The service sector is the largest contributor to GDP in India. Thissector accounts for 54 per cent of economic output and grew by an unprecedented 9.8 per cent. IMF forecast estimates that by 2010 this will be around 58 per cent, on par with a midlevel developed country. The service sector has been driven by IT exports which have grown at a CAGR of 26 per cent over the last 4 years. This was mainly the result of significant increases in the demand for domestic services.

As per the statistics of developed countries, services account for around 75 per cent of the jobs and 70 per cent of the Gross National Product (GNP) capital. In the industrial market, many services are offered to facilitate the process of production, finance and marketing. Manufacturers, wholesalers and retailers sell some services along with goods. They buy many services in the conduct of their business. There are specialized services firms selling their services to the industry. Industry requires the services of transport, storage, finance, insurance and communication, as these facilitate business operations. The service sector comprises trade, hotels and restaurants, transport, storage, communication, financing, insurance, real estate and business services, community services (public administration and defence) and other services. This sector provides services of final consumption nature as well as intermediate nature, the latter accounting for a major share. Substantial parts of services such as transport and communications are in the form of intermediate inputs for production of other goods and services. A growing urbanization too has contributed to the growth in service sector.


We can provide you detailed project reports on the following topics. Please select the projects of your interests.
Each detailed project reports cover all the aspects of business, from analysing the market, confirming availability of various necessities such as plant & machinery, raw materials to forecasting the financial requirements. The scope of the report includes assessing market potential, negotiating with collaborators, investment decision making, corporate diversification planning etc. in a very planned manner by formulating detailed manufacturing techniques and forecasting financial aspects by estimating the ost of raw material, formulating the cash flow statement, projecting the balance sheet etc.
We also offer self-contained Pre-Investment and Pre-Feasibility Studies, Market Surveys and Studies, Preparation of Techno-Economic Feasibility Reports, Identification and Selection of Plant and Machinery, Manufacturing Process and or Equipment required, General Guidance, Technical and Commercial Counseling for setting up new industrial projects on the following topics. Many of the engineers, project consultant & industrial consultancy firms in India and worldwide use our project reports as one of the input in doing their analysis.


We can modify the project capacity and project cost as per your requirement.
We can also prepare project report on any subject as per your requirement.

Add multiple items to inquiry

Select the items and then press Add to inquiry button

Sort by :
Conversion of Industrial Vitrified Tiles into Commercial Vitrified Tiles
Conversion of Industrial Vitrified Tiles into Commercial Vitrified Tiles

Industrial Vitrified tiles are largely used in the industrial floor or wall construction. In the industrial vitrification processed tiles are not c... Read More

Capacity : 300,00,000 Sq. Ft./Annum
Plant and Machinery cost: 300.00 Lakhs
Working Capital : 2200.00
Rate of Return (ROR):49.00%
Break Even Point (BEP):71.00 %
TCI :2700.00 Lakhs
Cost of Project : 2700.00Lakhs
Add To Inquiry Basket
Residential School
Residential School

Compulsory state education begins at 5 years but permissive legislation allows local education authorities to build also for children of 3-5 years,... Read More

Capacity : 700 student/Annum
Plant and Machinery cost: 209.00 Lakhs
Working Capital : 0.00
Rate of Return (ROR):11.63%
Break Even Point (BEP):70.62 %
TCI :687.00 Lakhs
Cost of Project : 687.00Lakhs
Add To Inquiry Basket
Start a Skill Development Training Centre
Start a Skill Development Training Centre

Start a Skill Development Training Centre. A Lucrative Business Opportunity.

Read More

Capacity : 0
Plant and Machinery cost: 0.00 Lakhs
Working Capital : 0.00
Rate of Return (ROR):0.00%
Break Even Point (BEP):0.00 %
TCI :0.00 Lakhs
Cost of Project : 0.00Lakhs
Add To Inquiry Basket
Disposable Nitrile Gloves (Powder Free)
Disposable Nitrile Gloves (Powder Free)

Nitrile gloves are a type of disposable gloves made from synthetic rubber, this means there is no risk of latex ... Read More

Capacity : Disposable Nitrile Gloves (Powder Free): 500,000.0 Pcs. / day
Plant and Machinery cost: 1321.00 Lakhs
Working Capital : 0.00
Rate of Return (ROR):30.00%
Break Even Point (BEP):45.00 %
TCI :0.00 Lakhs
Cost of Project : 2925.00Lakhs
Add To Inquiry Basket
Medical Devices & Disposables Industry in India (Disposable Plastic Syringes, Disposable Mask & Gloves, Blood Bags, X-Ray, Ultrasound, ECG, Pacemakers, IV Fluid Sets and Other Devices) Market Analysis, Trends & Opportunities, Growth Drivers, SWOT Analysis, Industry Size, Outlook and Forecasts Up to 2023
Medical Devices & Disposables Industry in India (Disposable Plastic Syringes, Disposable Mask & Gloves, Blood Bags, X-Ray, Ultrasound, ECG, Pacemakers, IV Fluid Sets and Other Devices) Market Analysis, Trends & Opportunities, Growth Drivers, SWOT Analysis, Industry Size, Outlook and Forecasts Up to 2023

Medical Devices & Disposables Industry in India (Disposable Plastic Syringes, Disposable ... Read More

Capacity : 0
Plant and Machinery cost: 0.00 Lakhs
Working Capital : 0.00
Rate of Return (ROR):0.00%
Break Even Point (BEP):0.00 %
TCI :0.00 Lakhs
Cost of Project : 0.00Lakhs
Add To Inquiry Basket
Residential Apartments
Residential Apartments

 

