Ethyl and butyl acetates are solvents used in surface coatings, inks, flavorings and pharmaceuticals, and other applications. Ethyl acetate (systemati...
|
Capacity : Ethyl Acetate: 8.3 MT/Day Butyl Acetate: 8.3 MT/Day |
Plant and Machinery cost: Rs 239 lakhs |
|
Working Capital : - |
Rate of Return (ROR): 27.00 |
|
Break Even Point (BEP): 0.00 |
TCI : Cost of Project: Rs 546 lakhs |
|
Cost of Project : 54600000 |
Curcumin is the main biologically active phytochemical compound of Turmeric. Molecular chemical formula of Curcumin: C21H20O6. The most important cons...
|
Capacity : Curcumin Powder: 25 Kgs/Day Turmeric Oil : 25 Kgs/Day Deoiled Turmeric : 440 Kgs/Day |
Plant and Machinery cost: Rs 149 lakhs |
|
Working Capital : - |
Rate of Return (ROR): 26.00 |
|
Break Even Point (BEP): 52.00 |
TCI : Cost of Project: Rs 303 lakhs |
|
Cost of Project : 30300000 |
Invert sugar (syrup) is an edible mixture of sugars made by heating up table sugar (sucrose) with water. As invert sugar is thought to be sweeter than...
|
Capacity : Invert Sugar Syrup: 20 MT/Day |
Plant and Machinery cost: Rs 397 lakhs |
|
Working Capital : - |
Rate of Return (ROR): 27.00 |
|
Break Even Point (BEP): 58.00 |
TCI : Cost of Project : Rs 733 lakhs |
|
Cost of Project : 73300000 |
A razor is a bladed tool primarily used in the removal of unwanted body hair through the act of shaving. Kinds of razors include straight razors, disp...
|
Capacity : Razor Blade (Double Edge): 100,000 PKTS/Day |
Plant and Machinery cost: Rs 681 lakhs |
|
Working Capital : - |
Rate of Return (ROR): 27.00 |
|
Break Even Point (BEP): 54.00 |
TCI : Cost of Project: Rs 1325 lakhs |
|
Cost of Project : 132500000 |
Poultry feed is food for farm poultry, including chickens, ducks, geese and other domestic birds. Healthy poultry require a sufficient amount of prote...
|
Capacity : Poultry Feed: 16 MT/Day |
Plant and Machinery cost: Rs 43 lakhs |
|
Working Capital : - |
Rate of Return (ROR): 26.00 |
|
Break Even Point (BEP): 55.00 |
TCI : Cost of Project: Rs 244 lakhs |
|
Cost of Project : 24400000 |
“The nation's competitiveness depends, in part, on the skills of tomorrow's engineers.” As the saying goes, there is need of engineering college...
|
Capacity : Engineering College: 40 Students each Branch, 6 Branches.Total Students in 4th Year 960 Nos. |
Plant and Machinery cost: Rs 571 lakhs |
|
Working Capital : - |
Rate of Return (ROR): 1.00 |
|
Break Even Point (BEP): 1.00 |
TCI : Cost of Project: Rs 3065 lakhs |
|
Cost of Project : 306500000 |
Zinc oxide is an inorganic compound with the formula ZnO. ZnO is a white powder that is insoluble in water, and it is widely used as an additive in nu...
|
Capacity : Zinc Oxide: 16 MT/Day |
Plant and Machinery cost: Rs 351 lakhs |
|
Working Capital : - |
Rate of Return (ROR): 29.00 |
|
Break Even Point (BEP): 59.00 |
TCI : Cost of Project: Rs 833 lakhs |
|
Cost of Project : 83300000 |
A cable is defined as the set of conductors, insulators, sheaths and armor protection or shielding, specifically built to carry the current both for e...
|
Capacity : Aluminium Cables and Conductors : 25 MT/Day |
Plant and Machinery cost: 376 lakhs |
|
Working Capital : - |
Rate of Return (ROR): 29.00 |
|
Break Even Point (BEP): 52.00 |
TCI : Cost of Project: Rs 1650 lakhs |
|
Cost of Project : 165000000 |
A Namkeen is seen in western culture as a type of food that is not meant to be eaten as part of the main meals of the day (breakfast, lunch, and diner...
|
Capacity : Namkeen, Bhujia, Dalmoth, Chana Chur & Khatta Meetha: 10 MT/Day |
Plant and Machinery cost: 221 lakhs |
|
Working Capital : - |
Rate of Return (ROR): 27.00 |
|
Break Even Point (BEP): 53.00 |
TCI : Cost of Project: Rs 495 lakhs |
|
Cost of Project : 49500000 |
A cold storage is a temperature-controlled supply chain network, with storage and distribution activities carried out in a manner such that the temper...
|
Capacity : Fruits & Vegetables Store: 2000 MT |
Plant and Machinery cost: 79 lakhs |
|
Working Capital : - |
Rate of Return (ROR): 23.00 |
|
Break Even Point (BEP): 52.00 |
TCI : Cost of Project: Rs 281 lakhs |
|
Cost of Project : 28100000 |
Liquid Glucose is usually manufactured by subjecting starch to high temperature in the presence of acid. However, Liquid Glucose of same Dextrose Equi...
|
Capacity : Liquid Glucose: 140 MT/Day |
Plant and Machinery cost: 1267 lakhs |
|
Working Capital : - |
Rate of Return (ROR): 25.00 |
|
Break Even Point (BEP): 43.00 |
TCI : Cost of Project: Rs 2275 lakhsb |
|
Cost of Project : 227500000 |
Liquefied Petroleum Gas is a Propane / Butane mixture liquefied under normal ambient temperature and moderate pressures. It is a safe, clean burning,...
|
Capacity : LPG Refilling Cylinders : 16000 Pcs./Day |
Plant and Machinery cost: 1391 lakhs |
|
Working Capital : - |
Rate of Return (ROR): 30.00 |
|
Break Even Point (BEP): 31.00 |
TCI : Cost of Project: Rs 11166 lakhs |
|
Cost of Project : 1116600000 |