This shift from the commodity-based economy to the value addition manufacturing and services is worth the try, and entrepreneurs plus investors have every reason to be optimistic. First, the natural abundance of raw materials – cotton, cashews, shea – is likely to increase the transshipment feasibility to Europe via Cotonou port.Finally, investing in the textile raw, agricultural processing and renewable logistics, plus distribution through local versions to exports manufacturers and the investors of SMEs and medium corporation size get realistic opportunities. Indeed, extreme incentives encouraged low-level manufacturing and no other non-factories might succeed due to their low-level input needs; however, investors that make political choices regarding local benefits weed a configuration of natural state factors into successful export businesses.
In 2024, the massive investment in transportation trade, agriculture, and market by donors and the government put up a strong performance, enabling the economy to attain a 7.5% real GDP growth.
Strategic advantages:
Thanks to the progress that Benin has achieved in the industrialization and value addition, it is an ideal investment that is ready to be tapped in the following fields, textile, cashew and shea processing, agro-food, logistics, and renewable energy. The sector development would be supported by affordable and competitive sources of energy in opportunities in the utilization of local raw material, market access, and broader industrial platform pull sector development would be supported in the scaling of projects and force that investment is based. However, success would have depended on data assessed from the feasibility test, secure off-take strategic negotiation and power network uncertainty and local collaboration in partnerships to address infrastructure and regulatory risk. Investors, in this case, would develop a lucrative investment right from the assessment phase testing and compliance with standards as quickly capturing the government’s incentive scheme would offer investors opportunities to make profits and minimize on the business s start-up time to cut on the job creation export proceed and the number of quantifiable social and economic benefit gained.
Please choose a project below related to this category.
Tyres and Tubes are the backbone of the bicycle and rickshaw. Bicycle and rickshaw continues to be the principal mode of transport for the low and mid...
|
Capacity : 300000 Nos. Tyres & 300000 Nos. Tubes |
Plant and Machinery cost: 158 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 42.00 |
|
Break Even Point (BEP): 53.00 |
TCI : Cost of Project : 351 Lakhs |
|
Cost of Project : 0 |
A toothpick is a small stick of wood, plastic, bamboo, metal, bone or other substance used to remove detritus from the teeth, usually after a meal. A...
|
Capacity : - |
Plant and Machinery cost: 6 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 42.00 |
|
Break Even Point (BEP): 62.00 |
TCI : 22 Lakhs |
|
Cost of Project : 0 |
Bottled Water means water intended for human consumption and which is sealed in bottles and other containers with no added ingredients except that it...
|
Capacity : - |
Plant and Machinery cost: 25 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 44.00 |
|
Break Even Point (BEP): 54.00 |
TCI : 100 Lakhs |
|
Cost of Project : 0 |
Bottled Water means water intended for human consumption and which is sealed in bottles and other containers with no added ingredients except that it...
|
Capacity : 3000000 Bottles/Annum |
Plant and Machinery cost: 39 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 41.00 |
|
Break Even Point (BEP): 52.00 |
TCI : Cost of Project : 108 Lakhs |
|
Cost of Project : 0 |
Bottled Water means water intended for human consumption and which is sealed in bottles and other containers with no added ingredients except that it...
|
Capacity : 60000000 Nos. Bottles/Annum |
Plant and Machinery cost: 217 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 45.00 |
|
Break Even Point (BEP): 60.00 |
TCI : Cost of Project : 454 Lakhs |
|
Cost of Project : 0 |
Bottled Water means water intended for human consumption and which is sealed in bottles and other containers with no added ingredients except that it...
|
Capacity : Drinking Water – 17280000 Nos. Bottles (1 Ltr.)/Annum,Soda Water – 1008000 Nos. Bottles (600 Ml)/Annum,Drinking Water Jar – 720000 Nos. Jar (20 Ltr.)/Annum |
Plant and Machinery cost: 403 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 44.00 |
|
Break Even Point (BEP): 60.00 |
TCI : Cost of Project : 695 Lakhs |
|
Cost of Project : 0 |
Bottled Water means water intended for human consumption and which is sealed in bottles and other containers with no added ingredients except that it...
|
Capacity : 6,00,00,000 Bottles/Annum |
Plant and Machinery cost: 217 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 45.00 |
|
Break Even Point (BEP): 60.00 |
TCI : Cost of Project : 455 Lakhs |
|
Cost of Project : 0 |
Hygiene is an essential component of healthy living, integral to achieving health and preventing disease. Not just selecting the right food choices bu...
|
Capacity : 3000 MT/Annum, 6 MT Paper Napkins, 2 MT Toilet Rolls, 2 MT Facial Paper |
Plant and Machinery cost: 41 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 49.00 |
|
Break Even Point (BEP): 25.00 |
TCI : 923 Lakhs |
|
Cost of Project : 0 |
Bicycle and motorcycle tubes are the backbone of the bicycle and motorcycle industries. Few numbers of companies in the organized sectors are engaged...
|
Capacity : 300000 Nos. Bicycle Tubes, 300000 Nos. Motorcycle Tubes |
Plant and Machinery cost: 105 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 43.00 |
|
Break Even Point (BEP): 50.00 |
TCI : Cost of Project : 240 Lakhs |
|
Cost of Project : 0 |
Wooden furniture is used for articles of daily use in dwelling house, place of business, public buildings and includes items such as chairs, tables, b...
|
Capacity : 7500 Pcs./Annum |
Plant and Machinery cost: 13 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 46.00 |
|
Break Even Point (BEP): 38.00 |
TCI : 118 Lakhs |
|
Cost of Project : 0 |
The most common, versatile and oldest material that is used for making furniture is wood. Almost all varieties of furniture can be made of wood. Wood...
|
Capacity : 48000 Pcs./Annum (Wooden Laboratory Furniture), Cabinet, Racks & Benches 20 Pc Per Day., Tables 60 Pcs & Chair 40 Pcs. Per Day. |
Plant and Machinery cost: 42 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 46.00 |
|
Break Even Point (BEP): 41.00 |
TCI : 288 Lakhs |
|
Cost of Project : 0 |
Bottled water industry, colloquially called, the mineral water industry, is a symbol of new life style emerging in India. While a large segment of th...
|
Capacity : - |
Plant and Machinery cost: 403 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 44.00 |
|
Break Even Point (BEP): 60.00 |
TCI : Cost of Project : 695 Lakhs |
|
Cost of Project : 69500000 |