Please choose a project below related to this category.
A collapsible tube is defined as a cylinder of pliable metal that can be sealed in such a manner that its contents, although readily discharged in any...
|
Capacity : Aluminium Collapsible Tubes (Printed): 2,00,000 Nos/Day |
Plant and Machinery cost: Rs 608 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 28.40 |
|
Break Even Point (BEP): 41.58 |
TCI : Cost of Project: Rs 1158 Lakhs |
|
Cost of Project : 115800000 |
The principal feed resources for animal consumption in the country are crop residues like straws of wheat, rice and other cereals and stovers, which a...
|
Capacity : 100 MT/Day |
Plant and Machinery cost: Rs 277 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 25.22 |
|
Break Even Point (BEP): 48.23 |
TCI : Cost of Project: Rs 869 Lakhs |
|
Cost of Project : 86900000 |
A restaurant is simply a place to have food outside your home. It is smaller in size than a hotel as it does not have accommodation facilities. It is...
|
Capacity : Restaurant (Veg. - Non-Veg.): 150 Nos/Day, Beer: 330 Pitchers/Day, Alcohol : 100 Nos/Day, Fresh Fruit Juice: 500 Nos/Day |
Plant and Machinery cost: Rs 189 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 27.28 |
|
Break Even Point (BEP): 63.08 |
TCI : Cost of Project: Rs 392 Lakhs |
|
Cost of Project : 39200000 |
Cement is a material with adhesive and cohesive properties which make it capable of bonding minerals fragments into a compact whole. It can be defined...
|
Capacity : 200 MT/Day |
Plant and Machinery cost: Rs 755 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 17.22 |
|
Break Even Point (BEP): 61.78 |
TCI : Cost of Project: Rs 1254 Lakhs |
|
Cost of Project : 125400000 |
A wire or combination or wires not insulated from one another, suitable for carrying a single electric current is called conductor. The term conductor...
|
Capacity : • All Aluminium Alloy Conductor: 10 MT/Day, Aluminium Conductor Steel Reinforced : 10 MT/Day |
Plant and Machinery cost: Rs 580 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 27.36 |
|
Break Even Point (BEP): 56.24 |
TCI : Cost of Project: Rs 1141 Lakhs |
|
Cost of Project : 114100000 |
Cement is an inorganic, non-metallic substance with hydraulic binding properties, and is used as a bonding agent in building materials. It is a fine p...
|
Capacity : Clinker for Cement: 100 MT/Day |
Plant and Machinery cost: Rs 436 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 23.00 |
|
Break Even Point (BEP): 55.00 |
TCI : Cost of Project: Rs 907 Lakhs |
|
Cost of Project : 90700000 |
Rice husk is an agricultural residue easily available in rice producing countries. India is a major rice producing country, and the husk generated dur...
|
Capacity : Precipitated Silica: 5 MT/Day,CaCO3 (by product):10.3 MT/Day |
Plant and Machinery cost: Rs 437 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 24.00 |
|
Break Even Point (BEP): 55.00 |
TCI : Cost of Project: Rs 660 Lakhs |
|
Cost of Project : 66000000 |
A match is a small stick of wood or strip of cardboard with a solidified mixture of flammable chemicals deposited on one end. When that end is struck...
|
Capacity : Match Boxes: 1000 Cases/Day |
Plant and Machinery cost: Rs 229 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 26.00 |
|
Break Even Point (BEP): 59.00 |
TCI : Cost of Project: Rs 778 Lakhs |
|
Cost of Project : 77800000 |
A lubricant is a substance introduced to reduce friction between moving surfaces. It may also have the function of transporting foreign particles. The...
|
Capacity : Blended Lubricating Oil 4 KL/ Day •Greases:1 KL/Day |
Plant and Machinery cost: Rs 174 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 25.00 |
|
Break Even Point (BEP): 52.00 |
TCI : Cost of Project: Rs 465 Lakhs |
|
Cost of Project : 46500000 |
Bicycle tubes are the backbone of the bicycle industries. Few numbers of companies in organized sector are engaged in the quality grade cycles tyres a...
|
Capacity : Bicycle Tubes: 10,000 Nos. /Day |
Plant and Machinery cost: Rs 118 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 26.00 |
|
Break Even Point (BEP): 45.00 |
TCI : Cost of Project: Rs 622 Lakhs |
|
Cost of Project : 62200000 |
Autoclaved Aerated Concrete (AAC) is a non-combustible, lime-based, cementitious building material that is expanding into new worldwide markets. As a...
|
Capacity : A.A.C. Blocks: 500 Cu.Mt /day |
Plant and Machinery cost: Rs 601 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 25.00 |
|
Break Even Point (BEP): 50.00 |
TCI : Cost of Project:Rs 1415 Lakhs |
|
Cost of Project : 141500000 |
Vodka is a neutral spirit that is without distinctive character, aroma, taste, or color. These properties are developed during the distillation proces...
|
Capacity : Vodka from Grain & Potato:30 KLs/Day |
Plant and Machinery cost: Rs 3845 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 25.00 |
|
Break Even Point (BEP): 41.00 |
TCI : Cost of Project: Rs 6316 Lakhs |
|
Cost of Project : 631600000 |