Please choose a project below related to this category.
-
|
Capacity : 2 Ton/Day |
Plant and Machinery cost: Rs. 11 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 50.00 |
|
Break Even Point (BEP): 39.00 |
TCI : Rs. 66 Lakhs |
|
Cost of Project : 0 |
The bleaching of the textile is done to bring the whiteness finishing in the fabric where as dyeing for various shades. The art lies in colouring the...
|
Capacity : 6000 K meters / Annum |
Plant and Machinery cost: 150 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 31.00 |
|
Break Even Point (BEP): 54.00 |
TCI : Cost of Project : 452 Lakhs |
|
Cost of Project : 0 |
Gin implies a machine especially is for hoisting a cotton-gin. Ginning pertains to clear of seeds by a cotton-gin, where as ginner is one who gives co...
|
Capacity : 10 MT / Day |
Plant and Machinery cost: 121 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 45.00 |
|
Break Even Point (BEP): 32.00 |
TCI : 596 Lakhs |
|
Cost of Project : 0 |
Fish is used as a source of food either in raw or dry state. It has protein which is amino acids. Another means of utilization of fish is the manufact...
|
Capacity : 1 MT/day Fish Oil. 2.3 MT/day Fish Meal. |
Plant and Machinery cost: 63 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 48.00 |
|
Break Even Point (BEP): 34.00 |
TCI : 219 Lakhs |
|
Cost of Project : 0 |
The Pharmaceutical Industry in general is well managed in sound economic principles and has excellent techniques of production, technological backing...
|
Capacity : - |
Plant and Machinery cost: 43 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 43.00 |
|
Break Even Point (BEP): 54.00 |
TCI : Cost of Project : 125 Lakhs |
|
Cost of Project : 0 |
Cement industry is one of the most important basic industries on which depends the economic health of a developing country. In fact the important indi...
|
Capacity : 5000 MT/Day |
Plant and Machinery cost: 105 Crores |
|
Working Capital : - |
Rate of Return (ROR): 41.00 |
|
Break Even Point (BEP): 79.00 |
TCI : Cost of Project : 175 Crores |
|
Cost of Project : 1750000000 |
Cotton seeds are one of the oil producing seeds. The cotton seed cake is the residue left after the extraction of cotton seed oil from the seeds. Thi...
|
Capacity : 3000 MT / Annum |
Plant and Machinery cost: 30 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 42.00 |
|
Break Even Point (BEP): 46.00 |
TCI : Cost of Project 128 Lakhs |
|
Cost of Project : 0 |
Solvent cement refers to any substance inorganic or organic synthetic that is capable of bonding other substances together by surface attachment. Pol...
|
Capacity : 500 Kg. / Day |
Plant and Machinery cost: 10 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 46.00 |
|
Break Even Point (BEP): 36.00 |
TCI : 104 Lakhs |
|
Cost of Project : 0 |
|
Capacity : 40 MT/Day |
Plant and Machinery cost: Rs. 207 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 52.00 |
|
Break Even Point (BEP): 38.00 |
TCI : Rs. 1929 Lakhs |
|
Cost of Project : 0 |
Bisleri, which pioneered the packaged drinking water business in India, catering to consumers need to have hygienic drinking water while on the move...
|
Capacity : 30,000 Thousand Nos./Annum or 1,00,000 Bottles /day |
Plant and Machinery cost: Rs. 105 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 44.00 |
|
Break Even Point (BEP): 63.00 |
TCI : Cost of Project Rs. 282 Lakhs |
|
Cost of Project : 0 |
The term parboiling covers the operation to which the paddy is subjected before milling. Water and heat are the two main elements in the process. Afte...
|
Capacity : Parboiled Rice: 3000 MT/Annum, Broken Rice : 230 MT/A, Rice Flake 1500 MT/A, Corn Flakes:1500 MT/A |
Plant and Machinery cost: Rs. 85 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 40.00 |
|
Break Even Point (BEP): 58.00 |
TCI : Cost of Project Rs. 308 Lakhs |
|
Cost of Project : 0 |
Poha or rice flakes are basically breakfast food. Rice flakes are derived from paddy, which is partially precooked and converted into form of flat fla...
|
Capacity : 10 Tons/day |
Plant and Machinery cost: Rs. 21 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 51.00 |
|
Break Even Point (BEP): 37.00 |
TCI : Rs. 141 Lakhs |
|
Cost of Project : 0 |