We can provide you detailed project reports on the following topics. Please select the projects of your interests.
Each detailed project reports cover all the aspects of business, from analysing the market, confirming availability of various necessities such as plant & machinery, raw materials to forecasting the financial requirements. The scope of the report includes assessing market potential, negotiating with collaborators, investment decision making, corporate diversification planning etc. in a very planned manner by formulating detailed manufacturing techniques and forecasting financial aspects by estimating the ost of raw material, formulating the cash flow statement, projecting the balance sheet etc.
We also offer self-contained Pre-Investment and Pre-Feasibility Studies, Market Surveys and Studies, Preparation of Techno-Economic Feasibility Reports, Identification and Selection of Plant and Machinery, Manufacturing Process and or Equipment required, General Guidance, Technical and Commercial Counseling for setting up new industrial projects on the following topics. Many of the engineers, project consultant & industrial consultancy firms in India and worldwide use our project reports as one of the input in doing their analysis.


We can modify the project capacity and project cost as per your requirement.
We can also prepare project report on any subject as per your requirement.

Add multiple items to inquiry

Select the items and then press Add to inquiry button

Sort by :
Automatic Packaged Drinking Water
Automatic Packaged Drinking Water

It is needless to mention that water, a compound of Hydrogen and Oxygen is a precious natural gift which is very essential for survival of mankind ... Read More

Capacity : Packaged Drinking Water (1 Ltr. Size):120000
Plant and Machinery cost: 65.00 Lakhs
Working Capital : 0.00
Rate of Return (ROR):28.00%
Break Even Point (BEP):60.00 %
TCI :268.00 Lakhs
Cost of Project : 268.00Lakhs
Add To Inquiry Basket
E–Waste Recycling Plant
E–Waste Recycling Plant

E-waste is a popular, informal name for electronic products nearing the end of their "useful life." Computers, televisions, VCRs, stereos, copiers,... Read More

Capacity : Monitors:10 Nos./Day•Plastic Granules: 4,600.00 Kgs/Day •Copper Wire Scraps:20 Kgs/Day •Glass from C
Plant and Machinery cost: 233.00 Lakhs
Working Capital : 0.00
Rate of Return (ROR):8.00%
Break Even Point (BEP):59.00 %
TCI :613.00 Lakhs
Cost of Project : 613.00Lakhs
Add To Inquiry Basket
E–Waste Recycling Plant
E–Waste Recycling Plant

Electronic wastes, "e-waste", "e-scrap", or "Waste Electrical and Electronic Equipment" ("WEEE") is a description of surplus, obsolete, broken or d... Read More

Capacity : Monitor : 3000 Pcs. /annum,Plastic Dana: 1559 MT/annum,Copper Wire Scraps: 7.5 MT/annum,Glass from
Plant and Machinery cost: 233.00 Lakhs
Working Capital : 0.00
Rate of Return (ROR):28.00%
Break Even Point (BEP):46.00 %
TCI :526.00 Lakhs
Cost of Project : 526.00Lakhs
Add To Inquiry Basket
Copper Sulphate from Metallic Scrap Copper
Copper Sulphate from Metallic Scrap Copper

Copper is one of the most widespread materials used in the production of electronic equipment and found in multiple appliances as, e.g. circuit boa... Read More

Capacity : 10000 MT /Annum
Plant and Machinery cost: 132.00 Lakhs
Working Capital : 0.00
Rate of Return (ROR):28.00%
Break Even Point (BEP):66.00 %
TCI :1208.00 Lakhs
Cost of Project : 1208.00Lakhs
Add To Inquiry Basket
Active Pharma Ingredients(API)
Active Pharma Ingredients(API)
An active ingredient (AI) is the substance in a pharmaceutical drug or a pesticide that is biologically active. The similar terms active pharmaceutic... Read More
Capacity : Cephalexin Monohydrate: 500 Kgs/Day, Ampicillin Trihydrate: 500 Kgs/Day,Ibuprofen: 500 Kgs/Day
Plant and Machinery cost: 448.00 Lakhs
Working Capital : 0.00
Rate of Return (ROR):46.00%
Break Even Point (BEP):44.00 %
TCI :958.00 Lakhs
Cost of Project : 958.00Lakhs
Add To Inquiry Basket
DISPOSABLE PLASTIC SYRINGES
DISPOSABLE PLASTIC SYRINGES

A syringe is a simple piston pump co... Read More

Capacity : 16800 Nos. Syringes (2.5 ml size/day),16800 Nos. Syringes/ (5 ml size/day)
Plant and Machinery cost: 104.00 Lakhs
Working Capital : 0.00
Rate of Return (ROR):26.00%
Break Even Point (BEP):48.00 %
TCI :255.00 Lakhs
Cost of Project : 255.00Lakhs
Add To Inquiry Basket
TYRES AND TUBES FOR BICYCLE AND RICKSHAW
TYRES AND TUBES FOR BICYCLE AND RICKSHAW

Tyres and Tubes are the backbone of the bicycle and rickshaw. Bicycle and rickshaw continues to be the principal mode of transport for the low and ... Read More

Capacity : 300000 Nos. Tyres & 300000 Nos. Tubes
Plant and Machinery cost: 158.00 Lakhs
Working Capital : 0.00
Rate of Return (ROR):42.00%
Break Even Point (BEP):53.00 %
TCI :351.00 Lakhs
Cost of Project : 351.00Lakhs
Add To Inquiry Basket
DISPOSABLE PLASTIC SYRINGES
DISPOSABLE PLASTIC SYRINGES

A plastic syringe is a cylindrical t... Read More

Capacity : 22500000 Nos. 5 Ml Size/Annum, 22500000 Nos. 10 Ml Size/Annum
Plant and Machinery cost: 636.00 Lakhs
Working Capital : 0.00
Rate of Return (ROR):46.00%
Break Even Point (BEP):42.00 %
TCI :837.00 Lakhs
Cost of Project : 837.00Lakhs
Add To Inquiry Basket
PACKAGED DRINKING WATER AND PET BOTTLES
PACKAGED DRINKING WATER AND PET BOTTLES

Bottled Water means water intended for human consumption and which is sealed in bottles and other containers with no added ingredients except that ... Read More

