Please choose a project below related to this category.
For a building being constructed the one and only thing which is to be considered is its strength of bearing load of both environmental artificial. Bu...
|
Capacity : 3000 MT / Annum |
Plant and Machinery cost: - |
|
Working Capital : - |
Rate of Return (ROR): 41.00 |
|
Break Even Point (BEP): 54.00 |
TCI : - |
|
Cost of Project : 0 |
In India three types of decorative and industrial laminated sheets are being manufactured usually being phenol formaldehyde or melamine formaldehyde...
|
Capacity : 50,00,000 Sq. Mt / Annum |
Plant and Machinery cost: 860 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 46.00 |
|
Break Even Point (BEP): 38.00 |
TCI : 1484 Lakhs |
|
Cost of Project : 0 |
In India three types of decorative and industrial laminated sheets are being manufactured usually being phenol formaldehyde or melamine formaldehyde...
|
Capacity : 50,00,000 Sq. Mt / Annum |
Plant and Machinery cost: 860 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 46.00 |
|
Break Even Point (BEP): 38.00 |
TCI : 1484 Lakhs |
|
Cost of Project : 0 |
Tyre is rubber shielded wheel of metal. The maximum use of tyre is captured by the automobile industry, because the automobiles cannot perform their...
|
Capacity : 5,00,000 Tyre / Annum |
Plant and Machinery cost: 279 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 41.00 |
|
Break Even Point (BEP): 74.00 |
TCI : Cost of Project : 861 Lakhs |
|
Cost of Project : 0 |
Solvent cement refers to any substance inorganic or organic synthetic that is capable of bonding other substances together by surface attachment. Pol...
|
Capacity : 500 Kg. / Day |
Plant and Machinery cost: 10 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 46.00 |
|
Break Even Point (BEP): 36.00 |
TCI : 104 Lakhs |
|
Cost of Project : 0 |
|
Capacity : 168000 Pcs./Day |
Plant and Machinery cost: Rs. 50 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 34.00 |
|
Break Even Point (BEP): 49.00 |
TCI : Rs. 136 Lakhs |
|
Cost of Project : 0 |
The term parboiling covers the operation to which the paddy is subjected before milling. Water and heat are the two main elements in the process. Afte...
|
Capacity : Parboiled Rice: 3000 MT/Annum, Broken Rice : 230 MT/A, Rice Flake 1500 MT/A, Corn Flakes:1500 MT/A |
Plant and Machinery cost: Rs. 85 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 40.00 |
|
Break Even Point (BEP): 58.00 |
TCI : Cost of Project Rs. 308 Lakhs |
|
Cost of Project : 0 |
Polychloroprenes, is the basis for one of the largest and most important groups of rubber adhesives. Four important applications for polychloropren...
|
Capacity : 270 MT/Annum |
Plant and Machinery cost: Rs. 39 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 43.00 |
|
Break Even Point (BEP): 44.00 |
TCI : Cost of Project Rs. 142 Lakhs |
|
Cost of Project : 14200000 |
The covering of chocolates was originally carried out solely by hand the process being known as hand dipping. Each piece or centre was handled individ...
|
Capacity : 600 Kg./day |
Plant and Machinery cost: Rs. 27 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 53.00 |
|
Break Even Point (BEP): 38.00 |
TCI : Rs. 131 Lakhs |
|
Cost of Project : 0 |
Maize is one of the best cereals after paddy and wheat. It is largely cultivated in the north and west India, though there is cultivation of maize in...
|
Capacity : 200 MT Maize Processing/Day Products Starch 133 MT, Glucose 20 MT, Gluten 18 MT Germ 8 MT, Fiber 4 MT |
Plant and Machinery cost: 2913 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 41.00 |
|
Break Even Point (BEP): 58.00 |
TCI : Cost of Project 6084 Lakhs |
|
Cost of Project : 0 |
Maize is one of the best cereals after paddy and wheat. It is largely cultivated in the north and west India, though there is cultivation of maize in...
|
Capacity : 200 MT Maize Processing/Day Products, Starch 133 MT, Glucose 20 MT, Gluten 18 MT, Germ 8 MT, Fiber 4 MT |
Plant and Machinery cost: 2913 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 41.00 |
|
Break Even Point (BEP): 58.00 |
TCI : Cost of Project 6084 Lakhs |
|
Cost of Project : 0 |
Adhesives are advantageous over other methods of joining materials. Thin films, fibers and small particles that cannot be combined satisfactorily by o...
|
Capacity : 1500 MT/Annum |
Plant and Machinery cost: 32 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 51.00 |
|
Break Even Point (BEP): 77.00 |
TCI : Cost of Project 92 Lakhs |
|
Cost of Project : 9200000 |