Arunachal Pradesh is one of the Indian northeastern states with a range of promising opportunities for entrepreneurs and investors. Being one of the regions with extensive natural resources, vast agricultural potential, and high renewable energy resources, the state captures the attention of many industry-oriented Indian companies. This paper summarizes a range of potential business sectors and opportunities that you may use in your start-up business development.
When combined, these factors in the state’s policy ecosystem cost and cost structure, together with a considerable number of government incentives, yield high returns, reduce operating costs, and drive down the payback period. Arunachal Pradesh has a lower cost of land acquisition and facilities than the majority of Indian states. Energy costs on average are reduced due to India as the best electricity available from renewable sources and hydropower at a much lower cost.
Particularly lower energy bills are on products and the first work with bamboo as raw material, food processing, and also a bunch of small manufacturing units. Reduced energy bills for air conditioning equipment and lighting can be mentioned as a noticeable economic improvement in almost every project. Also, the cost of delivery of goods from other states, such as bamboo, wood, products, fruits, and spices, is removed, particularly essential. Delivery and transport are expensive and take time that can mean a lot to the buyer. The cost of building itself is sometimes relatively small. The low cost of transportation alone can make projects viable, as can be kept to a minimum by auxiliary industries making a reasonable profit.
In Arunachal Pradesh, market conditions are changing very rapidly due to the rising per capita, urbanization and tourism income generating surge in the consumer demand for processed foods and beverages and lifestyle products.
From the exposure to export markets in the 6 to eight per year “ food processing and allied sectors already identified as employment opportunity For the promotion year, environmental sector, renewable energy production rely that is expected to grow by 10 to 12% annually under their help and more, industry in the areas to raise concern. Yet another important opportunity area can be ecotourism, adventure tourism, human heritage tourism which offers employment opportunity similarly on the sustainable business modal and as well if it requires availability subcategories tourist won’t buy anything from 5 subcategories generate business for handicraft items, organic food products, t-shirt industry is tea, medicine man, secondary opportunity in speedily expanding its field of focus all these major and related agricultural at 8 to 10% per annum.
To conclude, Arunachal Pradesh stands at an unprecedented inflection point in its economic journey of becoming. What used to be a metaphor on the maps of “incredible India” due to mountains, rivers, and tribal variety has now become a beacon of economic and industrial capacity of India’s Northeast. Such a combination of granted slaves of nature and mineral riches, fast-growing infrastructure, pro-regulatory business environment and market access to the three neighboring states arguably makes Arunachal Pradesh one of the most attractive places to set up a business or an industry for the next decade. As for the investors and start-ups searching for uncharted territories, Arunachal Pradesh offers a unique blend of opportunity, sustainability and growth rate; very few other states come close to providing all three in equal measures.
Please choose a project below related to this category.
Gelatin or gelatine (from Latin: gelatus meaning "stiff", "frozen") is a translucent, colourless, brittle (when dry), flavourless foodstuff, derived f...
|
Capacity : Gelatin Glue: 5 MT/Day |
Plant and Machinery cost: Rs 156 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 28.00 |
|
Break Even Point (BEP): 49.00 |
TCI : Cost of Project: Rs 733 Lakhs |
|
Cost of Project : 73300000 |
The Indian pharmaceutical sector has come a long way, being almost non-existent before 1970 to a prominent provider of healthcare products, meeting al...
|
Capacity : Tablets: 500,000 Nos./Day,Capsules:500,000 Nos./Day,Syrup (100 ml Size):12,500 Nos./Day |
Plant and Machinery cost: Rs 178 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 31.00 |
|
Break Even Point (BEP): 32.00 |
TCI : Cost of Project: Rs 6342 Lakhs |
|
Cost of Project : 634200000 |
Sanitary Napkin comes under Nonwoven fabrics which as a whole come under technical textile. A sanitary napkin or a sanitary towel is an absorbent item...
|
Capacity : 30,000 Pkts./Day |
Plant and Machinery cost: Rs 345 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 27.00 |
|
Break Even Point (BEP): 42.00 |
TCI : Cost of Project: Rs 685 Lakhs |
|
Cost of Project : 68500000 |
A transmission tower (colloquially termed an electricity pylon in the United Kingdom and parts of Europe, an ironman in Australia, and a hydro tower i...