Capacity : 6,00,00,000 Bottles/Annum
Plant and Machinery cost: 217.00 Lakhs
Working Capital : 0.00
Rate of Return (ROR):45.00%
Break Even Point (BEP):60.00 %
TCI :455.00 Lakhs
Cost of Project : 455.00Lakhs
Add To Inquiry Basket
COPPER WIRE DRAWING (From Higher Size To Very Thin Size Used In Electrical Cables)
COPPER WIRE DRAWING (From Higher Size To Very Thin Size Used In Electrical Cables)

Copper wire is an essential material for electrical cables and motor and transformer winding. Copper wire is available in different gauges (42 gaug... Read More

Capacity : 150 MT/Annum
Plant and Machinery cost: 69.00 Lakhs
Working Capital : 0.00
Rate of Return (ROR):45.00%
Break Even Point (BEP):42.00 %
TCI :167.00 Lakhs
Cost of Project : 167.00Lakhs
Add To Inquiry Basket
DISPOSABLE PLASTIC CUPS, PLATES AND GLASSES
DISPOSABLE PLASTIC CUPS, PLATES AND GLASSES

The plastic industry in India plays a very important and key role in industrialization. Disposable cups, glasses, plates are used in daily life now... Read More

Capacity : 150 Lakhs Pcs/Annum Cups, 300 Lakhs Pcs/Annum Glass, 150 Lakhs Pcs/Annum Plates
Plant and Machinery cost: 34.00 Lakhs
Working Capital : 0.00
Rate of Return (ROR):42.00%
Break Even Point (BEP):48.00 %
TCI :104.00 Lakhs
Cost of Project : 104.00Lakhs
Add To Inquiry Basket
E Waste Recycling plant (Electronic waste, e-waste, e-scrap, or Waste Electrical and Electronic Equipment (WEEE))
E Waste Recycling plant (Electronic waste, e-waste, e-scrap, or Waste Electrical and Electronic Equipment (WEEE))

E-waste is a popular informal name for electronic product nearing the end of their useful life. Computers, televisions, VCR, stereos, copier, and f... Read More

Capacity : Monitor -10 Pcs/Day, Plastic Dana “ 5.33 M.T/Day,Copper Wire Scrap-9 Kg/day, Glass Scrap from C.R.
Plant and Machinery cost: 51.00 Lakhs
Working Capital : 0.00
Rate of Return (ROR):47.00%
Break Even Point (BEP):40.00 %
TCI :196.00 Lakhs
Cost of Project : 196.00Lakhs
Add To Inquiry Basket
Oxygen and Nitrogen Gas Plant
Oxygen and Nitrogen Gas Plant

Oxygen and nitrogen are the most important industrial gases finding its application in large quantities in metal fabrication and cutting industries... Read More

Capacity : 1200 Cubic Meter/Day
Plant and Machinery cost: 21.00 Lakhs
Working Capital : 0.00
Rate of Return (ROR):40.00%
Break Even Point (BEP):52.00 %
TCI :68.00 Lakhs
Cost of Project : 68.00Lakhs
Add To Inquiry Basket
Good Future Prospects for E-WASTE RECYCLING PLANT (Electronic waste, e-waste, e-scrap, or Waste Electrical and Electronic Equipment (WEEE))
Good Future Prospects for E-WASTE RECYCLING PLANT (Electronic waste, e-waste, e-scrap, or Waste Electrical and Electronic Equipment (WEEE))

Electronic waste, e-waste, e-scrap, or Waste Electrical and Electronic Equipment (WEEE) is a loose category of surplus, obsolete, broken, or discar... Read More

Capacity : Monitor -10 Pcs/Day, Plastic Granules – 5.33 M.T/Day, Copper Wire Scrap-9 Kg/day, Glass Scrap
Plant and Machinery cost: 51.00 Lakhs
Working Capital : 0.00
Rate of Return (ROR):47.00%
Break Even Point (BEP):40.00 %
TCI :196.00 Lakhs
Cost of Project : 196.00Lakhs
Add To Inquiry Basket
INTEGRATED PRODUCTION UNIT OF GYPSUM POWDER, GYPSUM BOARD AND PVC LAMINATED GYPSUM CEILING TILES
INTEGRATED PRODUCTION UNIT OF GYPSUM POWDER, GYPSUM BOARD AND PVC LAMINATED GYPSUM CEILING TILES

INTEGRATED PRODUCTION UNIT OF GYPSUM POWDER, GYPSUM BOARD AND P.V.C. LAMINATED GYPSUM CEILING TILES... Read More

Capacity : 60,000 MT / A (Gypsum Powder), 3000 Thousand Sq. MT/A (Gypsum Board),600 Thousands Sq. MT/A (PVC Lam
Plant and Machinery cost: 840.00 Lakhs
Working Capital : 0.00
Rate of Return (ROR):42.00%
Break Even Point (BEP):57.00 %
TCI :2352.00 Lakhs
Cost of Project : 2352.00Lakhs
Add To Inquiry Basket
IRON ORE PELLETIZATION PLANT
IRON ORE PELLETIZATION PLANT

Iron ore pellets are used in blast / electric furnaces for producing sponge iron and steels. Market by high productivity, lower fuel consumption an... Read More

Capacity : 1008000 MT/Annum
Plant and Machinery cost: 13800.00 Lakhs
Working Capital : 0.00
Rate of Return (ROR):46.00%
Break Even Point (BEP):55.00 %
TCI :22400.00 Lakhs
Cost of Project : 22400.00Lakhs
Add To Inquiry Basket
Single Super Phosphate
Single Super Phosphate

Single Super Phosphate (SSP) Fertilizer industry is the pioneering fertilizer industry in the country and the first SSP plant is said to have been ... Read More

Capacity : 66000.00 MT/Annum
Plant and Machinery cost: 318.00 Lakhs
Working Capital : 0.00
Rate of Return (ROR):54.00%
Break Even Point (BEP):35.00 %
TCI :2000.00 Lakhs
Cost of Project : 2000.00Lakhs
Add To Inquiry Basket
COPPER INGOT  COPPER ASH FROM COPPER ORE
COPPER INGOT COPPER ASH FROM COPPER ORE

