Please choose a project below related to this category.
The words fabric and cloth are used in textile assembly trades (such as tailoring and dressmaking) as synonyms for textile. The most common use of tex...
|
Capacity : 86.40 Lakhs pieces/annum |
Plant and Machinery cost: Rs. 382 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 28.34 |
|
Break Even Point (BEP): 69.16 |
TCI : Cost of Project: Rs. 929 Lakhs |
|
Cost of Project : 92900000 |
A textile or cloth is a flexible woven material consisting of a network of natural or artificial fibers often referred to as thread or yarn. Yarn is p...
|
Capacity : 86 Lakhs pieces/annum |
Plant and Machinery cost: Rs. 382 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 28.00 |
|
Break Even Point (BEP): 69.00 |
TCI : Cost of Project: Rs. 929 Lakhs |
|
Cost of Project : 92900000 |
Yeasts are single-celled fungi. As fungi, they are related to the other fungi that people are more familiar with. These include edible mushrooms avai...
|
Capacity : 5 MT/ day |
Plant and Machinery cost: Rs.355 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 38.00 |
|
Break Even Point (BEP): 47.00 |
TCI : Rs.963 Lakhs |
|
Cost of Project : 0 |
The aluminium industry can be categorized into two principal segments. First key segment is the production of primary aluminium by integrated produces...
|
Capacity : 25000 MT/year |
Plant and Machinery cost: 392 lakhs |
|
Working Capital : - |
Rate of Return (ROR): 45.00 |
|
Break Even Point (BEP): 62.00 |
TCI : Cost of Project : 1951 lakhs |
|
Cost of Project : 0 |
Bentonite comes under the speciality of clay which has large use in the chemical industries, oil refineries, cosmetic industries, etc. Before mining...
|
Capacity : 100 MT/Day |
Plant and Machinery cost: 4 Crores |
|
Working Capital : - |
Rate of Return (ROR): 36.00 |
|
Break Even Point (BEP): 47.00 |
TCI : 7 Crores |
|
Cost of Project : 0 |
Jute Follows cotton in world textiles consumption. It is used in the United States chiefly in a floor covering, wrapping & industrial fabrics rather t...
|
Capacity : Jute Yarn 10 MT/Day, Jute Sutli 15 MT/Day, Hessian Cloth 10,000 Mtr./Day |
Plant and Machinery cost: 393 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 46.00 |
|
Break Even Point (BEP): 39.00 |
TCI : 690 Lakhs |
|
Cost of Project : 0 |