Bicycles are one of the oldest forms of transportation. Even today millions of people travel by bicycle daily to their work, college, universities and...
|
Capacity : Bicycles (Different Sizes): 2000 Nos./day |
Plant and Machinery cost: 336 lakhs |
|
Working Capital : - |
Rate of Return (ROR): 29.00 |
|
Break Even Point (BEP): 56.00 |
TCI : Cost of Project: Rs 1589 lakhs |
|
Cost of Project : 158900000 |
Roller Flour Mills involved in commercial milling operations and unorganized sector consisting of mainly Chakkis. Around 800 large Flour Mills in the...
|
Capacity : Maida: 50 MT /Day Sooji: 12 MT /Day Wheat Flour : 20 MT /Day Wheat Bran |
Plant and Machinery cost: 323 lakhs |
|
Working Capital : - |
Rate of Return (ROR): 29.00 |
|
Break Even Point (BEP): 56.00 |
TCI : Cost of Project : Rs 746 lakhs |
|
Cost of Project : 74600000 |
Chloroacetic Acid, industrially known as Monochloro Acetic Acid (MCA) is the organochlorine compound with the formula ClCH2CO2H. This carboxylic acid...
|
Capacity : 24,000 MT/annum |
Plant and Machinery cost: 313 lakhs |
|
Working Capital : - |
Rate of Return (ROR): 28.00 |
|
Break Even Point (BEP): 46.00 |
TCI : Cost of Project: 980 lakhs |
|
Cost of Project : 98000000 |
Paracetamol, also known as acetaminophen or APAP, is a medication used to treat pain and fever. It is typically used for mild to moderate pain. The qu...
|
Capacity : Paracetamol Tablets: 1500mt/annum Paracetamol Powder: 420mt/annum |
Plant and Machinery cost: 349 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 27.00 |
|
Break Even Point (BEP): 46.00 |
TCI : 863 Lakhs |
|
Cost of Project : 86300000 |
Paracetamol, also known as acetaminophen or APAP, is a medication used to treat pain and fever. It is typically used for mild to moderate pain. The qu...
|
Capacity : Paracetamol Tablets: 1500mt/annum Paracetamol Powder: 420mt/annum |
Plant and Machinery cost: 349 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 27.00 |
|
Break Even Point (BEP): 46.00 |
TCI : 863 Lakhs |
|
Cost of Project : 86300000 |
Paracetamol, also known as acetaminophen or APAP, is a medication used to treat pain and fever. It is typically used for mild to moderate pain. It is...
|
Capacity : Paracetamol Tablets: 1500mt/annum Paracetamol Powder: 420mt/annum |
Plant and Machinery cost: Rs 349 lakhs |
|
Working Capital : - |
Rate of Return (ROR): 27.00 |
|
Break Even Point (BEP): 46.00 |
TCI : Cost of Project: Rs 863 lakhs |
|
Cost of Project : 86300000 |
Concrete poles were first used over 60 years ago and were then made of normal reinforced concrete. As technology improved, production and use of concr...
|
Capacity : Prestressed Concrete Cement Electric Poles: 60,000nos/annum |
Plant and Machinery cost: Rs 304 lakhs |
|
Working Capital : - |
Rate of Return (ROR): 25.00 |
|
Break Even Point (BEP): 51.00 |
TCI : Cost of Project: Rs 713 lakhs |
|
Cost of Project : 71300000 |
Wire means Solid conductor or Insulated conductor which has strength and with cover or without cover and Cable means Insulated conductor (Solid or Str...
|
Capacity : Aluminium Wire (AAAC) Conductor: 900 MT/Annum Aluminium Wire (ACSR) Conductor: 400 MT/Annum Aluminium Cables: 450MT/Annum |
Plant and Machinery cost: Rs 314 lakhs |
|
Working Capital : - |
Rate of Return (ROR): 28.00 |
|
Break Even Point (BEP): 62.00 |
TCI : Cost of Project : Rs 579 lakhs |
|
Cost of Project : 57900000 |
Copper makes vital contributions to sustaining and improving society. Copper's chemical, physical and aesthetic propertiesmake it a materialof choice...
|
Capacity : Copper Powder : 15,000 MT/Annum |
Plant and Machinery cost: Rs 307 lakhs |
|
Working Capital : - |
Rate of Return (ROR): 31.00 |
|
Break Even Point (BEP): 46.00 |
TCI : Cost of Project: Rs3050 lakhs |
|
Cost of Project : 305000000 |
Corn flakes being one of most nutritious foods and is consumed as breakfast food not only in India but-everywhere in the world.Cornflakes are a very p...
|
Capacity : Plain Corn Flakes (250 gms& 375 gms Pouches):2,880,000 Kgs/annum Choco Flakes (250 gms& 375 gms Pouches): 5,280,000 Kgs/annum |
Plant and Machinery cost: 343 lakhs |
|
Working Capital : - |
Rate of Return (ROR): 26.00 |
|
Break Even Point (BEP): 46.00 |
TCI : Cost of Project: 2193 lakhs |
|
Cost of Project : 219300000 |
Beer is the world's oldest beverage, possibly dating back to the 6th millennium BC. It is also the most widely consumed alcoholic beverage and the thi...
|
Capacity : Beer (650 ml size Bottle):10,000 Litres/Day |
Plant and Machinery cost: Rs 306 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 27.00 |
|
Break Even Point (BEP): 55.00 |
TCI : Cost of Project : Rs 1055 Lakhs |
|
Cost of Project : 105500000 |
Sanitary Napkin comes under Nonwoven fabrics which as a whole come under technical textile. Technical textiles are defined as textile materials and pr...
|
Capacity : Sanitary Napkins Ultra Thin Type: 15000 Pkts/Day, Sanitary Napkins Cotton Core Type: 15000 Pkts/Day |
Plant and Machinery cost: Rs 345 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 27.92 |
|
Break Even Point (BEP): 40.85 |
TCI : Cost of Project : Rs 755 Lakhs |
|
Cost of Project : 75500000 |