We can provide you detailed project reports on the following topics. Please select the projects of your interests.
Each detailed project reports cover all the aspects of business, from analysing the market, confirming availability of various necessities such as plant & machinery, raw materials to forecasting the financial requirements. The scope of the report includes assessing market potential, negotiating with collaborators, investment decision making, corporate diversification planning etc. in a very planned manner by formulating detailed manufacturing techniques and forecasting financial aspects by estimating the ost of raw material, formulating the cash flow statement, projecting the balance sheet etc.
We also offer self-contained Pre-Investment and Pre-Feasibility Studies, Market Surveys and Studies, Preparation of Techno-Economic Feasibility Reports, Identification and Selection of Plant and Machinery, Manufacturing Process and or Equipment required, General Guidance, Technical and Commercial Counseling for setting up new industrial projects on the following topics. Many of the engineers, project consultant & industrial consultancy firms in India and worldwide use our project reports as one of the input in doing their analysis.


We can modify the project capacity and project cost as per your requirement.
We can also prepare project report on any subject as per your requirement.

Add multiple items to inquiry

Select the items and then press Add to inquiry button

Sort by :
Kraft Paper
Kraft Paper

Kraft paper is paper produced from chemical pulp produced in the kraft process. Sack kraft paper, or just sack paper, is a porous kraft paper with ... Read More

Capacity : Kraft Paper : 50 MT/day Duplex Board as by product : 9 MT/day
Plant and Machinery cost: 1069.00 Lakhs
Working Capital : 0.00
Rate of Return (ROR):27.00%
Break Even Point (BEP):53.00 %
TCI :0.00 Lakhs
Cost of Project : 2131.00Lakhs
Add To Inquiry Basket
Water Soluble Fertilizer Blends for Drip Irrigation Systems
Water Soluble Fertilizer Blends for Drip Irrigation Systems

A water soluble fertilizer is a compound that dissolves easily in water and provides nutrients for plants. This type of fertilizer may then be abso... Read More

Capacity : NPK Fertilizer (19-19-19) (in 5 Kgs Size Pack) : 32 MT/day
Plant and Machinery cost: 87.00 Lakhs
Working Capital : 0.00
Rate of Return (ROR):28.00%
Break Even Point (BEP):60.00 %
TCI :0.00 Lakhs
Cost of Project : 529.00Lakhs
Add To Inquiry Basket
Liquid Urea-Formaldehyde Resin for Wood Application
Liquid Urea-Formaldehyde Resin for Wood Application

Urea-formaldehyde resin is a major commercial adhesive, especially within the forest products industry. It offers a nu... Read More

Capacity : 8 MT/day
Plant and Machinery cost: 71.00 Lakhs
Working Capital : 0.00
Rate of Return (ROR):29.00%
Break Even Point (BEP):79.00 %
TCI :0.00 Lakhs
Cost of Project : 209.00Lakhs
Add To Inquiry Basket
Undergarments (Men and Women)
Undergarments (Men and Women)

Undergarments or underwear are clothes worn under other clothes, often next to the skin. They keep outer garments from... Read More

Capacity : Regular Silk & Cotton Panties : 1000 Pcs/Day Bikini Sets : 1000 Pcs/Day Brasseries (Wired) : 1000 P
Plant and Machinery cost: 165.00 Lakhs
Working Capital : 0.00
Rate of Return (ROR):27.00%
Break Even Point (BEP):61.00 %
TCI :0.00 Lakhs
Cost of Project : 462.00Lakhs
Add To Inquiry Basket
Prestressed Concrete Sleepers
Prestressed Concrete Sleepers

Prestressed concrete is that in which internal stresses are introduced to such a magnitude and distribution that the t... Read More

Capacity : 1000 Pcs./Day
Plant and Machinery cost: 1516.00 Lakhs
Working Capital : 0.00
Rate of Return (ROR):28.00%
Break Even Point (BEP):39.00 %
TCI :0.00 Lakhs
Cost of Project : 3058.00Lakhs
Add To Inquiry Basket
Water Soluble Fertilizer Manufacturing Industry
Water Soluble Fertilizer Manufacturing Industry

Water Soluble Fertilizer Manufacturing Industry. Water Soluble Fertilizer Blends Prod... Read More

Capacity : 0
Plant and Machinery cost: 0.00 Lakhs
Working Capital : 0.00
Rate of Return (ROR):0.00%
Break Even Point (BEP):0.00 %
TCI :0.00 Lakhs
Cost of Project : 0.00Lakhs
Add To Inquiry Basket
Polyurethane
Polyurethane

Polyurethane (PUR and PU) is a polymer composed of organic units joined by carbamate (urethane) links. While most poly... Read More

Capacity : 0
Plant and Machinery cost: 0.00 Lakhs
Working Capital : 0.00
Rate of Return (ROR):0.00%
Break Even Point (BEP):0.00 %
TCI :0.00 Lakhs
Cost of Project : 0.00Lakhs
Add To Inquiry Basket
Glass Manufacturing (Security Glass, Window Glass, Glass Basin & Elevation Glass)
Glass Manufacturing (Security Glass, Window Glass, Glass Basin & Elevation Glass)

Security Glass

Se... Read More

Capacity : 0
Plant and Machinery cost: 0.00 Lakhs
Working Capital : 0.00
Rate of Return (ROR):0.00%
Break Even Point (BEP):0.00 %
TCI :0.00 Lakhs
Cost of Project : 0.00Lakhs
Add To Inquiry Basket
LPG Cylinder Refilling Plant. LP Gas Industry
LPG Cylinder Refilling Plant. LP Gas Industry

LPG Cylinder Refilling Plant. LP Gas Industry. How to Start a Liquefied Petroleum Gas... Read More

Capacity : 0
Plant and Machinery cost: 0.00 Lakhs
Working Capital : 0.00
Rate of Return (ROR):0.00%
Break Even Point (BEP):0.00 %
TCI :0.00 Lakhs
Cost of Project : 0.00Lakhs
Add To Inquiry Basket
Production of Industrial Gases and Speciality Gases Mixture
Production of Industrial Gases and Speciality Gases Mixture

