Please choose a project below related to this category.
A cable is defined as the set of conductors, insulators, sheaths and armor protection or shielding, specifically built to carry the current both for e...
|
Capacity : Aluminium Cables and Conductors : 25 MT/Day |
Plant and Machinery cost: 376 lakhs |
|
Working Capital : - |
Rate of Return (ROR): 29.00 |
|
Break Even Point (BEP): 52.00 |
TCI : Cost of Project: Rs 1650 lakhs |
|
Cost of Project : 165000000 |
A cold storage is a temperature-controlled supply chain network, with storage and distribution activities carried out in a manner such that the temper...
|
Capacity : Fruits & Vegetables Store: 2000 MT |
Plant and Machinery cost: 79 lakhs |
|
Working Capital : - |
Rate of Return (ROR): 23.00 |
|
Break Even Point (BEP): 52.00 |
TCI : Cost of Project: Rs 281 lakhs |
|
Cost of Project : 28100000 |
Liquid Glucose is usually manufactured by subjecting starch to high temperature in the presence of acid. However, Liquid Glucose of same Dextrose Equi...
|
Capacity : Liquid Glucose: 140 MT/Day |
Plant and Machinery cost: 1267 lakhs |
|
Working Capital : - |
Rate of Return (ROR): 25.00 |
|
Break Even Point (BEP): 43.00 |
TCI : Cost of Project: Rs 2275 lakhsb |
|
Cost of Project : 227500000 |
Liquefied Petroleum Gas is a Propane / Butane mixture liquefied under normal ambient temperature and moderate pressures. It is a safe, clean burning,...
|
Capacity : LPG Refilling Cylinders : 16000 Pcs./Day |
Plant and Machinery cost: 1391 lakhs |
|
Working Capital : - |
Rate of Return (ROR): 30.00 |
|
Break Even Point (BEP): 31.00 |
TCI : Cost of Project: Rs 11166 lakhs |
|
Cost of Project : 1116600000 |
An Induction Furnace is an electrical furnace in which the heat is applied by induction heating of metal. Induction furnace capacities range from less...
|
Capacity : - |
Plant and Machinery cost: - |
|
Working Capital : - |
Rate of Return (ROR): 1.00 |
|
Break Even Point (BEP): 0.00 |
TCI : - |
|
Cost of Project : 0 |
Benzyl alcohol is an aromatic alcohol with the formula C6H5CH2OH. The benzyl group is often abbreviated "Bn" (not to be confused with "Bz" which is us...
|
Capacity : - |
Plant and Machinery cost: - |
|
Working Capital : - |
Rate of Return (ROR): 1.00 |
|
Break Even Point (BEP): 0.00 |
TCI : - |
|
Cost of Project : 0 |
Mango Pulp is the concentrated mango juice obtained on processing of various varieties of mangoes. The processed mango pulp has enhanced shelf life an...
|
Capacity : - |
Plant and Machinery cost: - |
|
Working Capital : - |
Rate of Return (ROR): 1.00 |
|
Break Even Point (BEP): 0.00 |
TCI : - |
|
Cost of Project : 0 |
Electroplating is the process of coating one metal or metal object with a very thin layer of another metal, typically by applying a direct electric cu...
|
Capacity : - |
Plant and Machinery cost: - |
|
Working Capital : - |
Rate of Return (ROR): 1.00 |
|
Break Even Point (BEP): 0.00 |
TCI : - |
|
Cost of Project : 0 |
The Gold is a relatively scarce yellow metal. Often found in the native State, which is the most malleable of all metals. It is extremely corrosion re...
|
Capacity : - |
Plant and Machinery cost: - |
|
Working Capital : - |
Rate of Return (ROR): 1.00 |
|
Break Even Point (BEP): 0.00 |
TCI : - |
|
Cost of Project : 0 |
A non-carbonated beverage flavored by the pulp from mangos. A mango is a tropical fruit that has a flavor which tastes like a blend of pineapple, apri...
|
Capacity : - |
Plant and Machinery cost: - |
|
Working Capital : - |
Rate of Return (ROR): 1.00 |
|
Break Even Point (BEP): 0.00 |
TCI : - |
|
Cost of Project : 0 |
Phthalocyanine is actually a chemical compound commonly used for dyes and pigments. Phthalocyanine Blue or Phthalo Blue is a bright, crystalline, synt...
|
Capacity : - |
Plant and Machinery cost: - |
|
Working Capital : - |
Rate of Return (ROR): 1.00 |
|
Break Even Point (BEP): 0.00 |
TCI : - |
|
Cost of Project : 0 |
A composite container is a canister or a container made from more than one constituent material in order to enhances the maximize useful properties an...
|
Capacity : - |
Plant and Machinery cost: - |
|
Working Capital : - |
Rate of Return (ROR): 1.00 |
|
Break Even Point (BEP): 0.00 |
TCI : - |
|
Cost of Project : 0 |