Business Ideas: 1 - 1.25 Crore (Plant and Machinery): Selected Project Profiles for Entrepreneurs, Startups

Please choose a project below related to this category.

Virgin Coconut Oil
Virgin Coconut Oil

Virgin coconut oil (VCO) is the purest form of coconut oil. Introduced onto the world market at the end of the 20th century, it is one of the highest...

Capacity :

Virgin Coconut Oil (Packed in 1 Ltr Glass Bottle): 180,000Ltrs/Annum Deffated Coconut Powder (Bye Products): 75,000 Kgs/annum

Plant and Machinery cost:

108 lakhs

Working Capital :

-

Rate of Return (ROR):

15.00

Break Even Point (BEP):

67.00

TCI :

Cost of Project : Rs 258 lakhs

Cost of Project :

25800000

Pharmaceutical Manufacturing Unit  (Beta-Lactam and Non-Beta Lactam) Manufacturing Plant, Detailed Project Report, Profile, Business Plan, Industry Trends, Market Research, Survey, Manufacturing Process, Machinery, Raw Materials, Feasibility Study
Pharmaceutical Manufacturing Unit (Beta-Lactam and Non-Beta Lactam) Manufacturing Plant, Detailed Project Report, Profile, Business Plan, Industry Trends, Market Research, Survey, Manufacturing Process, Machinery, Raw Materials, Feasibility Study

Pharmaceutical formulation, in pharmaceutics, is the process in which different chemical substances, including the active drug, are combined to produc...

Capacity :

-

Plant and Machinery cost:

103 lakhs

Working Capital :

-

Rate of Return (ROR):

33.00

Break Even Point (BEP):

45.00

TCI :

Cost of Project : Rs 1452 lakhs

Cost of Project :

145200000

Ginger Oil
Ginger Oil

Ginger products, such as ginger oil is internationally commercialized for use in food and pharmaceutical processing. To improve their appearance some...

Capacity :

45,000 Kgs/annum

Plant and Machinery cost:

Rs 103 lakhs

Working Capital :

-

Rate of Return (ROR):

27.00

Break Even Point (BEP):

62.00

TCI :

Cost of Project: Rs 274lakhs

Cost of Project :

27400000

Vitamin ‘C’
Vitamin ‘C’

Vitamin C is a physiological antioxidant of major importance for protection against diseases and degenerative processes caused by oxidative stress. Vi...

Capacity :

2400 MT/annum

Plant and Machinery cost:

Rs 123 lakhs

Working Capital :

-

Rate of Return (ROR):

29.00

Break Even Point (BEP):

50.00

TCI :

Cost of Project : Rs 563 lakhs

Cost of Project :

56300000

Pharmaceutical Manufacturing Unit (Betalactam and NonBetalactam)
Pharmaceutical Manufacturing Unit (Betalactam and NonBetalactam)

Pharmaceutical formulation, in pharmaceutics, is the process in which different chemical substances, including the active drug, are combined to produc...

Capacity :

Betalactam Cephalexin Tablets 400 mg: 3,000,000 Nos./annum Betalactam Cephalexin Capsules 400 mg:3,000,000 Nos./annum Betalactam Cephalexin Syrup 50 ml:1,500,000 Nos./annum Betalactam Cephalexin Dry Syrup 30 ml:1,500,000 Nos./annum Betalactam Cephalexin S

Plant and Machinery cost:

Rs 103 lakhs

Working Capital :

-

Rate of Return (ROR):

33.00

Break Even Point (BEP):

45.00

TCI :

Cost of Project: Rs 1452 lakhs

Cost of Project :

145200000

Ladies under Garments
Ladies under Garments

Hosiery industry is an ancient industry in the field of textile industry having very good potential in domestic market and also in the export market....

Capacity :

Bra:450,000 Pcs/annum Panties:450,000 Pcs/annum

Plant and Machinery cost:

Rs 121 lakhs

Working Capital :

-

Rate of Return (ROR):

28.00

Break Even Point (BEP):

56.00

TCI :

Cost of Project : Rs 270 lakhs

Cost of Project :

27000000

Carbon Fiber Composites
Carbon Fiber Composites

A Carbon Fiber is a fibrous carbon material having a micro graphite crystal structure made by fibrillation of Acrylic resin, a well-known textile mate...

Capacity :

300,000 Kgs/Annum

Plant and Machinery cost:

Rs 111 lakhs

Working Capital :

-

Rate of Return (ROR):

27.00

Break Even Point (BEP):

61.00

TCI :

Cost of Project : Rs 451 lakhs

Cost of Project :

45100000

Holiday Resort
Holiday Resort

A Holiday resort is a self-contained commercial establishment that endeavors to provide most of a vacationer's wants, such as food, drink, lodging, sp...