Production of Industrial Gases and Speciality Gases Mixture. Investment & Busines... Read More

Capacity : 0
Plant and Machinery cost: 0.00 Lakhs
Working Capital : 0.00
Rate of Return (ROR):0.00%
Break Even Point (BEP):0.00 %
TCI :0.00 Lakhs
Cost of Project : 0.00Lakhs
Add To Inquiry Basket
Gypsum Plaster Board
Gypsum Plaster Board

Gypsum Plaster Boards are constructional sheets composed of consigned Gypsum with about 15% fibre. Its outstanding contribu... Read More

Capacity : 50000 Sq.mt./Day
Plant and Machinery cost: 1605.00 Lakhs
Working Capital : 0.00
Rate of Return (ROR):34.00%
Break Even Point (BEP):32.00 %
TCI :0.00 Lakhs
Cost of Project : 12502.00Lakhs
Add To Inquiry Basket
Production and Formulation of Fish and Shrimp (Prawn) Feed
Production and Formulation of Fish and Shrimp (Prawn) Feed

Production and Formulation of Fish and Shrimp (Prawn) Feed. Commercial Aquaculture Feed Manufacturing Business Read More

Capacity : 0
Plant and Machinery cost: 0.00 Lakhs
Working Capital : 0.00
Rate of Return (ROR):0.00%
Break Even Point (BEP):0.00 %
TCI :0.00 Lakhs
Cost of Project : 0.00Lakhs
Add To Inquiry Basket
Surgical Cotton Manufacturing Business
Surgical Cotton Manufacturing Business

Surgical Cotton Manufacturing Business. Absorbent Cotton Roll Production Plant. Absorbent Cotton Wool Manufacturin... Read More

Capacity : 0
Plant and Machinery cost: 0.00 Lakhs
Working Capital : 0.00
Rate of Return (ROR):0.00%
Break Even Point (BEP):0.00 %
TCI :0.00 Lakhs
Cost of Project : 0.00Lakhs
Add To Inquiry Basket
Baby Diaper and Sanitary Napkins
Baby Diaper and Sanitary Napkins

A diaper or nappy is a kind of underwear that allows one to defecate or urinate in a discreet manner. Most materials in the diaper are held togethe... Read More

Capacity : Sanitary Napkins (8 Pcs/Pkt) : 31250 Packets/Day Baby Diapers (4 Pcs/Pkt) : 25000 Packets/Day
Plant and Machinery cost: 704.00 Lakhs
Working Capital : 0.00
Rate of Return (ROR):30.00%
Break Even Point (BEP):48.00 %
TCI :0.00 Lakhs
Cost of Project : 1331.00Lakhs
Add To Inquiry Basket
School (CBSE Pattern)
School (CBSE Pattern)

The importance of education was well recognized in India, ‘Swadeshepujyate raja, vidwansarvatrapujyate’ “... Read More

Capacity : KG to 12th Standard Students : 2000 Students/Annum
Plant and Machinery cost: 63.00 Lakhs
Working Capital : 0.00
Rate of Return (ROR):13.00%
Break Even Point (BEP):47.00 %
TCI :0.00 Lakhs
Cost of Project : 1098.00Lakhs
Add To Inquiry Basket
Recovery of Lead
Recovery of Lead

Lead is a material very easy to recycle and, provided that adequate procedures are implemented; the final product (secondary... Read More

Capacity : 1944 MT/annum
Plant and Machinery cost: 66.00 Lakhs
Working Capital : 0.00
Rate of Return (ROR):28.00%
Break Even Point (BEP):57.00 %
TCI :0.00 Lakhs
Cost of Project : 257.00Lakhs
Add To Inquiry Basket
Cotton Yarn Dying
Cotton Yarn Dying

Through bringing about a permanent union between the dyes and the yarn/fabric the yarns/textile are so colored that the colour is fast and is not o... Read More

Capacity : 2000 Kgs/Day
Plant and Machinery cost: 236.00 Lakhs
Working Capital : 0.00
Rate of Return (ROR):35.00%
Break Even Point (BEP):48.00 %
TCI :518.00 Lakhs
Cost of Project : 518.00Lakhs
Add To Inquiry Basket
Ginger (Dry, Powder, Flakes, Oil) & Garlic (Powder, Flakes, Oil) Processing Unit
Ginger (Dry, Powder, Flakes, Oil) & Garlic (Powder, Flakes, Oil) Processing Unit

The food processing industry is a strong component of the larger agro industrial sector. Dry ginger, ginger flakes, garlic flakes and dry powder ar... Read More

Capacity : Garlic Flakes 750kg, Garlic Powder 750kg & Garlic Oil 10kg/Day, Ginger Dry 500kg, Ginger Powder 500k
Plant and Machinery cost: 57.00 Lakhs
Working Capital : 0.00
Rate of Return (ROR):37.00%
Break Even Point (BEP):42.00 %
TCI :265.00 Lakhs
Cost of Project : 265.00Lakhs
Add To Inquiry Basket
Baby & Adult Diaper & Sanitary Pads
Baby & Adult Diaper & Sanitary Pads

A diaper or nappy is a kind of under... Read More

Capacity : Baby Diapers : 3000000 Pkts/annum Adult Diapers : 1500000 Pkts/annum Sanitary Napkins : 4500000 Pkts
Plant and Machinery cost: 1029.00 Lakhs
Working Capital : 0.00
Rate of Return (ROR):29.00%
Break Even Point (BEP):51.00 %
TCI :1657.00 Lakhs
Cost of Project : 1657.00Lakhs
Add To Inquiry Basket
Residential School
Residential School

