / Day 46.00 85.00
PECTIN FROM CITRUS, LEMON... 460 Kg. / Day 43.00 266.00
Fly Ash Bricks by Triboel... 12,000 Nos. / Day 42.00 655.00
Biogas Power Plant from C... 1000 KWh or 1 MWh 22.00 1245.00
Optical Whiteners 300 MT/Annum 41.00 92.00
Solar Photovoltaic System 0 0.00 0.00
Solar Power Plant 0 0.00 0.00
12345678910

Showing 61 - 120 of 282 Product(s)

Subject of your Interest

Information

  • One Lac / Lakh / Lakhs is equivalent to one hundred thousand (100,000)
  • One Crore is equivalent to ten million (10,000,000)
  • T.C.I is Total Capital Investment
  • We can modify the project capacity and project cost as per your requirement.
  • We can also prepare project report on any subject as per your requirement.
  • Caution: The project's cost, capacity and return are subject to change without any notice. Future projects may have different values of project cost, capacity or return.

ABOUT NPCS

 

NIIR PROJECT CONSULTANCY SERVICES (NPCS) is a reliable name in the industrial world for offering integrated technical consultancy services. NPCS is manned by engineers, planners, specialists, financial experts, economic analysts and design specialists with extensive experience in the related industries.

Our various services are: Detailed Project Report,  Business Plan for Manufacturing Plant, Start-up Ideas, Business Ideas for Entrepreneurs, Start up Business Opportunities, entrepreneurship projects, Successful Business Plan, Industry Trends, Market Research, Manufacturing Process, Machinery, Raw Materials, project report, Cost and Revenue, Pre-feasibility study for Profitable Manufacturing Business, Project Identification, Project Feasibility and Market Study, Identification of Profitable Industrial Project Opportunities, Business Opportunities, Investment Opportunities for Most Profitable Business in India, Manufacturing Business Ideas, Preparation of Project Profile, Pre-Investment and Pre-Feasibility Study, Market Research Study, Preparation of Techno-Economic Feasibility Report, Identification and Section of Plant, Process, Equipment, General Guidance, Startup Help, Technical and Commercial Counseling for setting up new industrial project and Most Profitable Small Scale Business.

NPCS also publishes varies process technology, technical, reference, self employment and startup books, directory, business and industry database, bankable detailed project report, market research report on various industries, small scale industry and profit making business. Besides being used by manufacturers, industrialists and entrepreneurs, our publications are also used by professionals including project engineers, information services bureau, consultants and project consultancy firms as one of the input in their research.

Our Detailed Project report aims at providing all the critical data required by any entrepreneur vying to venture into Project. While expanding a current business or while venturing into new business, entrepreneurs are often faced with the dilemma of zeroing in on a suitable product/line.

 


And before diversifying/venturing into any product, wish to study the following aspects of the identified product:


• Good Present/Future Demand
• Export-Import Market Potential
• Raw Material & Manpower Availability
• Project Costs and Payback Period


We at NPCS, through our reliable expertise in the project consultancy and market research field, Provides exhaustive information about the project, which satisfies all the above mentioned requirements and has high growth potential in the markets. And through our report we aim to help you make sound and informed business decision.

 

The report contains all the data which will help an entrepreneur find answers to questions like:

• Why I should invest in this project?
• What will drive the growth of the product?
• What are the costs involved?
• What will be the market potential?


The report first focuses on enhancing the basic knowledge of the entrepreneur about the main product, by elucidating details like product definition, its uses and applications, industry segmentation as well as an overall overview of the industry sector in India. The report then helps an entrepreneur identify the target customer group of its product. It further helps in making sound investment decision by listing and then elaborating on factors that will contribute to the growth of product consumption in India and also talks about the foreign trade of the product along with the list of top importing and top exporting countries. Report includes graphical representation and forecasts of key data discussed in the above mentioned segment. It further explicates the growth potential of the product.

The report includes other market data like key players in the Industry segment along with their contact information and recent developments. It includes crucial information like raw material requirements, list of machinery and manufacturing process for the plant. Core project financials like plant capacity, costs involved in setting up of project, working capital requirements, projected revenue and profit are further listed in the report.


Reasons for buying the report:

• This report helps you to identify a profitable project for investing or diversifying into by throwing light to crucial areas like industry size, demand of the product and reasons for investing in the product.

• This report provides vital information on the product like its definition, characteristics and segmentation.

• This report helps you market and place the product correctly by identifying the target customer group of the product.

• This report helps you understand the viability of the project by disclosing details like raw materials required, manufacturing process, project costs and snapshot of other project financials.

• The report provides forecasts of key parameters which helps to anticipate the industry performance and make sound business decision.

 

Our Approach:


• Our research reports broadly cover Indian markets, present analysis, outlook and forecast.

• The market forecasts are developed on the basis of secondary research and are cross-validated through interactions with the industry players. 

• We use reliable sources of information and databases.  And information from such sources is processed by us and included in the report.