COPPER INGOT/COPPER ASH FROM COPPER ORE

Copper is the perfect material for recycli... Read More

Capacity : 3000 MT / Annum
Plant and Machinery cost: 279.00 Lakhs
Working Capital : 0.00
Rate of Return (ROR):46.00%
Break Even Point (BEP):45.00 %
TCI :684.00 Lakhs
Cost of Project : 684.00Lakhs
Add To Inquiry Basket
Bicycle Plant
Bicycle Plant

As a machine, the bicycle is found to deliver about 75 watts, travelling at 18 kmph on a sustained basis, although on a very short term basis power... Read More

Capacity : 7000 Nos. / Day
Plant and Machinery cost: 5718.00 Lakhs
Working Capital : 0.00
Rate of Return (ROR):41.00%
Break Even Point (BEP):47.00 %
TCI :7861.00 Lakhs
Cost of Project : 7861.00Lakhs
Add To Inquiry Basket
TRADING OF IRON ORES
TRADING OF IRON ORES

Steel is considered to be the strongest material in that price. Day to day life and growth of industry and infrastructure in any country totally de... Read More

Capacity : 5000 MT/Day
Plant and Machinery cost: 156.00 Lakhs
Working Capital : 0.00
Rate of Return (ROR):52.00%
Break Even Point (BEP):21.00 %
TCI :2396.00 Lakhs
Cost of Project : 2396.00Lakhs
Add To Inquiry Basket
Disposable Plastic Syringes
Disposable Plastic Syringes

Disposable syringes are a great innov... Read More

Capacity : 0
Plant and Machinery cost: 0.00 Lakhs
Working Capital : 0.00
Rate of Return (ROR):0.00%
Break Even Point (BEP):0.00 %
TCI :0.00 Lakhs
Cost of Project : 0.00Lakhs
Add To Inquiry Basket
Wooden Furniture (With Mediocre Automation)
Wooden Furniture (With Mediocre Automation)

The term wooden furniture is used for articles of daily use in dwelling house, place of business, public buildings, and includes items such as chai... Read More

Capacity : 20 Articles/Day
Plant and Machinery cost: 13.00 Lakhs
Working Capital : 28.00
Rate of Return (ROR):42.81%
Break Even Point (BEP):48.28 %
TCI :73.00 Lakhs
Cost of Project : 73.00Lakhs
Add To Inquiry Basket
Paper Napkins
Paper Napkins

Tissue paper is often used for wrapping as in jewellery, liquors, fruits and florist trades etc. Napkins are manufactured from tissues. Paper napki... Read More

Capacity : 400 Kgs./ Day
Plant and Machinery cost: 0.00 Lakhs
Working Capital : 0.00
Rate of Return (ROR):43.88%
Break Even Point (BEP):47.25 %
TCI :0.00 Lakhs
Cost of Project : 0.00Lakhs
Add To Inquiry Basket
Bicycle Tyres
Bicycle Tyres

Bicycle tyre is the backbone of the cycle industries. There are few numbers of organized manufacturing companies are engaged in the quality grade c... Read More

Capacity : 4000 Nos./Day
Plant and Machinery cost: 36.00 Lakhs
Working Capital : 57.00
Rate of Return (ROR):59.50%
Break Even Point (BEP):38.47 %
TCI :163.00 Lakhs
Cost of Project : 163.00Lakhs
Add To Inquiry Basket
Wooden Furniture
Wooden Furniture

The furniture making is an ancient art in India before centuries. The expertise of India in manufacturing furniture was accepted by all the parts o... Read More

Capacity : 20 Pcs/Day
Plant and Machinery cost: 4.00 Lakhs
Working Capital : 5.00
Rate of Return (ROR):111.00%
Break Even Point (BEP):26.99 %
TCI :13.00 Lakhs
Cost of Project : 13.00Lakhs
Add To Inquiry Basket
Bioplastic Products Manufacturing Industry, Profitable Business Ideas on Biodegradable Products.
Bioplastic Products Manufacturing Industry, Profitable Business Ideas on Biodegradable Products.

Bioplastic Products Manufacturing Industry, Profitable Business Ideas on Biodegradable Produc... Read More

Capacity : 0
Plant and Machinery cost: 0.00 Lakhs
Working Capital : 0.00
Rate of Return (ROR):0.00%
Break Even Point (BEP):0.00 %
TCI :0.00 Lakhs
Cost of Project : 0.00Lakhs
Add To Inquiry Basket
Gypsum Plaster Board
Gypsum Plaster Board

Gypsum Plaster Boards are constructional sheets composed of consigned Gypsum with about 15% fibre. Its outstanding con... Read More

Capacity : Gypsum Plaster Board (Wall and Top Ceiling): 2,000,000 Sq.mt. per Annum
Plant and Machinery cost: 315.00 Lakhs
Working Capital : 0.00
Rate of Return (ROR):27.00%
Break Even Point (BEP):54.00 %
TCI :0.00 Lakhs
Cost of Project : 916.00Lakhs
Add To Inquiry Basket
Gypsum Plaster Board
Gypsum Plaster Board

Gypsum Plaster Boards are constructional sheets composed of consigned Gypsum with about 15% fibre. Its outstanding con... Read More

Capacity : 40000 Sq.mt. per day
Plant and Machinery cost: 944.00 Lakhs
Working Capital : 0.00
Rate of Return (ROR):27.00%
Break Even Point (BEP):54.00 %
TCI :0.00 Lakhs
Cost of Project : 1835.00Lakhs
Add To Inquiry Basket
Start a Production Of Compressed Biogas
Start a Production Of Compressed Biogas

Compressed bio gas (CBG) is a renewable energy source produced from organic material such as agricultural... Read More

Capacity : Compressed Bio Gas 6 MT Per Day Spent Slurry as Manure 60 MT Per Day
Plant and Machinery cost: 172.00 Lakhs
Working Capital : 0.00
Rate of Return (ROR):27.00%
Break Even Point (BEP):46.00 %
TCI :0.00 Lakhs
Cost of Project : 522.00Lakhs
Add To Inquiry Basket
Start Industry Of Craft Beer
Start Industry Of Craft Beer

