Best Business Opportunities in Somalia, Africa - Identification and Selection of right Project, Thrust areas for Investment, Industry Startup and Entrepreneurship Projects

Please choose a project below related to this category.

Automatic Packaged Drinking Water - Manufacturing Plant, Detailed Project Report, Profile, Business Plan, Industry Trends, Market Research, Survey, Manufacturing Process, Machinery, Raw Materials, Feasibility Study, Investment Opportunities, Plant Layout
Automatic Packaged Drinking Water - Manufacturing Plant, Detailed Project Report, Profile, Business Plan, Industry Trends, Market Research, Survey, Manufacturing Process, Machinery, Raw Materials, Feasibility Study, Investment Opportunities, Plant Layout

It is needless to mention that water, a compound of Hydrogen and Oxygen is a precious natural gift which is very essential for survival of mankind inc...

Capacity :

Packaged Drinking Water (1 Ltr. Size):120000

Plant and Machinery cost:

Rs 65 Lakhs

Working Capital :

-

Rate of Return (ROR):

28.00

Break Even Point (BEP):

60.00

TCI :

Cost of Project:Rs 268 Lakhs

Cost of Project :

26800000

Detergent Cake - Manufacturing Plant, Detailed Project Report, Profile, Business Plan, Industry Trends, Market Research, Survey, Manufacturing Process, Machinery, Raw Materials, Feasibility Study, Investment Opportunities, Cost and Revenue, Plant Economic
Detergent Cake - Manufacturing Plant, Detailed Project Report, Profile, Business Plan, Industry Trends, Market Research, Survey, Manufacturing Process, Machinery, Raw Materials, Feasibility Study, Investment Opportunities, Cost and Revenue, Plant Economic

Detergents are defined as complete washing or cleaning products, which contain among their ingredients an organic surface-active compound (Surfactant)...

Capacity :

4MT/Day

Plant and Machinery cost:

Rs 18 Lakhs

Working Capital :

-

Rate of Return (ROR):

26.00

Break Even Point (BEP):

43.00

TCI :

Cost of Project:Rs 228 Lakhs

Cost of Project :

22800000

Biodegradable Disposable Cups and Plates using Sugarcane Bagasse
Biodegradable Disposable Cups and Plates using Sugarcane Bagasse

Agricultural wastes constitute one of the main alternative raw materials for the pulp and paper industry. Wheat straw, bagasse, reed, and rice straw a...

Capacity :

•Disposable Paper Cups :7.5 MT/Day •Disposable Paper Plates:7.5 MT/Day

Plant and Machinery cost:

Rs 32 Lakhs

Working Capital :

-

Rate of Return (ROR):

28.18

Break Even Point (BEP):

56.37

TCI :

Cost of Project: Rs 314 Lakhs

Cost of Project :

31400000

Iron Ore Mining (E.O.U) - Manufacturing Plant, Detailed Project Report, Profile, Business Plan, Industry Trends, Market Research, Survey, Manufacturing Process, Machinery, Raw Materials, Feasibility Study, Investment Opportunities, Cost and Revenue
Iron Ore Mining (E.O.U) - Manufacturing Plant, Detailed Project Report, Profile, Business Plan, Industry Trends, Market Research, Survey, Manufacturing Process, Machinery, Raw Materials, Feasibility Study, Investment Opportunities, Cost and Revenue

An ‘Ore’ may be defined as the aggregate of minerals from which a desired constituent mineral can be extracted with profit. The most used of all metal...

