Please choose a project below related to this category.
Fresh tomatoes are very refreshing and appetizing. They are a good source of vitamin C. Most of the tomatoes products are made from tomato pulp, which...
|
Capacity : 1200 MT / Annum |
Plant and Machinery cost: 38 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 39.00 |
|
Break Even Point (BEP): 59.00 |
TCI : Cost of Project : 130 Lakhs |
|
Cost of Project : 0 |
-
|
Capacity : 10 Ton/Day |
Plant and Machinery cost: Rs. 21 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 51.00 |
|
Break Even Point (BEP): 37.00 |
TCI : Rs. 141 Lakhs |
|
Cost of Project : 0 |
-
|
Capacity : 2 Ton/Day |
Plant and Machinery cost: Rs. 11 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 50.00 |
|
Break Even Point (BEP): 39.00 |
TCI : Rs. 66 Lakhs |
|
Cost of Project : 0 |
The bleaching of the textile is done to bring the whiteness finishing in the fabric where as dyeing for various shades. The art lies in colouring the...
|
Capacity : 6000 K meters / Annum |
Plant and Machinery cost: 150 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 31.00 |
|
Break Even Point (BEP): 54.00 |
TCI : Cost of Project : 452 Lakhs |
|
Cost of Project : 0 |
Gin implies a machine especially is for hoisting a cotton-gin. Ginning pertains to clear of seeds by a cotton-gin, where as ginner is one who gives co...
|
Capacity : 10 MT / Day |
Plant and Machinery cost: 121 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 45.00 |
|
Break Even Point (BEP): 32.00 |
TCI : 596 Lakhs |
|
Cost of Project : 0 |
Fish is used as a source of food either in raw or dry state. It has protein which is amino acids. Another means of utilization of fish is the manufact...
|
Capacity : 1 MT/day Fish Oil. 2.3 MT/day Fish Meal. |
Plant and Machinery cost: 63 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 48.00 |
|
Break Even Point (BEP): 34.00 |
TCI : 219 Lakhs |
|
Cost of Project : 0 |
During the printing process, ink, dirt and other residue may accumulate on the blanket cylinders. The accumulation of such residues can cause various...
|
Capacity : 5000 Nos./day |
Plant and Machinery cost: 108 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 45.00 |
|
Break Even Point (BEP): 45.00 |
TCI : 315 Lakhs |
|
Cost of Project : 0 |
Food freezing is a technique by which the fruits and vegetables are brought into below freezing temperature and stored in the same temperature in orde...
|
Capacity : 5 ton Frozen Foods.5000 Cans Ready to Eat Food 450 gms.5000 Pack Tomato Purees (200 gms.)5000 Bottles Tomato Sauces (500 gm.) |
Plant and Machinery cost: 56 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 50.00 |
|
Break Even Point (BEP): 35.00 |
TCI : 703 Lakhs |
|
Cost of Project : 0 |
Copper is the most commonly used architectural metal now-a-days. Copper plays an essential role in the modern building. From recycled cladding and ro...
|
Capacity : 12 MT/day |
Plant and Machinery cost: 198 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 47.00 |
|
Break Even Point (BEP): 56.00 |
TCI : Cost of Project : 567 Lakhs |
|
Cost of Project : 0 |
Tamarind is a fruit of highly soured nature having big trees all over India. Tamarind cultivation is used for the extraction of its fruit juice and p...
|
Capacity : 0.50 MT/day |
Plant and Machinery cost: 11 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 49.00 |
|
Break Even Point (BEP): 38.00 |
TCI : 74 Lakhs |
|
Cost of Project : 0 |
These dyes are so powerful that very small amounts, comparatively, are needed to colour a large amount of material. The dyestuff should never be shake...
|
Capacity : 1500 MT/Annum |
Plant and Machinery cost: 23 Lakhs |
|
Working Capital : 8 Lakhs |
Rate of Return (ROR): 31.00 |
|
Break Even Point (BEP): 48.00 |
TCI : - |
|
Cost of Project : 0 |
The Indian wine industry is in its nascent stage. The per capita consumption of wine in India is only 10 ml per annum as against 100 litres per year i...
|
Capacity : 10500 Ltrs/day |
Plant and Machinery cost: 453 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 68.00 |
|
Break Even Point (BEP): 32.00 |
TCI : 1218 Lakhs |
|
Cost of Project : 0 |