Reasons why you should start a Business in Saint Helena:

Agriculture is the main source of income for the territory's economy, employing 90% of the working population; other businesses include fishing, manufacturing, and tourism. They can also farm land rented from their employer or grow food crops like potatoes, bananas, and vegetables to sell in rural regions. As a result, commodities must be transported by ship or plane from Cape Town, and then distributed by horse-drawn carts or boats throughout the island. Georgetown is a village whose primary sources of revenue are farming and tourism (including visiting military personnel who use it as a base).

 

What are the Natural Resources in Saint Helena?

The fact that St. Helena is located on an island with a temperate temperature is one of the island's key natural resources. St. Helena has become a popular tourist destination for those looking to get away from it all, with a 4500-foot mountain range running down its spine and stunning scenery to match. The economy of Saint Helena is mostly based on tourism. Smaller farms manage larger farms that produce cash crops for sale to England, such as bananas and pineapples. Not only is tourism one of St. Helena's most important sectors.

 

What Businesses are Successful in Saint Helena?

Manufacturing has a lot of opportunities. Aluminum casting, mining and minerals processing, gold mining, and stone crushing are all industrial sectors. In Saint Helena, there are now a number of registered businesses with a combined yearly revenue of roughly $8 million. A steel mill is being built in addition to the aluminum and bronze foundries that have already been created. Agriculture items with additional value, such as jams, juices, and organic fruit, are also viable options. There is also the possibility of expanding the firm to include furniture production, carpentry, and joinery, among other things. The island has natural resources, but it also has a lot of arable land that can be used for agriculture (although much of it is mountainous). The island's fishing sector provides an essential source of protein.

 

Is Saint Helena Good for Business?

Saint Helena is a fantastic place to do business. There are no taxes or VAT on any new firm here; Saint Helena has adopted this approach. Setting up a business here could be ideal for you if you run an internet business and want to shift it to a safe location where income tax is non-existent. You can benefit from low corporate tax rates of 10% for local enterprises and 15% for foreign businesses in addition to having no income tax. Telecommunications prices are also relatively low, which makes running a business much easier. Overall, shifting your business here could be a wonderful chance for you if you want to establish a new business but don't want to pay excessive taxes on it.

 

Business-Friendly Policies and Government Initiatives of Saint Helena:

The government of Saint Helena has implemented a number of policies and efforts to support the establishment of businesses. Tax breaks, grants, and funding programmers, as well as regulatory improvements, are all available to help new businesses get off the ground. This article will walk you through the steps of starting a business in Saint Helena.

 

Saint Helena Industrial Infrastructure:

In terms of business opportunities, Saint Helena has a lot of potential for growth. The expansion of tourism has had a significant positive impact on our economy. It is critical for new businesses to be long-term viable. St Helena Airport (SHAG) will be able to provide new services after the island provides a sufficient airport. More enterprises should be able to set up or relocate from South Africa as a result of this. Along with increasing export potential, there has already been a surge in interest in conducting business here, which will only rise once flights commence. There are other intriguing initiatives here, such as a solar power plant and an aquaculture farm, which, if they go forward as planned, might produce work for people. With so much going on right now, now is an excellent moment to invest.

 

What are the steps for Starting a Business in Saint Helena?

You must submit an application form to the government of Saint Helena at least 90 days before you begin any business. Expect to wait up to three months for your application to be processed after it is submitted. The following is a list of documents that must be submitted.

1) Fill out an application (available from Immigration Office)

2) Passport or Certificate of Birth (original and photocopy)

3) Sponsor's Letter of Introduction

4) Two photos the size of a passport (taken within last 6 months). Backs of photos must be signed with name and date. A white background is required. 5) Police Report/Certificate of Clearance

6) Form for Medical Examination

7) A curriculum vitae is a document that contains information on a person'

8) Business proof of funds

9) Sponsor's financial statement or proof of capitalization

10) If available, a copy of the lease agreement or the title deed to the premises or land. If you don't have access to a computer, a note from your landlord indicating that they agree to rent you space would suffice. The necessary documents, as well as your application form and £50 fee, must be provided (non-refundable).

Your application will be evaluated only after all needed documents have been received and costs have been paid.

An official letter with a license number is issued for display business premises once it has been approved by the immigration authorities.

 

Market size of Saint Helena:

There are various sectors in Saint Helena where you can invest your time and money to make money. Because of its proximity to South Africa, industries like as transportation and shipping are viable choices. Which has the largest economy on the African continent as a whole. According to the World Bank, Saint Helena's Gross Domestic Product (GDP) was US$15.42 million, with a GDP per capita of US$12,000. Because it is an island nation, no one will be surprised by weather or infrastructural issues.

 

Industrial growth of Saint Helena:

Coffee, tourism, fishing, and the selling of alcoholic liqueurs are all sources of revenue for Saint Helena. Private jets and Medevac services have been able to use the international airport. In October 2017, scheduled commercial air service began. The airport is the island's largest single investment, with a total investment of £285 million. For the 2018–19 fiscal year, Saint Helena's gross domestic product (GDP) was £38.5 million, with GDP per capita of £7,392 and GNP per capita of £8,230. The annual rate of inflation in 2019 was 3.3 percent, with a median employment income of £8,410. Solomon’s and Co and Thorpe’s are the two largest private sector employers on the islands, providing services across the board. The government is working to build a long-term tourism industry that is less reliant on imports.


We can provide you detailed project reports on the following topics. Please select the projects of your interests.
Each detailed project reports cover all the aspects of business, from analysing the market, confirming availability of various necessities such as plant & machinery, raw materials to forecasting the financial requirements. The scope of the report includes assessing market potential, negotiating with collaborators, investment decision making, corporate diversification planning etc. in a very planned manner by formulating detailed manufacturing techniques and forecasting financial aspects by estimating the ost of raw material, formulating the cash flow statement, projecting the balance sheet etc.
We also offer self-contained Pre-Investment and Pre-Feasibility Studies, Market Surveys and Studies, Preparation of Techno-Economic Feasibility Reports, Identification and Selection of Plant and Machinery, Manufacturing Process and or Equipment required, General Guidance, Technical and Commercial Counseling for setting up new industrial projects on the following topics. Many of the engineers, project consultant & industrial consultancy firms in India and worldwide use our project reports as one of the input in doing their analysis.


We can modify the project capacity and project cost as per your requirement.
We can also prepare project report on any subject as per your requirement.