The importance of education was well... Read More

Capacity : 5000 Nos of students
Plant and Machinery cost: 642.00 Lakhs
Working Capital : 0.00
Rate of Return (ROR):0.35%
Break Even Point (BEP):0.00 %
TCI :4887.00 Lakhs
Cost of Project : 4887.00Lakhs
Add To Inquiry Basket
Industrial and Pharmaceutical Grade Oxygen (500 Industrial Gas Cylinders and 500 medicated gas cylinders)
Industrial and Pharmaceutical Grade Oxygen (500 Industrial Gas Cylinders and 500 medicated gas cylinders)

This substance, which occupies 21 percent of the earth’s atmosphere, has a number of very important uses. Oxygen is a colourless... Read More

Capacity : 300000 Cylinders/Annum
Plant and Machinery cost: 675.00 Lakhs
Working Capital : 100.00
Rate of Return (ROR):30.00%
Break Even Point (BEP):54.00 %
TCI :1006.00 Lakhs
Cost of Project : 1006.00Lakhs
Add To Inquiry Basket
Sodium Hypochlorite (Bleach Liquor)
Sodium Hypochlorite (Bleach Liquor)

Prior to the development of chlorinated bleaches the process of bleaching textiles was a long and laborious one which required several months at a ... Read More

Capacity : 10 Ton/Day
Plant and Machinery cost: 34.00 Lakhs
Working Capital : 0.00
Rate of Return (ROR):21.00%
Break Even Point (BEP):53.00 %
TCI :191.00 Lakhs
Cost of Project : 191.00Lakhs
Add To Inquiry Basket
COTTON BUDS
COTTON BUDS

COTTON BUDS

Read More
Capacity : 75000 NO
Plant and Machinery cost: 6.00 Lakhs
Working Capital : 0.00
Rate of Return (ROR):55.00%
Break Even Point (BEP):48.00 %
TCI :22.00 Lakhs
Cost of Project : 22.00Lakhs
Add To Inquiry Basket
Fish Dehydration
Fish Dehydration

There are varieties of fish available in India. They are sweet water fish and salty water fish. Both the fishes can be stored by dehydration. Dehyd... Read More

Capacity : 1 MT/Day
Plant and Machinery cost: 21.00 Lakhs
Working Capital : 73.00
Rate of Return (ROR):38.29%
Break Even Point (BEP):44.56 %
TCI :146.00 Lakhs
Cost of Project : 146.00Lakhs
Add To Inquiry Basket
Garlic Oil and Powder
Garlic Oil and Powder

Garlic is one of the important bulb crops grown and used as spice and condiment throughout India. It possesses a high nutritive value and medicinal... Read More

Capacity : Garlic Oil :10 Kgs/ Day •Garlic Powder:2 MT /Day
Plant and Machinery cost: 58.00 Lakhs
Working Capital : 0.00
Rate of Return (ROR):25.00%
Break Even Point (BEP):56.00 %
TCI :241.00 Lakhs
Cost of Project : 241.00Lakhs
Add To Inquiry Basket
Bread Plant (Semi–Automatic)
Bread Plant (Semi–Automatic)

Bread is a staple foodstuff, which is made and eaten in most countries around the world. Bread products have evolved to take many forms, each based... Read More

Capacity : Bread (400 gms):10000 Pkts/Day
Plant and Machinery cost: 52.00 Lakhs
Working Capital : 0.00
Rate of Return (ROR):27.00%
Break Even Point (BEP):69.00 %
TCI :101.00 Lakhs
Cost of Project : 101.00Lakhs
Add To Inquiry Basket
Sanitary Napkins
Sanitary Napkins

Technical textiles are defined as textile materials and products used primarily for their technical performance and fu... Read More

Capacity : 96000 Pcs/Day
Plant and Machinery cost: 76.00 Lakhs
Working Capital : 0.00
Rate of Return (ROR):29.00%
Break Even Point (BEP):45.00 %
TCI :325.00 Lakhs
Cost of Project : 325.00Lakhs
Add To Inquiry Basket
Sanitary Napkins
Sanitary Napkins

Sanitary Napkin comes under Nonwoven fabrics which as a whole come under technical textile.Technical textiles are defi... Read More

Capacity : 1296 Lakh Nos. /Annum
Plant and Machinery cost: 103.00 Lakhs
Working Capital : 0.00
Rate of Return (ROR):33.00%
Break Even Point (BEP):36.00 %
TCI :980.00 Lakhs
Cost of Project : 980.00Lakhs
Add To Inquiry Basket
Bakery Industry in India (Bread, Biscuits and Other Products) Present & Future Prospects, Market Size, Statistics, Trends, SWOT Analysis and Forecasts (Upto 2017)
Bakery Industry in India (Bread, Biscuits and Other Products) Present & Future Prospects, Market Size, Statistics, Trends, SWOT Analysis and Forecasts (Upto 2017)

The market research report titled ‘Bakery Industry in India (Bread, Biscuit... Read More

Capacity : 0
Plant and Machinery cost: 0.00 Lakhs
Working Capital : 0.00
Rate of Return (ROR):1.00%
Break Even Point (BEP):0.00 %
TCI :0.00 Lakhs
Cost of Project : 0.00Lakhs
Add To Inquiry Basket
Sanitary Napkins
Sanitary Napkins

Sanitary napkins have an important place in women's history and in the history of technology. 19th Century research in... Read More

Capacity : 576,000 Pcs/Day.
Plant and Machinery cost: 134.00 Lakhs
Working Capital : 0.00
Rate of Return (ROR):35.41%
Break Even Point (BEP):34.00 %
TCI :1624.00 Lakhs
Cost of Project : 1624.00Lakhs
Add To Inquiry Basket
Functional Food Based Bakery Products  (Bread, Cookies and Biscuits)
Functional Food Based Bakery Products (Bread, Cookies and Biscuits)

Biscuits Sweet biscuits are commonly eaten as a snack food, and are, in general, made with wheat flour or oats, and sweetened with sugar or honey. ... Read More