Capacity :

Iron Ore: 800 MT/Day

Plant and Machinery cost:

Rs 779 Lakhs

Working Capital :

-

Rate of Return (ROR):

28.00

Break Even Point (BEP):

43.00

TCI :

Cost of Project: Rs 2485 Lakhs

Cost of Project :

2485

Bicycle Tubes - Manufacturing Plant, Detailed Project Report, Profile, Business Plan, Industry Trends, Market Research, Survey, Manufacturing Process, Machinery, Raw Materials, Feasibility Study, Investment Opportunities, Cost and Revenue, Plant Economics
Bicycle Tubes - Manufacturing Plant, Detailed Project Report, Profile, Business Plan, Industry Trends, Market Research, Survey, Manufacturing Process, Machinery, Raw Materials, Feasibility Study, Investment Opportunities, Cost and Revenue, Plant Economics

Bicycle tubes are the backbone of the bicycle industries. Few numbers of companies in organized sector are engaged in the quality grade cycles tyres a...

Capacity :

Bicycle Tubes: 10,000 Nos. /Day

Plant and Machinery cost:

Rs 118 Lakhs

Working Capital :

-

Rate of Return (ROR):

26.00

Break Even Point (BEP):

45.00

TCI :

Cost of Project: Rs 622 Lakhs

Cost of Project :

62200000

E–Waste Recycling Plant - Manufacturing Plant, Detailed Project Report, Profile, Business Plan, Industry Trends, Market Research, Survey, Manufacturing Process, Machinery, Raw Materials, Feasibility Study, Investment Opportunities, Cost and Revenue
E–Waste Recycling Plant - Manufacturing Plant, Detailed Project Report, Profile, Business Plan, Industry Trends, Market Research, Survey, Manufacturing Process, Machinery, Raw Materials, Feasibility Study, Investment Opportunities, Cost and Revenue

E-waste is a popular, informal name for electronic products nearing the end of their "useful life." Computers, televisions, VCRs, stereos, copiers, an...

Capacity :

Monitors:10 Nos./Day•Plastic Granules: 4,600.00 Kgs/Day •Copper Wire Scraps:20 Kgs/Day •Glass from CRT: 260 Kgs/Day • Other Metals:1100 Kgs/Day

Plant and Machinery cost:

Rs 233 Lakhs

Working Capital :

-

Rate of Return (ROR):

8.00

Break Even Point (BEP):

59.00

TCI :

Cost of Project: Rs 613 Lakhs

Cost of Project :

61300000

Solar Panel
Solar Panel

A solar panel is a collection of solar cells. Lots of small solar cells spread over a large area can work together to provide enough power to be usefu...

Capacity :

Solar Panel 5MW/Annum

Plant and Machinery cost:

Rs 109 Lakhs

Working Capital :

-

Rate of Return (ROR):

25.00

Break Even Point (BEP):

62.00

TCI :

Cost of Project: Rs 450 Lakhs

Cost of Project :

45000000

Rickshaw/Cycle Tyre & Tubes - Manufacturing Plant, Detailed Project Report, Profile, Business Plan, Industry Trends, Market Research, Survey, Manufacturing Process, Machinery, Raw Materials, Feasibility Study, Investment Opportunities, Cost and Revenue
Rickshaw/Cycle Tyre & Tubes - Manufacturing Plant, Detailed Project Report, Profile, Business Plan, Industry Trends, Market Research, Survey, Manufacturing Process, Machinery, Raw Materials, Feasibility Study, Investment Opportunities, Cost and Revenue

Bicycle and rickshaw tyres & tubes are the backbone of the bicycle and rickshaw. There are few numbers of organized manufacturing companies which are...

Capacity :

Rickshaw & Cycle Tyres : 1,500.00 Nos./Day,Rickshaw & Cycle Tubes: 1,500.00 Nos./Day

Plant and Machinery cost:

128 Lakhs

Working Capital :

-

Rate of Return (ROR):

26.00

Break Even Point (BEP):

72.00

TCI :

Cost of Project : 570 Lakhs

Cost of Project :

57000000

E–Waste Recycling Plant - Manufacturing Plant, Detailed Project Report, Profile, Business Plan, Industry Trends, Market Research, Survey, Manufacturing Process, Machinery, Raw Materials, Feasibility Study, Investment Opportunities, Cost and Revenue
E–Waste Recycling Plant - Manufacturing Plant, Detailed Project Report, Profile, Business Plan, Industry Trends, Market Research, Survey, Manufacturing Process, Machinery, Raw Materials, Feasibility Study, Investment Opportunities, Cost and Revenue

Electronic wastes, "e-waste", "e-scrap", or "Waste Electrical and Electronic Equipment" ("WEEE") is a description of surplus, obsolete, broken or disc...

