Please choose a project below related to this category.
Maize starch is the most commonly used carbohydrate found in plants. Industrially, starch is classified into two types viz. natural & modified starch...
|
Capacity : 61.56 MT/Day (Maize Starch), 50 MT /Day (Liquid Glucose) |
Plant and Machinery cost: 2 Crores |
|
Working Capital : - |
Rate of Return (ROR): 47.00 |
|
Break Even Point (BEP): 28.00 |
TCI : 20 Crores |
|
Cost of Project : 0 |
Potato is one of the important tuber vegetable, which is consumed throughout the year. It can be consumed in varied forms. In fact, it is a vegetable...
|
Capacity : 4 Ton / Day |
Plant and Machinery cost: 2 Crores |
|
Working Capital : - |
Rate of Return (ROR): 37.00 |
|
Break Even Point (BEP): 46.00 |
TCI : 5 Crores |
|
Cost of Project : 0 |
-
|
Capacity : 10 MT/Day |
Plant and Machinery cost: Rs. 2 Crores |
|
Working Capital : - |
Rate of Return (ROR): 47.00 |
|
Break Even Point (BEP): 36.00 |
TCI : Rs. 13 crores |
|
Cost of Project : 0 |
Potatoes are consumed in varied forms all over the world. They are also processed into powder form in order to prevent-their spoilage. Potato Powder i...
|
Capacity : 6.00 TON/day |
Plant and Machinery cost: Rs. 200 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 49.00 |
|
Break Even Point (BEP): 40.00 |
TCI : Rs. 500 Lakhs |
|
Cost of Project : 0 |
Hot dip galvanizing is a process in which an adherent, protective coating of zinc compounds is developed on the surface of iron and steel products by...
|
Capacity : 12 MT/Day |
Plant and Machinery cost: RS. 176 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 53.00 |
|
Break Even Point (BEP): 48.00 |
TCI : Rs. 859 Lakhs |
|
Cost of Project : 0 |
The importance of potato as food is immense as it can be consumed in varied forms. Potato powder is a highly concentrated and nutritious flour ground...
|
Capacity : 6 Ton/Day |
Plant and Machinery cost: Rs. 175 Lakhs |
|
Working Capital : Rs. 176 Lakhs |
Rate of Return (ROR): 48.98 |
|
Break Even Point (BEP): 50.23 |
TCI : Rs. 460 Lakhs |
|
Cost of Project : 0 |