Capacity : 1800 MT/Annum
Plant and Machinery cost: 324.00 Lakhs
Working Capital : 0.00
Rate of Return (ROR):26.00%
Break Even Point (BEP):57.00 %
TCI :600.00 Lakhs
Cost of Project : 600.00Lakhs
Add To Inquiry Basket
ELECTROLYTIC MANGANESE DIOXIDE
ELECTROLYTIC MANGANESE DIOXIDE

EMD is a complex composite of various crystals of manganese and oxygen that is produced through electro-winning. It is used primarily as the active... Read More

Capacity : Electrolytic Manganese Dioxide 5 MT Per Day
Plant and Machinery cost: 89.00 Lakhs
Working Capital : 0.00
Rate of Return (ROR):27.00%
Break Even Point (BEP):57.00 %
TCI :0.00 Lakhs
Cost of Project : 576.00Lakhs
Add To Inquiry Basket
Lead Acid Battery
Lead Acid Battery

Profile: The lead-acid storage battery, an important energy storage device, is the most widely used secondary storage cell by automobile and other ... Read More

Capacity : 300000 Nos./Annum
Plant and Machinery cost: 416.00 Lakhs
Working Capital : 0.00
Rate of Return (ROR):44.00%
Break Even Point (BEP):56.00 %
TCI :1327.00 Lakhs
Cost of Project : 1327.00Lakhs
Add To Inquiry Basket
FLY ASH BRICKS FROM LIMESTONE
FLY ASH BRICKS FROM LIMESTONE

Fly Ash bricks are alternative to burnt clay bricks in the construction sector in India. Fly ash bricks are an environment friendly cost saving bui... Read More

Capacity : 12000000 Nos./Annum
Plant and Machinery cost: 80.00 Lakhs
Working Capital : 0.00
Rate of Return (ROR):43.00%
Break Even Point (BEP):40.00 %
TCI :409.00 Lakhs
Cost of Project : 409.00Lakhs
Add To Inquiry Basket
E-WASTE RECYCLING PLANT
E-WASTE RECYCLING PLANT

Electronic waste, e-waste, e-scrap, or Waste Electrical and Electronic Equipment (WEEE) is a loose category of surplus, obsolete, broken, or discar... Read More

Capacity : -
Plant and Machinery cost: 51.00 Lakhs
Working Capital : 0.00
Rate of Return (ROR):47.00%
Break Even Point (BEP):40.00 %
TCI :196.00 Lakhs
Cost of Project : 196.00Lakhs
Add To Inquiry Basket
SODIUM PETROLEUM SULFONATE
SODIUM PETROLEUM SULFONATE

A sulfonate is a salt or ester of a sulfonic acid. It contains the functional group R-SO2O. Anions with the general formula RSO2O are called Sulfon... Read More

Capacity : 900 MT/Annum
Plant and Machinery cost: 122.00 Lakhs
Working Capital : 0.00
Rate of Return (ROR):41.00%
Break Even Point (BEP):55.00 %
TCI :307.00 Lakhs
Cost of Project : 307.00Lakhs
Add To Inquiry Basket
ACETYLENE GAS
ACETYLENE GAS

Acetylene is a colourless inflammable gas. It is an endothermic compound. It is an endothermic compound. Its heat of formation being nearly 50 Kg. ... Read More

Capacity : 240 Cubic Meter/day
Plant and Machinery cost: 44.00 Lakhs
Working Capital : 0.00
Rate of Return (ROR):40.00%
Break Even Point (BEP):44.00 %
TCI :163.00 Lakhs
Cost of Project : 163.00Lakhs
Add To Inquiry Basket
NURSERY SCHOOL
NURSERY SCHOOL

A nursery school is a school for children between the ages of three and five, staffed by qualified teachers and other professionals who encourage a... Read More

Capacity : 400 Children
Plant and Machinery cost: 4.00 Lakhs
Working Capital : 0.00
Rate of Return (ROR):42.00%
Break Even Point (BEP):39.00 %
TCI :66.00 Lakhs
Cost of Project : 66.00Lakhs
Add To Inquiry Basket
BLACK LEAD PENCIL
BLACK LEAD PENCIL

-

Read More
Capacity : 1000 Dozen/Day
Plant and Machinery cost: 9.00 Lakhs
Working Capital : 0.00
Rate of Return (ROR):67.00%
Break Even Point (BEP):45.00 %
TCI :19.00 Lakhs
Cost of Project : 19.00Lakhs
Add To Inquiry Basket
FOOD PROCESSING UNIT (PULSES & DATES)
FOOD PROCESSING UNIT (PULSES & DATES)

The food processing industry has been identified as a thrust area for development. This industry is included in the priority-lending sector. India ... Read More

Capacity : 12 MT / Day
Plant and Machinery cost: 26.00 Lakhs
Working Capital : 0.00
Rate of Return (ROR):47.00%
Break Even Point (BEP):39.00 %
TCI :406.00 Lakhs
Cost of Project : 406.00Lakhs
Add To Inquiry Basket
Fish Farming
Fish Farming

Now-a-days people are turning to fresh-water fish such as rainbow trout, carp & tench. These fish make an attractive substitute for the unprodu... Read More

Capacity : 4.00 Ton /Day
Plant and Machinery cost: 82.00 Lakhs
Working Capital : 0.00
Rate of Return (ROR):53.00%
Break Even Point (BEP):31.00 %
TCI :558.00 Lakhs
Cost of Project : 558.00Lakhs
Add To Inquiry Basket
AUTOMATIC BREAD AND BISCUITS PLANT
AUTOMATIC BREAD AND BISCUITS PLANT

Bread is most consumable wheat based... Read More

Capacity : (3000 Packets Bread, 200 Kg. Toasts, 100 Kg. Pastries, 200 Kg. Cakes, 600 Kg. Biscuits) Per Day
Plant and Machinery cost: 110.00 Lakhs
Working Capital : 0.00
Rate of Return (ROR):38.00%
Break Even Point (BEP):45.00 %
TCI :240.00 Lakhs
Cost of Project : 240.00Lakhs
Add To Inquiry Basket
GAS FILLING OF LPG CYLINDER
GAS FILLING OF LPG CYLINDER