Craft beer is a term used to describe a beer that has been made in a traditional and independent fashion. It is usually made in smaller batches wit... Read More

Capacity : Craft Beer (Bottles 650 ml Size) 3,847 Bottles per day Craft Beer (Al. Cans 500 ml Size) 5,000 Bot
Plant and Machinery cost: 780.00 Lakhs
Working Capital : 0.00
Rate of Return (ROR):27.00%
Break Even Point (BEP):49.00 %
TCI :0.00 Lakhs
Cost of Project : 2007.00Lakhs
Add To Inquiry Basket
Setup plant of  Acetate Tow  for Cigarette Filters
Setup plant of Acetate Tow for Cigarette Filters

Acetate tow is a type of material used in the cigarette industry to make filters. It is made of cellulose acet... Read More

Capacity : Acetate Tow 8 MT Per Day
Plant and Machinery cost: 542.00 Lakhs
Working Capital : 0.00
Rate of Return (ROR):29.00%
Break Even Point (BEP):50.00 %
TCI :0.00 Lakhs
Cost of Project : 1426.00Lakhs
Add To Inquiry Basket
Setup Plant  Of Titanium Dioxide From Rutile Ilmenite Ore
Setup Plant Of Titanium Dioxide From Rutile Ilmenite Ore

Titanium dioxide from rutil... Read More

Capacity : Titanium Dioxide 4 MT Per Day
Plant and Machinery cost: 390.00 Lakhs
Working Capital : 0.00
Rate of Return (ROR):27.00%
Break Even Point (BEP):62.00 %
TCI :0.00 Lakhs
Cost of Project : 1455.00Lakhs
Add To Inquiry Basket
Setup Plant Of  Lab Cultured Diamonds From Graphite
Setup Plant Of Lab Cultured Diamonds From Graphite

Lab-cultured diamonds are quickly becoming the new standard for luxury jewelry, offering many of the same qualities as trad... Read More

Capacity : Lab Cultured Diamonds (1 Carat) 30 Carat Per Day
Plant and Machinery cost: 200.00 Lakhs
Working Capital : 0.00
Rate of Return (ROR):25.00%
Break Even Point (BEP):57.00 %
TCI :0.00 Lakhs
Cost of Project : 361.00Lakhs
Add To Inquiry Basket
Start Lemon Processing Unit (Lemon Juice Powder, Lemon Peel Oil, Lemon Pectin)
Start Lemon Processing Unit (Lemon Juice Powder, Lemon Peel Oil, Lemon Pectin)

Lemon processing is the pro... Read More

Capacity : Lemon Juice Dry Powder 104 Kgs per day Lemon Peel Oil 40 Kgs per day Lemon Pectin 140 Kgs
Plant and Machinery cost: 163.00 Lakhs
Working Capital : 0.00
Rate of Return (ROR):25.00%
Break Even Point (BEP):54.00 %
TCI :0.00 Lakhs
Cost of Project : 314.00Lakhs
Add To Inquiry Basket
Solar PV (Photovoltaic) Glass Industry Manufacturing Business
Solar PV (Photovoltaic) Glass Industry Manufacturing Business

The global energy transition towards renewable sources is well underway, and solar po... Read More

Capacity : Solar PV (Photovoltaic) Glass 90,000 MT Per Annum
Plant and Machinery cost: 2800.00 Lakhs
Working Capital : 0.00
Rate of Return (ROR):28.00%
Break Even Point (BEP):69.00 %
TCI :0.00 Lakhs
Cost of Project : 4200.00Lakhs
Add To Inquiry Basket
A Business Plan For Pea Protein Isolate or Concentrate
A Business Plan For Pea Protein Isolate or Concentrate

Yellow peas are the source of the pea protein isolate and concentrate. These goods of... Read More

Capacity : Pea Protein Isolate 2 MT Per Day Spent Pea for Cattle Feed by Product 8 MT Per Day
Plant and Machinery cost: 118.00 Lakhs
Working Capital : 0.00
Rate of Return (ROR):27.00%
Break Even Point (BEP):54.00 %
TCI :0.00 Lakhs
Cost of Project : 614.00Lakhs
Add To Inquiry Basket
Setup Plant  Of  Acrylate Resins and Emulsions
Setup Plant Of Acrylate Resins and Emulsions

An important class of materials that have acquired extensive application in numerous ... Read More

Capacity : Acrylate Resins 10,000 MT Per Annum Acrylate Emulsions 10,000 MT Per Annum
Plant and Machinery cost: 500.00 Lakhs
Working Capital : 0.00
Rate of Return (ROR):30.00%
Break Even Point (BEP):54.00 %
TCI :0.00 Lakhs
Cost of Project : 2291.00Lakhs
Add To Inquiry Basket
Start Latex Rubber Thread Manufacturing Business
Start Latex Rubber Thread Manufacturing Business

A sort of elastic material created from either natural rubber... Read More

Capacity : Latex Rubber Thread 200 Kg. Per Day
Plant and Machinery cost: 145.00 Lakhs
Working Capital : 0.00
Rate of Return (ROR):26.00%
Break Even Point (BEP):53.00 %
TCI :0.00 Lakhs
Cost of Project : 412.00Lakhs
Add To Inquiry Basket
Start Cosmetic Unit (Serum, Cream, Shampoo & Lipstick) Manufacturing Business
Start Cosmetic Unit (Serum, Cream, Shampoo & Lipstick) Manufacturing Business

Serum, cream, shampoo, and lipstick are frequently seen in cosmetic units, which are ... Read More

Capacity : -
Plant and Machinery cost: 46.00 Lakhs
Working Capital : 0.00
Rate of Return (ROR):36.00%
Break Even Point (BEP):37.00 %
TCI :0.00 Lakhs
Cost of Project : 1617.00Lakhs
Add To Inquiry Basket
Pioneering Pea Protein Building a Successful Business Venture
Pioneering Pea Protein Building a Successful Business Venture

Healthy protein powder called pea healthy protein isolate/con... Read More

Capacity : 0
Plant and Machinery cost: 0.00 Lakhs
Working Capital : 0.00
Rate of Return (ROR):0.00%
Break Even Point (BEP):0.00 %
TCI :0.00 Lakhs
Cost of Project : 0.00Lakhs
Add To Inquiry Basket
Start Production Of Silica  From Rice Husk Ash
Start Production Of Silica From Rice Husk Ash

