Why Start an Industry in Bahrain
Economic & Strategic Advantages:
Furthermore, Bahrain and, in particular, its well-developed finance, tourism, and logistics and manufacturing sectors can be a socially well-placed territory to its neighboring hubs to the large adjacent markets of Saudi Arabia, the United Arab Emirates, or Qatar Oil, apart from being its biggest sector in the GDP combination as well one of the ways the money is generated as finance, logistics, and tourism go as industry and manufacturing on start – unique smart technology.
Infrastructure, Location & Connectivity:
In Bahrain, there are modern ports and airports, highways to other Gulf Cooperation Council countries, and others. One of the examples is the Khalifa The re Khalifa bin Salman Port, which is a state-of-the-art facility receiving and sending containerized and industrial goods. Besides, the Bahrain International Airport is used to transport air cargo and passengers..The airport is a state-of-the-art headquarters, as well as remarkable among other GCC nations, too.
Workforce Quality & Cost Factors:
The country has a very well-developed multilingual labor force. Workforce is a higher population sector in financial IT, and industrial services. In the meantime, labor is great compared to the GCC countries, the high demand, and high labor price draw an SME and startup that penetrates the country’s community-based market.
Bahrain’s natural and industrial resources support multiple sectors:
Last but not least, the output resources obtained have a high reliability index, leading to lower levels of operational risk. Efficiency is required in manufacturing industry, food processing and even in the renewable energy sector-solar and wind powers, leading to profitability.
Bahrain provides multiple incentives for investors:
To sum up, such organizations as expensive items in renewable energy, fintech manufacturing, tourism, and logistics are looking for lucrative markets for renewables, and one of them is Bahrain. They are prompted not by the ideal premises from a profitable fulfillment, scalability point of view, and security, but by the well-structured Bahraini ecosystem. The Government of Bahrain Chen’s dedication to innovative diversification and business facilitation can only naturally increase its long-term attractiveness, resulting in a customer-focused ecosystem. Therefore, only Bahrain’s visionaries trying to secure opportunities and wealth in nature would be the best-preferred place to limit in case. Moreover, the country hopes to invest the above concept idea into future success ventures to assure the Gulf state’s dynamism.
Please choose a project below related to this category.
Electronic wastes, "e-waste", "e-scrap", or "Waste Electrical and Electronic Equipment" ("WEEE") is a description of surplus, obsolete, broken or disc...
|
Capacity : Copper Wire:1.67 MT/day Plastic Granules:7.43 MT/day Glass :3.23 MT/day Ferrous Metal |
Plant and Machinery cost: 131 lakhs |
|
Working Capital : - |
Rate of Return (ROR): 26.00 |
|
Break Even Point (BEP): 30.00 |
TCI : Cost of Project: Rs 1272 lakhs |
|
Cost of Project : 127200000 |
A solar panel is a collection of solar cells. Lots of small solar cells spread over a large area can work together to provide enough power to be usefu...
|
Capacity : 25,000 KW/annum |
Plant and Machinery cost: 449 lakhs |
|
Working Capital : - |
Rate of Return (ROR): 29.00 |
|
Break Even Point (BEP): 47.00 |
TCI : Cost of Project 1126 lakhs |
|
Cost of Project : 112600000 |
A solar panel is a collection of solar cells. Lots of small solar cells spread over a large area can work together to provide enough power to be usefu...
|
Capacity : SOLAR PANEL:25,000Units/annumELECTRONIC TOYS:1,500,000 Units/annum |
Plant and Machinery cost: 498 lakhs |
|
Working Capital : - |
Rate of Return (ROR): 29.00 |
|
Break Even Point (BEP): 50.00 |
TCI : Cost of Project: Rs 1348 lakhs |
|
Cost of Project : 0 |
Electronic wastes, "e-waste", "e-scrap", or "Waste Electrical and Electronic Equipment" ("WEEE") is a description of surplus, obsolete, broken or disc...
|
Capacity : 7500 MT/annum |
Plant and Machinery cost: 131 lakhs |
|
Working Capital : - |
Rate of Return (ROR): 26.00 |
|
Break Even Point (BEP): 30.00 |
TCI : Cost of Project: 272 lakhs |
|
Cost of Project : 127200000 |
Micronutrients are elements which are essential for plant growth, but are required in much smaller amounts than those of the primary nutrients; nitrog...