Add multiple items to inquiry

Select the items and then press Add to inquiry button

Sort by :
Biomedical Waste Recycling
Biomedical Waste Recycling

Biomedical waste is waste that is either putrescible or potentially infectious. Biomedical waste may also include waste associated with the generat... Read More

Capacity : Plastic Granules 3 MT/Day •Recycled Paper 3 MT/Day •Recycled Glass 1 MT/Day •Recycled Metal 0.50 MT/
Plant and Machinery cost: 214.00 Lakhs
Working Capital : 0.00
Rate of Return (ROR):26.65%
Break Even Point (BEP):52.47 %
TCI :1182.00 Lakhs
Cost of Project : 1182.00Lakhs
Add To Inquiry Basket
Bicycle Tubes
Bicycle Tubes

Bicycle tubes are the backbone of the bicycle industries. Few numbers of companies in organized sector are engaged in the quality grade cycles tyre... Read More

Capacity : Bicycle Tubes: 10,000 Nos. /Day
Plant and Machinery cost: 118.00 Lakhs
Working Capital : 0.00
Rate of Return (ROR):26.00%
Break Even Point (BEP):45.00 %
TCI :622.00 Lakhs
Cost of Project : 622.00Lakhs
Add To Inquiry Basket
Amino Acid Metal Chelates for Agriculture Use (Zinc, Ferrous, Copper, Manganese, Magnesium, Calcium)
Amino Acid Metal Chelates for Agriculture Use (Zinc, Ferrous, Copper, Manganese, Magnesium, Calcium)
Amino acid chelates consists of a metal ion comprising iron, zinc, manganese, magnesium, copper, calcium and mixtures thereof. These cheltaes are mos... Read More
Capacity :
Plant and Machinery cost: 161.00 Lakhs
Working Capital : 0.00
Rate of Return (ROR):41.00%
Break Even Point (BEP):47.00 %
TCI :502.00 Lakhs
Cost of Project : 502.00Lakhs
Add To Inquiry Basket
Disposable Plastic Syringes with Needles
Disposable Plastic Syringes with Needles

Disposable Syringes made of plastic ... Read More

Capacity : Syringes (1 ml) :14,000.0 Nos./Day.,Syringes (3 ml):14,000.0 Nos./Day.,Syringes (5 ml):14,000.0 Nos.
Plant and Machinery cost: 174.00 Lakhs
Working Capital : 0.00
Rate of Return (ROR):30.00%
Break Even Point (BEP):40.00 %
TCI :515.00 Lakhs
Cost of Project : 515.00Lakhs
Add To Inquiry Basket
Packaged Drinking Water
Packaged Drinking Water

Water is the necessity of our daily life, it’s so important for us that we need clean, safe and sanitary water every day, and us... Read More

Capacity : 210 Lakhs Nos. /annum
Plant and Machinery cost: 719.00 Lakhs
Working Capital : 0.00
Rate of Return (ROR):25.00%
Break Even Point (BEP):56.00 %
TCI :1736.00 Lakhs
Cost of Project : 1736.00Lakhs
Add To Inquiry Basket
Start Ferrosilicon Production Business
Start Ferrosilicon Production Business

Basically, ferrosilicon is a silica and iron alloy that comprises somewhere between 15% and 90% silicon. A "heat-blocker" c... Read More

Capacity : 26.7 MT per day
Plant and Machinery cost: 1900.00 Lakhs
Working Capital : 0.00
Rate of Return (ROR):26.00%
Break Even Point (BEP):63.00 %
TCI :0.00 Lakhs
Cost of Project : 3900.00Lakhs
Add To Inquiry Basket
Start Assembling of Lithium Ion Battery (Battery Assembly)
Start Assembling of Lithium Ion Battery (Battery Assembly)

 

A lithium-ion bat... Read More

Capacity : 48 Volt, 60 AH Lithium-Ion Battery Pack 10 Nos per day 48 Volt, 80 AH Lithium-Ion Battery Pack 10 No
Plant and Machinery cost: 165.00 Lakhs
Working Capital : 0.00
Rate of Return (ROR):29.00%
Break Even Point (BEP):67.00 %
TCI :0.00 Lakhs
Cost of Project : 538.00Lakhs
Add To Inquiry Basket
Business Plan- Disposable Plastic Syringes
Business Plan- Disposable Plastic Syringes

A syringe is a simple piston pump consisting of a plunger that fits tightly in a tube. The plunger can be pulled and pushed along inside a cylindri... Read More

Capacity : Disposable Plastic Syringes 2 ml Size: 700 Boxes / Day (Each Box = 100 Pcs) Disposable Plastic Syrin
Plant and Machinery cost: 420.00 Lakhs
Working Capital : 0.00
Rate of Return (ROR):22.00%
Break Even Point (BEP):53.00 %
TCI :0.00 Lakhs
Cost of Project : 981.00Lakhs
Add To Inquiry Basket
Set up an E-Waste Recycling Plant Waste Electrical & Electronic Equipment WEEE
Set up an E-Waste Recycling Plant Waste Electrical & Electronic Equipment WEEE

 

Electronic wastes,... Read More

Capacity : Plastic 1.60 MT per day Ferrous Material 1.00 MT per day Aluminium 0.70 MT per day Glass 1.00 MT per
Plant and Machinery cost: 86.00 Lakhs
Working Capital : 0.00
Rate of Return (ROR):27.47%
Break Even Point (BEP):60.15 %
TCI :0.00 Lakhs
Cost of Project : 314.00Lakhs
Add To Inquiry Basket
Start Profitable Industry of Lithium Ion Battery (Battery Assembly)
Start Profitable Industry of Lithium Ion Battery (Battery Assembly)

 

Lithium batteries ... Read More

Capacity : 48 Volt, 60 AH Lithium-Ion Battery Pack: 5.0 Nos per day 48 Volt, 80 AH Lithium-Ion Battery Pack:
Plant and Machinery cost: 72.00 Lakhs
Working Capital : 0.00
Rate of Return (ROR):29.95%
Break Even Point (BEP):70.65 %
TCI :0.00 Lakhs
Cost of Project : 293.00Lakhs
Add To Inquiry Basket
Active Pharma Ingredients (API) (Cephalexin, Ampicillin Trihydrate, Ibuprofen and Paracetamol)
Active Pharma Ingredients (API) (Cephalexin, Ampicillin Trihydrate, Ibuprofen and Paracetamol)

 

The Active Pharmaceutical Ingredient (API) is the part of any drug that produce... Read More

Capacity : Paracetamol: 500 Kgs / day Cephalexin : 500 Kgs / day Ampicillin Trihydrate: 500 Kgs / day Ibuprofen
Plant and Machinery cost: 347.00 Lakhs
Working Capital : 0.00
Rate of Return (ROR):32.00%
Break Even Point (BEP):52.00 %
TCI :0.00 Lakhs
Cost of Project : 1656.00Lakhs
Add To Inquiry Basket
Lithium Ion Battery
Lithium Ion Battery

Lithium-ion batteries are all about the movement of lithium ions: the ions move one way when the battery charges (when... Read More

Capacity : 90 Volt, 180 AH Lithium Ion Battery Pack:100,000 Nos per Annum
Plant and Machinery cost: 1017.00 Lakhs
Working Capital : 0.00
Rate of Return (ROR):34.00%
Break Even Point (BEP):52.00 %
TCI :0.00 Lakhs
Cost of Project : 4978.00Lakhs
Add To Inquiry Basket
Opportunities in Commercial Vehicles Dealership
Opportunities in Commercial Vehicles Dealership

