Automobile Hoses (AC Hose, Fuel Hose, Hydraulic Hose, Petrol Pump Hose) and Production of Tyres
Automobile Hoses (AC Hose, Fuel Hose, Hydraulic Hose, Petrol Pump Hose) and Production of Tyres

A hose is a flexible hollow tube designed to carry fluids from one location to another. Hoses are also sometimes called pipes, or more generally tubin...

Capacity :

Automobile AC Hose: 300,000 Nos/Annum Fuel Hose: 500,000 Nos/Annum Hydraulic Hose:500,000 Nos/Annum Petrol Pump Hose: 200,000 Nos/Annum Tyres : 450,000 Nos/Annum

Plant and Machinery cost:

Rs 1020 lakhs

Working Capital :

-

Rate of Return (ROR):

27.00

Break Even Point (BEP):

52.00

TCI :

Cost of Project: Rs 2994 lakhs

Cost of Project :

299400000

Grain Based Alcohol Distillery
Grain Based Alcohol Distillery

The alcohol industry is the commercial industry involved in the manufacturing, distribution, and sale of alcoholic beverages. Alcohol has assumed very...

Capacity :

Extra Neutral Alcohol (ENA) : 15,000KLs/Annum Distilleries Dry Grain with Solubles (DDGS) by product: 7,350MT/Annum Fusel Oil (by product) : 24KLs/Ann

Plant and Machinery cost:

Rs 4637 lakhs

Working Capital :

-

Rate of Return (ROR):

24.00

Break Even Point (BEP):

48.00

TCI :

Cost of Project: Rs 6572 lakhs

Cost of Project :

657200000

Precipitated Silica  from Rice Husk Ash
Precipitated Silica from Rice Husk Ash

Rice milling generates a byproduct known as husk. This surrounds the paddy grain. During milling of paddy about 78 % of weight is received as rice, br...

Capacity :

Precipitated Silica: 1200mt/annum Activated Carbon (by product): 336mt/annum Sodium Carbonate (by product): 504 mt/annum

Plant and Machinery cost:

Rs 556 lakhs

Working Capital :

-

Rate of Return (ROR):

1.00

Break Even Point (BEP):

1.00

TCI :

Cost of Project : Rs 1200 lakhs

Cost of Project :

120000000

PCC Electric Poles
PCC Electric Poles

Concrete poles were first used over 60 years ago and were then made of normal reinforced concrete. As technology improved, production and use of concr...

Capacity :

Prestressed Concrete Cement Electric Poles: 60,000nos/annum

Plant and Machinery cost:

Rs 304 lakhs

Working Capital :

-

Rate of Return (ROR):

25.00

Break Even Point (BEP):

51.00

TCI :

Cost of Project: Rs 713 lakhs

Cost of Project :

71300000

Precipitated Silica from Rice Husk Ash
Precipitated Silica from Rice Husk Ash

Rice milling generates a byproduct known as husk. This surrounds the paddy grain. During milling of paddy about 78 % of weight is received as rice, br...

Capacity :

Precipitated Silica: 1500mt/annum Activated Carbon (by product): 420mt/annum Sodium Carbonate (by product): 630mt/annum

Plant and Machinery cost:

Rs 519 lakhs

Working Capital :

-

Rate of Return (ROR):

17.24

Break Even Point (BEP):

52.00

TCI :

Cost of Project: Rs 787 lakhs

Cost of Project :

78700000

Wood Plastic Composite (WPC)
Wood Plastic Composite (WPC)

Wood-plastic composites (WPCs) are a product class that has been developing over the last 40 years resulting in increased applications and expanded ma...

Capacity :

4800000 sq.ft.

Plant and Machinery cost:

Rs 146 lakhs

Working Capital :

-

Rate of Return (ROR):

27.00

Break Even Point (BEP):

56.00

TCI :

Cost of Project: Rs 391 lakhs

Cost of Project :

39100000

Wood Plastic Composite(WPC)
Wood Plastic Composite(WPC)

Wood-plastic composites (WPCs) are a product class that has been developing over the last 40 years resulting in increased applications and expanded ma...

Capacity :

4800000 sq.ft.

Plant and Machinery cost:

Rs 146 lakhs

Working Capital :

-

Rate of Return (ROR):

26.00

Break Even Point (BEP):

51.00

TCI :

Cost of Project: Rs 476 lakhs

Cost of Project :

47600000

Cotton Seed Delinting, Crushing and Refining of Oil
Cotton Seed Delinting, Crushing and Refining of Oil

Cotton is considered as the white gold and king of fibrecrops.It is one of the most important commercial crops of India and is the single largest natu...