Silica is a mineral compound composed of silicon and oxygen, and is one of the most a... Read More

Capacity : -
Plant and Machinery cost: 2995.00 Lakhs
Working Capital : 0.00
Rate of Return (ROR):28.00%
Break Even Point (BEP):50.00 %
TCI :0.00 Lakhs
Cost of Project : 4716.00Lakhs
Add To Inquiry Basket
A Business Plan for IV Fluid (BFS Technology)
A Business Plan for IV Fluid (BFS Technology)

 

IV fluids, also k... Read More

Capacity : IV Fluids (500 ml Size Pack) 78,000 Packs Per Day
Plant and Machinery cost: 744.00 Lakhs
Working Capital : 0.00
Rate of Return (ROR):27.00%
Break Even Point (BEP):51.00 %
TCI :0.00 Lakhs
Cost of Project : 1263.00Lakhs
Add To Inquiry Basket
Start Industry of Liquor from Mahua (Wine and Hard Liquor)
Start Industry of Liquor from Mahua (Wine and Hard Liquor)

Mahua is a tropical tree native to the Indian subcontinent and Southeast Asia. It is ... Read More

Capacity : Wine (750 ml Size) 4,000,000 Bottles per annum Whiskey (375 ml Size) 4,000,000 Bottles per annum B
Plant and Machinery cost: 782.00 Lakhs
Working Capital : 0.00
Rate of Return (ROR):28.00%
Break Even Point (BEP):56.00 %
TCI :0.00 Lakhs
Cost of Project : 1880.00Lakhs
Add To Inquiry Basket
Setup Pharmaceutical Unit (Ciprofloxacin Tablets, Co-Trimoxazole Tablets, Diclofenac Sodium Tablets, Paracetamol Tablets, Metronidazole Tablets, Doxycycline Tablets, Fluconazole Capsules, Propranolol Capsules, Ciprofloxacin Injectables) Plant
Setup Pharmaceutical Unit (Ciprofloxacin Tablets, Co-Trimoxazole Tablets, Diclofenac Sodium Tablets, Paracetamol Tablets, Metronidazole Tablets, Doxycycline Tablets, Fluconazole Capsules, Propranolol Capsules, Ciprofloxacin Injectables) Plant

 

Pharmaceutical unit tablets and capsules are c... Read More

Capacity : -
Plant and Machinery cost: 179.00 Lakhs
Working Capital : 0.00
Rate of Return (ROR):37.00%
Break Even Point (BEP):29.00 %
TCI :0.00 Lakhs
Cost of Project : 35774.00Lakhs
Add To Inquiry Basket
Start Industry with Serum, Cream, and Shampoo | Turning Your Passion for Cosmetics into a Thriving Business with Serum, Cream, and Shampoo
Start Industry with Serum, Cream, and Shampoo | Turning Your Passion for Cosmetics into a Thriving Business with Serum, Cream, and Shampoo

Why The Beauty Indu... Read More

Capacity : 0
Plant and Machinery cost: 0.00 Lakhs
Working Capital : 0.00
Rate of Return (ROR):0.00%
Break Even Point (BEP):0.00 %
TCI :0.00 Lakhs
Cost of Project : 0.00Lakhs
Add To Inquiry Basket
Setup Unit Of Cement Plant with Power Generation
Setup Unit Of Cement Plant with Power Generation

Cement is a crucial binding agent that is use... Read More

Capacity : Cement Plant 40,000 Bags per Day
Plant and Machinery cost: 16500.00 Lakhs
Working Capital : 0.00
Rate of Return (ROR):26.00%
Break Even Point (BEP):44.00 %
TCI :0.00 Lakhs
Cost of Project : 25200.00Lakhs
Add To Inquiry Basket
A Business Plan for Sterile Water for Injection
A Business Plan for Sterile Water for Injection

Sterile water refers to water that is completely free from any living organisms, such... Read More

Capacity : Sterial Water for Injection 500 ml Size Pack 20,000 Sachets Per Day
Plant and Machinery cost: 572.00 Lakhs
Working Capital : 0.00
Rate of Return (ROR):30.00%
Break Even Point (BEP):66.00 %
TCI :0.00 Lakhs
Cost of Project : 1234.00Lakhs
Add To Inquiry Basket
Setup Plant Of Lead From Galena
Setup Plant Of Lead From Galena

Lead is a heavy metal that is commonly found in the earth's crust. Its abundance, low... Read More

Capacity : Lead Ingot 30 MT Per Day
Plant and Machinery cost: 487.00 Lakhs
Working Capital : 0.00
Rate of Return (ROR):28.00%
Break Even Point (BEP):52.00 %
TCI :0.00 Lakhs
Cost of Project : 2231.00Lakhs
Add To Inquiry Basket
A Business Plan Blood Collection Tubes, Urine and Stool Containers
A Business Plan Blood Collection Tubes, Urine and Stool Containers


Read More

Capacity : -
Plant and Machinery cost: 1214.00 Lakhs
Working Capital : 0.00
Rate of Return (ROR):28.00%
Break Even Point (BEP):48.00 %
TCI :0.00 Lakhs
Cost of Project : 2294.00Lakhs
Add To Inquiry Basket
A Business Plan for Paracetamol
A Business Plan for Paracetamol

Paracetamol is a popular over-the-counter pain reliever and f... Read More

Capacity : Paracetamol Powder 7 MT Per Day
Plant and Machinery cost: 274.00 Lakhs
Working Capital : 0.00
Rate of Return (ROR):27.00%
Break Even Point (BEP):64.00 %
TCI :0.00 Lakhs
Cost of Project : 779.00Lakhs
Add To Inquiry Basket
Start Manufacturing Business  Of  Baby & Adult Diaper and Sanitary Napkins
Start Manufacturing Business Of Baby & Adult Diaper and Sanitary Napkins