Opportunities in Commercial Vehicles Dealership (Sale of Commercial Vehicles, Spares ... Read More

Capacity : 0
Plant and Machinery cost: 0.00 Lakhs
Working Capital : 0.00
Rate of Return (ROR):0.00%
Break Even Point (BEP):0.00 %
TCI :0.00 Lakhs
Cost of Project : 0.00Lakhs
Add To Inquiry Basket
E-Waste Recycling for Extraction of Precious Metals
E-Waste Recycling for Extraction of Precious Metals

E-Waste Recycling for Extraction of Precious Metals (Nickel, Tin & Zinc), Gold, S... Read More

Capacity : 0
Plant and Machinery cost: 0.00 Lakhs
Working Capital : 0.00
Rate of Return (ROR):0.00%
Break Even Point (BEP):0.00 %
TCI :0.00 Lakhs
Cost of Project : 0.00Lakhs
Add To Inquiry Basket
Hybrid Electric Scooter Assembling
Hybrid Electric Scooter Assembling

Plug-in hybrids (PHEVs) use an electric motor and battery that can be plugged into the power grid to charge the batter... Read More

Capacity : 15,000 Nos per Annum
Plant and Machinery cost: 95.00 Lakhs
Working Capital : 0.00
Rate of Return (ROR):33.00%
Break Even Point (BEP):73.00 %
TCI :0.00 Lakhs
Cost of Project : 279.00Lakhs
Add To Inquiry Basket
Bicycle Tyre & Tubes Production from Natural Rubber
Bicycle Tyre & Tubes Production from Natural Rubber

Bicycle Tyre & Tubes Production from Natural Rubber. How to Start a Tire and Tubes Manufacturing Business Read More

Capacity : 0
Plant and Machinery cost: 0.00 Lakhs
Working Capital : 0.00
Rate of Return (ROR):0.00%
Break Even Point (BEP):0.00 %
TCI :0.00 Lakhs
Cost of Project : 0.00Lakhs
Add To Inquiry Basket
Biomedical Waste Recycling Industry
Biomedical Waste Recycling Industry

Biomedical Waste Recycling Industry. Start a Medical or Hospital Waste Management Business Read More

Capacity : 0
Plant and Machinery cost: 0.00 Lakhs
Working Capital : 0.00
Rate of Return (ROR):0.00%
Break Even Point (BEP):0.00 %
TCI :0.00 Lakhs
Cost of Project : 0.00Lakhs
Add To Inquiry Basket
Bioplastic Film
Bioplastic Film

Biodegradable plastics are the type of plastics that undergo decomposition over a period of time under composting condition... Read More

Capacity : Bioplastic Film 25 Micron : 5000Kgs/Day
Plant and Machinery cost: 184.00 Lakhs
Working Capital : 0.00
Rate of Return (ROR):28.00%
Break Even Point (BEP):60.00 %
TCI :0.00 Lakhs
Cost of Project : 616.00Lakhs
Add To Inquiry Basket
Matchbox Manufacturing Business
Matchbox Manufacturing Business

Matchbox Manufacturing Business. Start a Match Box, Matchstick Factory. Safety Matche... Read More

Capacity : 0
Plant and Machinery cost: 0.00 Lakhs
Working Capital : 0.00
Rate of Return (ROR):0.00%
Break Even Point (BEP):0.00 %
TCI :0.00 Lakhs
Cost of Project : 0.00Lakhs
Add To Inquiry Basket
E-Rickshaw Assembling
E-Rickshaw Assembling

E-Rickshaws are three wheel battery operated vehicles, which are considered as an upgrade to c... Read More

Capacity : 4 Nos./Day
Plant and Machinery cost: 28.00 Lakhs
Working Capital : 0.00
Rate of Return (ROR):24.00%
Break Even Point (BEP):56.00 %
TCI :0.00 Lakhs
Cost of Project : 323.00Lakhs
Add To Inquiry Basket
Bioplastic Carry Bags and Garbage Bags
Bioplastic Carry Bags and Garbage Bags

BioPlastic shopping bags, carrier bags, or plastic grocery bags are a type of bioplastic bag used as shopping bags and... Read More

Capacity : Bioplastic Carry Bags (8"x16") Size: 3,500 Kgs per day Bioplastic Garbage Bags (950x810 mm) Size
Plant and Machinery cost: 62.00 Lakhs
Working Capital : 0.00
Rate of Return (ROR):30.00%
Break Even Point (BEP):59.00 %
TCI :0.00 Lakhs
Cost of Project : 396.00Lakhs
Add To Inquiry Basket
Production of Bioplastic Film using Biodegradable Resin
Production of Bioplastic Film using Biodegradable Resin

Production of Bioplastic Film using Biodegradable Resin, PLA (Polylactic Acid). Biode... Read More

Capacity : 0
Plant and Machinery cost: 0.00 Lakhs
Working Capital : 0.00
Rate of Return (ROR):0.00%
Break Even Point (BEP):0.00 %
TCI :0.00 Lakhs
Cost of Project : 0.00Lakhs
Add To Inquiry Basket
Solar Panel
Solar Panel

A solar panel is a collection of solar cells. Solar panel refers either to a photovoltaic module, a solar thermal ener... Read More

Capacity : 25 MW
Plant and Machinery cost: 161.00 Lakhs
Working Capital : 0.00
Rate of Return (ROR):54.00%
Break Even Point (BEP):28.00 %
TCI :0.00 Lakhs
Cost of Project : 804.00Lakhs
Add To Inquiry Basket
Wooden Furniture Manufacturing Industry
Wooden Furniture Manufacturing Industry

Wooden Furniture Manufacturing Industry. Furniture Production Factory. Most Profitable Wood Furniture Manufacturing Busine... Read More

Capacity : 0
Plant and Machinery cost: 0.00 Lakhs
Working Capital : 0.00
Rate of Return (ROR):0.00%
Break Even Point (BEP):0.00 %
TCI :0.00 Lakhs
Cost of Project : 0.00Lakhs
Add To Inquiry Basket
Agriculture Storage and Warehousing with Cold Storage
Agriculture Storage and Warehousing with Cold Storage

Agriculture Storage and Warehousing with Cold Storage- India Set to see Rs. 45,000 Crores Inve... Read More

Capacity : 0
Plant and Machinery cost: 0.00 Lakhs
Working Capital : 0.00
Rate of Return (ROR):0.00%
Break Even Point (BEP):0.00 %
TCI :0.00 Lakhs
Cost of Project : 0.00Lakhs
Add To Inquiry Basket
Bicycle and Cycle Rickshaw Manufacturing
Bicycle and Cycle Rickshaw Manufacturing