|
Capacity : Transmission & Tele Communication Tower: 80 MT/ Day |
Plant and Machinery cost: Rs 239 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 28.00 |
|
Break Even Point (BEP): 46.00 |
TCI : Cost of Project: Rs 1309 Lakhs |
|
Cost of Project : 130900000 |
Autoclaved Aerated Concrete (AAC) is a non-combustible, lime-based, cementitious building material that is expanding into new worldwide markets. As a...
|
Capacity : A.A.C. Blocks: 500 Cu.Mt /day |
Plant and Machinery cost: Rs 601 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 25.00 |
|
Break Even Point (BEP): 50.00 |
TCI : Cost of Project:Rs 1415 Lakhs |
|
Cost of Project : 141500000 |
Edible nuts are used by mankind for food, edible oils, spices, condiments or beverages. They have been an important food source from prehistoric times...
|
Capacity : Pea Nuts:500 Kgs./Day • Cashew Nuts:500 Kgs./Day •Almonds:500 Kgs./Day •Pistachio:500 Kgs./Day |
Plant and Machinery cost: Rs 26 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 28.00 |
|
Break Even Point (BEP): 58.00 |
TCI : Cost of Project:: Rs 222 Lakhs |
|
Cost of Project : 22200000 |
Vodka is a neutral spirit that is without distinctive character, aroma, taste, or color. These properties are developed during the distillation proces...
|
Capacity : Vodka from Grain & Potato:30 KLs/Day |
Plant and Machinery cost: Rs 3845 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 25.00 |
|
Break Even Point (BEP): 41.00 |
TCI : Cost of Project: Rs 6316 Lakhs |
|
Cost of Project : 631600000 |
There is cleaning requirement everywhere. Cleanliness is the source of beauty and also the placement of God. Laundry unit is one of the unit by which...
|
Capacity : Washing & Iron: 700.0 Pcs/ day |
Plant and Machinery cost: Rs 48 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 21.00 |
|
Break Even Point (BEP): 51.00 |
TCI : Cost of Project: Rs 145 Lakhs |
|
Cost of Project : 14500000 |
Powdered milk is a dairy product produced from cow milk. Cow milk basically contains water, fats, protein sugar and ash. About 86% to 88% of cow milk...
|
Capacity : Skimmed Milk Powder 8.00 MT/Day • Whole Milk Powder 2.67 MT/Day • Dairy Whitener 1.50 MT/Day |
Plant and Machinery cost: Rs 387 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 27.00 |
|
Break Even Point (BEP): 56.00 |
TCI : Cost of Project: Rs 973 Lakhs |
|
Cost of Project : 97300000 |
A medical college is meant to impart education of medical field to students to qualify them as doctors in different specialized disciplines so as to t...
|
Capacity : Total Students per Annum:150 Students Admitted/Annum 700 Beded Hospital |
Plant and Machinery cost: Rs 2047 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 1.00 |
|
Break Even Point (BEP): 36.00 |
TCI : Cost of Project : Rs 31862 Lakhs |
|
Cost of Project : 3186200000 |
The generation, transmission, and distribution of power involve electrical facilities, apparatus, and components, to carry the electrical energy from...
|
Capacity : Single Core Wires (THHN/THWN) 60 KM/Day,Single Core Stranded (CU/PVC)45 KM/Day,Multiple-Core Flexible-Wire (Sheathed)21 KM/Day |
Plant and Machinery cost: Rs 55 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 31.00 |
|
Break Even Point (BEP): 71.00 |
TCI : Cost of Project: Rs 189 Lakhs |
|
Cost of Project : 18900000 |
India is the largest producer of fruits and second largest producer of vegetables in the world. Fruits & vegetables, being perishable in nature re...
|
Capacity : 3000 MT |
Plant and Machinery cost: Rs 266 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 26.00 |
|
Break Even Point (BEP): 43.00 |
TCI : Cost of Project: Rs 882 Lakhs |
|
Cost of Project : 88200000 |