Please choose a project below related to this category.
Matchbox Manufacturing Business. Start a Match Box, Matchstick Factory. Safety Matches Production Matchsticks are a very handy tool used in starting...
|
Capacity : - |
Plant and Machinery cost: - |
|
Working Capital : - |
Rate of Return (ROR): 1.00 |
|
Break Even Point (BEP): 0.00 |
TCI : - |
|
Cost of Project : 0 |
Bauxite Calcination Plant by Rotary Kiln with Fine Grinding Ball Mill. Refractory Grade Calcined Bauxite Calcined bauxite is produced by sintering/ca...
|
Capacity : - |
Plant and Machinery cost: - |
|
Working Capital : - |
Rate of Return (ROR): 1.00 |
|
Break Even Point (BEP): 0.00 |
TCI : - |
|
Cost of Project : 0 |
Calcined bauxite is an important raw material for two main markets: refractories and abrasives.Bauxite is a naturally occurring, heterogeneous materia...
|
Capacity : Calcined Bauxite: 40 MT/day |
Plant and Machinery cost: Rs. 219 lakhs |
|
Working Capital : - |
Rate of Return (ROR): 26.00 |
|
Break Even Point (BEP): 56.00 |
TCI : Cost of Project: Rs766 lakhs |
|
Cost of Project : 76600000 |
Calcined bauxite is an important raw material for two main markets: refractories and abrasives.Bauxite is a naturally occurring, heterogeneous materia...
|
Capacity : Calcined Bauxite: 40 MT/day |
Plant and Machinery cost: Rs. 219 lakhs |
|
Working Capital : - |
Rate of Return (ROR): 26.00 |
|
Break Even Point (BEP): 56.00 |
TCI : Cost of Project: Rs766 lakhs |
|
Cost of Project : 76600000 |
E-Rickshaws are three wheel battery operated vehicles, which are considered as an upgrade to conventional rickshaws, and economically better than auto...
|
Capacity : E Rickshaw: 4 Nos./Day |
Plant and Machinery cost: Rs. 28 lakhs |
|
Working Capital : - |
Rate of Return (ROR): 24.00 |
|
Break Even Point (BEP): 56.00 |
TCI : Cost of Project: Rs. 323 lakhs |
|
Cost of Project : 32300000 |
Diamond is a solid form of carbon with a diamond cubic crystal structure. At room temperature and pressure it is metastable and graphite is the stable...
|
Capacity : - |
Plant and Machinery cost: - |
|
Working Capital : - |
Rate of Return (ROR): 1.00 |
|
Break Even Point (BEP): 0.00 |
TCI : - |
|
Cost of Project : 0 |
E-Rickshaw (Electric tuk-tuks) Manufacturing Business. How to Start Electric Vehicle Assembling Industry E-Rickshaws are small vehicles, with thr...
|
Capacity : - |
Plant and Machinery cost: - |
|
Working Capital : - |
Rate of Return (ROR): 1.00 |
|
Break Even Point (BEP): 0.00 |
TCI : - |
|
Cost of Project : 0 |
Electric Rickshaw, in short, also called as E-Rickshaw. This kind of transport vehicle are famous in many countries, this is eco-friendly vehicles for...
|
Capacity : 1,200 Nos per Annum |
Plant and Machinery cost: 29 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 24.00 |
|
Break Even Point (BEP): 56.00 |
TCI : Cost of Project: 324 Lakhs |
|
Cost of Project : 32400000 |
A solar panel is a collection of solar cells.Solar panel refers either to a photovoltaic module, a solar thermal energy panel, or to a set of solar ph...
|
Capacity : Solar Panel: 25 MW |
Plant and Machinery cost: Rs. 161 lakhs |
|
Working Capital : - |
Rate of Return (ROR): 54.00 |
|
Break Even Point (BEP): 28.00 |
TCI : Rs.804 lakhs |
|
Cost of Project : 80400000 |
Investment Opportunity in Bicycle and Cycle Rickshaw Manufacturing Industry. Best Industry for Starting a Business. Bicycles are one of the world's m...
|
Capacity : - |
Plant and Machinery cost: - |
|
Working Capital : - |
Rate of Return (ROR): 1.00 |
|
Break Even Point (BEP): 0.00 |
TCI : - |
|
Cost of Project : 0 |
Investment Opportunity in Bicycle and Cycle Rickshaw Manufacturing Industry. Best Industry for Starting a Business. Bicycles are one of the world's m...
|
Capacity : - |
Plant and Machinery cost: - |
|
Working Capital : - |
Rate of Return (ROR): 1.00 |
|
Break Even Point (BEP): 0.00 |
TCI : - |
|
Cost of Project : 0 |
Solar panel refers to a panel designed to absorb the sun's rays as a source of energy to generating electricity and heating. It reduces the amount of...
|
Capacity : - |
Plant and Machinery cost: - |
|
Working Capital : - |
Rate of Return (ROR): 1.00 |
|
Break Even Point (BEP): 0.00 |
TCI : - |
|
Cost of Project : 0 |