|
Capacity : Micronutrient Fertilizer for Fruits : 187,500 Kgs/annum Micronutrient Fertilizer for Vegeta.... |
Plant and Machinery cost: 23 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 26.00 |
|
Break Even Point (BEP): 76.00 |
TCI : Cost of Project 114 Lakhs |
|
Cost of Project : 11400000 |
The tissues paper sector has boomed over the last few years. With a move to more luxurious tissue paper and ultra-absorbent paper towels the industry...
|
Capacity : Toilet Paper Rolls : 7,200,000 Nos./annum Paper Napkin (100 Pcs.): 558,000 Nos./annum Facial Tissue |
Plant and Machinery cost: 59 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 29.00 |
|
Break Even Point (BEP): 41.00 |
TCI : Cost of Project 341 Lakhs |
|
Cost of Project : 34100000 |
Detergents are defined as complete washing or cleaning products, which contain among their ingredients an organic surface-active compound (Surfactant)...
|
Capacity : Detergent Cake:180,000Kgs/annum Detergent Powder:180,000Kgs/annum |
Plant and Machinery cost: Rs 15 lakhs |
|
Working Capital : - |
Rate of Return (ROR): 27.00 |
|
Break Even Point (BEP): 76.00 |
TCI : Cost of Project : Rs 36 lakhs |
|
Cost of Project : 3600000 |
Micronutrients are elements which are essential for plant growth, but are required in much smaller amounts than those of the primary nutrients; nitrog...
|
Capacity : Micronutrient Fertilizer for Fruits: 187,500 Kgs/annum Micronutrient Fertilizer for Vegetables: 112,500 Kgs/annum |
Plant and Machinery cost: Rs 23 lakhs |
|
Working Capital : - |
Rate of Return (ROR): 26.00 |
|
Break Even Point (BEP): 76.00 |
TCI : Cost of Project: Rs 114 lakhs |
|
Cost of Project : 11400000 |
The tissues paper sector has boomed over the last few years. With a move to more luxurious tissue paper and ultra-absorbent paper towels the industry...
|
Capacity : Toilet Paper Rolls: 7,200,000 Nos./annum Paper Napkin (100 Pcs.): 558,000 Nos./annum Facial Tissue (100 Pcs.): 1,251,000 Nos./annum |
Plant and Machinery cost: Rs 59 lakhs |
|
Working Capital : - |
Rate of Return (ROR): 29.00 |
|
Break Even Point (BEP): 41.00 |
TCI : Cost of Project : Rs 341 lakhs |
|
Cost of Project : 34100000 |
Electronic wastes, e-waste, e-scrap, or Waste Electrical and Electronic Equipment (WEEE) is a description of surplus, obsolete, broken or discarded el...
|
Capacity : Copper Wire: 500mt/annum Plastic Granules: 2230mt/annum Glass: 970mt/annum Ferrous Metal: 800mt/annum Monitors (Repair): 3000mt/annum |
Plant and Machinery cost: Rs 132 lakhs |
|
Working Capital : - |
Rate of Return (ROR): 27.00 |
|
Break Even Point (BEP): 54.00 |
TCI : Cost of Project: Rs 518 lakhs |
|
Cost of Project : 51800000 |
A solar cell, sometimes called a photovoltaic cell, is a device that converts light energy into electrical energy.Solar panels generate free power fro...
|
Capacity : Poly Crystaline Solar PV Modules Cap10 Watt: 1,200,000 Nos/Annum Poly Crystaline Solar PV Module Cap. 20 Watt: 600,000 Nos/Annum Poly Crystaline Solar PV Module Cap. 50 Watt:240,000Nos/Annum Poly Crystaline Solar PV Module Cap. 100 Watt: 150,000Nos/Annum |
Plant and Machinery cost: Rs 1225 lakhs |
|
Working Capital : - |
Rate of Return (ROR): 26.00 |
|
Break Even Point (BEP): 56.00 |
TCI : Cost of Project: Rs 1674 lakhs |
|
Cost of Project : 167400000 |
A solar cell, sometimes called a photovoltaic cell, is a device that converts light energy into electrical energy. Solar panels generate free power fr...
|
Capacity : Poly Crystaline Solar PV Modules (10, 20, 50,100 & 300 Watt): 74,00,000 Nos per annum Solar Inverters (Grid Tie String Inverters 1, 10, 30, 50 & 60 KVA) & (Solar Hydrid Inverters 1, 30, 60, 100 & 120 KVA: 7200 Nos per annum Solar Pump Controller |
Plant and Machinery cost: 2162.88 lakhs |
|
Working Capital : - |
Rate of Return (ROR): 36.00 |
|
Break Even Point (BEP): 31.00 |
TCI : Cost of Project: Rs. 21918 |
|
Cost of Project : 2191800000 |