Please choose a project below related to this category.
It is an instrument which is used for injecting any liquid into the body of human beings or of animals. These syringes are used for injecting the medi...
|
Capacity : 180 Lakh Nos. /annum |
Plant and Machinery cost: 245 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 26.00 |
|
Break Even Point (BEP): 46.00 |
TCI : Cost of Project: 455 Lakhs |
|
Cost of Project : 45500000 |
In India dairying has been practiced as a rural cottage industry since the remote past. Semi commercial dairying started with the establishment of mil...
|
Capacity : 25,20,000 LTS/Annum |
Plant and Machinery cost: Rs. 239 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 34.00 |
|
Break Even Point (BEP): 39.00 |
TCI : Cost of Project: Rs 605 Lakhs |
|
Cost of Project : 60500000 |
Fasteners have played a major role in the advancement of the human race since prehistoric days when the caveman used thongs to hold a rock into the sp...
|
Capacity : 600 MT/Annum |
Plant and Machinery cost: Rs. 207 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 25.00 |
|
Break Even Point (BEP): 54.00 |
TCI : Cost of Project: Rs 441 Lakhs |
|
Cost of Project : 44100000 |
It is an instrument which is used for injecting any liquid into the body of human beings or of animals. These syringes are used for injecting the medi...
|
Capacity : 180 Lakh Nos. /annum |
Plant and Machinery cost: 245 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 26.00 |
|
Break Even Point (BEP): 46.00 |
TCI : Cost of Project: 455 Lakhs |
|
Cost of Project : 45500000 |
Rice (Oryza sativa L.) is one of the leading food crops of the world, and is produced in all the continents. Rice was an important food even before th...
|
Capacity : 289 MT/Day |
Plant and Machinery cost: Rs. 236 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 38.03 |
|
Break Even Point (BEP): 46.93 |
TCI : Cost of Project: Rs. 1074 Lakhs |
|
Cost of Project : 107400000 |
Yeasts are single celled fungi. Over 600 different species of yeast are known and they are widely distributed in nature. They are found in association...
|
Capacity : 3 MT/Day |
Plant and Machinery cost: 201 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 20.00 |
|
Break Even Point (BEP): 47.00 |
TCI : Cost of Project : Rs. 473 Lakhs |
|
Cost of Project : 47300000 |
Potato is one of the important tuber vegetables, which is consumed throughout the year. Its Botanical name is Solanum Tuberosum. Potatoes can be consu...
|
Capacity : 4 MT/Day |
Plant and Machinery cost: 204 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 37.00 |
|
Break Even Point (BEP): 46.00 |
TCI : 478 Lakhs |
|
Cost of Project : 0 |
Sesame is a flowering plant in the genus sesamum. Numerous wild relatives occur in Africa and a smaller number in India. It is widely naturalized in t...
|
Capacity : 9000 MT/Annum |
Plant and Machinery cost: 266 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 52.00 |
|
Break Even Point (BEP): 38.00 |
TCI : 2094 Lakhs |
|
Cost of Project : 0 |
Infusion therapy is a type of medical treatment in which medication is delivered directly into the body via a blood vessel, the spinal cord, or a musc...
|
Capacity : Total 40,000 Sets/Day, 20,000 Infusion Sets/Day, 20,000 Blood Transfusion Sets/Day |
Plant and Machinery cost: 220 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 50.00 |
|
Break Even Point (BEP): 40.00 |
TCI : 707 Lakhs |
|
Cost of Project : 0 |
-
|
Capacity : - |
Plant and Machinery cost: - |
|
Working Capital : - |
Rate of Return (ROR): 1.00 |
|
Break Even Point (BEP): 0.00 |
TCI : - |
|
Cost of Project : 0 |
-
|
Capacity : 100 MT/day |
Plant and Machinery cost: Rs. 240 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 46.00 |
|
Break Even Point (BEP): 35.00 |
TCI : Rs. 1279 Lakhs |
|
Cost of Project : 0 |
Compulsory state education begins at 5 years but permissive legislation allows local education authorities to build also for children of 3 to 5 years...
|
Capacity : 700 students |
Plant and Machinery cost: Rs 209 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 12.00 |
|
Break Even Point (BEP): 70.00 |
TCI : Rs 687 Lakhs |
|
Cost of Project : 0 |