Residential Apart... Read More

Capacity : 0
Plant and Machinery cost: 0.00 Lakhs
Working Capital : 0.00
Rate of Return (ROR):8.94%
Break Even Point (BEP):0.89 %
TCI :0.00 Lakhs
Cost of Project : 13771.00Lakhs
Add To Inquiry Basket
Estate Management Services
Estate Management Services

Estate Management Services

Read More

Capacity : 0
Plant and Machinery cost: 0.00 Lakhs
Working Capital : 0.00
Rate of Return (ROR):0.00%
Break Even Point (BEP):0.00 %
TCI :0.00 Lakhs
Cost of Project : 0.00Lakhs
Add To Inquiry Basket
Tyre Retreading Business
Tyre Retreading Business

Tyre Retreading Business. Retread Tire. Start an Automobile Tyre Retreading Industry<... Read More

Capacity : 0
Plant and Machinery cost: 0.00 Lakhs
Working Capital : 0.00
Rate of Return (ROR):0.00%
Break Even Point (BEP):0.00 %
TCI :0.00 Lakhs
Cost of Project : 0.00Lakhs
Add To Inquiry Basket
Estate Management Services
Estate Management Services

Estate management is an organizational function that enhances the quality of life and improves the productivity of the... Read More

Capacity : Annual Maintenance Contracts Housing Society, Hotels, Clubs & Conventional Centres etc. : 40 Nos
Plant and Machinery cost: 111.00 Lakhs
Working Capital : 0.00
Rate of Return (ROR):11.00%
Break Even Point (BEP):64.00 %
TCI :0.00 Lakhs
Cost of Project : 6417.00Lakhs
Add To Inquiry Basket
Medical Transcription Centre
Medical Transcription Centre

Medical transcription, also known as MT, is an allied health profession dealing with the process of transcribing voice... Read More

Capacity : 0
Plant and Machinery cost: 0.00 Lakhs
Working Capital : 0.00
Rate of Return (ROR):0.00%
Break Even Point (BEP):0.00 %
TCI :0.00 Lakhs
Cost of Project : 0.00Lakhs
Add To Inquiry Basket
Real Estate, Home Building & Construction Industry
Real Estate, Home Building & Construction Industry

Real Estate, Home Building & Construction Industry. Residential Apartment Develop... Read More

Capacity : 0
Plant and Machinery cost: 0.00 Lakhs
Working Capital : 0.00
Rate of Return (ROR):0.00%
Break Even Point (BEP):0.00 %
TCI :0.00 Lakhs
Cost of Project : 0.00Lakhs
Add To Inquiry Basket
Small Hotel/Motel with Party Room, Restaurant, Fast Food Parlour & Banquet Hall
Small Hotel/Motel with Party Room, Restaurant, Fast Food Parlour & Banquet Hall

A hotel is an establishment that provides paid lodging on a short-term basis. Facilities provided may range from a mod... Read More

Capacity : 0
Plant and Machinery cost: 0.00 Lakhs
Working Capital : 0.00
Rate of Return (ROR):0.00%
Break Even Point (BEP):0.00 %
TCI :0.00 Lakhs
Cost of Project : 0.00Lakhs
Add To Inquiry Basket
Business Opportunities in Tourism and Hospitality Sector
Business Opportunities in Tourism and Hospitality Sector

Business Opportunities in Tourism and Hospitality Sector. Setting Up a 5 Star Hotel. Rising O... Read More

Capacity : 0
Plant and Machinery cost: 0.00 Lakhs
Working Capital : 0.00
Rate of Return (ROR):0.00%
Break Even Point (BEP):0.00 %
TCI :0.00 Lakhs
Cost of Project : 0.00Lakhs
Add To Inquiry Basket
Low Cost Airlines
Low Cost Airlines

An airline is a company that provides air transport services for traveling passengers and freight. Airlines utilize aircraf... Read More

Capacity : 0
Plant and Machinery cost: 0.00 Lakhs
Working Capital : 0.00
Rate of Return (ROR):0.00%
Break Even Point (BEP):0.00 %
TCI :0.00 Lakhs
Cost of Project : 0.00Lakhs
Add To Inquiry Basket
Hotel with Discotheque
Hotel with Discotheque

The Indian hotel industry has emerged as one of the key industries driving the growth of the services sector and, ther... Read More

Capacity : 0
Plant and Machinery cost: 0.00 Lakhs
Working Capital : 0.00
Rate of Return (ROR):0.00%
Break Even Point (BEP):0.00 %
TCI :0.00 Lakhs
Cost of Project : 0.00Lakhs
Add To Inquiry Basket
Start, Run and Manage a Super Speciality Hospital
Start, Run and Manage a Super Speciality Hospital

Start, Run and Manage a Super Speciality Hospital. India Healthcare Market Potential Opportunities for Market Entr... Read More

Capacity : 0
Plant and Machinery cost: 0.00 Lakhs
Working Capital : 0.00
Rate of Return (ROR):0.00%
Break Even Point (BEP):0.00 %
TCI :0.00 Lakhs
Cost of Project : 0.00Lakhs
Add To Inquiry Basket
Profitable Opportunities in E-commerce Business
Profitable Opportunities in E-commerce Business

E-commerce -- electronic commerce or EC -- is the buying and selling of goods and services, or the transmitting of funds or data, over an electroni... Read More

Capacity : 0
Plant and Machinery cost: 0.00 Lakhs
Working Capital : 0.00
Rate of Return (ROR):0.00%
Break Even Point (BEP):0.00 %
TCI :0.00 Lakhs
Cost of Project : 0.00Lakhs
Add To Inquiry Basket
Hospital Bed
Hospital Bed

Hospital beds permit body positioning that is not feasible in a regular home bed. They also permit the attachment of other pieces of equipment that... Read More

Capacity : 0
Plant and Machinery cost: 0.00 Lakhs
Working Capital : 0.00
Rate of Return (ROR):0.00%
Break Even Point (BEP):0.00 %
TCI :0.00 Lakhs
Cost of Project : 0.00Lakhs
Add To Inquiry Basket
Engineering College
Engineering College

“The nation's competitiveness depends, in part, on the skills of tomorrow's engineers.” 