GAS FILLING OF L.P.G. CYLINDER

Bulk petroleum and hydrocarbons generally are most c... Read More

Capacity : 10000 /day
Plant and Machinery cost: 100.00 Lakhs
Working Capital : 0.00
Rate of Return (ROR):54.00%
Break Even Point (BEP):21.00 %
TCI :2700.00 Lakhs
Cost of Project : 2700.00Lakhs
Add To Inquiry Basket
Manufacturing Ideas & Investment Opportunities in the Business of Disposable Plates and Cups from Waste Rice Husk Powder
Manufacturing Ideas & Investment Opportunities in the Business of Disposable Plates and Cups from Waste Rice Husk Powder

Low-grade material is used to make a lot of disposable paper and plastic plates. They... Read More

Capacity : 0
Plant and Machinery cost: 0.00 Lakhs
Working Capital : 0.00
Rate of Return (ROR):0.00%
Break Even Point (BEP):0.00 %
TCI :0.00 Lakhs
Cost of Project : 0.00Lakhs
Add To Inquiry Basket
Opportunities in Production of Ayurvedic Pain Balm Herbal Pain Relief Balm Making Business
Opportunities in Production of Ayurvedic Pain Balm Herbal Pain Relief Balm Making Business

Ayurveda is a system of alt... Read More

Capacity : 0
Plant and Machinery cost: 0.00 Lakhs
Working Capital : 0.00
Rate of Return (ROR):0.00%
Break Even Point (BEP):0.00 %
TCI :0.00 Lakhs
Cost of Project : 0.00Lakhs
Add To Inquiry Basket
Setup a Lucrative Business of Solar Panel Renewable Energy is the Fastest-Growing Industry in the World
Setup a Lucrative Business of Solar Panel Renewable Energy is the Fastest-Growing Industry in the World

 

A solar panel is ... Read More

Capacity : 0
Plant and Machinery cost: 0.00 Lakhs
Working Capital : 0.00
Rate of Return (ROR):0.00%
Break Even Point (BEP):0.00 %
TCI :0.00 Lakhs
Cost of Project : 0.00Lakhs
Add To Inquiry Basket
Oxygen Gas Plant
Oxygen Gas Plant

Oxygen as a raw material for synthesizing chemical compounds is in daily life. ... Read More

Capacity : 172 Cylinders Per Day (each Cylinder 7M3)
Plant and Machinery cost: 178.00 Lakhs
Working Capital : 0.00
Rate of Return (ROR):39.00%
Break Even Point (BEP):50.00 %
TCI :0.00 Lakhs
Cost of Project : 582.00Lakhs
Add To Inquiry Basket
Business of Medical Disposables Gowns and Drapes
Business of Medical Disposables Gowns and Drapes

 

Surgical gowns mu... Read More

Capacity : Medical Gowns: 1,250 Pcs per Day Medical Drapes: 1,250 Pcs per Day
Plant and Machinery cost: 209.00 Lakhs
Working Capital : 0.00
Rate of Return (ROR):30.54%
Break Even Point (BEP):55.16 %
TCI :0.00 Lakhs
Cost of Project : 529.00Lakhs
Add To Inquiry Basket
Manufacturing Business of Disposable Plate and Cups from Waste Rice Husk Powder
Manufacturing Business of Disposable Plate and Cups from Waste Rice Husk Powder

 

Disposable plate ... Read More

Capacity : Disposable Plates from Waste Rice Husk Powder: 10,000 Pcs per Day Disposable Cups from Waste Rice Hu
Plant and Machinery cost: 38.00 Lakhs
Working Capital : 0.00
Rate of Return (ROR):28.44%
Break Even Point (BEP):59.78 %
TCI :0.00 Lakhs
Cost of Project : 166.00Lakhs
Add To Inquiry Basket
Start Business of Surgical Hand Gloves
Start Business of Surgical Hand Gloves

 

A surgical (surge... Read More

Capacity : 40,000 Pairs per day
Plant and Machinery cost: 239.00 Lakhs
Working Capital : 0.00
Rate of Return (ROR):29.41%
Break Even Point (BEP):45.36 %
TCI :0.00 Lakhs
Cost of Project : 816.00Lakhs
Add To Inquiry Basket
Business of Oxygen Gas Plant (Industrial and Pharmaceutical Grade)
Business of Oxygen Gas Plant (Industrial and Pharmaceutical Grade)

 

Oxygen (CO2<... Read More

Capacity : Oxygen Gas (Medical Grade) Purity 99.5-99.9%: 500 Cylinders per Day Oxygen Gas (Indudrial Grade) Pur
Plant and Machinery cost: 418.00 Lakhs
Working Capital : 0.00
Rate of Return (ROR):57.69%
Break Even Point (BEP):26.80 %
TCI :0.00 Lakhs
Cost of Project : 748.00Lakhs
Add To Inquiry Basket
Start Investing in Most Growing Business of Medical Disposable Start Manufacturing Unit of Medical Disposables Gowns and Drapes
Start Investing in Most Growing Business of Medical Disposable Start Manufacturing Unit of Medical Disposables Gowns and Drapes


Read More

Capacity : 0
Plant and Machinery cost: 0.00 Lakhs
Working Capital : 0.00
Rate of Return (ROR):1.00%
Break Even Point (BEP):0.00 %
TCI :0.00 Lakhs
Cost of Project : 0.00Lakhs
Add To Inquiry Basket
Start Production of Surgical Hand Gloves Rising Demand of Surgical Hand Gloves in Covid19 Pandemic
Start Production of Surgical Hand Gloves Rising Demand of Surgical Hand Gloves in Covid19 Pandemic

