Please choose a project below related to this category.
Calcium compounds such as calcium carbonate, calcium phosphate, calcium Sulphate are widely distributed in nature. Calcium carbonate forms major const...
|
Capacity : 120000 MT/Annum |
Plant and Machinery cost: 871 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 45.00 |
|
Break Even Point (BEP): 57.00 |
TCI : 1482 Lakhs |
|
Cost of Project : 0 |
India has a strong base in agriculture and provides large varieties of fruits and vegetables for food processing. However, inadequate cold storage fac...
|
Capacity : 1800 Kls./Annum |
Plant and Machinery cost: 134 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 37.00 |
|
Break Even Point (BEP): 34.00 |
TCI : 324 Lakhs |
|
Cost of Project : 0 |
Bindiya is one of the most popular costume jewellery in India. Now a days it is the main feature of the ladies beauty. It is used by every women in ou...
|
Capacity : 1.5 Lakhs Pcs /Day |
Plant and Machinery cost: 2 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 68.00 |
|
Break Even Point (BEP): 44.00 |
TCI : 21 Lakhs |
|
Cost of Project : 0 |
The principal methods for producing copper powder is electrolytic deposition at high current densities and the atomization of molten metal. Copper pow...
|
Capacity : 150 MT/Day |
Plant and Machinery cost: 45 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 39.00 |
|
Break Even Point (BEP): 63.00 |
TCI : 158 Lakhs |
|
Cost of Project : 0 |
Today we find iron and steels of so many types and their products so wide spread all around, that it is hard to think if the world could progress any...
|
Capacity : 10 Lakhs MT/Day |
Plant and Machinery cost: 38 Crores |
|
Working Capital : - |
Rate of Return (ROR): 48.00 |
|
Break Even Point (BEP): 29.00 |
TCI : 388 Crores |
|
Cost of Project : 0 |
Aluminium, the wonder metal of today and tomorrow, is poised for a remarkable growth. The specific characteristics of aluminium that have led it to a...
|
Capacity : 2 MT/Day |
Plant and Machinery cost: 76 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 52.00 |
|
Break Even Point (BEP): 37.00 |
TCI : 313 Lakhs |
|
Cost of Project : 0 |
The term additives denotes auxiliary products that, even is small concentrations, significantly improve technological properties of paints or coating...
|
Capacity : Hydrogenated Castor Oil, Butyl Acrylate, Aluminium Plamitate each 300 MT/Annum |
Plant and Machinery cost: 74 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 30.00 |
|
Break Even Point (BEP): 58.00 |
TCI : 173 Lakhs |
|
Cost of Project : 0 |
Fuel bricks from the different raw materials now a days are very popular for the resources of renewable energy. There is great efforts have been taken...
|
Capacity : 3600 MT/Annum |
Plant and Machinery cost: 3 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 40.00 |
|
Break Even Point (BEP): 53.00 |
TCI : 52 Lakhs |
|
Cost of Project : 0 |
Perforated bricks are light in weight and provide better thermal insulation as compared to common bricks. Now in India there is a very good growth of...
|
Capacity : 60 Lakhs Bricks /Annum |
Plant and Machinery cost: 27 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 41.00 |
|
Break Even Point (BEP): 39.00 |
TCI : 135 Lakhs |
|
Cost of Project : 0 |
When a metal is rolled, extruded or drawn at temperature below the recrystallization, the metal is cold worked. The cold rolling mills use hot rolled...
|
Capacity : 200 MT/Day |
Plant and Machinery cost: Rs. 16 Crores |
|
Working Capital : - |
Rate of Return (ROR): 43.00 |
|
Break Even Point (BEP): 46.00 |
TCI : Rs. 67 Crores |
|
Cost of Project : 0 |
The tyre and tube industry has been continuously in process of upgradation of product quality to satisfy the requirements of Indian automotive manufac...
|
Capacity : 5500 Nos./Day |
Plant and Machinery cost: 210 Lakhs |
|
Working Capital : |
Rate of Return (ROR): 1.00 |
|
Break Even Point (BEP): 25.00 |
TCI : 1415 Lakhs |
|
Cost of Project : 0 |
The onions are perishable commodity and can not be stored for a long time after harvest in a ordinary conditions. Dehydration is simply, effective and...
|
Capacity : 1.5 MT/Day |
Plant and Machinery cost: 65 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 50.00 |
|
Break Even Point (BEP): 41.00 |
TCI : 220 Lakhs |
|
Cost of Project : 0 |