Please choose a project below related to this category.
Banana powder is prepared from pulp of fruits after mashing and drying in a drum or spray driers. Then dried product is pulverized and passed through...
|
Capacity : 1000.00 KG./day |
Plant and Machinery cost: Rs. 21 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 44.00 |
|
Break Even Point (BEP): 45.00 |
TCI : Rs. 117 Lakhs |
|
Cost of Project : 0 |
Pearl Sugar candies are cubical crystals, which are transparent white in colour and more sweater than sugar. These are the cheapest source of calories...
|
Capacity : 3.00 TON/day |
Plant and Machinery cost: Rs. 32 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 51.00 |
|
Break Even Point (BEP): 38.00 |
TCI : Rs. 134 Lakhs |
|
Cost of Project : 0 |
It is a colourless crystalline product, which is soluble in water in liquid ammonia and highly toxic. It is manufactured by using Sodium Ammonia and S...
|
Capacity : 10.00 MT/day |
Plant and Machinery cost: Rs. 2 Crores |
|
Working Capital : - |
Rate of Return (ROR): 54.00 |
|
Break Even Point (BEP): 30.00 |
TCI : Rs. 12 Crores |
|
Cost of Project : 0 |
Dental education occupies a place of pride in the field of medical studies. The basic aim of the dental colleges is to provide health-oriented courses...
|
Capacity : 100 Students in Dental College ,4 year course with Dental College |
Plant and Machinery cost: 674 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 50.00 |
|
Break Even Point (BEP): 43.00 |
TCI : 1642 Lakhs |
|
Cost of Project : 0 |
It is non crystalline solid or viscous material having adhesive properties, which is completely soluble in carbon disulfide. It is generally brown or...
|
Capacity : 20 Tonne/day |
Plant and Machinery cost: Rs. 14 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 41.00 |
|
Break Even Point (BEP): 49.00 |
TCI : Rs. 71 Lakhs |
|
Cost of Project : 0 |
Drum stick powder is basically a by product of poultry processing unit. Hen legs are collected in polystyrene tray and then it is dried by chain conve...
|
Capacity : 50.00 KGS./day |
Plant and Machinery cost: Rs. 6 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 37.00 |
|
Break Even Point (BEP): 53.00 |
TCI : Rs. 18 Lakhs |
|
Cost of Project : 0 |
Admixtures are materials added to the concrete before or during its mixing, with a view to modify one or more of the properties of concrete in the pla...
|
Capacity : 500 kg. Air Entraining Admix, 500 kg. Accelerating Admixture, 500 kg. Retarding Admixture, 500 kg. Water Reducing Admix (PER DAY) |
Plant and Machinery cost: Rs. 10 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 51.00 |
|
Break Even Point (BEP): 31.00 |
TCI : Rs. 162 Lakhs |
|
Cost of Project : 0 |
Jute fibre is natural fibre obtained from stalks of Plants of the genes Corchorus of the Tiliaceal family. Garments made of jute is not only soft but...
|
Capacity : Jute Garments Substitute Of Woollen, Garments 1000 Pcs/Day (Wt. 500 Gms ) |
Plant and Machinery cost: Rs. 100 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 41.00 |
|
Break Even Point (BEP): 44.00 |
TCI : Rs. 294 Lakhs |
|
Cost of Project : 0 |
Magnesium is a very light, silver white metal, moderately hard and alkaline earth metal. It is strong reducing agent and has electrical conductivity s...
|
Capacity : 10,000MT/Annum |
Plant and Machinery cost: Rs. 298 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 39.00 |
|
Break Even Point (BEP): 63.00 |
TCI : cost of project Rs. 937 Lakhs |
|
Cost of Project : 0 |
Crushing of stone is physical process applied over the available natural stone to reduce size. Crushed stone should be hard enough to withstand heavy...
|
Capacity : 150.00 Tonnes/day |
Plant and Machinery cost: Rs. 80 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 61.00 |
|
Break Even Point (BEP): 45.00 |
TCI : Rs. 190 Lakhs |
|
Cost of Project : 0 |
Gum Karaya is partially acetylated polysaccharide that is characterized by a high degree of water absorption and low solution PH. It is used in pharma...
|
Capacity : 1.00 MT/day |
Plant and Machinery cost: Rs. 11 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 56.00 |
|
Break Even Point (BEP): 35.00 |
TCI : Rs. 113 Lakhs |
|
Cost of Project : 0 |
Golf is quite a respectable and expensive game. Participants of golf course are considered as regardable and honourable people of the society. Golf co...
|
Capacity : 20000 MEMBERS |
Plant and Machinery cost: Land & Building : Rs. 19.62 Crore |
|
Working Capital : - |
Rate of Return (ROR): 26.00 |
|
Break Even Point (BEP): 34.00 |
TCI : Rs. 21 Crores |
|
Cost of Project : 0 |