Medical gloves assist minim... Read More

Capacity : 0
Plant and Machinery cost: 0.00 Lakhs
Working Capital : 0.00
Rate of Return (ROR):0.00%
Break Even Point (BEP):0.00 %
TCI :0.00 Lakhs
Cost of Project : 0.00Lakhs
Add To Inquiry Basket
Opportunities in Business of Adhesive Fevicol Type
Opportunities in Business of Adhesive Fevicol Type

 

Adhesive, also kno... Read More

Capacity : Adhesive (Fevicol Type) 10.0 MT per Day
Plant and Machinery cost: 17.00 Lakhs
Working Capital : 0.00
Rate of Return (ROR):26.70%
Break Even Point (BEP):65.62 %
TCI :0.00 Lakhs
Cost of Project : 161.00Lakhs
Add To Inquiry Basket
Start Manufacturing of Menthol Crystal
Start Manufacturing of Menthol Crystal

Menthol is a white crystalli... Read More

Capacity : Menthol Crystal 1,000.0 Kgs per day Dmentha Oil 333.3 Kgs per day
Plant and Machinery cost: 196.00 Lakhs
Working Capital : 0.00
Rate of Return (ROR):28.87%
Break Even Point (BEP):52.17 %
TCI :0.00 Lakhs
Cost of Project : 643.00Lakhs
Add To Inquiry Basket
Paprika Oleoresin
Paprika Oleoresin

 

Paprika oleoresin... Read More

Capacity : Paprika Oleoresin 160.0 Kgs Per Day Paprika Spent 1,093.3 Kgs Per Day
Plant and Machinery cost: 395.00 Lakhs
Working Capital : 0.00
Rate of Return (ROR):29.32%
Break Even Point (BEP):57.23 %
TCI :0.00 Lakhs
Cost of Project : 1700.00Lakhs
Add To Inquiry Basket
Investment Opportunities in Business of PET Recycling &  Production of Flakes
Investment Opportunities in Business of PET Recycling & Production of Flakes

 

Municipal solid wa... Read More

Capacity : Recycled PET Flakes 64.0 MT per day
Plant and Machinery cost: 174.00 Lakhs
Working Capital : 0.00
Rate of Return (ROR):30.45%
Break Even Point (BEP):71.77 %
TCI :0.00 Lakhs
Cost of Project : 440.00Lakhs
Add To Inquiry Basket
Emerging Business of  Xanthan Gum Food and Oil Drilling Grade
Emerging Business of Xanthan Gum Food and Oil Drilling Grade

 

Xanthan gum is a p... Read More

Capacity : Xanthan Gum Food Grade 720.0 Kg. Per Day Xanthan Gum Oil Drilling Grade 340.0 Kg. Per Day
Plant and Machinery cost: 120.00 Lakhs
Working Capital : 0.00
Rate of Return (ROR):25.27%
Break Even Point (BEP):61.77 %
TCI :0.00 Lakhs
Cost of Project : 555.00Lakhs
Add To Inquiry Basket
Profitable Business of Industrial and Pharmaceutical Gases Start Oxygen Gas Plant Industrial and Pharmaceutical Grade
Profitable Business of Industrial and Pharmaceutical Gases Start Oxygen Gas Plant Industrial and Pharmaceutical Grade

Industrial gases are employ... Read More

Capacity : 0
Plant and Machinery cost: 0.00 Lakhs
Working Capital : 0.00
Rate of Return (ROR):0.00%
Break Even Point (BEP):0.00 %
TCI :0.00 Lakhs
Cost of Project : 0.00Lakhs
Add To Inquiry Basket
Business Plan to Make Money from Lemon Grass Essential Oil Extraction
Business Plan to Make Money from Lemon Grass Essential Oil Extraction

Lemongrass oil (Cymbopogon ... Read More

Capacity : 0
Plant and Machinery cost: 0.00 Lakhs
Working Capital : 0.00
Rate of Return (ROR):0.00%
Break Even Point (BEP):0.00 %
TCI :0.00 Lakhs
Cost of Project : 0.00Lakhs
Add To Inquiry Basket
NameCapacityRate of return (ROR):Cost of project
Manufacturing of Disposa... 0 0.00 0.00
Liquid Hand Wash 0 0.00 0.00
Gold and Diamond Jeweller... Gold Jewellery:9.50 Kgs /day Gold Plus Diamond Jewellery :2.38 Kgs / day 34.00 2504.00
Hand Sanitizer Hand Sanitizer (50 ml size Bolltes):10,000 Bottles/day 31.00 156.00
Particle Board from Wheat... Particle Board (Size 6x3x0.471') : 5,000,000.0 Sq.Mtrs. / Annum 28.00 930.00
Manufacturing Opportuniti... 0 0.00 0.00
A Business Plan For Sanit... Sanitary Napkins 4,800 PKTS per day 27.00 84.00
Start Manufacturing Of Bl... - 32.00 985.00
Start Production Of Potat... Potato Flakes 2 MT Per Day 25.00 563.00
Setup Manufacturing Unit ... Saddle 7,000 Unit Per Day Pedals 10,000 Unit Per Day 31.00 575.00
Opportunity in Sodium Sul... Sodium Sulfide Flakes 10,000 MT Per Annum 30.00 1426.00
Business Plan for Lithium... - 29.00 812.00
Start Manufacturing Busin... Cargo Containers (Size 20 Feet) 34 Nos Per Day 29.00 1992.00
Start Cutting and Grindin... Cutting Disc Size: (115 mm x 1 mm) 2,000 Pcs Pr Day Grinding Disc (115 mm x 6 mm) 2,000 Pcs Pr Day 28.00 423.00
Mink Blankets Production - 27.00 6000.00
A Business Plan for Micro... Micronutrient Fortified Energy Dense Food 100 MT Per Day 28.00 3500.00
Start Business of Caustic... - 25.00 56500.00
Start Crumb Rubber Powder... Crumb Rubber Powder 10 MT Per Day By Product Steel Wire 2 MT Per Day 26.00 303.00
PSA Oxygen Plant 30 to 36 cylinders per day 0.00 0.00
PSA Oxygen Gas Plant 180 to 200 cylinders per day 0.00 0.00
Production Business of Ra... Disposable Safety Razors: 864,000 Units per Day Razor Blade: 172,800 Units per Day Steel Scrap: 500 34.51 2285.00
Investing into Business o... 12 MT per Day 33.83 1135.00
Business of Disposable Sa... Razor Blade for Safety Razors Pack of 5 pcs each: 57,600 Units per Day Steel Scrap: 500 Units per Da 57.75 815.00
Emerging Business of Duct... 0 0.00 0.00
Extraction of Essential O... Lemon Grass Oil (10 ml Size Pack) 1,334 Ltrs per Day 34.60 607.00
Production of Bicarbonate... Bicarbonate Cartridge 720g 166.7 Nos. per day Bicarbonate Cartridge 650g 500.0 Nos. per day Acid Co 25.28 1153.00
Profitable Industry of Su... Surgical Methylated Spirit 1 Ltr Size Bottle 4,000.0 Nos. Per Day Surgical Methylated Spirit 5 Ltr S 27.53 265.00
Manufacturing of Rubber P... Rubber Powder 5.0 MT per day By Product Steel Wire 1.4 MT per day 26.98 191.00
Start extraction of Cashe... Cashew Nut Shell Oil 11.0 MT per day Cardanol 5.5 MT per day De-Oiled Cashew Nut Shell Cake (bye Pro 26.72 752.00
Setup a Manufacturing Pla... Disposable Plastic Syringes with Needles 1 ml Size each Packed in Polypack: 50,000.0 Nos. per day D 30.78 345.00
12345678910...

