Please choose a project below related to this category.
Solar power is one of the most promising renewables. It is reliable and less vulnerable to changes in seasonal weather patterns. Hydrogen, in the capa...
|
Capacity : Solar Power: 1 MW |
Plant and Machinery cost: Rs. 411 lakhs |
|
Working Capital : - |
Rate of Return (ROR): 1.00 |
|
Break Even Point (BEP): 1.00 |
TCI : Cost of Project: Rs.811 lakhs |
|
Cost of Project : 81100000 |
Tissue paper or simply tissue is a light weight paper or, light crêpe paper. Tissue can be made from recycled paper pulp. Tissue is a category compris...
|
Capacity : 20 MT/Day |
Plant and Machinery cost: 410 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 27.00 |
|
Break Even Point (BEP): 56.00 |
TCI : Cost of Project: 986.13 Lakhs |
|
Cost of Project : 98600000 |
Titanium is known as a transition metal on the periodic table of elements denoted by the symbol Ti. It is a lightweight, silver-gray material with an...
|
Capacity : 200000 MT /Annum |
Plant and Machinery cost: 431 lakhs |
|
Working Capital : - |
Rate of Return (ROR): 32.00 |
|
Break Even Point (BEP): 51.00 |
TCI : Cost of Project : Rs 3700 lakhs |
|
Cost of Project : 3700000 |
Titanium is known as a transition metal on the periodic table of elements denoted by the symbol Ti. It is a lightweight, silver-gray material with an...
|
Capacity : 200000 MT /Annum |
Plant and Machinery cost: 431 lakhs |
|
Working Capital : - |
Rate of Return (ROR): 32.00 |
|
Break Even Point (BEP): 51.00 |
TCI : Cost of Project : Rs 3700 lakhs |
|
Cost of Project : 3700000 |
An aerodrome or airdrome is a location from which aircraft flight operations take place, regardless of whether they involve air cargo, passengers, or...
|
Capacity : Flight Landing Charges: 4,320 Nos./annum Annually Lease Charages of Shops (20 Nos.): 12 Nos./annum Annually Lease Charges of Parking: 12 Nos./annum Annually Lease Charges of Parking:12 Nos./annum |
Plant and Machinery cost: Rs 442 lakhs |
|
Working Capital : - |
Rate of Return (ROR): 1.00 |
|
Break Even Point (BEP): 1.00 |
TCI : Cost of Project: Rs 6777 lakhs |
|
Cost of Project : 677700000 |
Aluminium fluoride is the chemical compound with the formula AlF3. It has the consistency of a white powder. AlF3 is refractory, in strong contrast to...
|
Capacity : Aluminium Fluoride : 16.7 MT/Day •Silica as by product: 5.67 MT/Day |
Plant and Machinery cost: Rs 408 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 26.69 |
|
Break Even Point (BEP): 56.04 |
TCI : Cost of Project : Rs 1069 Lakhs |
|
Cost of Project : 106900000 |
Rice husk is an agricultural residue easily available in rice producing countries. India is a major rice producing country, and the husk generated dur...
|
Capacity : Precipitated Silica: 5 MT/Day,CaCO3 (by product):10.3 MT/Day |
Plant and Machinery cost: Rs 437 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 24.00 |
|
Break Even Point (BEP): 55.00 |
TCI : Cost of Project: Rs 660 Lakhs |
|
Cost of Project : 66000000 |
Steel is one such material that has played an important role in the development of mankind in the last century. Today, it is difficult to imagine a wo...
|
Capacity : 36000 MT/Annum |
Plant and Machinery cost: 408 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 46.00 |
|
Break Even Point (BEP): 48.00 |
TCI : Cost of Project : 1543 Lakhs |
|
Cost of Project : 0 |