Baby & Adult Diapers an... Read More

Capacity : Baby Diapers (4 Pcs.) 84,000 Pkts Per Day Adult Diapers (4 Pcs.) 18,000 Pkts Per Day Sanitary
Plant and Machinery cost: 2356.00 Lakhs
Working Capital : 0.00
Rate of Return (ROR):29.00%
Break Even Point (BEP):41.00 %
TCI :0.00 Lakhs
Cost of Project : 4201.00Lakhs
Add To Inquiry Basket
Start Tissue Paper Manufacturing Business
Start Tissue Paper Manufacturing Business

Tissue paper is a lightweig... Read More

Capacity : Tissue Paper 20 MT Per Day
Plant and Machinery cost: 497.00 Lakhs
Working Capital : 0.00
Rate of Return (ROR):27.00%
Break Even Point (BEP):59.00 %
TCI :0.00 Lakhs
Cost of Project : 2101.00Lakhs
Add To Inquiry Basket
Launching a  Solar Panel Production Business
Launching a Solar Panel Production Business

 

Solar panels are ... Read More

Capacity : Solar Panel 500 MW per annum
Plant and Machinery cost: 810.00 Lakhs
Working Capital : 0.00
Rate of Return (ROR):32.00%
Break Even Point (BEP):56.00 %
TCI :0.00 Lakhs
Cost of Project : 5353.00Lakhs
Add To Inquiry Basket
Biodegradable Disposable Cups and Plates (Tableware) Manufacturing Using Sugarcane Bagasse Business
Biodegradable Disposable Cups and Plates (Tableware) Manufacturing Using Sugarcane Bagasse Business

Bagasse is the fibrous residue that remains after sugarcane o... Read More

Capacity : -
Plant and Machinery cost: 1941.00 Lakhs
Working Capital : 0.00
Rate of Return (ROR):27.00%
Break Even Point (BEP):46.00 %
TCI :0.00 Lakhs
Cost of Project : 2774.00Lakhs
Add To Inquiry Basket
Setup Curcumin Extraction Plant
Setup Curcumin Extraction Plant

Curcumin extraction refers to the process of isolating and ex... Read More

Capacity : Curcumin Powder 100 Kgs per day Turmeric Oil 47 Kgs per day Deoiled Turmeric 1,853 Kgs
Plant and Machinery cost: 216.00 Lakhs
Working Capital : 0.00
Rate of Return (ROR):28.00%
Break Even Point (BEP):64.00 %
TCI :0.00 Lakhs
Cost of Project : 491.00Lakhs
Add To Inquiry Basket
Setup Active Pharmaceutical Ingredients Acetaminophen, Metformin Hydrochloride, Azithromycin Dihydrate Unit
Setup Active Pharmaceutical Ingredients Acetaminophen, Metformin Hydrochloride, Azithromycin Dihydrate Unit

 

Active Pharmaceut... Read More

Capacity : Paracetamol 10,000 Kgs Per Day Azithromycin 10,000 Kgs Per Day Metformin 10,000 Kgs
Plant and Machinery cost: 1111.00 Lakhs
Working Capital : 0.00
Rate of Return (ROR):33.00%
Break Even Point (BEP):55.00 %
TCI :0.00 Lakhs
Cost of Project : 5246.00Lakhs
Add To Inquiry Basket
A Business Plan For Sanitary Napkins
A Business Plan For Sanitary Napkins

A sanitary napkin, also kno... Read More

Capacity : Sanitary Napkins 4,800 PKTS per day
Plant and Machinery cost: 26.00 Lakhs
Working Capital : 0.00
Rate of Return (ROR):27.00%
Break Even Point (BEP):67.00 %
TCI :0.00 Lakhs
Cost of Project : 84.00Lakhs
Add To Inquiry Basket
Start Manufacturing Of Blood Collection Tubes (Vacutainer)
Start Manufacturing Of Blood Collection Tubes (Vacutainer)

Blood collection tubes, also known as Vacutainer, are essential tools used in the med... Read More

Capacity : -
Plant and Machinery cost: 464.00 Lakhs
Working Capital : 0.00
Rate of Return (ROR):32.00%
Break Even Point (BEP):53.00 %
TCI :0.00 Lakhs
Cost of Project : 985.00Lakhs
Add To Inquiry Basket
Start Production Of Potato Flakes
Start Production Of Potato Flakes

Capacity : Potato Flakes 2 MT Per Day
Plant and Machinery cost: 178.00 Lakhs
Working Capital : 0.00
Rate of Return (ROR):25.00%
Break Even Point (BEP):45.00 %
TCI :0.00 Lakhs
Cost of Project : 563.00Lakhs
Add To Inquiry Basket
Setup Manufacturing Unit Of Bicycle Saddle & Pedals
Setup Manufacturing Unit Of Bicycle Saddle & Pedals