As the saying g... Read More

Capacity : 40 Students each Branch, 6 Branches. Total Students in 4th Year 960 Nos.
Plant and Machinery cost: 571.00 Lakhs
Working Capital : 0.00
Rate of Return (ROR):0.00%
Break Even Point (BEP):0.00 %
TCI :0.00 Lakhs
Cost of Project : 3065.00Lakhs
Add To Inquiry Basket
Holiday Resort
Holiday Resort

Holiday Resort

Detailed Project Report, Profile, Business Plan, Ind... Read More

Capacity : 0
Plant and Machinery cost: 0.00 Lakhs
Working Capital : 0.00
Rate of Return (ROR):0.00%
Break Even Point (BEP):0.00 %
TCI :0.00 Lakhs
Cost of Project : 0.00Lakhs
Add To Inquiry Basket
Health Club, Beauty Parlour with Hair Salon
Health Club, Beauty Parlour with Hair Salon

Health club (also known as a fitness club, fitness centre, health spa, and commonly referred to as a gym) is a place that houses exercise equipment... Read More

Capacity : 0
Plant and Machinery cost: 0.00 Lakhs
Working Capital : 0.00
Rate of Return (ROR):0.00%
Break Even Point (BEP):0.00 %
TCI :0.00 Lakhs
Cost of Project : 0.00Lakhs
Add To Inquiry Basket
Restaurant  (with Micro Brewery)
Restaurant (with Micro Brewery)

A restaurant is simply a place to have food outside your home. It is smaller in size than a hotel as it does not have accommodation facilities. It ... Read More

Capacity : Restaurant (Veg. Non-Veg.): 150 Nos/Day, Beer: 330 Pitchers/Day, Alcohol : 100 Nos/Day, Fresh Fruit
Plant and Machinery cost: 189.00 Lakhs
Working Capital : 0.00
Rate of Return (ROR):27.28%
Break Even Point (BEP):63.08 %
TCI :392.00 Lakhs
Cost of Project : 392.00Lakhs
Add To Inquiry Basket
TRADING BUSINESS (IMPORT AND EXPORT- MERCHANT)
TRADING BUSINESS (IMPORT AND EXPORT- MERCHANT)

International trade is the exchange of goods and services between countries. This type of trade gives rise to a world economy .The economy of India... Read More

Capacity :
Plant and Machinery cost: 0.00 Lakhs
Working Capital : 0.00
Rate of Return (ROR):52.00%
Break Even Point (BEP):41.00 %
TCI :428.00 Lakhs
Cost of Project : 428.00Lakhs
Add To Inquiry Basket
Mechanized Laundry
Mechanized Laundry
Todays dry cleaning & Washing business rely heavily on manual labor, especially the manual tagging, cataloging and searching of hundreds of customers ... Read More
Capacity : 1000 Pcs./day
Plant and Machinery cost: 65.00 Lakhs
Working Capital : 0.00
Rate of Return (ROR):42.00%
Break Even Point (BEP):39.00 %
TCI :283.00 Lakhs
Cost of Project : 283.00Lakhs
Add To Inquiry Basket
CBSE PRIMARY SCHOOL
CBSE PRIMARY SCHOOL

PROFILE The Central Board of Secondary Education (abbreviated CBSE) is a Board of Education for public and private sch... Read More

Capacity : 800Students/Annum
Plant and Machinery cost: 193.00 Lakhs
Working Capital : 0.00
Rate of Return (ROR):37.00%
Break Even Point (BEP):36.00 %
TCI :818.00 Lakhs
Cost of Project : 818.00Lakhs
Add To Inquiry Basket
POWER LAUNDRY
POWER LAUNDRY
There is cleaning requirement everywhere. Cleanliness is the sources of beauty and also the placement of God. If we wear dirty clothes no one wants t... Read More
Capacity : 1000 Pcs/Day
Plant and Machinery cost: 33.00 Lakhs
Working Capital : 0.00
Rate of Return (ROR):47.00%
Break Even Point (BEP):44.00 %
TCI :134.00 Lakhs
Cost of Project : 134.00Lakhs
Add To Inquiry Basket
Management Institute
Management Institute

-

Read More
Capacity : 300 MBA Students
Plant and Machinery cost: 51.00 Lakhs
Working Capital : 0.00
Rate of Return (ROR):34.00%
Break Even Point (BEP):46.00 %
TCI :606.00 Lakhs
Cost of Project : 606.00Lakhs
Add To Inquiry Basket
HOLIDAY RESORT
HOLIDAY RESORT

India is a booming hospitality market, yet it has minuscule contribution to the timeshare business model existing worldwide. USA alone comprises tw... Read More

Capacity : 30 Room
Plant and Machinery cost: 147.00 Lakhs
Working Capital : 0.00
Rate of Return (ROR):41.00%
Break Even Point (BEP):35.00 %
TCI :1239.00 Lakhs
Cost of Project : 1239.00Lakhs
Add To Inquiry Basket
CYBER CAFE  (INTERNET BROWSING CENTRE)
CYBER CAFE (INTERNET BROWSING CENTRE)

A cyber cafe is a café that has a number of personal computers connected to the Internet and available for use by custome... Read More

Capacity : 60 Hours/Day
Plant and Machinery cost: 3.00 Lakhs
Working Capital : 0.00
Rate of Return (ROR):41.00%
Break Even Point (BEP):53.00 %
TCI :6.00 Lakhs
Cost of Project : 6.00Lakhs
Add To Inquiry Basket
RESIDENTIAL APARTMENT
RESIDENTIAL APARTMENT

