Please choose a project below related to this category.
E-waste is a popular, informal name for electronic products nearing the end of their useful life. While there is no generally accepted definition of e...
|
Capacity : 2164500 kgs. /annum |
Plant and Machinery cost: Rs. 233 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 22.91 |
|
Break Even Point (BEP): 49.81 |
TCI : Cost of Project: Rs. 500 Lakhs |
|
Cost of Project : 50000000 |
As the name implies, the mineral water is the purified water fortified with requisite amounts of minerals. It is either obtained from natural resource...
|
Capacity : 3000000 Ltrs. /Annum |
Plant and Machinery cost: 24 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 24.00 |
|
Break Even Point (BEP): 62.00 |
TCI : Cost of Project: 112 Lakhs |
|
Cost of Project : 11200000 |
Water is the necessity of our daily life, it’s so important for us that we need clean, safe and sanitary water every day, and usually there’s a more s...
|
Capacity : 210 Lakhs Nos. /annum |
Plant and Machinery cost: Rs. 719 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 25.00 |
|
Break Even Point (BEP): 56.00 |
TCI : Cost of Project: Rs. 1736 Lakhs |
|
Cost of Project : 173600000 |
E-waste is a popular, informal name for electronic products nearing the end of their useful life. Computers, televisions, VCRs, stereos, copiers, an...
|
Capacity : 2164500 kgs. /annum |
Plant and Machinery cost: Rs. 233 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 22.00 |
|
Break Even Point (BEP): 49.00 |
TCI : Cost of Project: Rs. 500 Lakhs |
|
Cost of Project : 50000000 |
An ‘Ore’ may be defined as the aggregate of minerals from which a desired constituent mineral can be extracted with profit. The most used of all metal...
|
Capacity : 140 MT/Day |
Plant and Machinery cost: Rs. 358 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 28.18 |
|
Break Even Point (BEP): 57.96 |
TCI : Cost of Project: Rs. 635 Lakhs |
|
Cost of Project : 63500000 |
Liquid oxygen must be handled with all the precaution required for safety with any cryogenic fluid. Gaseous Oxygen is authorized for shipment in cylin...
|
Capacity : 4152 cum/Day |
Plant and Machinery cost: Rs.105 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 23.00 |
|
Break Even Point (BEP): 58.00 |
TCI : Cost Of Project : Rs. 286 Lakhs |
|
Cost of Project : 28600000 |
Amino acid chelates consists of a metal ion comprising iron, zinc, manganese, magnesium, copper, calcium and mixtures thereof. These cheltaes are mos...
|
Capacity : - |
Plant and Machinery cost: Rs.161 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 41.00 |
|
Break Even Point (BEP): 47.00 |
TCI : Cost Of Project : Rs.502 Lakhs |
|
Cost of Project : 50200000 |
An active ingredient (AI) is the substance in a pharmaceutical drug or a pesticide that is biologically active. The similar terms active pharmaceutic...
|
Capacity : Cephalexin Monohydrate: 500 Kgs/Day, Ampicillin Trihydrate: 500 Kgs/Day,Ibuprofen: 500 Kgs/Day |
Plant and Machinery cost: Rs.448 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 46.00 |
|
Break Even Point (BEP): 44.00 |
TCI : Cost Of Project : Rs.958 Lakhs |
|
Cost of Project : 95800000 |
E waste is a popular, informal name for electronic products nearing the end of their useful life. Computers, televisions, VCRs, stereos, copiers, and...
|
Capacity : 5 MT/Day |
Plant and Machinery cost: 60 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 15.00 |
|
Break Even Point (BEP): 43.00 |
TCI : Cost of Project : 241 Lakhs |
|
Cost of Project : 24100000 |
Water is the necessity of our daily life, it’s so important for us that we need clean, safe and sanitary water every day, and usually there’s a more s...
|
Capacity : 40000 Ltrs./Day |
Plant and Machinery cost: 59 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 29.00 |
|
Break Even Point (BEP): 63.00 |
TCI : Cost of Project : 171 Lakhs |
|
Cost of Project : 17100000 |
Lead acid batteries are rechargeable batteries made of lead plates situated in a ‘bath’ of sulfuric acid within a plastic casing. They are used in eve...
|
Capacity : 40 MT/Day |
Plant and Machinery cost: 316 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 32.00 |
|
Break Even Point (BEP): 50.00 |
TCI : Cost of Project : 696 Lakhs |
|
Cost of Project : 0 |
Paper is one of the necessities of civilization and it is almost impossible to imagine the continuance of a world without the printed books and newspa...
|
Capacity : - |
Plant and Machinery cost: 88 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 32.00 |
|
Break Even Point (BEP): 39.00 |
TCI : Cost of Project : 595 Lakhs |
|
Cost of Project : 59500000 |