Establishment of numerous development entities like Gambia Vision 2050, that profiles the country development pathway on a comprehensive term and the coming to being of an eventual self-sufficient socio-economic society by 2050, and, more recently the National Development Plan 2023–2027 that, further reinvestment in the private sector, intensifies industrialization and economic diversification, all the while maintaining a safe investment political stability adaptable to create a quality space, and elevated infrastructure base. In incremental paces, The Gambia is becoming a regional trade, logistics, production, and agro-industrial hub, henceforth an extensive range of possible forestry, tourism, soft manufacture, renewable power, ICT etc. investment opportunities.
Entrepreneurs can tap into high-potential sectors aligned with the government’s economic diversification goals:
Market Demand
The Gambia’s economy’s gradual transformation has increased demand in various sectors:
The Gambia Investment and Export Promotion Agency (GIEPA) provides a wide range of investor incentives, including:
In light of the aforementioned detailed analysis, in a politically stable environment, arable land, a youthful population, and a strategic regional location, the focus on industrialization through the private sector, the Gambia will undoubtedly attract investment. In energy—agro-processing, fisheries, renewable energy, ICT, tourism, regional integration, and light manufacturing focus are ripe for growth under the vision 2050 framework. In sum, the Gambia is progressively becoming a hub to the West African market and a pace of sustainable and inclusive growth in the region.
Please choose a project below related to this category.
Detergents are defined as complete washing or cleaning products, which contain among their ingredients an organic surface-active compound (Surfactant)...
|
Capacity : 4MT/Day |
Plant and Machinery cost: Rs 18 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 26.00 |
|
Break Even Point (BEP): 43.00 |
TCI : Cost of Project:Rs 228 Lakhs |
|
Cost of Project : 22800000 |
A bicycle, is a human-powered, pedal-driven, single-track vehicle, having two wheels attached to a frame, one behind the other. A bicycle rider is cal...
|
Capacity : Bicycles (Different Sizes):2000 Nos./Day |
Plant and Machinery cost: Rs 270 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 26.39 |
|
Break Even Point (BEP): 31.24 |
TCI : Cost of Project:Rs 3972 Lakhs |
|
Cost of Project : 397200000 |
Disposable Syringes made of plastic material have been successfully used in medical and pharmaceutical practice for many years. The constantly increas...
|
Capacity : •Disposable Plastic Syringes (2 ml Size):40000 Pcs/Day•Disposable Plastic Syringes (5 ml Size):40000 Pcs/Day |
Plant and Machinery cost: Rs 490 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 15.24 |
|
Break Even Point (BEP): 61.07 |
TCI : Cost of Project:Rs 757 Lakhs |
|
Cost of Project : 75700000 |
It is needless to mention that water, a compound of Hydrogen and Oxygen is a precious natural gift which is very essential for survival of mankind inc...
|
Capacity : Packaged Drinking Water (1 Ltr. Size):120000 |
Plant and Machinery cost: Rs 65 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 28.00 |
|
Break Even Point (BEP): 60.00 |
TCI : Cost of Project:Rs 268 Lakhs |
|
Cost of Project : 26800000 |
Detergents are defined as complete washing or cleaning products, which contain among their ingredients an organic surface-active compound (Surfactant)...
|
Capacity : 4MT/Day |
Plant and Machinery cost: Rs 18 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 26.00 |
|
Break Even Point (BEP): 43.00 |
TCI : Cost of Project:Rs 228 Lakhs |
|
Cost of Project : 22800000 |
Autoclaved Aerated Concrete (AAC) is a non-combustible, lime-based, cementitious building material that is expanding into new worldwide markets. As a...
|
Capacity : 500 Cu. Mt/Day |
Plant and Machinery cost: Rs 542 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 26.36 |
|
Break Even Point (BEP): 50.87 |
TCI : Cost of Project:Rs 1187 Lakhs |
|
Cost of Project : 118700000 |
Autoclaved Aerated Concrete (AAC) is a non-combustible, lime-based, cementitious building material that is expanding into new worldwide markets. As a...
|
Capacity : 500 Cu. Mt/Day |
Plant and Machinery cost: Rs 542 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 26.36 |
|
Break Even Point (BEP): 50.87 |
TCI : Cost of Project:Rs 1187 Lakhs |
|
Cost of Project : 118700000 |
Agricultural wastes constitute one of the main alternative raw materials for the pulp and paper industry. Wheat straw, bagasse, reed, and rice straw a...
|
Capacity : •Disposable Paper Cups :7.5 MT/Day •Disposable Paper Plates:7.5 MT/Day |
Plant and Machinery cost: Rs 32 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 28.18 |
|
Break Even Point (BEP): 56.37 |
TCI : Cost of Project: Rs 314 Lakhs |
|
Cost of Project : 31400000 |
The cashew tree (Anacardium occidentale) is a tropical evergreen tree that produces the cashew nut and the cashew apple. It can grow as high as 14 met...
|
Capacity : Cashew Nuts: 600 Kgs/Day, Cashew Nut Shell by product: 1650 Kgs/Day |
Plant and Machinery cost: Rs 53 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 25.45 |
|
Break Even Point (BEP): 56.36 |
TCI : Cost of Project: Rs 126 Lakhs |
|
Cost of Project : 12600000 |
Bicycle tubes are the backbone of the bicycle industries. Few numbers of companies in organized sector are engaged in the quality grade cycles tyres a...
|
Capacity : Bicycle Tubes: 10,000 Nos. /Day |
Plant and Machinery cost: Rs 118 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 26.00 |
|
Break Even Point (BEP): 45.00 |
TCI : Cost of Project: Rs 622 Lakhs |
|
Cost of Project : 62200000 |
Edible nuts are used by mankind for food, edible oils, spices, condiments or beverages. They have been an important food source from prehistoric times...
|
Capacity : Pea Nuts:500 Kgs./Day • Cashew Nuts:500 Kgs./Day •Almonds:500 Kgs./Day •Pistachio:500 Kgs./Day |
Plant and Machinery cost: Rs 26 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 28.00 |
|
Break Even Point (BEP): 58.00 |
TCI : Cost of Project:: Rs 222 Lakhs |
|
Cost of Project : 22200000 |
Most foods contain very high percentage of water. Microorganisms thrive when there is water, spoiling the food and altering its taste. Removing water...
|
Capacity : Freeze Dried Vegetables: 2MT/Day |
Plant and Machinery cost: Rs 242 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 25.00 |
|
Break Even Point (BEP): 66.00 |
TCI : Cost of Project: Rs 743 Lakhs |
|
Cost of Project : 74300000 |