Liquefied petroleum gas (LPG) is a term describing a group of hydrocarbon-based gases derived from crude oil and or natural gas. LPG Cylinder is an es...
|
Capacity : LPG Cylinders (14.20 Kgs Size): 1000 Nos./day LPG Cylinders (19 Kgs Size): 1000 Nos./day |
Plant and Machinery cost: Rs 471 lakhs |
|
Working Capital : - |
Rate of Return (ROR): 30.00 |
|
Break Even Point (BEP): 56.00 |
TCI : Cost of Project: Rs 1113 lakhs |
|
Cost of Project : 111300000 |
Bentonite is a clay generated frequently from the alteration of volcanic ash, consisting predominantly of smectite minerals, usually montmorillonite....
|
Capacity : Bentonite Clay Granules : 288 MT/day |
Plant and Machinery cost: Rs. 416 lakhs |
|
Working Capital : - |
Rate of Return (ROR): 28.00 |
|
Break Even Point (BEP): 59.00 |
TCI : Cost of Project: Rs 1228 lakhs |
|
Cost of Project : 122800000 |
Red oxide primer is a specially formulated coating used as a base coat for ferrous metals. Red-oxide primer serves a similar purpose to interior wall...
|
Capacity : Red Oxide Primer (Each Packed in 20 Ltrs Container): 1000 Packs/Day Red Oxide Primer (Each Packed in 5 Ltrs Container): 4000 Packs/Day |
Plant and Machinery cost: Rs. 412 lakhs |
|
Working Capital : - |
Rate of Return (ROR): 27.00 |
|
Break Even Point (BEP): 59.00 |
TCI : Cost of Project : Rs1247 lakhs |
|
Cost of Project : 124700000 |
Nuts and Bolts are available in various sizes and shapes. The kind of the classification of bolts and nuts may broadly be those made by the cold and h...
|
Capacity : Mild Steel Zinc Coated Bolts (DR M8-M18): 2310 MT/Annum Mild Steel Zinc Coated Nuts (DR M8-M30): 690 MT/Annum |
Plant and Machinery cost: Rs. 404 lakhs |
|
Working Capital : - |
Rate of Return (ROR): 28.00 |
|
Break Even Point (BEP): 48.00 |
TCI : Cost of Project: Rs. 897lakhs |
|
Cost of Project : 897100000 |
Gypsum Plaster Boards are constructional sheets composed of consigned Gypsum with about 15% fibre. Its outstanding contributes are fire resistance, di...
|
Capacity : Gypsum Plaster Board: 13333 Sq.mt./Day |
Plant and Machinery cost: Rs. 476 lakhs |
|
Working Capital : - |
Rate of Return (ROR): 34.00 |
|
Break Even Point (BEP): 33.00 |
TCI : Cost of Project: Rs 3394 lakhs |
|
Cost of Project : 339400000 |
Woven is a method by many threads or tapes woven in two directions (warp and weft), to form a fabric for plastic industry needs. In the plastic woven...
|
Capacity : 8.4 MT/Day |
Plant and Machinery cost: 500 lakhs |
|
Working Capital : - |
Rate of Return (ROR): 28.00 |
|
Break Even Point (BEP): 60.00 |
TCI : Cost of Project: Rs 923 lakhs |
|
Cost of Project : 92300000 |
Intravenous fluids are fluids which are intended to be administered to a patient intravenously, directly through the circulatory system. These fluids...
|
Capacity : 27,000,000 Bottles/annum |
Plant and Machinery cost: 476 lakhs |
|
Working Capital : - |
Rate of Return (ROR): 26.00 |
|
Break Even Point (BEP): 53.00 |
TCI : Cost of Project: Rs1060 lakhs |
|
Cost of Project : 106000000 |
A solar panel is a collection of solar cells. Lots of small solar cells spread over a large area can work together to provide enough power to be usefu...
|
Capacity : 25,000 KW/annum |
Plant and Machinery cost: 449 lakhs |
|
Working Capital : - |
Rate of Return (ROR): 29.00 |
|
Break Even Point (BEP): 47.00 |
TCI : Cost of Project 1126 lakhs |
|
Cost of Project : 112600000 |
A solar panel is a collection of solar cells. Lots of small solar cells spread over a large area can work together to provide enough power to be usefu...
|
Capacity : SOLAR PANEL:25,000Units/annumELECTRONIC TOYS:1,500,000 Units/annum |
Plant and Machinery cost: 498 lakhs |
|
Working Capital : - |
Rate of Return (ROR): 29.00 |
|
Break Even Point (BEP): 50.00 |
TCI : Cost of Project: Rs 1348 lakhs |
|
Cost of Project : 0 |
Intravenous fluids are fluids which are intended to be administered to a patient intravenously, directly through the circulatory system. These fluids...
|
Capacity : I.V. Fluid (500 ml.):14,400,000 Bottles/annum |
Plant and Machinery cost: Rs 476 lakhs |
|
Working Capital : - |
Rate of Return (ROR): 26.00 |
|
Break Even Point (BEP): 53.00 |
TCI : Cost of Project: Rs 1092 lakhs |
|
Cost of Project : 109200000 |
Intravenous fluids are fluids which are intended to be administered to a patient intravenously, directly through the circulatory system. These fluids...
|
Capacity : 1,44,00,000 bottles/annum |
Plant and Machinery cost: Rs 462 lakhs |
|
Working Capital : - |
Rate of Return (ROR): 27.00 |
|
Break Even Point (BEP): 66.00 |
TCI : Cost of Project : Rs 1362lakhs |
|
Cost of Project : 136200000 |
Cold storage is a system for holding produce in an atmosphere that differs substantially from normal air in respect to CO2 and O2 levels. The gas mixt...
|
Capacity : Mango Pulp (200 Kgs Size Drum Pack) : 10,000 Packs/Annum Mango Jelly (10 Kgs Size Poly Pack): 25,000 Packs/Annum Tomato Pulp (100 Kgs Size Drum Pack) : 30,000 Packs/Annum Cashew Nuts (50 Kgs Size Bag): 72,000 Packs/Annum Cashew Chikkes ( |
Plant and Machinery cost: Rs 500 lakhs |
|
Working Capital : - |
Rate of Return (ROR): 29.00 |
|
Break Even Point (BEP): 54.00 |
TCI : Cost of Project: Rs 1749 lakhs |
|
Cost of Project : 174900000 |