A Bicycle, is a human-powered, pedal-driven, single-track vehicle, having two wheels attached to a frame, one behind the ot... Read More

Capacity : Bicycles (Different Sizes) : 1000 Nos. /Day Cycle Rickshaw : 1000 Nos. Day
Plant and Machinery cost: 336.00 Lakhs
Working Capital : 0.00
Rate of Return (ROR):27.00%
Break Even Point (BEP):63.00 %
TCI :0.00 Lakhs
Cost of Project : 1525.00Lakhs
Add To Inquiry Basket
Medical Disposables (Gowns,Drapes)
Medical Disposables (Gowns,Drapes)

Medical Disposables (Gowns/Drapes)

Surgical gowns are worn by doctors and nurses ... Read More

Capacity : Surgeon Gowns : 250 Pcs./Day Pateint Gowns : 250 Pcs./Day Bed Sheets : 300 Pcs./Day Pillow Co
Plant and Machinery cost: 204.00 Lakhs
Working Capital : 0.00
Rate of Return (ROR):27.00%
Break Even Point (BEP):51.00 %
TCI :0.00 Lakhs
Cost of Project : 492.00Lakhs
Add To Inquiry Basket
E-Waste Recycling Plant
E-Waste Recycling Plant

Electronic wastes, "e-waste", "e-scrap", or "Waste Electrical and Electronic Equipment" ("WEEE") is a description of surplus, obsolete, broken or d... Read More

Capacity : Monitors : 5 Kgs /Day Plastic Granules : 2333.33 Kgs /Day Copper Wire Scraps : 13.33 Kgs /Day Gl
Plant and Machinery cost: 100.00 Lakhs
Working Capital : 0.00
Rate of Return (ROR):18.00%
Break Even Point (BEP):55.00 %
TCI :0.00 Lakhs
Cost of Project : 325.00Lakhs
Add To Inquiry Basket
Production of Micronutrients Fertilizer Manufacturing Plant, Detailed Project Report, Profile, Business Plan, Industry Trends, Market Research, Survey, Manufacturing Process, Machinery, Raw Materials, Feasibility Study, Investment Opportunities, Cost and Revenue, Plant Economics, Production Schedule, Working Capital Requirement, Plant Layout, Process Flow Sheet, Cost of Project, Projected Balance Sheets, Profitability Ratios, Break Even Analysis
Production of Micronutrients Fertilizer Manufacturing Plant, Detailed Project Report, Profile, Business Plan, Industry Trends, Market Research, Survey, Manufacturing Process, Machinery, Raw Materials, Feasibility Study, Investment Opportunities, Cost and Revenue, Plant Economics, Production Schedule, Working Capital Requirement, Plant Layout, Process Flow Sheet, Cost of Project, Projected Balance Sheets, Profitability Ratios, Break Even Analysis

Micronutrients are elements which are essential for plant growth, but are required in much smaller amounts than those of th... Read More

Capacity : Micronutrient Fertilizer for Fruits : 187,500 Kgs/annum Micronutrient Fertilizer for Vegetabl....
Plant and Machinery cost: 23.00 Lakhs
Working Capital : 0.00
Rate of Return (ROR):26.00%
Break Even Point (BEP):76.00 %
TCI :0.00 Lakhs
Cost of Project : 114.00Lakhs
Add To Inquiry Basket
Micronutrients Fertilizer
Micronutrients Fertilizer

Micronutrients are elements which are essential for plant growth, but are required in much smaller amounts than those of th... Read More

Capacity : Micronutrient Fertilizer for Fruits : 187,500 Kgs/annum Micronutrient Fertilizer for Vegetabl
Plant and Machinery cost: 23.00 Lakhs
Working Capital : 0.00
Rate of Return (ROR):26.00%
Break Even Point (BEP):76.00 %
TCI :0.00 Lakhs
Cost of Project : 114.00Lakhs
Add To Inquiry Basket
PACKAGED DRINKING WATER, SODA WATER AND PET BOTTLES
PACKAGED DRINKING WATER, SODA WATER AND PET BOTTLES

Bottled water industry, colloquially called, the mineral water industry, is a symbol of new life style emerging in India. While a large segment of... Read More

Capacity : 0
Plant and Machinery cost: 403.00 Lakhs
Working Capital : 0.00
Rate of Return (ROR):44.00%
Break Even Point (BEP):60.00 %
TCI :695.00 Lakhs
Cost of Project : 695.00Lakhs
Add To Inquiry Basket
Bicycle Manufacturing
Bicycle Manufacturing

A bicycle, is a human-powered, pedal-driven, single-track vehicle, having two wheels attached to a frame, one behind the other. A bicycle rider is ... Read More

Capacity : Bicycles (Different Sizes):2000 Nos./Day
Plant and Machinery cost: 270.00 Lakhs
Working Capital : 0.00
Rate of Return (ROR):26.39%
Break Even Point (BEP):31.24 %
TCI :3972.00 Lakhs
Cost of Project : 3972.00Lakhs
Add To Inquiry Basket
Solar Panel
Solar Panel

A solar panel is a collection of solar cells. Lots of small solar cells spread over a large area can work together to provide enough power to be us... Read More

Capacity : Solar Panel 5MW/Annum
Plant and Machinery cost: 109.00 Lakhs
Working Capital : 0.00
Rate of Return (ROR):25.00%
Break Even Point (BEP):62.00 %
TCI :450.00 Lakhs
Cost of Project : 450.00Lakhs
Add To Inquiry Basket
Disposable Plastic Syringes
Disposable Plastic Syringes

A syringe is a simple piston pump co... Read More

Capacity : Syringes (2 ml) : 90 Lakh Nos. /Annum,Syringes (5 ml) : 90 Lakh Nos. /Annum
Plant and Machinery cost: 245.00 Lakhs
Working Capital : 0.00
Rate of Return (ROR):26.00%
Break Even Point (BEP):46.00 %
TCI :455.00 Lakhs
Cost of Project : 455.00Lakhs
Add To Inquiry Basket
E–Waste Recycling Plant
E–Waste Recycling Plant

Electronic wastes, "e-waste", "e-scrap", or "Waste Electrical and Electronic Equipment" ("WEEE") is a description of surplus, obsolete, broken or d... Read More

Capacity : 2164500 Kgs /Annum
Plant and Machinery cost: 233.00 Lakhs
Working Capital : 0.00
Rate of Return (ROR):28.00%
Break Even Point (BEP):46.00 %
TCI :526.00 Lakhs
Cost of Project : 526.00Lakhs
Add To Inquiry Basket
E - WASTE RECYCLING  Electronic Waste, E Waste, E scrap, or Waste Electrical and Electronic Equipment (weee)
E - WASTE RECYCLING Electronic Waste, E Waste, E scrap, or Waste Electrical and Electronic Equipment (weee)

E waste is a popular, informal name for electronic products nearing the end of their useful life. Computers, televisions, VCRs, stereos, copiers, a... Read More