Residential Apartment is a part of housing, which has encouraging scope or development. House is a very complex term. A building or part of buildin... Read More

Capacity : 27 Nos. of Apartments
Plant and Machinery cost: 0.00 Lakhs
Working Capital : 0.00
Rate of Return (ROR):85.00%
Break Even Point (BEP):0.00 %
TCI :73.15 Lakhs
Cost of Project : 73.15Lakhs
Add To Inquiry Basket
Hot Dip Galvanizing Plant
Hot Dip Galvanizing Plant

Hot dip galvanizing is a process in which an adherent, protective coating of zinc compounds is developed on the surface of iron and steel products ... Read More

Capacity : 12 MT/Day
Plant and Machinery cost: 176.00 Lakhs
Working Capital : 0.00
Rate of Return (ROR):53.00%
Break Even Point (BEP):48.00 %
TCI :859.00 Lakhs
Cost of Project : 859.00Lakhs
Add To Inquiry Basket
Automobile Workshop, Garage and Service Centre
Automobile Workshop, Garage and Service Centre

A limited nos. of manufacturers of various types of automobiles vehicles in India. More & more enterprises are coming up with something designs... Read More

Capacity :
Plant and Machinery cost: 0.00 Lakhs
Working Capital : 0.00
Rate of Return (ROR):50.00%
Break Even Point (BEP):36.00 %
TCI :0.00 Lakhs
Cost of Project : 0.00Lakhs
Add To Inquiry Basket
Nature Care Centre
Nature Care Centre
God makes the universe in which world is one place. Where human beings other animals and plant kingdoms are lived. In this world God has created so fi... Read More
Capacity : 20 Acres
Plant and Machinery cost: 21.00 Lakhs
Working Capital : 14.00
Rate of Return (ROR):18.21%
Break Even Point (BEP):5759.00 %
TCI :250.00 Lakhs
Cost of Project : 250.00Lakhs
Add To Inquiry Basket
Games Parlour
Games Parlour
There is human society being developed from since immemorial by the way of gather food, shelter and safety. When human being are built up society due ... Read More
Capacity :
Plant and Machinery cost: 854.00 Lakhs
Working Capital : 14.00
Rate of Return (ROR):18.50%
Break Even Point (BEP):67.25 %
TCI :1250.00 Lakhs
Cost of Project : 1250.00Lakhs
Add To Inquiry Basket
Online Shopping Mall
Online Shopping Mall
With an explosion of new web sites, almost anything for sale in shopping mall can be bought on internet at a faster speed and cheaper price. The speed... Read More
Capacity : 400000 Transactions/Annum
Plant and Machinery cost: 10.00 Lakhs
Working Capital : 9.00
Rate of Return (ROR):69.47%
Break Even Point (BEP):48.32 %
TCI :35.00 Lakhs
Cost of Project : 35.00Lakhs
Add To Inquiry Basket
Five Star Hotel
Five Star Hotel

The hotel industry is an important component of tourism industry. Its foreign exchange earning capacity is also high. The irritation of economic re... Read More

Capacity : 150 Rooms
Plant and Machinery cost: 2000.00 Lakhs
Working Capital : 237.00
Rate of Return (ROR):30.68%
Break Even Point (BEP):47.21 %
TCI :1000.00 Lakhs
Cost of Project : 1000.00Lakhs
Add To Inquiry Basket
Satellite Broadcasting TV Channel
Satellite Broadcasting TV Channel

Satellite Broadcasting T.V. Channel

The Indian television business is packed with c... Read More

Capacity : 24 Hours/Day
Plant and Machinery cost: 324.00 Lakhs
Working Capital : 654.00
Rate of Return (ROR):67.84%
Break Even Point (BEP):41.26 %
TCI :1412.00 Lakhs
Cost of Project : 1412.00Lakhs
Add To Inquiry Basket
Water Park
Water Park
Read More
Capacity : 2500 visitor/day
Plant and Machinery cost: 55.00 Lakhs
Working Capital : 0.00
Rate of Return (ROR):20.00%
Break Even Point (BEP):57.00 %
TCI :182.00 Lakhs
Cost of Project : 182.00Lakhs
Add To Inquiry Basket
Information Technology  (IT) Park
Information Technology (IT) Park

IT park is basically construction unit which will be used by MNCs technical men or business men for the development of technology based on computer... Read More

Capacity : Area 15 Acres of Land
Plant and Machinery cost: 27000.00 Lakhs
Working Capital : 36.00
Rate of Return (ROR):0.00%
Break Even Point (BEP):0.00 %
TCI :39369.00 Lakhs
Cost of Project : 39369.00Lakhs
Add To Inquiry Basket
Pre Nursery & Nursery School
Pre Nursery & Nursery School

The classification of nursery schools and those attending them, have undergone several changes, schools and with a few exception, they are no longe... Read More

Capacity : 400 Children?s
Plant and Machinery cost: 2.00 Lakhs
Working Capital : 5.00
Rate of Return (ROR):30.78%
Break Even Point (BEP):48.00 %
TCI :63.00 Lakhs
Cost of Project : 63.00Lakhs
Add To Inquiry Basket
Medical Devices & Disposables Industry in India (Disposable Plastic Syringes, Disposable Mask & Gloves, Blood Bags, X-Ray, Ultrasound, ECG, Pacemakers, IV Fluid Sets and Other Devices) Market Analysis, Trends & Opportunities, Growth Drivers, SWOT Analysis, Industry Size, Outlook and Forecasts Up to 2023
Medical Devices & Disposables Industry in India (Disposable Plastic Syringes, Disposable Mask & Gloves, Blood Bags, X-Ray, Ultrasound, ECG, Pacemakers, IV Fluid Sets and Other Devices) Market Analysis, Trends & Opportunities, Growth Drivers, SWOT Analysis, Industry Size, Outlook and Forecasts Up to 2023

