Hinges are devices that are made out of two symmetrical or none symmetrical sheet metal pieces pivot joined together with wire rod for free swinging o...
|
Capacity : Steel Hinges: 540 MT/Annum Steel Tower Bolts: 540 MT/Annum |
Plant and Machinery cost: Rs 78 lakhs |
|
Working Capital : - |
Rate of Return (ROR): 28.00 |
|
Break Even Point (BEP): 55.00 |
TCI : Cost of Project : Rs 261 lakhs |
|
Cost of Project : 26100000 |
Welding electrodes comprise basically of steel core wire and coating ingredientsor flux mild steel core wires are used in majority of unalloyed steel...
|
Capacity : Welding Electrode: 10 MT/day |
Plant and Machinery cost: Rs 344 lakhs |
|
Working Capital : - |
Rate of Return (ROR): 28.00 |
|
Break Even Point (BEP): 63.00 |
TCI : Cost of Project: Rs 731 lakhs |
|
Cost of Project : 73100000 |
The hypodermic syringe, also known as the hypodermic needle, is a device used by medical professionals to transfer liquids into or out of the body.A s...
|
Capacity : Disposable Plastic Syringes with Needles 1 ml Size each Packed in Polypack: 82000 Th.Nos./annum |
Plant and Machinery cost: Rs. 2410 lakhs |
|
Working Capital : - |
Rate of Return (ROR): 21.00 |
|
Break Even Point (BEP): 17.00 |
TCI : Cost of Project: Rs14240 lakhs |
|
Cost of Project : 1424000000 |
Zinc sulphate is a very water soluble, transparent, colorless, crystalline compound. It is commonly used as the heptahydrate, ZnSO4 •7H2O, and is comm...
|
Capacity : Zinc Sulphate 33%: 2 MT/day Zinc Sulphate 21%: 3 MT/day Zinc Sulphate 12% Soln. : 5 MT/day |
Plant and Machinery cost: Rs 146 lakhs |
|
Working Capital : - |
Rate of Return (ROR): 32.00 |
|
Break Even Point (BEP): 62.00 |
TCI : Cost of Project: Rs 237 lakhs |
|
Cost of Project : 23700000 |
Zinc Chloride (ZnCl2) is available as white, crystalline powder, odourless, moulded in pencils or porcelains like mass.Zinc chloride is the name of ch...
|
Capacity : Zinc Chloride from Zinc Ash: 9MT/day Zinc Chloride from Zinc Oxide: 1 MT/day |
Plant and Machinery cost: Rs. 146 lakhs |
|
Working Capital : - |
Rate of Return (ROR): 27.00 |
|
Break Even Point (BEP): 65.00 |
TCI : Cost of Project: Rs. 246 lakhs |
|
Cost of Project : 24600000 |
Sanitary Napkin comes under Nonwoven fabrics which as a whole come under technical textile.In addition to sanitary napkins non-woven fabric is also us...
|
Capacity : Sanitary Napkins: 172800Pcs./day |
Plant and Machinery cost: Rs 257 lakhs |
|
Working Capital : - |
Rate of Return (ROR): 30.00 |
|
Break Even Point (BEP): 44.00 |
TCI : Cost of Project: Rs 674 lakhs |
|
Cost of Project : 67400000 |
The recovery of metals from metal scrap has the advantage that it is easier and far less energy dependent than the production of primary lead from ore...
|
Capacity : Lead Ingot: 8 MT/day |
Plant and Machinery cost: Rs 96 lakhs |
|
Working Capital : - |
Rate of Return (ROR): 29.00 |
|
Break Even Point (BEP): 54.00 |
TCI : Cost of Project: Rs 370 lakhs |
|
Cost of Project : 37000000 |
Microcrystalline cellulose (MCC) is a term for refined wood pulp and is used as a texturizer, an anti-caking agent, a fat substitute, an emulsifier, a...
|
Capacity : Microcrystalline Celluose (Pharmaceutical Grade): 5 MT/day |
Plant and Machinery cost: Rs 74 lakhs |
|
Working Capital : - |
Rate of Return (ROR): 29.00 |
|
Break Even Point (BEP): 78.00 |
TCI : Cost of Project: Rs 277 lakhs |
|
Cost of Project : 27700000 |
Sanitary Napkin comes under Nonwoven fabrics which as a whole come under technical textile.In addition to sanitary napkins non-woven fabric is also us...
|
Capacity : Sanitary Napkins: 23040Pcs./day |
Plant and Machinery cost: Rs 38 lakhs |
|
Working Capital : - |
Rate of Return (ROR): 28.00 |
|
Break Even Point (BEP): 51.00 |
TCI : Cost of Project: Rs.127 lakhs |
|
Cost of Project : 12700000 |
Agar-agar is a mixture of Polysaccharides (agarose+agaropectine) of a high molecular weight. Agar-agar belongs to the family of galactan polysaccharid...
|
Capacity : Agar Agar: 500Kgs./day |
Plant and Machinery cost: Rs. 211 lakhs |
|
Working Capital : Cost of Project: Rs697 lakhs |
Rate of Return (ROR): 27.00 |
|
Break Even Point (BEP): 43.00 |
TCI : - |
|
Cost of Project : 69700000 |
Intravenous fluids are fluids which are intended to be administered to a patient intravenously, directly through the circulatory system. These fluids...
|
Capacity : IV Fluids (500 ml Bottle): 40000 Pcs./day |
Plant and Machinery cost: Rs. 2658 lakhs |
|
Working Capital : - |
Rate of Return (ROR): 17.00 |
|
Break Even Point (BEP): 25.00 |
TCI : Cost of Project: Rs10817 lakhs |
|
Cost of Project : 1081700000 |
Bentonite is clay generated frequently from the alteration of volcanic ash, consisting predominantly of smectite minerals, usually montmorillonite. Ot...
|
Capacity : 144 MT/day |
Plant and Machinery cost: 63 lakhs |
|
Working Capital : - |
Rate of Return (ROR): 27.00 |
|
Break Even Point (BEP): 52.00 |
TCI : Cost of Project: Rs. 445 lakhs |
|
Cost of Project : 44500000 |