Please choose a project below related to this category.
The International General Certificate of Secondary Education is an international qualification for school students. IGCSE is developed by University...
|
Capacity : 2400 Students |
Plant and Machinery cost: Equipment : 121 Lakh |
|
Working Capital : - |
Rate of Return (ROR): 46.00 |
|
Break Even Point (BEP): 39.00 |
TCI : 2357 Lakh |
|
Cost of Project : 0 |
Biofuel will be the best alternative to the energy crisis arising out of soaring crude prices and depletion of fossil fuels at a faster rate. Biofuel...
|
Capacity : 8 Kls./Day |
Plant and Machinery cost: 120 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 41.00 |
|
Break Even Point (BEP): 47.00 |
TCI : 438 Lakhs |
|
Cost of Project : 0 |
Lubricating oil is generally used to reduce wear of one or both surfaces in close proximity, and moving relative to each another, by interposing a sub...
|
Capacity : 1000 Ltrs. / Day |
Plant and Machinery cost: 16 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 59.00 |
|
Break Even Point (BEP): 32.00 |
TCI : 150 Lakhs |
|
Cost of Project : 0 |
Potato starch is essential as a universal binding and food thickening agent. Leveraging on over expertise in potato starch production, we began produc...
|
Capacity : 167 MT / Day |
Plant and Machinery cost: 463 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 51.00 |
|
Break Even Point (BEP): 27.00 |
TCI : 3843 Lakhs |
|
Cost of Project : 0 |
Solar cell comprises by two words. Solar means sunlight & cell is the device to provide the current supply and as the whole solar cell is device, whi...
|
Capacity : 10000 Nos. / Day |
Plant and Machinery cost: 49 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 45.00 |
|
Break Even Point (BEP): 39.00 |
TCI : 358 Lakhs |
|
Cost of Project : 0 |
Coal tar pitch is the residue from the processing of coal tar. Since pitch constituents over 50% of crude tar, its utilization has a major effect on t...
|
Capacity : 7500 MT/Annum |
Plant and Machinery cost: 143 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 43.00 |
|
Break Even Point (BEP): 56.00 |
TCI : Cost of Project : 340 Lakhs |
|
Cost of Project : 0 |
Tomato pulp is very much popular item derived from tomato fruit. It is a ground form of tomato having only 6% solid content. A wide variety of product...
|
Capacity : 10,000 Bottles/Day |
Plant and Machinery cost: 19 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 51.00 |
|
Break Even Point (BEP): 37.00 |
TCI : 158 Lakhs |
|
Cost of Project : 0 |
In case of Photovoltaic or direct conversion of sunlight to electricity via solar cell, the efficiencies limited to about 20 percent of the absorbed s...
|
Capacity : - |
Plant and Machinery cost: - |
|
Working Capital : - |
Rate of Return (ROR): 1.00 |
|
Break Even Point (BEP): 0.00 |
TCI : - |
|
Cost of Project : 0 |
The wax crayons are used for outlining and shading by the artist for drawing. Two types of crayons are produced in India chalk crayons and marking cr...
|
Capacity : 7200 Dozens / Day |
Plant and Machinery cost: 2 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 56.00 |
|
Break Even Point (BEP): 34.00 |
TCI : 50 Lakhs |
|
Cost of Project : 0 |
Silicone is the material on which some fluids are based. Usually, a non-mineral type oil is used in hydraulic brake equipments. It has applications...
|
Capacity : 1 MT / Day |
Plant and Machinery cost: 9 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 52.70 |
|
Break Even Point (BEP): 33.32 |
TCI : 2 Crores |
|
Cost of Project : 0 |
Milk is considered the most nutritious form of food for all mammals. In India, the dairy sector contributes 15% of the Gross National Income. Witho...
|
Capacity : 6680 Litres /Day |
Plant and Machinery cost: 2 Crores |
|
Working Capital : - |
Rate of Return (ROR): 35.99 |
|
Break Even Point (BEP): 40.27 |
TCI : Cost of Project : 3.96 Crores |
|
Cost of Project : 0 |
The importance of milk in human diet especially for children and expectant and nursing matters is vital. To meet the demand of the increasing populat...
|
Capacity : 27000 Kgs. Milk / Day, 5 MW Power Plant Based on Cow Dung |
Plant and Machinery cost: 4 Crores |
|
Working Capital : - |
Rate of Return (ROR): 43.00 |
|
Break Even Point (BEP): 32.00 |
TCI : 25 Crores |
|
Cost of Project : 0 |