Capacity :

Refined Cotton Seed Oil : 27000mt/annum Linter: 8100mt/annum DOC: 33750mt/annum Hulls: 40500mt/annum Soap Stock: 21600mt/annum Acid Oil

Plant and Machinery cost:

Rs 1474 lakhs

Working Capital :

-

Rate of Return (ROR):

29.00

Break Even Point (BEP):

50.00

TCI :

Cost of Project: Rs 3024 lakhs

Cost of Project :

302400000

Aluminium Wire & Cables - Manufacturing Plant, Detailed Project Report, Profile, Business Plan, Industry Trends, Market Research, Survey, Manufacturing Process, Machinery, Raw Materials, Feasibility Study, Investment Opportunities, Cost and Revenue
Aluminium Wire & Cables - Manufacturing Plant, Detailed Project Report, Profile, Business Plan, Industry Trends, Market Research, Survey, Manufacturing Process, Machinery, Raw Materials, Feasibility Study, Investment Opportunities, Cost and Revenue

Wire means Solid conductor or Insulated conductor which has strength and with cover or without cover and Cable means Insulated conductor (Solid or Str...

Capacity :

Aluminium Wire (AAAC) Conductor: 900 MT/Annum Aluminium Wire (ACSR) Conductor: 400 MT/Annum Aluminium Cables: 450MT/Annum

Plant and Machinery cost:

Rs 314 lakhs

Working Capital :

-

Rate of Return (ROR):

28.00

Break Even Point (BEP):

62.00

TCI :

Cost of Project : Rs 579 lakhs

Cost of Project :

57900000

Maize Starch & Its By Products - Manufacturing Plant, Detailed Project Report, Profile, Business Plan, Industry Trends, Market Research, Survey, Manufacturing Process, Machinery, Raw Materials, Feasibility Study, Investment Opportunities, Cost and Revenue
Maize Starch & Its By Products - Manufacturing Plant, Detailed Project Report, Profile, Business Plan, Industry Trends, Market Research, Survey, Manufacturing Process, Machinery, Raw Materials, Feasibility Study, Investment Opportunities, Cost and Revenue

Starch is the most abundant reserve polysaccharide in plants. Today, the main sources of starch extraction are tubers, roots and seeds, primarily from...

Capacity :

Maize Starch: 11520MT/Annum Germs: 1170MT/Annum Gluten: 990MT/Annum Fiber: 2520MT/Annum

Plant and Machinery cost:

Rs 1790 lakhs

Working Capital :

-

Rate of Return (ROR):

23.00

Break Even Point (BEP):

45.00

TCI :

Cost of Project: Rs 2749 lakhs

Cost of Project :

274900000

Low Carbon Silicomanganese - Manufacturing Plant, Detailed Project Report, Profile, Business Plan, Industry Trends, Market Research, Survey, Manufacturing Process, Machinery, Raw Materials, Feasibility Study, Investment Opportunities, Cost and Revenue
Low Carbon Silicomanganese - Manufacturing Plant, Detailed Project Report, Profile, Business Plan, Industry Trends, Market Research, Survey, Manufacturing Process, Machinery, Raw Materials, Feasibility Study, Investment Opportunities, Cost and Revenue

Low Carbon Silico Manganese which is popularly known as LCSiMn is a ferrous alloy with content of carbon, silica and manganese. A large number of stee...

Capacity :

Low Carbon Silicomanganese: 15,000 MT/Annum

Plant and Machinery cost:

Rs 1422 lakhs

Working Capital :

-

Rate of Return (ROR):

28.00

Break Even Point (BEP):

55.00

TCI :

Cost of Project : Rs 3936 lakhs

Cost of Project :

393600000

Low Carbon Ferromanganese - Manufacturing Plant, Detailed Project Report, Profile, Business Plan, Industry Trends, Market Research, Survey, Manufacturing Process, Machinery, Raw Materials, Feasibility Study, Investment Opportunities, Cost and Revenue
Low Carbon Ferromanganese - Manufacturing Plant, Detailed Project Report, Profile, Business Plan, Industry Trends, Market Research, Survey, Manufacturing Process, Machinery, Raw Materials, Feasibility Study, Investment Opportunities, Cost and Revenue

High Carbon Ferro- manganese containing about 7% carbon is not suitable for the production of steels or other alloys containing manganese in which it...

Capacity :

Low Carbon Ferromanganes : 15,000 MT/Annum

Plant and Machinery cost:

Rs 371 lakhs

Working Capital :

-

Rate of Return (ROR):

27.00

Break Even Point (BEP):

61.00

TCI :

Cost of Project : Rs 2804 lakhs

Cost of Project :

280400000