Please choose a project below related to this category.
Maize and its By Products (Maize Starch, Modified Starches & Animal Feed) Corn starch, corn flour or maize starch is the starch derived from the c...
|
Capacity : Maize Starch : 37.50 MT/day•Modified Starch : 45 MT/day•Animal Feed:45 MT/day |
Plant and Machinery cost: Rs 1105 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 26.00 |
|
Break Even Point (BEP): 45.00 |
TCI : Cost of Project : Rs 2894 Lakhs |
|
Cost of Project : 289400000 |
Snack foods have become very popular among all age groups in India and its popularity is growing day by day. A variety of snack foods are presently av...
|
Capacity : Banana Wafers: 800 Kgs/Day |
Plant and Machinery cost: Rs 20 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 24.00 |
|
Break Even Point (BEP): 57.00 |
TCI : Cost of Project : Rs 121 Lakhs |
|
Cost of Project : 12100000 |
The tobacco industry is one of the most profitable industries in the world. Tobacco companies use their enormous wealth and influence both locally and...
|
Capacity : Baba Zarda Type : 250 Kg/Day,Tulsi Zarda Type: 250 Kg/Day,Gopal Zarda Type: 250 Kg/Day,Bhola Zarda Type : 250 Kg/Day |
Plant and Machinery cost: Rs 24 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 30.00 |
|
Break Even Point (BEP): 55.00 |
TCI : Cost of Project : Rs 238 Lakhs |
|
Cost of Project : 23800000 |
The production of poultry throughout the world is carried out by a highly specialized, efficient poultry industry that has been a leader in trends of...
|
Capacity : Broilers : 400 Nos/Day,Eggs :600 Nos/Day |
Plant and Machinery cost: Rs 22 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 12.00 |
|
Break Even Point (BEP): 60.00 |
TCI : Cost of Project : Rs 103 Lakhs |
|
Cost of Project : 10300000 |
Cashew (Botanical name Anacardium Occidentale) was introduced in India by the Portuguese four centuries ago mainly to prevent soil erosion. The cashew...
|
Capacity : Cashew Nut Kernels: 2.0 MT/Day,Cashew Nut Shell Liquid: 1.7 MT/Day,Waste Shells: 4.0 MT/Day |
Plant and Machinery cost: Rs 232 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 27.00 |
|
Break Even Point (BEP): 66.00 |
TCI : Cost of Project : Rs 417 Lakhs |
|
Cost of Project : 41700000 |
Poultry feed is needed to produce poultry, a substantial part of the food industry. Feeds are used as edible materials, which are consumed poultry and...
|
Capacity : 72000 MT/ Annum |
Plant and Machinery cost: Rs. 294 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 29.00 |
|
Break Even Point (BEP): 56.00 |
TCI : Cost of Project: Rs. 1167 Lakhs |
|
Cost of Project : 116700000 |
Rice husk a major by-product of the rice milling industry, is one of the most commonly available lignocellulosic materials that can be converted to di...
|
Capacity : 6000 MT/ Annum |
Plant and Machinery cost: Rs. 144 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 28.00 |
|
Break Even Point (BEP): 58.00 |
TCI : Cost of Project : Rs. 374 Lakhs |
|
Cost of Project : 37400000 |
PSC stands for pre-stressed concrete. These are highly durable and strong PSC Poles fabricated from excellent quality concrete material. These poles a...
|
Capacity : 60000 Nos. / Annum |
Plant and Machinery cost: Rs. 126 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 25.00 |
|
Break Even Point (BEP): 52.00 |
TCI : Cost of Project : Rs. 415 Lakhs |
|
Cost of Project : 41500000 |
In India the animal feed industry is of recent origin, the first animal food plant having been established in 1960. There are today as many as 14 plan...
|
Capacity : 15000 MT/ Annum |
Plant and Machinery cost: Rs. 160 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 25.00 |
|
Break Even Point (BEP): 57.00 |
TCI : Cost of Project : Rs. 405 Lakhs |
|
Cost of Project : 40500000 |
Potato is one of the important tuber vegetables, which is consumed throughout the year. Its botanical name is Solanum Tuberosum. Potatoes can be consu...
|
Capacity : 8.4 MT/ Day |
Plant and Machinery cost: Rs. 789 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 25.00 |
|
Break Even Point (BEP): 47.00 |
TCI : Cost of Project : Rs. 1161 Lakhs |
|
Cost of Project : 116100000 |
Copper is mankind’s oldest metal, dating back some 10,000 years. All of the great civilizations of the past used copper and copper alloys (principally...
|
Capacity : Copper Ingot: 8 MT/Day, Copper Rod: 36 MT/Day, Copper Wire: 4 MT/Day |
Plant and Machinery cost: Rs. 278 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 62.00 |
|
Break Even Point (BEP): 54.00 |
TCI : Cost of Project : Rs. 1201 Lakhs |
|
Cost of Project : 120100000 |
The term “hydrated lime” is widely used to describe a powdered calcium hydroxide product made by reacting quicklime with a controlled excess of water....
|
Capacity : 15000 MT/annum |
Plant and Machinery cost: Rs. 264 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 43.00 |
|
Break Even Point (BEP): 53.00 |
TCI : Cost of Project : Rs. 784 Lakhs |
|
Cost of Project : 78400000 |