Capacity :
Plant and Machinery cost: 219.00 Lakhs
Working Capital : 0.00
Rate of Return (ROR):24.00%
Break Even Point (BEP):46.00 %
TCI :489.00 Lakhs
Cost of Project : 489.00Lakhs
Add To Inquiry Basket
Disposable Plastic Syringes
Disposable Plastic Syringes

A syringe is a simple piston pump co... Read More

Capacity : -
Plant and Machinery cost: 113.00 Lakhs
Working Capital : 0.00
Rate of Return (ROR):27.00%
Break Even Point (BEP):46.00 %
TCI :288.00 Lakhs
Cost of Project : 288.00Lakhs
Add To Inquiry Basket
Oxygen and Nitrogen Gas Plant
Oxygen and Nitrogen Gas Plant

Liquid oxygen must be handled with all the precaution required for safety with any cryogenic fluid. Gaseous Oxygen is authorized for shipment in cy... Read More

Capacity : 4152 cum/Day
Plant and Machinery cost: 105.00 Lakhs
Working Capital : 0.00
Rate of Return (ROR):23.00%
Break Even Point (BEP):58.00 %
TCI :286.00 Lakhs
Cost of Project : 286.00Lakhs
Add To Inquiry Basket
E–WASTE RECYCLING PLANT
E–WASTE RECYCLING PLANT

E-waste is a popular, informal name for electronic products nearing the end of their useful life. Computers, televisions, VCRs, stereos, copiers,... Read More

Capacity : 2164500 kgs. /annum
Plant and Machinery cost: 233.00 Lakhs
Working Capital : 0.00
Rate of Return (ROR):22.00%
Break Even Point (BEP):49.00 %
TCI :500.00 Lakhs
Cost of Project : 500.00Lakhs
Add To Inquiry Basket
Disposable Plastic Syringes
Disposable Plastic Syringes

It is an instrument which is used fo... Read More

Capacity : 180 Lakh Nos. /annum
Plant and Machinery cost: 245.00 Lakhs
Working Capital : 0.00
Rate of Return (ROR):26.00%
Break Even Point (BEP):46.00 %
TCI :455.00 Lakhs
Cost of Project : 455.00Lakhs
Add To Inquiry Basket
Disposable Plastic Syringes
Disposable Plastic Syringes

A syringe is a simple piston pump co... Read More

Capacity : 33600 NOS./Day
Plant and Machinery cost: 112.00 Lakhs
Working Capital : 0.00
Rate of Return (ROR):30.00%
Break Even Point (BEP):44.00 %
TCI :287.00 Lakhs
Cost of Project : 287.00Lakhs
Add To Inquiry Basket
Disposable Plastic Cups, Plates & Glasses
Disposable Plastic Cups, Plates & Glasses

The plastic industry in India plays a very important and key role in Industrializations. A wide spectrum of plastics and articles manufactured by t... Read More

Capacity : 1354 Lakh Pcs./annum
Plant and Machinery cost: 51.00 Lakhs
Working Capital : 0.00
Rate of Return (ROR):40.87%
Break Even Point (BEP):45.83 %
TCI :216.00 Lakhs
Cost of Project : 216.00Lakhs
Add To Inquiry Basket
DISPOSABLE PLASTIC SYRINGES
DISPOSABLE PLASTIC SYRINGES

Disposable plastic syringes are a gre... Read More

Capacity : 0
Plant and Machinery cost: 0.00 Lakhs
Working Capital : 0.00
Rate of Return (ROR):0.00%
Break Even Point (BEP):0.00 %
TCI :0.00 Lakhs
Cost of Project : 0.00Lakhs
Add To Inquiry Basket
PACKAGED DRINKING WATER WITH PET BOTTLES
PACKAGED DRINKING WATER WITH PET BOTTLES

Bottled Water means water intended for human consumption and which is sealed in bottles and other containers with no added ingredients except that ... Read More

Capacity : 60000000 Nos. Bottles/Annum
Plant and Machinery cost: 217.00 Lakhs
Working Capital : 0.00
Rate of Return (ROR):45.00%
Break Even Point (BEP):60.00 %
TCI :456.00 Lakhs
Cost of Project : 456.00Lakhs
Add To Inquiry Basket
BICYCLE TUBES AND MOTORCYCLE TUBES
BICYCLE TUBES AND MOTORCYCLE TUBES

Bicycle and motorcycle tubes are the backbone of the bicycle and motorcycle industries. Few numbers of companies in the organized sectors are engag... Read More

Capacity : 300000 Nos. Bicycle Tubes, 300000 Nos. Motorcycle Tubes
Plant and Machinery cost: 105.00 Lakhs
Working Capital : 0.00
Rate of Return (ROR):43.00%
Break Even Point (BEP):50.00 %
TCI :240.00 Lakhs
Cost of Project : 240.00Lakhs
Add To Inquiry Basket
DISPOSABLE PLASTIC SYRINGES
DISPOSABLE PLASTIC SYRINGES

Disposable needle is widely used by d... Read More

Capacity : 40000 Nos./Day (Disposable Plastic Syringes)
Plant and Machinery cost: 0.00 Lakhs
Working Capital : 0.00
Rate of Return (ROR):0.00%
Break Even Point (BEP):0.00 %
TCI :0.00 Lakhs
Cost of Project : 0.00Lakhs
Add To Inquiry Basket
PACKAGED DRINKING WATER, SODA WATER AND PET BOTTLES
PACKAGED DRINKING WATER, SODA WATER AND PET BOTTLES

Bottled Water means water intended for human consumption and which is sealed in bottles and other containers with no added ingredients except that ... Read More

Capacity : Drinking Water – 17280000 Nos. Bottles (1 Ltr.)/Annum,Soda Water – 1008000 Nos. Bottles (600 Ml)
Plant and Machinery cost: 403.00 Lakhs
Working Capital : 0.00
Rate of Return (ROR):44.00%
Break Even Point (BEP):60.00 %
TCI :695.00 Lakhs
Cost of Project : 695.00Lakhs
Add To Inquiry Basket
DISPOSABLE PLASTIC SYRINGES
DISPOSABLE PLASTIC SYRINGES

Disposable syringes are a great inno... Read More

Capacity : Plastic Syringe 3 ml size 6000000 Nos./Annum,Syringe 5 ml Size 6000000 Nos./Annum,Syringe 10 ml Si
Plant and Machinery cost: 101.00 Lakhs
Working Capital : 0.00
Rate of Return (ROR):36.00%
Break Even Point (BEP):45.00 %
TCI :209.00 Lakhs
Cost of Project : 209.00Lakhs
Add To Inquiry Basket
Packaged Drinking Water with Pet Glasses (250 ml) (Automatic Plant)
Packaged Drinking Water with Pet Glasses (250 ml) (Automatic Plant)

Almost a decade ago, the introduction of bottled water or packaged water has changed the traditional of serving and consuming drinking water. Accor... Read More