Showing 361 - 420 of 1630 Product(s)

Subject of your Interest

Information

  • One Lac / Lakh / Lakhs is equivalent to one hundred thousand (100,000)
  • One Crore is equivalent to ten million (10,000,000)
  • T.C.I is Total Capital Investment
  • We can modify the project capacity and project cost as per your requirement.
  • We can also prepare project report on any subject as per your requirement.
  • Caution: The project's cost, capacity and return are subject to change without any notice. Future projects may have different values of project cost, capacity or return.

ABOUT NPCS

 

NIIR PROJECT CONSULTANCY SERVICES (NPCS) is a reliable name in the industrial world for offering integrated technical consultancy services. NPCS is manned by engineers, planners, specialists, financial experts, economic analysts and design specialists with extensive experience in the related industries.

Our various services are: Detailed Project Report,  Business Plan for Manufacturing Plant, Start-up Ideas, Business Ideas for Entrepreneurs, Start up Business Opportunities, entrepreneurship projects, Successful Business Plan, Industry Trends, Market Research, Manufacturing Process, Machinery, Raw Materials, project report, Cost and Revenue, Pre-feasibility study for Profitable Manufacturing Business, Project Identification, Project Feasibility and Market Study, Identification of Profitable Industrial Project Opportunities, Business Opportunities, Investment Opportunities for Most Profitable Business in India, Manufacturing Business Ideas, Preparation of Project Profile, Pre-Investment and Pre-Feasibility Study, Market Research Study, Preparation of Techno-Economic Feasibility Report, Identification and Section of Plant, Process, Equipment, General Guidance, Startup Help, Technical and Commercial Counseling for setting up new industrial project and Most Profitable Small Scale Business.

NPCS also publishes varies process technology, technical, reference, self employment and startup books, directory, business and industry database, bankable detailed project report, market research report on various industries, small scale industry and profit making business. Besides being used by manufacturers, industrialists and entrepreneurs, our publications are also used by professionals including project engineers, information services bureau, consultants and project consultancy firms as one of the input in their research.

Our Detailed Project report aims at providing all the critical data required by any entrepreneur vying to venture into Project. While expanding a current business or while venturing into new business, entrepreneurs are often faced with the dilemma of zeroing in on a suitable product/line.

 


And before diversifying/venturing into any product, wish to study the following aspects of the identified product:


• Good Present/Future Demand
• Export-Import Market Potential
• Raw Material & Manpower Availability
• Project Costs and Payback Period


We at NPCS, through our reliable expertise in the project consultancy and market research field, Provides exhaustive information about the project, which satisfies all the above mentioned requirements and has high growth potential in the markets. And through our report we aim to help you make sound and informed business decision.

 

The report contains all the data which will help an entrepreneur find answers to questions like:

• Why I should invest in this project?
• What will drive the growth of the product?
• What are the costs involved?
• What will be the market potential?


The report first focuses on enhancing the basic knowledge of the entrepreneur about the main product, by elucidating details like product definition, its uses and applications, industry segmentation as well as an overall overview of the industry sector in India. The report then helps an entrepreneur identify the target customer group of its product. It further helps in making sound investment decision by listing and then elaborating on factors that will contribute to the growth of product consumption in India and also talks about the foreign trade of the product along with the list of top importing and top exporting countries. Report includes graphical representation and forecasts of key data discussed in the above mentioned segment. It further explicates the growth potential of the product.

The report includes other market data like key players in the Industry segment along with their contact information and recent developments. It includes crucial information like raw material requirements, list of machinery and manufacturing process for the plant. Core project financials like plant capacity, costs involved in setting up of project, working capital requirements, projected revenue and profit are further listed in the report.


Reasons for buying the report:

• This report helps you to identify a profitable project for investing or diversifying into by throwing light to crucial areas like industry size, demand of the product and reasons for investing in the product.

• This report provides vital information on the product like its definition, characteristics and segmentation.

• This report helps you market and place the product correctly by identifying the target customer group of the product.

• This report helps you understand the viability of the project by disclosing details like raw materials required, manufacturing process, project costs and snapshot of other project financials.

• The report provides forecasts of key parameters which helps to anticipate the industry performance and make sound business decision.

 

Our Approach:


• Our research reports broadly cover Indian markets, present analysis, outlook and forecast.

• The market forecasts are developed on the basis of secondary research and are cross-validated through interactions with the industry players. 

