Best Business Opportunities in United Arab Emirates, Middle East - Identification and Selection of right Project, Thrust areas for Investment, Industry Startup and Entrepreneurship

Best Business Opportunities in United Arab Emirates, Middle East - Identification and Selection of right Project, Thrust areas for Investment, Industry Startup and Entrepreneurship

Please choose a project below related to this category.

Aluminium Billets from Aluminium Scrap — A Smart Manufacturing Bet for Startups
Aluminium Billets from Aluminium Scrap — A Smart Manufacturing Bet for Startups

Aluminium billets, when produced from recycled scrap, balance the increasing demand for downstream infrastructures like extrusion for EVs, building, s...

Capacity :

Aluminium Billets:1,200 MTPA, Aluminium Dross by Product:54 MTPA

Plant and Machinery cost:

274

Working Capital :

N/A

Rate of Return (ROR):

31

Break Even Point (BEP):

61

TCI :

Cost of Project :

730

Steel Structure Fabrication, Pre-Assembly & Finishing Project: A Lucrative Opportunity for Startups
Steel Structure Fabrication, Pre-Assembly & Finishing Project: A Lucrative Opportunity for Startups

The industrial steel structure fabrication industry is direct at the intersection of building our cities and fuelling our industrialization. It is a h...

Capacity :

PEB Components, Crash Barriers, Transmission Towers, Steel Gates, Grills & Railings: All 500 MTPD.

Plant and Machinery cost:

1500

Working Capital :

N/A

Rate of Return (ROR):

35

Break Even Point (BEP):

39

TCI :

Cost of Project :

18700

Eggshell Powder Manufacturing: A Golden Opportunity for Forward-Thinking Entrepreneurs
Eggshell Powder Manufacturing: A Golden Opportunity for Forward-Thinking Entrepreneurs

Currently, in the context of green entrepreneurship and the circular economy, the processing of eggshells into a powder represents a promising idea fo...

Capacity :

5 MT Per Day

Plant and Machinery cost:

16

Working Capital :

N/A

Rate of Return (ROR):

29

Break Even Point (BEP):

52

TCI :

Cost of Project :

226

Screen Ink and Roller Ink Used in Plywood: A Lucrative Manufacturing Opportunity for Startups
Screen Ink and Roller Ink Used in Plywood: A Lucrative Manufacturing Opportunity for Startups

The plywood industry is one of the fastest-growing sectors in the global construction and furniture markets, with the India Plywood Market valued at I...

Capacity :

Screen Ink: 1,000 Kgs Per Day Roller Ink: 1,000 Kgs Per Day

Plant and Machinery cost:

57

Working Capital :

0

Rate of Return (ROR):

27

Break Even Point (BEP):

61

TCI :

Cost of Project :

240

Carbon Fibre Manufacturing: A High-Potential Opportunity for Startups and Entrepreneurs
Carbon Fibre Manufacturing: A High-Potential Opportunity for Startups and Entrepreneurs

When it comes to advanced materials that are light in weight, ultra-strong, and driven by performance, carbon fiber stands out as a clear winner. Spin...

Capacity :

10,00,000 Kg Per Annum

Plant and Machinery cost:

6.5 Crores

Working Capital :

-

Rate of Return (ROR):

30

Break Even Point (BEP):

54

TCI :

-

Cost of Project :

170000000

Start Production Of Sodium Chlorite (NaClO2) Direct Electrolysis Process from Sodium Chloride to Sodium Chlorite
Start Production Of Sodium Chlorite (NaClO2) Direct Electrolysis Process from Sodium Chloride to Sodium Chlorite

Chemically, sodium chlorite has the formula NaClO2. It is a white, crystalline material that is non-flammable and odourless. It is employed in industr...

Capacity :

Sodium Chlorite (NaClO2: 15 MT Per Day

Plant and Machinery cost:

567 Lakhs

Working Capital :

-

Rate of Return (ROR):

26.00

Break Even Point (BEP):

48.00

TCI :

Cost of Project: 1892 Lakhs

Cost of Project :

189200000

Hybrid Electric Scooter Assembling
Hybrid Electric Scooter Assembling

A plug-in hybrid electric vehicle (PHEV) is an HEV that can be plugged-in or recharged from wall electricity. PHEVs are distinguished by much larger b...

Capacity :

50 Nos./day

Plant and Machinery cost:

95 lakhs

Working Capital :

-

Rate of Return (ROR):

34.00

Break Even Point (BEP):

74.00

TCI :

Cost of Project: Rs 279 lakhs

Cost of Project :

27900000

Detergent Cake and Detergent Powder Manufacturing Industry
Detergent Cake and Detergent Powder Manufacturing Industry

Detergent Cake and Detergent Powder Manufacturing Industry. Start a Washing Powder and Cake Business Detergent is a blend of surfactants with cleanin...

Capacity :

-

Plant and Machinery cost:

-

Working Capital :

-

Rate of Return (ROR):

1.00

Break Even Point (BEP):

0.00

TCI :

-

Cost of Project :

0

Hybrid Electric Scooter Assembling Business
Hybrid Electric Scooter Assembling Business

Hybrid Electric Scooter Assembling Business. Electric Vehicles (EVs) Industry. Business Opportunities in Electric Two-Wheelers Manufacturing Industry...

Capacity :

-

Plant and Machinery cost:

-

Working Capital :

-

Rate of Return (ROR):

1.00

Break Even Point (BEP):

0.00

TCI :

-

Cost of Project :

0

Bicycle Rim
Bicycle Rim

A bicycle wheel is a wheel, most commonly a wire wheel, designed for a bicycle. A pair is often called a wheel set, especially in the context of ready...

Capacity :

-

Plant and Machinery cost:

-

Working Capital :

-

Rate of Return (ROR):

1.00

Break Even Point (BEP):

0.00

TCI :

-

Cost of Project :

0

Bicycle Tyre & Tubes Production from Natural Rubber
Bicycle Tyre & Tubes Production from Natural Rubber

Bicycle Tyre & Tubes Production from Natural Rubber. How to Start a Tire and Tubes Manufacturing Business Tyres are one of the most important compone...

Capacity :

-

Plant and Machinery cost:

-

Working Capital :

-

Rate of Return (ROR):

1.00

Break Even Point (BEP):

0.00

TCI :

-

Cost of Project :

0

Lithium Ion Battery (Battery Assembly)
Lithium Ion Battery (Battery Assembly)

Lithium batteries are now powering a wide range of electrical and electronical devices, including laptop computers, mobile phones, power tools, teleco...

Capacity :

90 Volt, 180 AH Lithium Ion Battery Pack: 56 Nos/day

Plant and Machinery cost:

Rs 90 lakhs

Working Capital :

-

Rate of Return (ROR):

34.00

Break Even Point (BEP):

55.00

TCI :

Cost of Project: Rs 1076 lakhs

Cost of Project :

107600000

Make An Appointment

Talk to Our Experts Today!

appoinment
Call Us WhatsApp