Please choose a project below related to this category.
Rabbit farming is increasing commercially in many countries. Rabbit farming on a small scale involves small number (a few dozen or less) of animals fe...
|
Capacity : 5000 Angora Rabbits Farming, 2 MT Rabbit Feed/Hr. & 100 kg Rabbit Yarn Wool/Day |
Plant and Machinery cost: 414 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 20.00 |
|
Break Even Point (BEP): 62.00 |
TCI : 608 Lakhs |
|
Cost of Project : 0 |
Maize is one of the cereal grains which produce through out India and is placed 3rd position in agricultural base production though maize is not our s...
|
Capacity : - |
Plant and Machinery cost: - |
|
Working Capital : - |
Rate of Return (ROR): 1.00 |
|
Break Even Point (BEP): 0.00 |
TCI : - |
|
Cost of Project : 0 |
The maize also called “corn or Indian corn” is widely cultivated in India. Maize ranks high among the four or five principal cereal crops of the world...
|
Capacity : - |
Plant and Machinery cost: - |
|
Working Capital : - |
Rate of Return (ROR): 1.00 |
|
Break Even Point (BEP): 0.00 |
TCI : - |
|
Cost of Project : 0 |
Soft drinks are largely used in the society to serve any guest in the house, in the commercial and industrial units to entertain the customers. It som...
|
Capacity : 48000 Bottles/Day |
Plant and Machinery cost: 94 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 41.00 |
|
Break Even Point (BEP): 49.00 |
TCI : 474 Lakhs |
|
Cost of Project : 0 |
Maize is one of the most important cereal crops in the world agricultural economy and is grown in many countries in each of the continents of the worl...
|
Capacity : - |
Plant and Machinery cost: - |
|
Working Capital : - |
Rate of Return (ROR): 1.00 |
|
Break Even Point (BEP): 0.00 |
TCI : - |
|
Cost of Project : 0 |
Potato is widely consumed as food all over the world. It contains the starch as a major carbohydrate. Surplus and cull potatoes are used as feed for l...
|
Capacity : 6 MT/Day |
Plant and Machinery cost: 27 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 34.00 |
|
Break Even Point (BEP): 52.00 |
TCI : 86 Lakhs |
|
Cost of Project : 0 |
In view of the important of tomato either fresh or processed in the daily diet due to the high nutritive value, there are good potentials to develop t...
|
Capacity : 12 Ton/Day |
Plant and Machinery cost: 23 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 47.00 |
|
Break Even Point (BEP): 36.00 |
TCI : 469 Lakhs |
|
Cost of Project : 0 |
Gravity casting which is in fact is a permanent mould casting in which the molten metal is poured under the force of gravity into the permanent mould...
|
Capacity : 300.00 Kgs/day |
Plant and Machinery cost: 10 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 44.00 |
|
Break Even Point (BEP): 46.00 |
TCI : 65 Lakhs |
|
Cost of Project : 0 |
The tyre and tubes are very important rubber products and widely used everywhere in the world. Various types of tyres are available namely pneumatic s...
|
Capacity : 12 Tyres/Day |
Plant and Machinery cost: 190 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 42.00 |
|
Break Even Point (BEP): 47.00 |
TCI : 340 Lakhs |
|
Cost of Project : 0 |
Prestressed Concrete poles for electrical H.T. and L.T. lines widely used now a days in different power distribution in the villages specially rather...
|
Capacity : 30,000 Nos/Annum |
Plant and Machinery cost: 71 Lacs |
|
Working Capital : - |
Rate of Return (ROR): 42.00 |
|
Break Even Point (BEP): 56.00 |
TCI : 209 Lacs |
|
Cost of Project : 0 |
Goats are allied to sheep but are much hardier and more active animals. Their males or billy goats have a tuft of hair (beards) under the chin. The pr...
|
Capacity : 20000 MT Milk/Annum |
Plant and Machinery cost: 2 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 55.00 |
|
Break Even Point (BEP): 38.00 |
TCI : 37 Lakhs |
|
Cost of Project : 0 |
Residual rocks, in which the alumina trihydrate and monohydrate minerals gibbsite, boehmite, and diaspore predominate are classified as bauxite. Other...
|
Capacity : 20000 MT/Annum |
Plant and Machinery cost: 615 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 17.00 |
|
Break Even Point (BEP): 54.00 |
TCI : 1875 Lakhs |
|
Cost of Project : 0 |