Please choose a project below related to this category.
Soda water is fizzy water used for mixing with alcoholic drinks and fruit juice. Soda water is carbonated water and is often used for mixing with alco...
|
Capacity : - |
Plant and Machinery cost: - |
|
Working Capital : - |
Rate of Return (ROR): 1.00 |
|
Break Even Point (BEP): 0.00 |
TCI : - |
|
Cost of Project : 0 |
Kerosene, also spelled kerosine, also called paraffin or paraffin oil, flammable hydrocarbon liquid commonly used as a fuel. Kerosene is typically pal...
|
Capacity : - |
Plant and Machinery cost: - |
|
Working Capital : - |
Rate of Return (ROR): 1.00 |
|
Break Even Point (BEP): 0.00 |
TCI : - |
|
Cost of Project : 0 |
An entertainment center is a piece of furniture designed to house consumer electronic appliances and components, such as televisions. A family entert...
|
Capacity : - |
Plant and Machinery cost: - |
|
Working Capital : - |
Rate of Return (ROR): 1.00 |
|
Break Even Point (BEP): 0.00 |
TCI : - |
|
Cost of Project : 0 |
Aluminium is the strongest and most durable material, easy to clean and maintain. Aluminium Angle has rounded corners and is generally used for struc...
|
Capacity : - |
Plant and Machinery cost: - |
|
Working Capital : - |
Rate of Return (ROR): 1.00 |
|
Break Even Point (BEP): 0.00 |
TCI : - |
|
Cost of Project : 0 |
Garden Pipe is widely used in for water supply in gardening, steel mills and engineering works and in irrigation projects. To ensure its flawlessness...
|
Capacity : - |
Plant and Machinery cost: - |
|
Working Capital : - |
Rate of Return (ROR): 1.00 |
|
Break Even Point (BEP): 0.00 |
TCI : - |
|
Cost of Project : 0 |
Wood pulp is wood that has been cut up into small pieces and crushed. Wood pulp is used to make paper. Wood reduced to pulp through mechanical and che...
|
Capacity : - |
Plant and Machinery cost: - |
|
Working Capital : - |
Rate of Return (ROR): 1.00 |
|
Break Even Point (BEP): 0.00 |
TCI : - |
|
Cost of Project : 0 |
Woodchips are small to medium sized pieces of wood formed by cutting or chipping larger pieces of wood such as trees, branches, logging residues, stum...
|
Capacity : - |
Plant and Machinery cost: - |
|
Working Capital : - |
Rate of Return (ROR): 1.00 |
|
Break Even Point (BEP): 0.00 |
TCI : - |
|
Cost of Project : 0 |
Palm Oil Production and Processing Industry. Profitable Edible Oil Manufacturing Business Palm oil is an edible vegetable oil high in saturated f...
|
Capacity : - |
Plant and Machinery cost: - |
|
Working Capital : - |
Rate of Return (ROR): 1.00 |
|
Break Even Point (BEP): 0.00 |
TCI : - |
|
Cost of Project : 0 |
Truck Body Building Industry. How to Start a Profitable Automobile Body Building Business Automobile body building is an important activity. The ch...
|
Capacity : - |
Plant and Machinery cost: - |
|
Working Capital : - |
Rate of Return (ROR): 1.00 |
|
Break Even Point (BEP): 0.00 |
TCI : - |
|
Cost of Project : 0 |
Production of Rice Bran Oil with Rice Mill and Captive Power Plant (Integrated Unit). Business Opportunities in Rice Processing Industry Rice, edib...
|
Capacity : - |
Plant and Machinery cost: - |
|
Working Capital : - |
Rate of Return (ROR): 1.00 |
|
Break Even Point (BEP): 0.00 |
TCI : - |
|
Cost of Project : 0 |
Cashew nuts are a popular snack and food source. Cashews, unlike other oily tree nuts, contain starch to about 10% of their weight. This makes them mo...
|
Capacity : Cashewnut (Tin Pack 10 Kgs Size & Poly Packs 1 Kg Size) : 1050 MT/Annum Wallnut (Tin Pack 10 Kgs Size & Poly Packs 1 Kg Size) : 300 MT/Annum Almond (Badam) (Tin Pack 10 Kgs Size & Poly Packs 1 Kg Size): 750 MT/Annum Raisins (Kishmish/ Munakka) (Tin Pack |
Plant and Machinery cost: Rs 957 lakhs |
|
Working Capital : - |
Rate of Return (ROR): 27.00 |
|
Break Even Point (BEP): 53.00 |
TCI : Cost of Project: Rs1597lakhs |
|
Cost of Project : 159700000 |
Chili oil is essentially dried chilies, preserved in oil. It adds a delightful kick to whatever dish you’re using it in. Commonly used as a finishing...
|
Capacity : Chilli Oil: 27,300 Kg./Annum Oleoresin: 122,700 Kg./Annum |
Plant and Machinery cost: Rs 1828 lakhs |
|
Working Capital : - |
Rate of Return (ROR): 27.00 |
|
Break Even Point (BEP): 45.00 |
TCI : Cost of Project: Rs2450 lakhs |
|
Cost of Project : 245000000 |