Medical Devices & Disposables Industry in India (Disposable Plastic Syringes, Disposable ... Read More

Capacity : 0
Plant and Machinery cost: 0.00 Lakhs
Working Capital : 0.00
Rate of Return (ROR):0.00%
Break Even Point (BEP):0.00 %
TCI :0.00 Lakhs
Cost of Project : 0.00Lakhs
Add To Inquiry Basket
Hospital
Hospital

A hospital is meant to treat patients suffering from various ailments. Doctors with their dedicated spirit serve the n... Read More

Capacity : 100 Bedded
Plant and Machinery cost: 355.00 Lakhs
Working Capital : 0.00
Rate of Return (ROR):28.00%
Break Even Point (BEP):67.00 %
TCI :0.00 Lakhs
Cost of Project : 1229.00Lakhs
Add To Inquiry Basket
Multispeciality Hospital
Multispeciality Hospital

A specialty hospital is dedicated to specific sub-speciality care (paediatric centres, oncology centres, and psychiatr... Read More

Capacity : 360 Bedded
Plant and Machinery cost: 4738.00 Lakhs
Working Capital : 0.00
Rate of Return (ROR):28.00%
Break Even Point (BEP):46.00 %
TCI :0.00 Lakhs
Cost of Project : 9075.00Lakhs
Add To Inquiry Basket
Internet Service Provider
Internet Service Provider

An Internet service provider (ISP) is an organization that provides services for accessing, using, or participat... Read More

Capacity : 0
Plant and Machinery cost: 0.00 Lakhs
Working Capital : 0.00
Rate of Return (ROR):0.00%
Break Even Point (BEP):0.00 %
TCI :0.00 Lakhs
Cost of Project : 0.00Lakhs
Add To Inquiry Basket
China Clay Washing/Purification
China Clay Washing/Purification

China Clay is also known as kaolin & white clay. Primary clay formed by natural kaolinisation process. It is forme... Read More

Capacity : 0
Plant and Machinery cost: 0.00 Lakhs
Working Capital : 0.00
Rate of Return (ROR):0.00%
Break Even Point (BEP):0.00 %
TCI :0.00 Lakhs
Cost of Project : 0.00Lakhs
Add To Inquiry Basket
Residential Apartment
Residential Apartment

Residential Apartment is a part of Housing, which has encouraging scope or development. House is a very complex term.A standard residential buildin... Read More

Capacity : 312 Nos./Annum
Plant and Machinery cost: 0.00 Lakhs
Working Capital : 0.00
Rate of Return (ROR):0.00%
Break Even Point (BEP):0.00 %
TCI :0.00 Lakhs
Cost of Project : 10676.00Lakhs
Add To Inquiry Basket
Shopping Mall with Four Screen Multiplex & 3 Star Hotel
Shopping Mall with Four Screen Multiplex & 3 Star Hotel

Shopping Mall with Four Screen Multiplex

A shopping mall is a modern, chief... Read More

Capacity : 0
Plant and Machinery cost: 0.00 Lakhs
Working Capital : 0.00
Rate of Return (ROR):0.00%
Break Even Point (BEP):0.00 %
TCI :0.00 Lakhs
Cost of Project : 0.00Lakhs
Add To Inquiry Basket
LPG Bottling Plant
LPG Bottling Plant

LPG cylinder filling plants vary considerably in size, complexity and layout. The type and siz... Read More

Capacity : LPG Cylinders (5 Kgs Size) : 1360 Cylinders/Day LPG Cylinders (14.2 Kgs Size) : 1000 Cylinders/Day L
Plant and Machinery cost: 113.00 Lakhs
Working Capital : 0.00
Rate of Return (ROR):27.00%
Break Even Point (BEP):35.00 %
TCI :0.00 Lakhs
Cost of Project : 984.00Lakhs
Add To Inquiry Basket
Super Speciality Hospital
Super Speciality Hospital

This pre-feasibility report on Speciality/ Multi-speciality hospital consists of the feasibility detailing for three m... Read More

Capacity : 30 bedded
Plant and Machinery cost: 113.00 Lakhs
Working Capital : 0.00
Rate of Return (ROR):28.00%
Break Even Point (BEP):61.00 %
TCI :0.00 Lakhs
Cost of Project : 978.00Lakhs
Add To Inquiry Basket
Departmental Store
Departmental Store

A departmenta... Read More

Capacity : 0
Plant and Machinery cost: 0.00 Lakhs
Working Capital : 0.00
Rate of Return (ROR):0.00%
Break Even Point (BEP):0.00 %
TCI :0.00 Lakhs
Cost of Project : 0.00Lakhs
Add To Inquiry Basket
LPG Bottling Plant
LPG Bottling Plant

Liquefied Petroleum Gas is a Propane/Butane mixture liquefied under normal ambient temperature and moderate pressures. It is a safe, clean burning,... Read More

Capacity : 0
Plant and Machinery cost: 0.00 Lakhs
Working Capital : 0.00
Rate of Return (ROR):0.00%
Break Even Point (BEP):0.00 %
TCI :0.00 Lakhs
Cost of Project : 0.00Lakhs
Add To Inquiry Basket
How to Start a Microbrewery or Brewpub Business. Nano Brewery Business Plan
How to Start a Microbrewery or Brewpub Business. Nano Brewery Business Plan

A microbrewery or craft brewery is a brewery that produces small amounts of beer, typically much smaller than large-scale corporate breweries, and ... Read More