Capacity : 128000 Packs/Day
Plant and Machinery cost: 219.00 Lakhs
Working Capital : 0.00
Rate of Return (ROR):20.00%
Break Even Point (BEP):59.00 %
TCI :323.00 Lakhs
Cost of Project : 323.00Lakhs
Add To Inquiry Basket
Packaged Drinking Water with Pet Bottles (1 ltr) (Automatic Plant)
Packaged Drinking Water with Pet Bottles (1 ltr) (Automatic Plant)

Bottled Water means water intended for human consumption and which is sealed in bottles and other containers with no added ingredients except that ... Read More

Capacity : 32,000 Ltrs/Day
Plant and Machinery cost: 221.00 Lakhs
Working Capital : 0.00
Rate of Return (ROR):19.00%
Break Even Point (BEP):60.00 %
TCI :327.00 Lakhs
Cost of Project : 327.00Lakhs
Add To Inquiry Basket
Detergent cake, Powder and Dish washing Detergent cake and Powder
Detergent cake, Powder and Dish washing Detergent cake and Powder

Soaps are the earliest form of detergents. Though at present the term detergent is used for synthetic detergent derived from petroleum products. Th... Read More

Capacity : Detergent Cake, Powder, Dish washing Cake & Powder Each 1 MT/Day = 4 MT/Day
Plant and Machinery cost: 28.00 Lakhs
Working Capital : 0.00
Rate of Return (ROR):47.00%
Break Even Point (BEP):37.00 %
TCI :239.00 Lakhs
Cost of Project : 239.00Lakhs
Add To Inquiry Basket
MATCHBOX
MATCHBOX

Matchbox is one of the most important items. Though it is looked upon as small and insignificant, earlier it was a big problem. In the 17th century... Read More

Capacity : 50000 Nos. /Day
Plant and Machinery cost: 5.00 Lakhs
Working Capital : 0.00
Rate of Return (ROR):46.00%
Break Even Point (BEP):52.00 %
TCI :29.00 Lakhs
Cost of Project : 29.00Lakhs
Add To Inquiry Basket
Packaged Drinking Water
Packaged Drinking Water

Bisleri, which pioneered the packaged drinking water business in India, catering to consumers need to have hygienic drinking water while on the mov... Read More

Capacity : 30,000 Thousand Nos./Annum or 1,00,000 Bottles /day
Plant and Machinery cost: 105.00 Lakhs
Working Capital : 0.00
Rate of Return (ROR):44.00%
Break Even Point (BEP):63.00 %
TCI :282.00 Lakhs
Cost of Project : 282.00Lakhs
Add To Inquiry Basket
FISH OIL (Production and Refining) with Fish Meal
FISH OIL (Production and Refining) with Fish Meal

Fish is used as a source of food either in raw or dry state. It has protein which is amino acids. Another means of utilization of fish is the manuf... Read More

Capacity : 1 MT/day Fish Oil. 2.3 MT/day Fish Meal.
Plant and Machinery cost: 63.00 Lakhs
Working Capital : 0.00
Rate of Return (ROR):48.00%
Break Even Point (BEP):34.00 %
TCI :219.00 Lakhs
Cost of Project : 219.00Lakhs
Add To Inquiry Basket
PACKAGED DRINKING WATER
PACKAGED DRINKING WATER

Water quality and quantity are interdependent, interacting elements of water system. The term water quality refers to the level of suitability of w... Read More

Capacity : 10000 Ltrs./day
Plant and Machinery cost: 60.00 Lakhs
Working Capital : 0.00
Rate of Return (ROR):43.00%
Break Even Point (BEP):40.00 %
TCI :180.00 Lakhs
Cost of Project : 180.00Lakhs
Add To Inquiry Basket
Paper Napkins, Facial Paper & Toilet Rolls From Tissue Paper Rolls
Paper Napkins, Facial Paper & Toilet Rolls From Tissue Paper Rolls

Due to Govt. emphasis for popularizing tourism, number of new hotels, holiday resorts, restaurants etc. have demand of paper conversion products li... Read More

Capacity : 2 Mt Toilet Rolls, 2 Mt Facial Paper, 6 Mt Paper Napkin (Per Day)
Plant and Machinery cost: 41.00 Lakhs
Working Capital : 0.00
Rate of Return (ROR):69.00%
Break Even Point (BEP):23.00 %
TCI :600.00 Lakhs
Cost of Project : 600.00Lakhs
Add To Inquiry Basket
Disposable Plastic Cups, Plates and Glasses
Disposable Plastic Cups, Plates and Glasses

The plastic in India plays a very important key role in industrialization. A wide spectrum of plastics and its articles have touched the life of ev... Read More

Capacity : 50,000 Plastics Glass, 25,000 Plastics Cups
Plant and Machinery cost: 25.00 Lakhs
Working Capital : 0.00
Rate of Return (ROR):39.00%
Break Even Point (BEP):51.00 %
TCI :69.00 Lakhs
Cost of Project : 69.00Lakhs
Add To Inquiry Basket
Detergent Cake & Washing Powder
Detergent Cake & Washing Powder

Detergent are complete washing or cleaning products. The synthetic detergent industry is one of the largest chemical process industries. Some impor... Read More

Capacity : 600 Kgs/ Day
Plant and Machinery cost: 3.00 Lakhs
Working Capital : 12.00
Rate of Return (ROR):35.06%
Break Even Point (BEP):55.03 %
TCI :28.00 Lakhs
Cost of Project : 28.00Lakhs
Add To Inquiry Basket
Fish Meal
Fish Meal

Fish Meal is a dry & easily stored product forming a valuable ingredient of the rations of farm animals, particularly young pigs & poultry.... Read More

Capacity : 30 Ton/Day
Plant and Machinery cost: 11.00 Lakhs
Working Capital : 144.00
Rate of Return (ROR):50.00%
Break Even Point (BEP):32.00 %
TCI :209.00 Lakhs
Cost of Project : 209.00Lakhs
Add To Inquiry Basket
Medical Devices & Disposables Industry in India (Disposable Plastic Syringes, Disposable Mask & Gloves, Blood Bags, X-Ray, Ultrasound, ECG, Pacemakers, IV Fluid Sets and Other Devices) Market Analysis, Trends & Opportunities, Growth Drivers, SWOT Analysis, Industry Size, Outlook and Forecasts Up to 2023
Medical Devices & Disposables Industry in India (Disposable Plastic Syringes, Disposable Mask & Gloves, Blood Bags, X-Ray, Ultrasound, ECG, Pacemakers, IV Fluid Sets and Other Devices) Market Analysis, Trends & Opportunities, Growth Drivers, SWOT Analysis, Industry Size, Outlook and Forecasts Up to 2023

Medical Devices & Disposables Industry in India (Disposable Plastic Syringes, Disposable ... Read More

