Please choose a project below related to this category.
The alcohol industry is the commercial industry involved in the manufacturing, distribution, and sale of alcoholic beverages. Alcohol has assumed very...
|
Capacity : Extra Neutral Alcohol (ENA) : 15,000KLs/Annum Distilleries Dry Grain with Solubles (DDGS) by product: 7,350MT/Annum Fusel Oil (by product) : 24KLs/Ann |
Plant and Machinery cost: Rs 4637 lakhs |
|
Working Capital : - |
Rate of Return (ROR): 24.00 |
|
Break Even Point (BEP): 48.00 |
TCI : Cost of Project: Rs 6572 lakhs |
|
Cost of Project : 657200000 |
Polyaluminium chloride (PAC) is a general name given to polyaluminium chloride compounds, namely polyaluminium chloride hydroxide and polyaluminium ch...
|
Capacity : Poly Aluminium Chloride Liquid Form: 16,500 MT/Annum Poly Aluminium Chloride Powder Form: 13,500 MT/Annum |
Plant and Machinery cost: Rs 1266 lakhs |
|
Working Capital : - |
Rate of Return (ROR): 26.00 |
|
Break Even Point (BEP): 55.00 |
TCI : Cost of Project: Rs 2418 lakhs |
|
Cost of Project : 241800000 |
Rice milling generates a byproduct known as husk. This surrounds the paddy grain. During milling of paddy about 78 % of weight is received as rice, br...
|
Capacity : Precipitated Silica: 1200mt/annum Activated Carbon (by product): 336mt/annum Sodium Carbonate (by product): 504 mt/annum |
Plant and Machinery cost: Rs 556 lakhs |
|
Working Capital : - |
Rate of Return (ROR): 1.00 |
|
Break Even Point (BEP): 1.00 |
TCI : Cost of Project : Rs 1200 lakhs |
|
Cost of Project : 120000000 |
Electric Resistance Welded (ERW) steel pipes and tubes are used in various engineering purposes, fencing, scaffolding, line pipes etc. ERW steel pipes...
|
Capacity : ERW Pipes (Black): 18000MT/Annum |
Plant and Machinery cost: Rs 1637 lakhs |
|
Working Capital : - |
Rate of Return (ROR): 28.00 |
|
Break Even Point (BEP): 60.00 |
TCI : Cost of Project: Rs 3129 lakhs |
|
Cost of Project : 312900000 |
Earlier, wooden sleepers were used for laying the railway tracks but due to the depleting wooden resources and increasing concern of the ecological ba...
|
Capacity : 120,000 Pcs/annum |
Plant and Machinery cost: Rs 1509 lakhs |
|
Working Capital : - |
Rate of Return (ROR): 26.00 |
|
Break Even Point (BEP): 39.00 |
TCI : Cost of Project: Rs 1970 lakhs |
|
Cost of Project : 197000000 |
The objective of formulating and compounding sterile preparations is to provide adosage form of a labeled drug, in the stated potency that is safe to...
|
Capacity : Ampoules 5 ml Size: 300,000 Th. Nos./annum Ampoules 10 ml Size: 260,000 Th. Nos./annum Ampoules 20 ml Size: 120,000 Th. Nos./annum |
Plant and Machinery cost: Rs 607 lakhs |
|
Working Capital : - |
Rate of Return (ROR): 28.00 |
|
Break Even Point (BEP): 55.00 |
TCI : Cost of Project: Rs 917 lakhs |
|
Cost of Project : 91700000 |
The cashew nut is a popular dessert nut, eaten out of hand, with other mixed nuts and used in baking and confections. Sixty percent of cashews are con...
|
Capacity : Cashew Nut (W320 Grade) Domestic: 218MT/annum Cashew Nut (W320 Grade) Export: 327MT/annum Cashew Nut (W240 Grade) Domestic: 145.2 MT/annum Cashew Nut (W240 Grade) Export: 217.80 MT/annum Cashew Nut (LWP Grade) Domestic: 148.40 MT/annum Cashew Nut (LWP Gra |
Plant and Machinery cost: Rs 2358 lakhs |
|
Working Capital : - |
Rate of Return (ROR): 24.00 |
|
Break Even Point (BEP): 48.00 |
TCI : Cost of Project: Rs 4477 lakhs |
|
Cost of Project : 447700000 |
Aluminium fluoride is the chemical compound with the formula AlF3. It has the consistency of a white powder. AlF3 is refractory, in strong contrast to...
|
Capacity : Aluminium Fluoride: 60,000MT/annum, Silica as bye product: 20,400MT/annum |
Plant and Machinery cost: Rs 1739 lakhs |
|
Working Capital : - |
Rate of Return (ROR): 28.00 |
|
Break Even Point (BEP): 49.00 |
TCI : Cost of Project: Rs 3496 lakhs |
|
Cost of Project : 349600000 |
Engineering education is the activity of teaching knowledge and principles related to the professional practice of engineering. It includes the initia...
|
Capacity : Aeronautical Engineering: 60 students/annum Mechanical Engineering: 60 students/annum Civil Engineering: 60 students/annum Aircraft Maintenance Engineering: 60 students/annum Air Hostage Training Course (6 Month Diploma):120 students/annum |
Plant and Machinery cost: Rs 623 lakhs |
|
Working Capital : - |
Rate of Return (ROR): 1.00 |
|
Break Even Point (BEP): 93.00 |
TCI : Cost of Project: Rs 3336 lakhs |
|
Cost of Project : 333600000 |
Rice milling generates a byproduct known as husk. This surrounds the paddy grain. During milling of paddy about 78 % of weight is received as rice, br...
|
Capacity : Precipitated Silica: 1500mt/annum Activated Carbon (by product): 420mt/annum Sodium Carbonate (by product): 630mt/annum |
Plant and Machinery cost: Rs 519 lakhs |
|
Working Capital : - |
Rate of Return (ROR): 17.24 |
|
Break Even Point (BEP): 52.00 |
TCI : Cost of Project: Rs 787 lakhs |
|
Cost of Project : 78700000 |
Pectin is a naturally occurring substance (a polysaccaride) found in all plant tissue, calcium pectin being present between the cell walls and serving...
|
Capacity : Pectin: 150,000Kgs/annum |
Plant and Machinery cost: Rs 1289 lakhs |
|
Working Capital : - |
Rate of Return (ROR): 23.00 |
|
Break Even Point (BEP): 44.00 |
TCI : Cost of Project: Rs 1660 lakhs |
|
Cost of Project : 166000000 |
Packing, in a way represents the extent of industrialization of a country. Packaging has been assuming importance in the context of growth of industri...
|
Capacity : Corrugated Cardboard Boxes: 12000mt/annum Printed Corrugated Cardboard Boxes: 6000mt/annum |
Plant and Machinery cost: Rs 3545 lakhs |
|
Working Capital : - |
Rate of Return (ROR): 25.00 |
|
Break Even Point (BEP): 41.00 |
TCI : Cost of Project: Rs 5726 lakhs |
|
Cost of Project : 572600000 |