Capacity : 0
Plant and Machinery cost: 0.00 Lakhs
Working Capital : 0.00
Rate of Return (ROR):0.00%
Break Even Point (BEP):0.00 %
TCI :0.00 Lakhs
Cost of Project : 0.00Lakhs
Add To Inquiry Basket
Super Speciality Hospital
Super Speciality Hospital

The Indian healthcare industry is divided into two segments - services and manufacturing. While the manufacturing segment consists of medical equip... Read More

Capacity : Gereral Ward Room: 23400 patients/annum Double Bed Room: 27000 patients/annum Single Bed Room: 9000
Plant and Machinery cost: 5289.00 Lakhs
Working Capital : 0.00
Rate of Return (ROR):2.69%
Break Even Point (BEP):23.00 %
TCI :0.00 Lakhs
Cost of Project : 29196.00Lakhs
Add To Inquiry Basket
Trauma center
Trauma center
Read More
Capacity : 0
Plant and Machinery cost: 0.00 Lakhs
Working Capital : 0.00
Rate of Return (ROR):0.00%
Break Even Point (BEP):0.00 %
TCI :0.00 Lakhs
Cost of Project : 0.00Lakhs
Add To Inquiry Basket
Resort
Resort

Holiday resorts business is very flourishing business these days not in India only but it has brilliant prospects in other countries also. After oi... Read More

Capacity :
Plant and Machinery cost: 64.00 Lakhs
Working Capital : 0.00
Rate of Return (ROR):46.00%
Break Even Point (BEP):33.00 %
TCI :1299.00 Lakhs
Cost of Project : 1299.00Lakhs
Add To Inquiry Basket
LAUNDRY UNIT
LAUNDRY UNIT
Laundry unit is one of the unit by which dirty clothes are cleaned by operation. In older ages there is a system of washer men who collect the dirty c... Read More
Capacity : 500 Pcs/day
Plant and Machinery cost: 12.00 Lakhs
Working Capital : 0.00
Rate of Return (ROR):47.28%
Break Even Point (BEP):42.72 %
TCI :51.00 Lakhs
Cost of Project : 51.00Lakhs
Add To Inquiry Basket
FOOD PARK
FOOD PARK

Food Parks are comprehensive industrial estates for food processing units where the industries would have provision of common facilities like cold ... Read More

Capacity :
Plant and Machinery cost: 0.00 Lakhs
Working Capital : 0.00
Rate of Return (ROR):1.00%
Break Even Point (BEP):0.00 %
TCI :0.00 Lakhs
Cost of Project : 0.00Lakhs
Add To Inquiry Basket
MARINE ENGINEERING COLLEGE
MARINE ENGINEERING COLLEGE

The direction in which education starts a man will determine his future life. A good degree course module recognize the wisdom in what was stated b... Read More

Capacity : B.E. Marine Engg. -4 Years, B.Sc. Nautical Bsc.-3 Years, 40+60 = 100 Students Per Year,Classes Avg.
Plant and Machinery cost: 685.00 Lakhs
Working Capital : 0.00
Rate of Return (ROR):38.00%
Break Even Point (BEP):45.00 %
TCI :1840.00 Lakhs
Cost of Project : 1840.00Lakhs
Add To Inquiry Basket
POLYTECHNIC COLLEGE (Technical Education Institution)
POLYTECHNIC COLLEGE (Technical Education Institution)

Technical Education plays a vital role in human resource development of the country by creating skilled manpower, enhancing industrial productivity... Read More

Capacity :
Plant and Machinery cost: 790.00 Lakhs
Working Capital : 0.00
Rate of Return (ROR):33.00%
Break Even Point (BEP):46.00 %
TCI :1573.00 Lakhs
Cost of Project : 1573.00Lakhs
Add To Inquiry Basket
MANAGEMENT COLLEGE (BBA, MBA, BCA & MCA)
MANAGEMENT COLLEGE (BBA, MBA, BCA & MCA)

There is need of management colleges in India for the economic development of the country and give the better opportunity to students. Now obtainin... Read More

Capacity :
Plant and Machinery cost: 0.00 Lakhs
Working Capital : 0.00
Rate of Return (ROR):0.00%
Break Even Point (BEP):0.00 %
TCI :0.00 Lakhs
Cost of Project : 0.00Lakhs
Add To Inquiry Basket
NameCapacityRate of return (ROR):Cost of project
Workshop for Motors of Lo... Repair & Maintenance Motors (100 KW):2 Units per day On Site Annual Maintenance Contract (AMC):0.8 U 30.00 76.00
Flexographic Printing Ind... 0 0.00 0.00
LPG Bottling Plant LPG Cylinders (5 Kgs Size 1360 Nos/day) : 2040 MT/Annum LPG Cylinders (14.2 Kgs Size 1000 Nos/day) 28.00 919.00
Setting Up a Hospital in ... 0 0.00 0.00
Setting Up Profitable Mic... 0 0.00 0.00
LPG Cylinder Refilling Pl... 0 0.00 0.00
Outdoor & Indoor Entertai... 0 0.00 0.00
Holiday Resort, Timeshare... 0 0.00 0.00
Nursing Home 0 0.00 0.00
School (CBSE Pattern) KG to 12th Standard Students : 2000 Students/Annum 13.00 1098.00
Industrial Training Insti... Total number of students: 3600 students/annum (each trade 120 students) 16 Trade 1 year duration 14 27.00 2476.00
Solar Photovoltaic System 0 0.00 0.00
NURSERY SCHOOL 400 Children 42.00 66.00
MANAGEMENT COLLEGE (BBA, ... 660 Nos. Students, Hostlers 90% = 600 Nos. 23.00 85.00
OLD AGE HOME (Senior Citi... Old Age Home 200 Room with Balcony, Open Land Lawn & Garden 2 Acre, Orphan Children Hall 100 Beds 36.00 375.00
SAFARI PARK Visitors 6000 Nos./Day 36.00 49486.00
THREE STAR HOTEL Single Room - 30 Nos. Double Room - 40 Nos. Suites - 10 Nos. Banquet Hall - 1 Number 48.00 1500.00
INFORMATION TECHNOLOGY (I... 0 46.00 200.00
Water Park 1000 visitors / Day 41.00 362.00
MANAGEMENT COLLEGE 0.00 0.00
BACHELOR OF PHYSIOTHERAPY... 0.00 0.00 0.00
Five Star Hotel & Busines... 59.00 30000.00
Golf Course 20000 MEMBERS 26.00 2100.00
BANQUET HALL 75.00 496.00
Greenhouse (Plant Micropr... 10000 NOS./day 31.00 462.00
Nature Care Centre 20 Acres 18.21 250.00
Fast Food Center (Restaur... 41.81 55.00
Holiday Resort & Entertai... 0.00 0.00
Pharmaceutical College (B... B. Pharma 100 Student, D. Pharma 150 Student 0.00 396.43
Old Age Home Orphan Child... 200 Rooms Old Age Home 100 Beds Orphan Children Hall 25 Rooms Dharamshala 5.60 363.00
12345