Capacity : 0
Plant and Machinery cost: 0.00 Lakhs
Working Capital : 0.00
Rate of Return (ROR):0.00%
Break Even Point (BEP):0.00 %
TCI :0.00 Lakhs
Cost of Project : 0.00Lakhs
Add To Inquiry Basket
NameCapacityRate of return (ROR):Cost of project
A Business Plan For Sanit... Sanitary Napkins 4,800 PKTS per day 27.00 84.00
Start Manufacturing Of Bl... - 32.00 985.00
Start Production Of Potat... Potato Flakes 2 MT Per Day 25.00 563.00
Setup Manufacturing Unit ... Saddle 7,000 Unit Per Day Pedals 10,000 Unit Per Day 31.00 575.00
Opportunity in Sodium Sul... Sodium Sulfide Flakes 10,000 MT Per Annum 30.00 1426.00
Business Plan for Lithium... - 29.00 812.00
Start Manufacturing Busin... Cargo Containers (Size 20 Feet) 34 Nos Per Day 29.00 1992.00
Start Cutting and Grindin... Cutting Disc Size: (115 mm x 1 mm) 2,000 Pcs Pr Day Grinding Disc (115 mm x 6 mm) 2,000 Pcs Pr Day 28.00 423.00
Mink Blankets Production - 27.00 6000.00
A Business Plan for Micro... Micronutrient Fortified Energy Dense Food 100 MT Per Day 28.00 3500.00
Start Business of Caustic... - 25.00 56500.00
Start Crumb Rubber Powder... Crumb Rubber Powder 10 MT Per Day By Product Steel Wire 2 MT Per Day 26.00 303.00
Ferrochrome Manufacturing... Ferrochrome 135 MT Per Day 10.00 40400.00
Start a Business Of LPG C... LPG Cylinders (14.20 Kgs Size) 3,334.0 Nos. per day LPG Cylinders (19 Kgs Size) 3,334.0 Nos. per day 32.00 3475.00
Start Banana Wine Product... Banana Wine (750 ml size Bollte) 2,960 Bottles per day 25.00 1189.00
Activated Carbon From Ric... Activated Carbon 2,000 Kg Per Day 25.00 606.00
Set Up Activated Carbon F... Activated Carbon 2,000 Kg Per Day 25.00 606.00
Set Up Business of Flat G... 0 0.00 0.00
Set Up Business of Double... 0 0.00 0.00
A Business Plan for Bio-D... 10,000 MT Per Annum 28.00 8100.00
Sulphur Powder Manufactur... 20,000 MT Per Annum 24.00 4318.00
Manufacturing Business Gi... 60,000 Kg. Per Annum , 1,44,000 Kg. Per Annum 28.00 528.00
Start a Business of Manuf... 1,500 Dz. Per Annum 35.00 34.00
Start Activated Carbon fr... 0 0.00 0.00
Most Demandable Business ... 0 0.00 0.00
Cumin, Turmeric, Chilly &... 0 0.00 0.00
Start Production Of Wire ... Wire Nails: 48,000 MT Per Annum, Wire Scraps: 4,500 MT Per Annum 30.00 1736.00
Auto Brake Pad and Auto... Auto Brake Pads 3,600,000 Nos. Per Annum Auto Brake Shoes 720,000 Nos. Per Annum 27.00 1422.00
Business Plan for Product... Double Wall Vacuum Steel Bottles 600,000 Bottles Per Annum Single Wall Vacuum Steel Bottles 600,0 28.00 1619.00
A Business Plan for Ferri... Ferric Pyrophosphate 600 MT Per Annum 31.00 133.00
12345678910...

Showing 121 - 180 of 574 Product(s)

Subject of your Interest

Information

  • One Lac / Lakh / Lakhs is equivalent to one hundred thousand (100,000)
  • One Crore is equivalent to ten million (10,000,000)
  • T.C.I is Total Capital Investment
  • We can modify the project capacity and project cost as per your requirement.
  • We can also prepare project report on any subject as per your requirement.
  • Caution: The project's cost, capacity and return are subject to change without any notice. Future projects may have different values of project cost, capacity or return.

ABOUT NPCS

 

NIIR PROJECT CONSULTANCY SERVICES (NPCS) is a reliable name in the industrial world for offering integrated technical consultancy services. NPCS is manned by engineers, planners, specialists, financial experts, economic analysts and design specialists with extensive experience in the related industries.

Our various services are: Detailed Project Report,  Business Plan for Manufacturing Plant, Start-up Ideas, Business Ideas for Entrepreneurs, Start up Business Opportunities, entrepreneurship projects, Successful Business Plan, Industry Trends, Market Research, Manufacturing Process, Machinery, Raw Materials, project report, Cost and Revenue, Pre-feasibility study for Profitable Manufacturing Business, Project Identification, Project Feasibility and Market Study, Identification of Profitable Industrial Project Opportunities, Business Opportunities, Investment Opportunities for Most Profitable Business in India, Manufacturing Business Ideas, Preparation of Project Profile, Pre-Investment and Pre-Feasibility Study, Market Research Study, Preparation of Techno-Economic Feasibility Report, Identification and Section of Plant, Process, Equipment, General Guidance, Startup Help, Technical and Commercial Counseling for setting up new industrial project and Most Profitable Small Scale Business.

NPCS also publishes varies process technology, technical, reference, self employment and startup books, directory, business and industry database, bankable detailed project report, market research report on various industries, small scale industry and profit making business. Besides being used by manufacturers, industrialists and entrepreneurs, our publications are also used by professionals including project engineers, information services bureau, consultants and project consultancy firms as one of the input in their research.

Our Detailed Project report aims at providing all the critical data required by any entrepreneur vying to venture into Project. While expanding a current business or while venturing into new business, entrepreneurs are often faced with the dilemma of zeroing in on a suitable product/line.

 


And before diversifying/venturing into any product, wish to study the following aspects of the identified product:


• Good Present/Future Demand
• Export-Import Market Potential
• Raw Material & Manpower Availability
• Project Costs and Payback Period


We at NPCS, through our reliable expertise in the project consultancy and market research field, Provides exhaustive information about the project, which satisfies all the above mentioned requirements and has high growth potential in the markets. And through our report we aim to help you make sound and informed business decision.

 

The report contains all the data which will help an entrepreneur find answers to questions like:

• Why I should invest in this project?
• What will drive the growth of the product?
• What are the costs involved?
• What will be the market potential?


The report first focuses on enhancing the basic knowledge of the entrepreneur about the main product, by elucidating details like product definition, its uses and applications, industry segmentation as well as an overall overview of the industry sector in India. The report then helps an entrepreneur identify the target customer group of its product. It further helps in making sound investment decision by listing and then elaborating on factors that will contribute to the growth of product consumption in India and also talks about the foreign trade of the product along with the list of top importing and top exporting countries. Report includes graphical representation and forecasts of key data discussed in the above mentioned segment. It further explicates the growth potential of the product.

