Enamelled copper wire is an essential material for motor and transformer winding. There is a heavy consumption of enamelled copper wire. Enamelled co...
|
Capacity : 2 MT / Day |
Plant and Machinery cost: 85 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 44.00 |
|
Break Even Point (BEP): 34.00 |
TCI : 550 Lakhs |
|
Cost of Project : 0 |
Ongoing rise of Air Conditioners and Refrigerators in the market and production in GCC and other part of the world and Heat Transfer Systems in engine...
|
Capacity : 12000 TPA |
Plant and Machinery cost: - |
|
Working Capital : - |
Rate of Return (ROR): 1.00 |
|
Break Even Point (BEP): 0.00 |
TCI : 65 Crores |
|
Cost of Project : 0 |
Ongoing rise of Air Conditioners and Refrigerators in the market and production in GCC and other part of the world and Heat Transfer Systems in engine...
|
Capacity : 12000 TPA |
Plant and Machinery cost: - |
|
Working Capital : - |
Rate of Return (ROR): 1.00 |
|
Break Even Point (BEP): 0.00 |
TCI : 65 Crores |
|
Cost of Project : 0 |
Lime is manufactured from lime stone. Lime is mainly used for manufacture of hydrated lime. Hydrated lime is a dry powder obtained by treating quick...
|
Capacity : 600 MT/Day |
Plant and Machinery cost: 131 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 24.00 |
|
Break Even Point (BEP): 42.00 |
TCI : Cost of Project : 548 Lakhs |
|
Cost of Project : 0 |
Broadly speaking a fertilizer or manure, may be interpreted to mean anything that will increase the yield of a crop is added to the soil. Generally...
|
Capacity : 20 Ton / Day |
Plant and Machinery cost: 100 Lakh |
|
Working Capital : - |
Rate of Return (ROR): 43.00 |
|
Break Even Point (BEP): 38.00 |
TCI : 468 Lakh |
|
Cost of Project : 0 |
Calcium carbonate occurs naturally as the principal constituent of limestone, marble and chalk. Powdered calcium carbonate is produced by two metho...
|
Capacity : 300 MT / Day |
Plant and Machinery cost: 12 Crores |
|
Working Capital : - |
Rate of Return (ROR): 85.00 |
|
Break Even Point (BEP): 28.00 |
TCI : 29 Crores |
|
Cost of Project : 0 |
Iron ore pellets are used in blast furnaces for producing sponge iron & steels. Marked by high productivity lower fuel consumption and improved furnac...
|
Capacity : 6000 MT / Annum |
Plant and Machinery cost: 187 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 44.00 |
|
Break Even Point (BEP): 46.00 |
TCI : Cost of Project : 479 Lakhs |
|
Cost of Project : 0 |
Carpentry and joinery are common terms used with any class of work with wood. Strictly speaking carpentry deals with all works of a carpentry such as...
|
Capacity : 80 Pcs./day |
Plant and Machinery cost: 10 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 50.00 |
|
Break Even Point (BEP): 42.00 |
TCI : 93 Lakhs |
|
Cost of Project : 0 |
The Pharmaceutical Industry in general is well managed in sound economic principles and has excellent techniques of production, technological backing...
|
Capacity : - |
Plant and Machinery cost: 43 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 43.00 |
|
Break Even Point (BEP): 54.00 |
TCI : Cost of Project : 125 Lakhs |
|
Cost of Project : 0 |
Copper is the most commonly used architectural metal now-a-days. Copper plays an essential role in the modern building. From recycled cladding and ro...
|
Capacity : 12 MT/day |
Plant and Machinery cost: 198 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 47.00 |
|
Break Even Point (BEP): 56.00 |
TCI : Cost of Project : 567 Lakhs |
|
Cost of Project : 0 |
Castings of suitable shape and size intended for subsequent hot working are termed as ingots. Ingot iron has very low carbon in steel. This is general...
|
Capacity : 60,000 MT / Annum |
Plant and Machinery cost: 4012 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 43.00 |
|
Break Even Point (BEP): 30.00 |
TCI : 6454 Lakhs |
|
Cost of Project : 0 |
Bisleri, which pioneered the packaged drinking water business in India, catering to consumers need to have hygienic drinking water while on the move...
|
Capacity : 30,000 Thousand Nos./Annum or 1,00,000 Bottles /day |
Plant and Machinery cost: Rs. 105 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 44.00 |
|
Break Even Point (BEP): 63.00 |
TCI : Cost of Project Rs. 282 Lakhs |
|
Cost of Project : 0 |