• We use reliable sources of information and databases.  And information from such sources is processed by us and included in the report.

 

Our Market Survey cum Detailed Techno Economic Feasibility Report Contains following information:

 

 

Ø  Introduction

·         Project Introduction

·         Project Objective and Strategy

·         Concise History of the Product

·         Properties

·         BIS (Bureau of Indian Standards) Provision & Specification

·         Uses & Applications

 

Ø  Market Study and Assessment

·         Current Indian Market Scenario

·         Present Market Demand and Supply

·         Estimated Future Market Demand and Forecast

·         Statistics of Import & Export

·         Names & Addresses of Existing Units (Present Players)

·         Market Opportunity

 

Ø  Raw Material

·         List of Raw Materials

·         Properties of Raw Materials

·         Prescribed Quality of Raw Materials

·         List of Suppliers and Manufacturers

 

Ø  Personnel (Manpower) Requirements

·         Requirement of Staff & Labor (Skilled and Unskilled) Managerial, Technical, Office Staff and Marketing Personnel

 

Ø  Plant and Machinery

·         List of Plant & Machinery

·         Miscellaneous Items

·         Appliances & Equipments

·         Laboratory Equipments & Accessories

·         Electrification

·         Electric Load & Water

·         Maintenance Cost

·         Sources of Plant & Machinery (Suppliers and Manufacturers)

 

Ø  Manufacturing Process and Formulations

·         Detailed Process of Manufacture with Formulation

·         Packaging Required

·         Process Flow Sheet Diagram

 

Ø  Infrastructure and Utilities

·         Project Location

·         Requirement of Land Area

·         Rates of the Land

·         Built Up Area

·         Construction Schedule

·         Plant Layout and Requirement of Utilities

 

Project at a Glance

Along with financial details as under:

 

  •     Assumptions for Profitability workings

  •    Plant Economics

  •    Production Schedule

  •    Land & Building

            Factory Land & Building

            Site Development Expenses

  •    Plant & Machinery

             Indigenous Machineries

            Other Machineries (Miscellaneous, Laboratory etc.)

  •    Other Fixed Assets

            Furniture & Fixtures

            Pre-operative and Preliminary Expenses

            Technical Knowhow

            Provision of Contingencies

  •   Working Capital Requirement Per Month

             Raw Material

            Packing Material

            Lab & ETP Chemical Cost

           Consumable Store

  •   Overheads Required Per Month And Per Annum

         Utilities & Overheads (Power, Water and Fuel Expenses etc.)

             Royalty and Other Charges

            Selling and Distribution Expenses

  •    Salary and Wages

  •    Turnover Per Annum

  •   Share Capital

            Equity Capital

            Preference Share Capital

 

  •    Annexure 1:: Cost of Project and Means of Finance

  •    Annexure 2::  Profitability and Net Cash Accruals

                Revenue/Income/Realisation

                Expenses/Cost of Products/Services/Items

                Gross Profit

                Financial Charges     

                Total Cost of Sales

                Net Profit After Taxes

                Net Cash Accruals

  •   Annexure 3 :: Assessment of Working Capital requirements

                Current Assets

                Gross Working. Capital

                Current Liabilities

                Net Working Capital

                Working Note for Calculation of Work-in-process

  •    Annexure 4 :: Sources and Disposition of Funds

  •    Annexure 5 :: Projected Balance Sheets

                ROI (Average of Fixed Assets)

                RONW (Average of Share Capital)

                ROI (Average of Total Assets)

  •    Annexure 6 :: Profitability ratios

                D.S.C.R

                Earnings Per Share (EPS)

               

             Debt Equity Ratio

        Annexure 7   :: Break-Even Analysis

                Variable Cost & Expenses

                Semi-Var./Semi-Fixed Exp.

                Profit Volume Ratio (PVR)

                Fixed Expenses / Cost 

                B.E.P

  •   Annexure 8 to 11:: Sensitivity Analysis-Price/Volume

            Resultant N.P.B.T

            Resultant D.S.C.R

   Resultant PV Ratio

   Resultant DER

  Resultant ROI

          Resultant BEP

  •    Annexure 12 :: Shareholding Pattern and Stake Status

        Equity Capital

        Preference Share Capital

  •   Annexure 13 :: Quantitative Details-Output/Sales/Stocks

        Determined Capacity P.A of Products/Services

        Achievable Efficiency/Yield % of Products/Services/Items 

        Net Usable Load/Capacity of Products/Services/Items   

       Expected Sales/ Revenue/ Income of Products/ Services/ Items   

  •    Annexure 14 :: Product wise domestic Sales Realisation

  •    Annexure 15 :: Total Raw Material Cost

  •    Annexure 16 :: Raw Material Cost per unit

  •    Annexure 17 :: Total Lab & ETP Chemical Cost

  •    Annexure 18  :: Consumables, Store etc.,

  •    Annexure 19  :: Packing Material Cost

  •    Annexure 20  :: Packing Material Cost Per Unit

  •    Annexure 21 :: Employees Expenses

  •    Annexure 22 :: Fuel Expenses

  •    Annexure 23 :: Power/Electricity Expenses

  •    Annexure 24 :: Royalty & Other Charges

  •    Annexure 25 :: Repairs & Maintenance Exp.

  •    Annexure 26 :: Other Mfg. Expenses

  •    Annexure 27 :: Administration Expenses

  •    Annexure 28 :: Selling Expenses

  •    Annexure 29 :: Depreciation Charges – as per Books (Total)

  •   Annexure 30   :: Depreciation Charges – as per Books (P & M)

  •   Annexure 31   :: Depreciation Charges - As per IT Act WDV (Total)

  •   Annexure 32   :: Depreciation Charges - As per IT Act WDV (P & M)

  •   Annexure 33   :: Interest and Repayment - Term Loans

  •   Annexure 34   :: Tax on Profits

  •   Annexure 35   ::Projected Pay-Back Period And IRR