Capacity :

Monitor : 3000 Pcs. /annum,Plastic Dana: 1559 MT/annum,Copper Wire Scraps: 7.5 MT/annum,Glass from CRT : 105 MT/annum,Other Metals: 450 MT/annum

Plant and Machinery cost:

Rs. 233 Lakhs

Working Capital :

-

Rate of Return (ROR):

28.00

Break Even Point (BEP):

46.00

TCI :

Cost of Project : Rs. 526 Lakhs

Cost of Project :

52600000

E–Waste Recycling Plant - Manufacturing Plant, Detailed Project Report, Profile, Business Plan, Industry Trends, Market Research, Survey, Manufacturing Process, Machinery, Raw Materials, Feasibility Study, Investment Opportunities, Cost and Revenue
E–Waste Recycling Plant - Manufacturing Plant, Detailed Project Report, Profile, Business Plan, Industry Trends, Market Research, Survey, Manufacturing Process, Machinery, Raw Materials, Feasibility Study, Investment Opportunities, Cost and Revenue

Electronic wastes, "e-waste", "e-scrap", or "Waste Electrical and Electronic Equipment" ("WEEE") is a description of surplus, obsolete, broken or disc...

Capacity :

2164500 Kgs /Annum

Plant and Machinery cost:

Rs. 233 Lakhs

Working Capital :

-

Rate of Return (ROR):

28.00

Break Even Point (BEP):

46.00

TCI :

Cost of Project : Rs. 526 Lakhs

Cost of Project :

52600000

E–Waste Recycling Plant - Manufacturing Plant, Detailed Project Report, Profile, Business Plan, Industry Trends, Market Research, Survey, Manufacturing Process, Machinery, Raw Materials, Feasibility Study, Investment Opportunities, Cost and Revenue
E–Waste Recycling Plant - Manufacturing Plant, Detailed Project Report, Profile, Business Plan, Industry Trends, Market Research, Survey, Manufacturing Process, Machinery, Raw Materials, Feasibility Study, Investment Opportunities, Cost and Revenue

Electronic wastes, "e-waste", "e-scrap", or "Waste Electrical and Electronic Equipment" ("WEEE") is a description of surplus, obsolete, broken or disc...

Capacity :

2164500 Kgs /Annum

Plant and Machinery cost:

Rs. 233 Lakhs

Working Capital :

-

Rate of Return (ROR):

28.00

Break Even Point (BEP):

46.00

TCI :

Cost of Project : Rs. 526 Lakhs

Cost of Project :

52600000

Neutralization of Phospho-Gypsum - Manufacturing Plant, Detailed Project Report, Profile, Business Plan, Industry Trends, Market Research, Survey, Manufacturing Process, Machinery, Raw Materials, Feasibility Study, Investment Opportunities, Cost & Revenue
Neutralization of Phospho-Gypsum - Manufacturing Plant, Detailed Project Report, Profile, Business Plan, Industry Trends, Market Research, Survey, Manufacturing Process, Machinery, Raw Materials, Feasibility Study, Investment Opportunities, Cost & Revenue

Phospho-gypsum is a by-product of the phosphoric acid industry and consists of 65-70 % gypsum, 25-30 % water and 5-10 % impurities, i.e. phosphoric ac...

Capacity :

600000 MT/annum

Plant and Machinery cost:

Rs 1008 Lakhs

Working Capital :

-

Rate of Return (ROR):

36.89

Break Even Point (BEP):

43.92

TCI :

Cost of Project: Rs. 3114 Lakhs

Cost of Project :

311400000

Make An Appointment

Talk to Our Experts Today!

appoinment
Call Us WhatsApp