Showing 61 - 120 of 132 Product(s)

Subject of your Interest

Information

  • One Lac / Lakh / Lakhs is equivalent to one hundred thousand (100,000)
  • One Crore is equivalent to ten million (10,000,000)
  • T.C.I is Total Capital Investment
  • We can modify the project capacity and project cost as per your requirement.
  • We can also prepare project report on any subject as per your requirement.
  • Caution: The project's cost, capacity and return are subject to change without any notice. Future projects may have different values of project cost, capacity or return.

ABOUT NPCS

 

NIIR PROJECT CONSULTANCY SERVICES (NPCS) is a reliable name in the industrial world for offering integrated technical consultancy services. NPCS is manned by engineers, planners, specialists, financial experts, economic analysts and design specialists with extensive experience in the related industries.

Our various services are: Detailed Project Report,  Business Plan for Manufacturing Plant, Start-up Ideas, Business Ideas for Entrepreneurs, Start up Business Opportunities, entrepreneurship projects, Successful Business Plan, Industry Trends, Market Research, Manufacturing Process, Machinery, Raw Materials, project report, Cost and Revenue, Pre-feasibility study for Profitable Manufacturing Business, Project Identification, Project Feasibility and Market Study, Identification of Profitable Industrial Project Opportunities, Business Opportunities, Investment Opportunities for Most Profitable Business in India, Manufacturing Business Ideas, Preparation of Project Profile, Pre-Investment and Pre-Feasibility Study, Market Research Study, Preparation of Techno-Economic Feasibility Report, Identification and Section of Plant, Process, Equipment, General Guidance, Startup Help, Technical and Commercial Counseling for setting up new industrial project and Most Profitable Small Scale Business.

NPCS also publishes varies process technology, technical, reference, self employment and startup books, directory, business and industry database, bankable detailed project report, market research report on various industries, small scale industry and profit making business. Besides being used by manufacturers, industrialists and entrepreneurs, our publications are also used by professionals including project engineers, information services bureau, consultants and project consultancy firms as one of the input in their research.

Our Detailed Project report aims at providing all the critical data required by any entrepreneur vying to venture into Project. While expanding a current business or while venturing into new business, entrepreneurs are often faced with the dilemma of zeroing in on a suitable product/line.

 


And before diversifying/venturing into any product, wish to study the following aspects of the identified product:


• Good Present/Future Demand
• Export-Import Market Potential
• Raw Material & Manpower Availability
• Project Costs and Payback Period


We at NPCS, through our reliable expertise in the project consultancy and market research field, Provides exhaustive information about the project, which satisfies all the above mentioned requirements and has high growth potential in the markets. And through our report we aim to help you make sound and informed business decision.

 

The report contains all the data which will help an entrepreneur find answers to questions like:

• Why I should invest in this project?
• What will drive the growth of the product?
• What are the costs involved?
• What will be the market potential?


The report first focuses on enhancing the basic knowledge of the entrepreneur about the main product, by elucidating details like product definition, its uses and applications, industry segmentation as well as an overall overview of the industry sector in India. The report then helps an entrepreneur identify the target customer group of its product. It further helps in making sound investment decision by listing and then elaborating on factors that will contribute to the growth of product consumption in India and also talks about the foreign trade of the product along with the list of top importing and top exporting countries. Report includes graphical representation and forecasts of key data discussed in the above mentioned segment. It further explicates the growth potential of the product.

The report includes other market data like key players in the Industry segment along with their contact information and recent developments. It includes crucial information like raw material requirements, list of machinery and manufacturing process for the plant. Core project financials like plant capacity, costs involved in setting up of project, working capital requirements, projected revenue and profit are further listed in the report.


Reasons for buying the report:

• This report helps you to identify a profitable project for investing or diversifying into by throwing light to crucial areas like industry size, demand of the product and reasons for investing in the product.

• This report provides vital information on the product like its definition, characteristics and segmentation.

• This report helps you market and place the product correctly by identifying the target customer group of the product.

• This report helps you understand the viability of the project by disclosing details like raw materials required, manufacturing process, project costs and snapshot of other project financials.

• The report provides forecasts of key parameters which helps to anticipate the industry performance and make sound business decision.

 

Our Approach:


• Our research reports broadly cover Indian markets, present analysis, outlook and forecast.

• The market forecasts are developed on the basis of secondary research and are cross-validated through interactions with the industry players. 

• We use reliable sources of information and databases.  And information from such sources is processed by us and included in the report.

