Please choose a project below related to this category.
Perfumery Compounds Manufacturing and Formulation. Agarbatti Perfumery Compounds. Fragrance Oil. A perfume may be defined as any mixture of pleas...
|
Capacity : - |
Plant and Machinery cost: - |
|
Working Capital : - |
Rate of Return (ROR): 1.00 |
|
Break Even Point (BEP): 0.00 |
TCI : - |
|
Cost of Project : 0 |
Medical Oxygen Gas Plant. Oxygen Bottling Plant. Oxygen Cylinder Filling Plant. Industrial Oxygen Gas Filling Plant. Manufacture of Industrial Gases....
|
Capacity : - |
Plant and Machinery cost: - |
|
Working Capital : - |
Rate of Return (ROR): 1.00 |
|
Break Even Point (BEP): 0.00 |
TCI : - |
|
Cost of Project : 0 |
How to Start Mustard Oil Mill. Profitable Business Idea. Business with huge Profit in India Mustard oil is a fatty vegetable oil extracted from t...
|
Capacity : - |
Plant and Machinery cost: - |
|
Working Capital : - |
Rate of Return (ROR): 1.00 |
|
Break Even Point (BEP): 0.00 |
TCI : - |
|
Cost of Project : 0 |
Mushroom Production Process, How to Start Button Mushroom Farming, Mushroom Technology- Cultivation, Processing The Button mushroom (Agaricus bis...
|
Capacity : - |
Plant and Machinery cost: - |
|
Working Capital : - |
Rate of Return (ROR): 1.00 |
|
Break Even Point (BEP): 0.00 |
TCI : - |
|
Cost of Project : 0 |
A safety razor is a shaving implement with a protective device positioned between the edge of the blade and the skin. The initial purpose of these pro...
|
Capacity : - |
Plant and Machinery cost: - |
|
Working Capital : - |
Rate of Return (ROR): 1.00 |
|
Break Even Point (BEP): 0.00 |
TCI : - |
|
Cost of Project : 0 |
Setting Up a Hospital in India. Investment Opportunity in Healthcare Industry. Start a Hospital in India. The Healthcare market can increase three fol...
|
Capacity : - |
Plant and Machinery cost: - |
|
Working Capital : - |
Rate of Return (ROR): 1.00 |
|
Break Even Point (BEP): 0.00 |
TCI : - |
|
Cost of Project : 0 |
Xanthan gum is a polysaccharide with many industrial uses, including as a common food additive. It is an effective thickening agent and stabilizer to...
|
Capacity : Xanthan Gum Food Grade : 500 Kgs/Day Xanthan Gum Oil Grade : 600 Kgs/Day |
Plant and Machinery cost: 120 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 26.00 |
|
Break Even Point (BEP): 60.00 |
TCI : Cost of Project: 318 Lakhs |
|
Cost of Project : 31800000 |
Aluminium foil is aluminium prepared in thin metal leaves, with a thickness less than 0.2 millimetres (8 mils), thinner gauges down to 6 µm (0.2 mils)...
|
Capacity : Aluminium Foil: 1,200 MT per Annum Aluminium PP Caps: 2,400 MT per Annum Aluminium Scraps: 90 MT per Annum |
Plant and Machinery cost: 669 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 26.00 |
|
Break Even Point (BEP): 48.00 |
TCI : Cost of Project: 1092.10 Lakhs |
|
Cost of Project : 109200000 |
Sugar Manufacturing Industry. Mini Sugar Plant. Sugarcane Mill. How Cane Sugar is processed? Manufacturing Project of Sugar Mill. Sugar can be pro...
|
Capacity : - |
Plant and Machinery cost: - |
|
Working Capital : - |
Rate of Return (ROR): 1.00 |
|
Break Even Point (BEP): 0.00 |
TCI : - |
|
Cost of Project : 0 |
Vermicelli Vermicelli is a traditional type of pasta round in section similar to spaghetti. In Italy vermicelli is slightly thicker than spaghetti, b...
|
Capacity : - |
Plant and Machinery cost: - |
|
Working Capital : - |
Rate of Return (ROR): 1.00 |
|
Break Even Point (BEP): 0.00 |
TCI : - |
|
Cost of Project : 0 |
Grease & Lube Oil Blending Plant. Lubricants & Greases Manufacturing Business. Lube Oil Blending and Filling Plant. Lubrication is simply the use...
|
Capacity : - |
Plant and Machinery cost: - |
|
Working Capital : - |
Rate of Return (ROR): 1.00 |
|
Break Even Point (BEP): 0.00 |
TCI : - |
|
Cost of Project : 0 |
How to Start LPG Cylinder Manufacturing Plant. Domestic and Commercial LPG Cylinders Production Project LPG Cylinder is an essential item for fil...
|
Capacity : - |
Plant and Machinery cost: - |
|
Working Capital : - |
Rate of Return (ROR): 1.00 |
|
Break Even Point (BEP): 0.00 |
TCI : - |
|
Cost of Project : 0 |