Business Ideas: 4 - 4.5 Crore (Plant and Machinery): Selected Project Profiles for Entrepreneurs, Startups

Business Ideas: 4 - 4.5 Crore (Plant and Machinery): Selected Project Profiles for Entrepreneurs, Startups

Please choose a project below related to this category.

Solar Power Plant
Solar Power Plant

Solar power is one of the most promising renewables. It is reliable and less vulnerable to changes in seasonal weather patterns. Hydrogen, in the capa...

Capacity :

Solar Power: 1 MW

Plant and Machinery cost:

Rs. 411 lakhs

Working Capital :

-

Rate of Return (ROR):

1.00

Break Even Point (BEP):

1.00

TCI :

Cost of Project: Rs.811 lakhs

Cost of Project :

81100000

Tissue Paper from Recycled Paper
Tissue Paper from Recycled Paper

Tissue paper or simply tissue is a light weight paper or, light crêpe paper. Tissue can be made from recycled paper pulp. Tissue is a category compris...

Capacity :

20 MT/Day

Plant and Machinery cost:

410 Lakhs

Working Capital :

-

Rate of Return (ROR):

27.00

Break Even Point (BEP):

56.00

TCI :

Cost of Project: 986.13 Lakhs

Cost of Project :

98600000

Titanium Dioxide (Chloride Process)
Titanium Dioxide (Chloride Process)

Titanium is known as a transition metal on the periodic table of elements denoted by the symbol Ti. It is a lightweight, silver-gray material with an...

Capacity :

200000 MT /Annum

Plant and Machinery cost:

431 lakhs

Working Capital :

-

Rate of Return (ROR):

32.00

Break Even Point (BEP):

51.00

TCI :

Cost of Project : Rs 3700 lakhs

Cost of Project :

3700000

Titanium Dioxide
Titanium Dioxide

Titanium is known as a transition metal on the periodic table of elements denoted by the symbol Ti. It is a lightweight, silver-gray material with an...

Capacity :

200000 MT /Annum

Plant and Machinery cost:

431 lakhs

Working Capital :

-

Rate of Return (ROR):

32.00

Break Even Point (BEP):

51.00

TCI :

Cost of Project : Rs 3700 lakhs

Cost of Project :

3700000

Mini Aerodrome
Mini Aerodrome

An aerodrome or airdrome is a location from which aircraft flight operations take place, regardless of whether they involve air cargo, passengers, or...

Capacity :

Flight Landing Charges: 4,320 Nos./annum Annually Lease Charages of Shops (20 Nos.): 12 Nos./annum Annually Lease Charges of Parking: 12 Nos./annum Annually Lease Charges of Parking:12 Nos./annum

Plant and Machinery cost:

Rs 442 lakhs

Working Capital :

-

Rate of Return (ROR):

1.00

Break Even Point (BEP):

1.00

TCI :

Cost of Project: Rs 6777 lakhs

Cost of Project :

677700000

Aluminium Fluoride - Manufacturing Plant, Detailed Project Report, Profile, Business Plan, Industry Trends, Market Research, Survey, Manufacturing Process, Machinery, Raw Materials, Feasibility Study, Investment Opportunities, Cost and Revenue
Aluminium Fluoride - Manufacturing Plant, Detailed Project Report, Profile, Business Plan, Industry Trends, Market Research, Survey, Manufacturing Process, Machinery, Raw Materials, Feasibility Study, Investment Opportunities, Cost and Revenue

Aluminium fluoride is the chemical compound with the formula AlF3. It has the consistency of a white powder. AlF3 is refractory, in strong contrast to...

Capacity :

Aluminium Fluoride : 16.7 MT/Day •Silica as by product: 5.67 MT/Day

Plant and Machinery cost:

Rs 408 Lakhs

Working Capital :

-

Rate of Return (ROR):

26.69

Break Even Point (BEP):

56.04

TCI :

Cost of Project : Rs 1069 Lakhs

Cost of Project :

106900000

Precipitated Silica from Rice Husk Ash - Manufacturing Plant, Detailed Project Report, Profile, Business Plan, Industry Trends, Market Research, Survey, Manufacturing Process, Machinery, Raw Materials, Feasibility Study, Investment Opportunities
Precipitated Silica from Rice Husk Ash - Manufacturing Plant, Detailed Project Report, Profile, Business Plan, Industry Trends, Market Research, Survey, Manufacturing Process, Machinery, Raw Materials, Feasibility Study, Investment Opportunities

Rice husk is an agricultural residue easily available in rice producing countries. India is a major rice producing country, and the husk generated dur...

Capacity :

Precipitated Silica: 5 MT/Day,CaCO3 (by product):10.3 MT/Day

Plant and Machinery cost:

Rs 437 Lakhs

Working Capital :

-

Rate of Return (ROR):

24.00

Break Even Point (BEP):

55.00

TCI :

Cost of Project: Rs 660 Lakhs

Cost of Project :

66000000

FUSION BONDED EPOXY COATED TMT REBARS - Manufacturing Plant, Detailed Project Report, Profile, Business Plan, Industry Trends, Market Research, Survey, Manufacturing Process, Machinery, Raw Materials, Feasibility Study, Investment Opportunities
FUSION BONDED EPOXY COATED TMT REBARS - Manufacturing Plant, Detailed Project Report, Profile, Business Plan, Industry Trends, Market Research, Survey, Manufacturing Process, Machinery, Raw Materials, Feasibility Study, Investment Opportunities

Steel is one such material that has played an important role in the development of mankind in the last century. Today, it is difficult to imagine a wo...

Capacity :

36000 MT/Annum

Plant and Machinery cost:

408 Lakhs

Working Capital :

-

Rate of Return (ROR):

46.00

Break Even Point (BEP):

48.00

TCI :

Cost of Project : 1543 Lakhs

Cost of Project :

0