Bicycle saddles and pedals are two crucial components that di... Read More

Capacity : Saddle 7,000 Unit Per Day Pedals 10,000 Unit Per Day
Plant and Machinery cost: 208.00 Lakhs
Working Capital : 0.00
Rate of Return (ROR):31.00%
Break Even Point (BEP):54.00 %
TCI :0.00 Lakhs
Cost of Project : 575.00Lakhs
Add To Inquiry Basket
NameCapacityRate of return (ROR):Cost of project
Business Ideas, Projects ... 0 0.00 0.00
Production of Bioplastic ... 0 0.00 0.00
Filter (for All Vehicles) 0 0.00 0.00
Plastic Waste Recycling P... Plastic Granules : 2400 Kgs/Day PET Granules : 2400 Kgs/Day 27.00 238.00
Production of PROM (Phosp... 0 0.00 0.00
Disposable Plastic Syring... Disposable Plastic Syringes 2 ml Size : 350 Boxes/day Disposable Plastic Syringes 5 ml Size : 350 Bo 26.00 343.00
E-Waste Recycling Plant Copper Wire: 500mt/annum Plastic Granules: 2230mt/annum Glass: 970mt/annum Ferrous Metal: 800mt/annu 27.00 51800000.00
Copper Powder By Electrol... Copper Powder : 15,000 MT/Annum 31.00 3050.00
Solar Panel Assembling & ... Poly Crystaline Solar PV Modules Cap10 Watt: 1,200,000 Nos/Annum Poly Crystaline Solar PV Module Cap 26.00 1674.00
Disposable Plastic Syring... Disposable Plastic Syringes 2 ml Size : 300,000 Boxes/Annum Disposable Plastic Syringes 5 ml Size 27.00 1474.00
Copper Powder by Electrol... Copper Powder:3.33 MT/Day 27.33 321.00
Bicycle Manufacturing Bicycles (Different Sizes):2000 Nos./Day 26.39 3972.00
Bicycle Tubes Bicycle Tubes: 10,000 Nos. /Day 26.00 622.00
Disposable Plastic Syring... Syringes (1 ml) :14,000.0 Nos./Day.,Syringes (3 ml):14,000.0 Nos./Day.,Syringes (5 ml):14,000.0 Nos. 30.00 515.00
Packaged Drinking Water 210 Lakhs Nos. /annum 25.00 1736.00
E–Waste Recycling Plant 2164500 kgs. /annum 22.91 500.00
Amino Acid Metal Chelates... 41.00 502.00
ELECTROLYTIC MANGANESE DI... Electrolytic Manganese Dioxide 5 MT Per Day 27.00 576.00
E Waste Recycling Plant 5 MT/Day 15.00 241.00
SODIUM TRI POLY PHOSPHATE 0.00 0.00
Packaged Drinking Water w... 40.00 350.00
Curcumin(Turmeric) The In... 23400 Kg/Annum, Curcumin 23400 kg/Annum, Turmeric oil 550 MT/ Annum, De-oiled turmeric powder 54.00 289.00
COPPER ROD CASTING, WIRE ... 6300 MT/Annum 45.00 1126.00
E-WASTE RECYCLING PLANT - 47.00 196.00
DISPOSABLE PLASTIC SYRING... 120 Lakhs/ Annum 42.00 253.00
Growing Prospects for Pac... 30,000 Thousand Nos./Annum or 1,00,000 Bottles /day 44.00 282.00
MEDICAL DISPOSABLES: Disp... 0 43.00 426.00
COPPER FLATS AND COPPER T... 12 MT/day 47.00 567.00
Copper Wire Drawing, Anne... 1 MT / day 47.00 209.00
COMPACT COPPER TUBE LIGHT... 1000 Nos./Day 47.00 83.00
12345678910...

Showing 361 - 420 of 631 Product(s)

Subject of your Interest

Information

  • One Lac / Lakh / Lakhs is equivalent to one hundred thousand (100,000)
  • One Crore is equivalent to ten million (10,000,000)
  • T.C.I is Total Capital Investment
  • We can modify the project capacity and project cost as per your requirement.
  • We can also prepare project report on any subject as per your requirement.
  • Caution: The project's cost, capacity and return are subject to change without any notice. Future projects may have different values of project cost, capacity or return.

ABOUT NPCS

 

NIIR PROJECT CONSULTANCY SERVICES (NPCS) is a reliable name in the industrial world for offering integrated technical consultancy services. NPCS is manned by engineers, planners, specialists, financial experts, economic analysts and design specialists with extensive experience in the related industries.

Our various services are: Detailed Project Report,  Business Plan for Manufacturing Plant, Start-up Ideas, Business Ideas for Entrepreneurs, Start up Business Opportunities, entrepreneurship projects, Successful Business Plan, Industry Trends, Market Research, Manufacturing Process, Machinery, Raw Materials, project report, Cost and Revenue, Pre-feasibility study for Profitable Manufacturing Business, Project Identification, Project Feasibility and Market Study, Identification of Profitable Industrial Project Opportunities, Business Opportunities, Investment Opportunities for Most Profitable Business in India, Manufacturing Business Ideas, Preparation of Project Profile, Pre-Investment and Pre-Feasibility Study, Market Research Study, Preparation of Techno-Economic Feasibility Report, Identification and Section of Plant, Process, Equipment, General Guidance, Startup Help, Technical and Commercial Counseling for setting up new industrial project and Most Profitable Small Scale Business.

NPCS also publishes varies process technology, technical, reference, self employment and startup books, directory, business and industry database, bankable detailed project report, market research report on various industries, small scale industry and profit making business. Besides being used by manufacturers, industrialists and entrepreneurs, our publications are also used by professionals including project engineers, information services bureau, consultants and project consultancy firms as one of the input in their research.

Our Detailed Project report aims at providing all the critical data required by any entrepreneur vying to venture into Project. While expanding a current business or while venturing into new business, entrepreneurs are often faced with the dilemma of zeroing in on a suitable product/line.

 


And before diversifying/venturing into any product, wish to study the following aspects of the identified product:


• Good Present/Future Demand
• Export-Import Market Potential
• Raw Material & Manpower Availability
• Project Costs and Payback Period


We at NPCS, through our reliable expertise in the project consultancy and market research field, Provides exhaustive information about the project, which satisfies all the above mentioned requirements and has high growth potential in the markets. And through our report we aim to help you make sound and informed business decision.

 

The report contains all the data which will help an entrepreneur find answers to questions like:

• Why I should invest in this project?
• What will drive the growth of the product?
• What are the costs involved?
• What will be the market potential?


The report first focuses on enhancing the basic knowledge of the entrepreneur about the main product, by elucidating details like product definition, its uses and applications, industry segmentation as well as an overall overview of the industry sector in India. The report then helps an entrepreneur identify the target customer group of its product. It further helps in making sound investment decision by listing and then elaborating on factors that will contribute to the growth of product consumption in India and also talks about the foreign trade of the product along with the list of top importing and top exporting countries. Report includes graphical representation and forecasts of key data discussed in the above mentioned segment. It further explicates the growth potential of the product.

The report includes other market data like key players in the Industry segment along with their contact information and recent developments. It includes crucial information like raw material requirements, list of machinery and manufacturing process for the plant. Core project financials like plant capacity, costs involved in setting up of project, working capital requirements, projected revenue and profit are further listed in the report.


Reasons for buying the report:

• This report helps you to identify a profitable project for investing or diversifying into by throwing light to crucial areas like industry size, demand of the product and reasons for investing in the product.

• This report provides vital information on the product like its definition, characteristics and segmentation.

• This report helps you market and place the product correctly by identifying the target customer group of the product.

• This report helps you understand the viability of the project by disclosing details like raw materials required, manufacturing process, project costs and snapshot of other project financials.