The report includes other market data like key players in the Industry segment along with their contact information and recent developments. It includes crucial information like raw material requirements, list of machinery and manufacturing process for the plant. Core project financials like plant capacity, costs involved in setting up of project, working capital requirements, projected revenue and profit are further listed in the report.


Reasons for buying the report:

• This report helps you to identify a profitable project for investing or diversifying into by throwing light to crucial areas like industry size, demand of the product and reasons for investing in the product.

• This report provides vital information on the product like its definition, characteristics and segmentation.

• This report helps you market and place the product correctly by identifying the target customer group of the product.

• This report helps you understand the viability of the project by disclosing details like raw materials required, manufacturing process, project costs and snapshot of other project financials.

• The report provides forecasts of key parameters which helps to anticipate the industry performance and make sound business decision.

 

Our Approach:


• Our research reports broadly cover Indian markets, present analysis, outlook and forecast.

• The market forecasts are developed on the basis of secondary research and are cross-validated through interactions with the industry players. 

• We use reliable sources of information and databases.  And information from such sources is processed by us and included in the report.

 

Our Market Survey cum Detailed Techno Economic Feasibility Report Contains following information:

 

 

Ø  Introduction

·         Project Introduction

·         Project Objective and Strategy

·         Concise History of the Product

·         Properties

·         BIS (Bureau of Indian Standards) Provision & Specification

·         Uses & Applications

 

Ø  Market Study and Assessment

·         Current Indian Market Scenario

·         Present Market Demand and Supply

·         Estimated Future Market Demand and Forecast

·         Statistics of Import & Export

·         Names & Addresses of Existing Units (Present Players)

·         Market Opportunity

 

Ø  Raw Material

·         List of Raw Materials

·         Properties of Raw Materials

·         Prescribed Quality of Raw Materials

·         List of Suppliers and Manufacturers

 

Ø  Personnel (Manpower) Requirements

·         Requirement of Staff & Labor (Skilled and Unskilled) Managerial, Technical, Office Staff and Marketing Personnel

 

Ø  Plant and Machinery

·         List of Plant & Machinery

·         Miscellaneous Items

·         Appliances & Equipments

·         Laboratory Equipments & Accessories

·         Electrification

·         Electric Load & Water

·         Maintenance Cost

·         Sources of Plant & Machinery (Suppliers and Manufacturers)

 

Ø  Manufacturing Process and Formulations

·         Detailed Process of Manufacture with Formulation

·         Packaging Required

·         Process Flow Sheet Diagram

 

Ø  Infrastructure and Utilities

·         Project Location

·         Requirement of Land Area

·         Rates of the Land

·         Built Up Area

·         Construction Schedule

·         Plant Layout and Requirement of Utilities

 

Project at a Glance

Along with financial details as under:

 

  •     Assumptions for Profitability workings

  •    Plant Economics

  •    Production Schedule

  •    Land & Building

            Factory Land & Building

            Site Development Expenses

  •    Plant & Machinery

             Indigenous Machineries

            Other Machineries (Miscellaneous, Laboratory etc.)

  •    Other Fixed Assets

            Furniture & Fixtures

            Pre-operative and Preliminary Expenses

            Technical Knowhow

            Provision of Contingencies

  •   Working Capital Requirement Per Month

             Raw Material

            Packing Material

            Lab & ETP Chemical Cost

           Consumable Store

  •   Overheads Required Per Month And Per Annum

         Utilities & Overheads (Power, Water and Fuel Expenses etc.)

             Royalty and Other Charges

            Selling and Distribution Expenses

  •    Salary and Wages

  •    Turnover Per Annum

  •   Share Capital

            Equity Capital

            Preference Share Capital

 

  •    Annexure 1:: Cost of Project and Means of Finance

  •    Annexure 2::  Profitability and Net Cash Accruals

                Revenue/Income/Realisation

                Expenses/Cost of Products/Services/Items

                Gross Profit

                Financial Charges     

                Total Cost of Sales

                Net Profit After Taxes

                Net Cash Accruals

  •   Annexure 3 :: Assessment of Working Capital requirements

                Current Assets

                Gross Working. Capital

                Current Liabilities

                Net Working Capital

                Working Note for Calculation of Work-in-process

  •    Annexure 4 :: Sources and Disposition of Funds

  •    Annexure 5 :: Projected Balance Sheets

                ROI (Average of Fixed Assets)

                RONW (Average of Share Capital)

                ROI (Average of Total Assets)

  •    Annexure 6 :: Profitability ratios

                D.S.C.R

                Earnings Per Share (EPS)

               

             Debt Equity Ratio

        Annexure 7   :: Break-Even Analysis

                Variable Cost & Expenses

                Semi-Var./Semi-Fixed Exp.

                Profit Volume Ratio (PVR)

                Fixed Expenses / Cost 

                B.E.P

  •   Annexure 8 to 11:: Sensitivity Analysis-Price/Volume

            Resultant N.P.B.T

            Resultant D.S.C.R

   Resultant PV Ratio

   Resultant DER

  Resultant ROI

          Resultant BEP

  •    Annexure 12 :: Shareholding Pattern and Stake Status

        Equity Capital

        Preference Share Capital

  •   Annexure 13 :: Quantitative Details-Output/Sales/Stocks

        Determined Capacity P.A of Products/Services

        Achievable Efficiency/Yield % of Products/Services/Items 

        Net Usable Load/Capacity of Products/Services/Items   

       Expected Sales/ Revenue/ Income of Products/ Services/ Items   

  •    Annexure 14 :: Product wise domestic Sales Realisation

  •    Annexure 15 :: Total Raw Material Cost

  •    Annexure 16 :: Raw Material Cost per unit

  •    Annexure 17 :: Total Lab & ETP Chemical Cost

  •    Annexure 18  :: Consumables, Store etc.,

  •    Annexure 19  :: Packing Material Cost

  •    Annexure 20  :: Packing Material Cost Per Unit

  •    Annexure 21 :: Employees Expenses

  •    Annexure 22 :: Fuel Expenses

  •    Annexure 23 :: Power/Electricity Expenses

  •    Annexure 24 :: Royalty & Other Charges

  •    Annexure 25 :: Repairs & Maintenance Exp.

  •    Annexure 26 :: Other Mfg. Expenses

  •    Annexure 27 :: Administration Expenses

  •    Annexure 28 :: Selling Expenses

  •    Annexure 29 :: Depreciation Charges – as per Books (Total)

  •   Annexure 30   :: Depreciation Charges – as per Books (P & M)

  •   Annexure 31   :: Depreciation Charges - As per IT Act WDV (Total)

  •   Annexure 32   :: Depreciation Charges - As per IT Act WDV (P & M)

  •   Annexure 33   :: Interest and Repayment - Term Loans

  •   Annexure 34   :: Tax on Profits

  •   Annexure 35   ::Projected Pay-Back Period And IRR