 

Our Market Survey cum Detailed Techno Economic Feasibility Report Contains following information:

 

 

Ø  Introduction

·         Project Introduction

·         Project Objective and Strategy

·         Concise History of the Product

·         Properties

·         BIS (Bureau of Indian Standards) Provision & Specification

·         Uses & Applications

 

Ø  Market Study and Assessment

·         Current Indian Market Scenario

·         Present Market Demand and Supply

·         Estimated Future Market Demand and Forecast

·         Statistics of Import & Export

·         Names & Addresses of Existing Units (Present Players)

·         Market Opportunity

 

Ø  Raw Material

·         List of Raw Materials

·         Properties of Raw Materials

·         Prescribed Quality of Raw Materials

·         List of Suppliers and Manufacturers

 

Ø  Personnel (Manpower) Requirements

·         Requirement of Staff & Labor (Skilled and Unskilled) Managerial, Technical, Office Staff and Marketing Personnel

 

Ø  Plant and Machinery

·         List of Plant & Machinery

·         Miscellaneous Items

·         Appliances & Equipments

·         Laboratory Equipments & Accessories

·         Electrification

·         Electric Load & Water

·         Maintenance Cost

·         Sources of Plant & Machinery (Suppliers and Manufacturers)

 

Ø  Manufacturing Process and Formulations

·         Detailed Process of Manufacture with Formulation

·         Packaging Required

·         Process Flow Sheet Diagram

 

Ø  Infrastructure and Utilities

·         Project Location

·         Requirement of Land Area

·         Rates of the Land

·         Built Up Area

·         Construction Schedule

·         Plant Layout and Requirement of Utilities

 

Project at a Glance

Along with financial details as under:

 

  •     Assumptions for Profitability workings

  •    Plant Economics

  •    Production Schedule

  •    Land & Building

            Factory Land & Building

            Site Development Expenses

  •    Plant & Machinery

             Indigenous Machineries

            Other Machineries (Miscellaneous, Laboratory etc.)

  •    Other Fixed Assets

            Furniture & Fixtures

            Pre-operative and Preliminary Expenses

            Technical Knowhow

            Provision of Contingencies

  •   Working Capital Requirement Per Month

             Raw Material

            Packing Material

            Lab & ETP Chemical Cost

           Consumable Store

  •   Overheads Required Per Month And Per Annum

         Utilities & Overheads (Power, Water and Fuel Expenses etc.)

             Royalty and Other Charges

            Selling and Distribution Expenses

  •    Salary and Wages

  •    Turnover Per Annum

  •   Share Capital

            Equity Capital

            Preference Share Capital

 

  •    Annexure 1:: Cost of Project and Means of Finance

  •    Annexure 2::  Profitability and Net Cash Accruals

                Revenue/Income/Realisation

                Expenses/Cost of Products/Services/Items

                Gross Profit

                Financial Charges     

                Total Cost of Sales

                Net Profit After Taxes

                Net Cash Accruals

  •   Annexure 3 :: Assessment of Working Capital requirements

                Current Assets

                Gross Working. Capital

                Current Liabilities

                Net Working Capital

                Working Note for Calculation of Work-in-process

  •    Annexure 4 :: Sources and Disposition of Funds

  •    Annexure 5 :: Projected Balance Sheets

                ROI (Average of Fixed Assets)

                RONW (Average of Share Capital)

                ROI (Average of Total Assets)

  •    Annexure 6 :: Profitability ratios

                D.S.C.R

                Earnings Per Share (EPS)

               

             Debt Equity Ratio

        Annexure 7   :: Break-Even Analysis

                Variable Cost & Expenses

                Semi-Var./Semi-Fixed Exp.

                Profit Volume Ratio (PVR)

                Fixed Expenses / Cost 

                B.E.P

  •   Annexure 8 to 11:: Sensitivity Analysis-Price/Volume

            Resultant N.P.B.T

            Resultant D.S.C.R

   Resultant PV Ratio

   Resultant DER

  Resultant ROI

          Resultant BEP

  •    Annexure 12 :: Shareholding Pattern and Stake Status

        Equity Capital

        Preference Share Capital

  •   Annexure 13 :: Quantitative Details-Output/Sales/Stocks

        Determined Capacity P.A of Products/Services

        Achievable Efficiency/Yield % of Products/Services/Items 

        Net Usable Load/Capacity of Products/Services/Items   

       Expected Sales/ Revenue/ Income of Products/ Services/ Items   

  •    Annexure 14 :: Product wise domestic Sales Realisation

  •    Annexure 15 :: Total Raw Material Cost

  •    Annexure 16 :: Raw Material Cost per unit

  •    Annexure 17 :: Total Lab & ETP Chemical Cost

  •    Annexure 18  :: Consumables, Store etc.,

  •    Annexure 19  :: Packing Material Cost

  •    Annexure 20  :: Packing Material Cost Per Unit

  •    Annexure 21 :: Employees Expenses

  •    Annexure 22 :: Fuel Expenses

  •    Annexure 23 :: Power/Electricity Expenses

  •    Annexure 24 :: Royalty & Other Charges

  •    Annexure 25 :: Repairs & Maintenance Exp.

  •    Annexure 26 :: Other Mfg. Expenses

  •    Annexure 27 :: Administration Expenses

  •    Annexure 28 :: Selling Expenses

  •    Annexure 29 :: Depreciation Charges – as per Books (Total)

  •   Annexure 30   :: Depreciation Charges – as per Books (P & M)

  •   Annexure 31   :: Depreciation Charges - As per IT Act WDV (Total)

  •   Annexure 32   :: Depreciation Charges - As per IT Act WDV (P & M)

  •   Annexure 33   :: Interest and Repayment - Term Loans

  •   Annexure 34   :: Tax on Profits

  •   Annexure 35   ::Projected Pay-Back Period And IRR