Please choose a project below related to this category.
It is dark solid form of carbon, produced from the thermal decomposition and polymerization of heavy liquid hydrocarbons that are derived from crude o...
|
Capacity : 30.00 MT/day |
Plant and Machinery cost: Rs. 271 Lacs |
|
Working Capital : - |
Rate of Return (ROR): 49.00 |
|
Break Even Point (BEP): 39.00 |
TCI : Rs. 1386 Lacs |
|
Cost of Project : 0 |
Dental education occupies a place of pride in the field of medical studies. The basic aim of the dental colleges is to provide health-oriented courses...
|
Capacity : 100 Students in Dental College ,4 year course with Dental College |
Plant and Machinery cost: 674 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 50.00 |
|
Break Even Point (BEP): 43.00 |
TCI : 1642 Lakhs |
|
Cost of Project : 0 |
It is non crystalline solid or viscous material having adhesive properties, which is completely soluble in carbon disulfide. It is generally brown or...
|
Capacity : 20 Tonne/day |
Plant and Machinery cost: Rs. 14 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 41.00 |
|
Break Even Point (BEP): 49.00 |
TCI : Rs. 71 Lakhs |
|
Cost of Project : 0 |
Golf is quite a respectable and expensive game. Participants of golf course are considered as regardable and honourable people of the society. Golf co...
|
Capacity : 20000 MEMBERS |
Plant and Machinery cost: Land & Building : Rs. 19.62 Crore |
|
Working Capital : - |
Rate of Return (ROR): 26.00 |
|
Break Even Point (BEP): 34.00 |
TCI : Rs. 21 Crores |
|
Cost of Project : 0 |
Potatoes are consumed in varied forms all over the world. They are also processed into powder form in order to prevent-their spoilage. Potato Powder i...
|
Capacity : 6.00 TON/day |
Plant and Machinery cost: Rs. 200 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 49.00 |
|
Break Even Point (BEP): 40.00 |
TCI : Rs. 500 Lakhs |
|
Cost of Project : 0 |
|
Capacity : 400 Kg/DAY |
Plant and Machinery cost: Rs. 10 LAKHS |
|
Working Capital : - |
Rate of Return (ROR): 57.00 |
|
Break Even Point (BEP): 34.00 |
TCI : Rs. 62 LAKHS |
|
Cost of Project : 0 |
Petroleum coke is a dark form of carbon, produced from the thermal decomposition and polymerization of heavy liquid hydrocarbons that are derived from...
|
Capacity : 15 MT/Day |
Plant and Machinery cost: 164 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 42.00 |
|
Break Even Point (BEP): 46.00 |
TCI : 526 Lakhs |
|
Cost of Project : 0 |
The vehicle owners should only use the minimum amount of ethylene glycol used based antifreeze to protect the system. The higher concentrate of antifr...
|
Capacity : 30 Lts. Coolant/Day, 300 Lts. Brake Oil/Day, 1000 Lts. Lube/Day, 1000 Lts. Grease/Day |
Plant and Machinery cost: 5 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 15.00 |
|
Break Even Point (BEP): 35.00 |
TCI : 70 Lakhs |
|
Cost of Project : 0 |
Increase of inputs on tangible or non-tangible way in agriculture increased the production of crops. Soyabean, known as golden bean has emerged as the...
|
Capacity : 7.5 MT Soyabean Processing / Day (Cultivation in 1000 Hactares) |
Plant and Machinery cost: 1726 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 31.00 |
|
Break Even Point (BEP): 40.00 |
TCI : 2686 Lakhs |
|
Cost of Project : 0 |
Today ice cream may be considered a luxury food item, although its popularity is increasing rapidly. Ice cream is defined as a frozen dairy product ma...
|
Capacity : 1000 kgs/Day |
Plant and Machinery cost: 14 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 57.00 |
|
Break Even Point (BEP): 34.00 |
TCI : 112 Lakhs |
|
Cost of Project : 0 |
This is a medium sized free, with a clear bole of 10-25 and a girth of 6-8. Although described as evergreen in drier areas it becomes deciduous. Its b...
|
Capacity : 1 Mt/Day |
Plant and Machinery cost: - |
|
Working Capital : - |
Rate of Return (ROR): 43.00 |
|
Break Even Point (BEP): 47.00 |
TCI : - |
|
Cost of Project : 0 |
In the modern industrial era grease have been increasingly employed to coke with a variety if difficult lubrication problems, particularly those where...
|
Capacity : 2 ton/Day |
Plant and Machinery cost: 26 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 40.00 |
|
Break Even Point (BEP): 30.00 |
TCI : 468 Lakhs |
|
Cost of Project : 0 |