 

Our Market Survey cum Detailed Techno Economic Feasibility Report Contains following information:

 

 

Ø  Introduction

·         Project Introduction

·         Project Objective and Strategy

·         Concise History of the Product

·         Properties

·         BIS (Bureau of Indian Standards) Provision & Specification

·         Uses & Applications

 

Ø  Market Study and Assessment

·         Current Indian Market Scenario

·         Present Market Demand and Supply

·         Estimated Future Market Demand and Forecast

·         Statistics of Import & Export

·         Names & Addresses of Existing Units (Present Players)

·         Market Opportunity

 

Ø  Raw Material

·         List of Raw Materials

·         Properties of Raw Materials

·         Prescribed Quality of Raw Materials

·         List of Suppliers and Manufacturers

 

Ø  Personnel (Manpower) Requirements

·         Requirement of Staff & Labor (Skilled and Unskilled) Managerial, Technical, Office Staff and Marketing Personnel

 

Ø  Plant and Machinery

·         List of Plant & Machinery

·         Miscellaneous Items

·         Appliances & Equipments

·         Laboratory Equipments & Accessories

·         Electrification

·         Electric Load & Water

·         Maintenance Cost

·         Sources of Plant & Machinery (Suppliers and Manufacturers)

 

Ø  Manufacturing Process and Formulations

·         Detailed Process of Manufacture with Formulation

·         Packaging Required

·         Process Flow Sheet Diagram

 

Ø  Infrastructure and Utilities

·         Project Location

·         Requirement of Land Area

·         Rates of the Land

·         Built Up Area

·         Construction Schedule

·         Plant Layout and Requirement of Utilities

 

Project at a Glance

Along with financial details as under:

 

  •     Assumptions for Profitability workings

  •    Plant Economics

  •    Production Schedule

  •    Land & Building

            Factory Land & Building

            Site Development Expenses

  •    Plant & Machinery

             Indigenous Machineries

            Other Machineries (Miscellaneous, Laboratory etc.)

  •    Other Fixed Assets

            Furniture & Fixtures

            Pre-operative and Preliminary Expenses

            Technical Knowhow

            Provision of Contingencies

  •   Working Capital Requirement Per Month

             Raw Material

            Packing Material

            Lab & ETP Chemical Cost

           Consumable Store

  •   Overheads Required Per Month And Per Annum

         Utilities & Overheads (Power, Water and Fuel Expenses etc.)

             Royalty and Other Charges

            Selling and Distribution Expenses

  •    Salary and Wages

  •    Turnover Per Annum

  •   Share Capital

            Equity Capital

            Preference Share Capital

 

  •    Annexure 1:: Cost of Project and Means of Finance

  •    Annexure 2::  Profitability and Net Cash Accruals

                Revenue/Income/Realisation

                Expenses/Cost of Products/Services/Items

                Gross Profit

                Financial Charges     

                Total Cost of Sales

                Net Profit After Taxes

                Net Cash Accruals

  •   Annexure 3 :: Assessment of Working Capital requirements

                Current Assets

                Gross Working. Capital

                Current Liabilities

                Net Working Capital

                Working Note for Calculation of Work-in-process

  •    Annexure 4 :: Sources and Disposition of Funds

  •    Annexure 5 :: Projected Balance Sheets

                ROI (Average of Fixed Assets)

                RONW (Average of Share Capital)

                ROI (Average of Total Assets)

  •    Annexure 6 :: Profitability ratios

                D.S.C.R

                Earnings Per Share (EPS)

               

             Debt Equity Ratio

        Annexure 7   :: Break-Even Analysis

                Variable Cost & Expenses

                Semi-Var./Semi-Fixed Exp.

                Profit Volume Ratio (PVR)

                Fixed Expenses / Cost 

                B.E.P

  •   Annexure 8 to 11:: Sensitivity Analysis-Price/Volume

            Resultant N.P.B.T

            Resultant D.S.C.R

   Resultant PV Ratio

   Resultant DER

  Resultant ROI

          Resultant BEP

  •    Annexure 12 :: Shareholding Pattern and Stake Status

        Equity Capital

        Preference Share Capital

  •   Annexure 13 :: Quantitative Details-Output/Sales/Stocks

        Determined Capacity P.A of Products/Services

        Achievable Efficiency/Yield % of Products/Services/Items 

        Net Usable Load/Capacity of Products/Services/Items   

       Expected Sales/ Revenue/ Income of Products/ Services/ Items   

  •    Annexure 14 :: Product wise domestic Sales Realisation

  •    Annexure 15 :: Total Raw Material Cost

  •    Annexure 16 :: Raw Material Cost per unit

  •    Annexure 17 :: Total Lab & ETP Chemical Cost

  •    Annexure 18  :: Consumables, Store etc.,

  •    Annexure 19  :: Packing Material Cost

  •    Annexure 20  :: Packing Material Cost Per Unit

  •    Annexure 21 :: Employees Expenses

  •    Annexure 22 :: Fuel Expenses

  •    Annexure 23 :: Power/Electricity Expenses

  •    Annexure 24 :: Royalty & Other Charges

  •    Annexure 25 :: Repairs & Maintenance Exp.

  •    Annexure 26 :: Other Mfg. Expenses

  •    Annexure 27 :: Administration Expenses

  •    Annexure 28 :: Selling Expenses

  •    Annexure 29 :: Depreciation Charges – as per Books (Total)

  •   Annexure 30   :: Depreciation Charges – as per Books (P & M)

  •   Annexure 31   :: Depreciation Charges - As per IT Act WDV (Total)

  •   Annexure 32   :: Depreciation Charges - As per IT Act WDV (P & M)

  •   Annexure 33   :: Interest and Repayment - Term Loans

  •   Annexure 34   :: Tax on Profits

  •   Annexure 35   ::Projected Pay-Back Period And IRR