Capacity :

Double Bed Rooms Accomodation 60 Rooms (60%): 12,960 Nos./annum Resort Foods and Ammenities: 10,800 Nos./annum Restaurant: 216,000 Nos./annum Bar: 36,000 Nos./annum Banquet (Main) Lawn Area Mix &: 90,000 Nos/annum Dinning (60 Days in Year) 1500 Person/day

Plant and Machinery cost:

Rs 120 lakhs

Working Capital :

-

Rate of Return (ROR):

26.00

Break Even Point (BEP):

47.00

TCI :

Cost of Project : Rs 1549 lakhs

Cost of Project :

154900000

Insulator(HT & LT)- Manufacturing Plant, Detailed Project Report, Profile, Business Plan, Industry Trends, Market Research, Survey, Manufacturing Process, Machinery, Raw Materials, Feasibility Study, Investment Opportunities, Cost and Revenue
Insulator(HT & LT)- Manufacturing Plant, Detailed Project Report, Profile, Business Plan, Industry Trends, Market Research, Survey, Manufacturing Process, Machinery, Raw Materials, Feasibility Study, Investment Opportunities, Cost and Revenue

Electricity play a vital role in the development and growth of Agriculture and Industry, as it is a high priority item for all the developing or devel...

Capacity :

3,500MT/Annum

Plant and Machinery cost:

107 lakhs

Working Capital :

-

Rate of Return (ROR):

27.00

Break Even Point (BEP):

59.00

TCI :

Cost of Project: Rs 691lakhs

Cost of Project :

691100000

Cashew Nut Processing with CNSL - Manufacturing Plant, Detailed Project Report, Profile, Business Plan, Industry Trends, Market Research, Survey, Manufacturing Process, Machinery, Raw Materials, Feasibility Study, Investment Opportunities
Cashew Nut Processing with CNSL - Manufacturing Plant, Detailed Project Report, Profile, Business Plan, Industry Trends, Market Research, Survey, Manufacturing Process, Machinery, Raw Materials, Feasibility Study, Investment Opportunities

The cashew is a resilient and fast-growing evergreen tree that can grow to a height of 20 m (60 ft).The cashew nut is a popular dessert nut, eaten out...

Capacity :

Cashew Nut: 750 MT/Annum Cashew Nut Shell Liquid: 630 MT/Annum

Plant and Machinery cost:

Rs. 108 lakhs

Working Capital :

-

Rate of Return (ROR):

27.00

Break Even Point (BEP):

67.00

TCI :

Cost of Project: Rs. 371 lakhs

Cost of Project :

37100000

Quartz Slabs - Manufacturing Plant, Detailed Project Report, Profile, Business Plan, Industry Trends, Market Research, Survey, Manufacturing Process, Machinery, Raw Materials, Feasibility Study, Investment Opportunities, Cost and Revenue, Plant Economics
Quartz Slabs - Manufacturing Plant, Detailed Project Report, Profile, Business Plan, Industry Trends, Market Research, Survey, Manufacturing Process, Machinery, Raw Materials, Feasibility Study, Investment Opportunities, Cost and Revenue, Plant Economics

Engineered stone is a composite material made of crushed stone bound together by an adhesive, (most commonly polymer resin, with some newer versions u...

Capacity :

Quartz Slabs (760 x 2440 x 15 mm):60 Nos/Day

Plant and Machinery cost:

Rs 101 Lakhs

Working Capital :

-

Rate of Return (ROR):

26.58

Break Even Point (BEP):

51.79

TCI :

Cost of Project : Rs 350 Lakhs

Cost of Project :

35000000

Instant Noodles - Manufacturing Plant, Detailed Project Report, Profile, Business Plan, Industry Trends, Market Research, Survey, Manufacturing Process, Machinery, Raw Materials, Feasibility Study, Investment Opportunities, Cost and Revenue, Plant Layout
Instant Noodles - Manufacturing Plant, Detailed Project Report, Profile, Business Plan, Industry Trends, Market Research, Survey, Manufacturing Process, Machinery, Raw Materials, Feasibility Study, Investment Opportunities, Cost and Revenue, Plant Layout

Many fast food items have flooded the markets but noodles have emerged as the most popular item as it is cheaper, very easy to make and nutritious. Ur...

Capacity :

Instant Noodles (75 gms Pouches):5000 Kgs/Day

Plant and Machinery cost:

Rs 125 Lakhs

Working Capital :

-

Rate of Return (ROR):

25.83

Break Even Point (BEP):

54.21

TCI :

Cost of Project:Rs 386 Lakhs

Cost of Project :

386

Make An Appointment

Talk to Our Experts Today!

appoinment
Call Us WhatsApp