• The report provides forecasts of key parameters which helps to anticipate the industry performance and make sound business decision.

 

Our Approach:


• Our research reports broadly cover Indian markets, present analysis, outlook and forecast.

• The market forecasts are developed on the basis of secondary research and are cross-validated through interactions with the industry players. 

• We use reliable sources of information and databases.  And information from such sources is processed by us and included in the report.

 

Our Market Survey cum Detailed Techno Economic Feasibility Report Contains following information:

 

 

Ø  Introduction

·         Project Introduction

·         Project Objective and Strategy

·         Concise History of the Product

·         Properties

·         BIS (Bureau of Indian Standards) Provision & Specification

·         Uses & Applications

 

Ø  Market Study and Assessment

·         Current Indian Market Scenario

·         Present Market Demand and Supply

·         Estimated Future Market Demand and Forecast

·         Statistics of Import & Export

·         Names & Addresses of Existing Units (Present Players)

·         Market Opportunity

 

Ø  Raw Material

·         List of Raw Materials

·         Properties of Raw Materials

·         Prescribed Quality of Raw Materials

·         List of Suppliers and Manufacturers

 

Ø  Personnel (Manpower) Requirements

·         Requirement of Staff & Labor (Skilled and Unskilled) Managerial, Technical, Office Staff and Marketing Personnel

 

Ø  Plant and Machinery

·         List of Plant & Machinery

·         Miscellaneous Items

·         Appliances & Equipments

·         Laboratory Equipments & Accessories

·         Electrification

·         Electric Load & Water

·         Maintenance Cost

·         Sources of Plant & Machinery (Suppliers and Manufacturers)

 

Ø  Manufacturing Process and Formulations

·         Detailed Process of Manufacture with Formulation

·         Packaging Required

·         Process Flow Sheet Diagram

 

Ø  Infrastructure and Utilities

·         Project Location

·         Requirement of Land Area

·         Rates of the Land

·         Built Up Area

·         Construction Schedule

·         Plant Layout and Requirement of Utilities

 

Project at a Glance

Along with financial details as under:

 

  •     Assumptions for Profitability workings

  •    Plant Economics

  •    Production Schedule

  •    Land & Building

            Factory Land & Building

            Site Development Expenses

  •    Plant & Machinery

             Indigenous Machineries

            Other Machineries (Miscellaneous, Laboratory etc.)

  •    Other Fixed Assets

            Furniture & Fixtures

            Pre-operative and Preliminary Expenses

            Technical Knowhow

            Provision of Contingencies

  •   Working Capital Requirement Per Month

             Raw Material

            Packing Material

            Lab & ETP Chemical Cost

           Consumable Store

  •   Overheads Required Per Month And Per Annum

         Utilities & Overheads (Power, Water and Fuel Expenses etc.)

             Royalty and Other Charges

            Selling and Distribution Expenses

  •    Salary and Wages

  •    Turnover Per Annum

  •   Share Capital

            Equity Capital

            Preference Share Capital

 

  •    Annexure 1:: Cost of Project and Means of Finance

  •    Annexure 2::  Profitability and Net Cash Accruals

                Revenue/Income/Realisation

                Expenses/Cost of Products/Services/Items

                Gross Profit

                Financial Charges     

                Total Cost of Sales

                Net Profit After Taxes

                Net Cash Accruals

  •   Annexure 3 :: Assessment of Working Capital requirements

                Current Assets

                Gross Working. Capital

                Current Liabilities

                Net Working Capital

                Working Note for Calculation of Work-in-process

  •    Annexure 4 :: Sources and Disposition of Funds

  •    Annexure 5 :: Projected Balance Sheets

                ROI (Average of Fixed Assets)

                RONW (Average of Share Capital)

                ROI (Average of Total Assets)

  •    Annexure 6 :: Profitability ratios

                D.S.C.R

                Earnings Per Share (EPS)

               

             Debt Equity Ratio

        Annexure 7   :: Break-Even Analysis

                Variable Cost & Expenses

                Semi-Var./Semi-Fixed Exp.

                Profit Volume Ratio (PVR)

                Fixed Expenses / Cost 

                B.E.P

  •   Annexure 8 to 11:: Sensitivity Analysis-Price/Volume

            Resultant N.P.B.T

            Resultant D.S.C.R

   Resultant PV Ratio

   Resultant DER

  Resultant ROI

          Resultant BEP

  •    Annexure 12 :: Shareholding Pattern and Stake Status

        Equity Capital

        Preference Share Capital

  •   Annexure 13 :: Quantitative Details-Output/Sales/Stocks

        Determined Capacity P.A of Products/Services

        Achievable Efficiency/Yield % of Products/Services/Items 

        Net Usable Load/Capacity of Products/Services/Items   

       Expected Sales/ Revenue/ Income of Products/ Services/ Items   

  •    Annexure 14 :: Product wise domestic Sales Realisation

  •    Annexure 15 :: Total Raw Material Cost

  •    Annexure 16 :: Raw Material Cost per unit

  •    Annexure 17 :: Total Lab & ETP Chemical Cost

  •    Annexure 18  :: Consumables, Store etc.,

  •    Annexure 19  :: Packing Material Cost

  •    Annexure 20  :: Packing Material Cost Per Unit

  •    Annexure 21 :: Employees Expenses

  •    Annexure 22 :: Fuel Expenses

  •    Annexure 23 :: Power/Electricity Expenses

  •    Annexure 24 :: Royalty & Other Charges

  •    Annexure 25 :: Repairs & Maintenance Exp.

  •    Annexure 26 :: Other Mfg. Expenses

  •    Annexure 27 :: Administration Expenses

  •    Annexure 28 :: Selling Expenses

  •    Annexure 29 :: Depreciation Charges – as per Books (Total)

  •   Annexure 30   :: Depreciation Charges – as per Books (P & M)

  •   Annexure 31   :: Depreciation Charges - As per IT Act WDV (Total)

  •   Annexure 32   :: Depreciation Charges - As per IT Act WDV (P & M)

  •   Annexure 33   :: Interest and Repayment - Term Loans

  •   Annexure 34   :: Tax on Profits

  •   Annexure 35   ::Projected Pay-Back Period And IRR