Establishment of numerous development entities like Gambia Vision 2050, that profiles the country development pathway on a comprehensive term and the coming to being of an eventual self-sufficient socio-economic society by 2050, and, more recently the National Development Plan 2023–2027 that, further reinvestment in the private sector, intensifies industrialization and economic diversification, all the while maintaining a safe investment political stability adaptable to create a quality space, and elevated infrastructure base. In incremental paces, The Gambia is becoming a regional trade, logistics, production, and agro-industrial hub, henceforth an extensive range of possible forestry, tourism, soft manufacture, renewable power, ICT etc. investment opportunities.
Entrepreneurs can tap into high-potential sectors aligned with the government’s economic diversification goals:
Market Demand
The Gambia’s economy’s gradual transformation has increased demand in various sectors:
The Gambia Investment and Export Promotion Agency (GIEPA) provides a wide range of investor incentives, including:
In light of the aforementioned detailed analysis, in a politically stable environment, arable land, a youthful population, and a strategic regional location, the focus on industrialization through the private sector, the Gambia will undoubtedly attract investment. In energy—agro-processing, fisheries, renewable energy, ICT, tourism, regional integration, and light manufacturing focus are ripe for growth under the vision 2050 framework. In sum, the Gambia is progressively becoming a hub to the West African market and a pace of sustainable and inclusive growth in the region.
Please choose a project below related to this category.
E-waste is a popular, informal name for electronic products nearing the end of their "useful life." Computers, televisions, VCRs, stereos, copiers, an...
|
Capacity : Monitors:10 Nos./Day•Plastic Granules: 4,600.00 Kgs/Day •Copper Wire Scraps:20 Kgs/Day •Glass from CRT: 260 Kgs/Day • Other Metals:1100 Kgs/Day |
Plant and Machinery cost: Rs 233 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 8.00 |
|
Break Even Point (BEP): 59.00 |
TCI : Cost of Project: Rs 613 Lakhs |
|
Cost of Project : 61300000 |
A solar panel is a collection of solar cells. Lots of small solar cells spread over a large area can work together to provide enough power to be usefu...
|
Capacity : Solar Panel 5MW/Annum |
Plant and Machinery cost: Rs 109 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 25.00 |
|
Break Even Point (BEP): 62.00 |
TCI : Cost of Project: Rs 450 Lakhs |
|
Cost of Project : 45000000 |
Fruit juices are health drinks; it is largely used throughout the society and popularity of fruit juices are gradually increasing. There is good scope...
|
Capacity : PET Bottle (250 ml Size) : 16000 Packs of Mango Juice/Day,Aseptic Pack (200 ml Size) : 20,000 Packs of Mango Juice/Day |
Plant and Machinery cost: Rs 156 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 25.00 |
|
Break Even Point (BEP): 45.00 |
TCI : Cost of Project : Rs 588 Lakhs |
|
Cost of Project : 588 |
Cashew (Botanical name Anacardium Occidentale) was introduced in India by the Portuguese four centuries ago mainly to prevent soil erosion. The cashew...
|
Capacity : Cashew Nut Kernels: 2.0 MT/Day,Cashew Nut Shell Liquid: 1.7 MT/Day,Waste Shells: 4.0 MT/Day |
Plant and Machinery cost: Rs 232 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 27.00 |
|
Break Even Point (BEP): 66.00 |
TCI : Cost of Project : Rs 417 Lakhs |
|
Cost of Project : 41700000 |
Bicycle and rickshaw tyres & tubes are the backbone of the bicycle and rickshaw. There are few numbers of organized manufacturing companies which are...
|
Capacity : Rickshaw & Cycle Tyres : 1,500.00 Nos./Day,Rickshaw & Cycle Tubes: 1,500.00 Nos./Day |
Plant and Machinery cost: 128 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 26.00 |
|
Break Even Point (BEP): 72.00 |
TCI : Cost of Project : 570 Lakhs |
|
Cost of Project : 57000000 |
Electronic wastes, "e-waste", "e-scrap", or "Waste Electrical and Electronic Equipment" ("WEEE") is a description of surplus, obsolete, broken or disc...
|
Capacity : Monitor : 3000 Pcs. /annum,Plastic Dana: 1559 MT/annum,Copper Wire Scraps: 7.5 MT/annum,Glass from CRT : 105 MT/annum,Other Metals: 450 MT/annum |
Plant and Machinery cost: Rs. 233 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 28.00 |
|
Break Even Point (BEP): 46.00 |
TCI : Cost of Project : Rs. 526 Lakhs |
|
Cost of Project : 52600000 |
Cashew was introduced in India by the Portuguese four centuries ago mainly to prevent soil erosion. Cashew ranks second among the nine tree nuts which...
|
Capacity : - |
Plant and Machinery cost: Rs. 150 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 28.00 |
|
Break Even Point (BEP): 62.00 |
TCI : Cost of Project: Rs. 667 Lakhs |
|
Cost of Project : 66700000 |
A syringe is a simple piston pump consisting of a plunger that fits tightly in a tube. The plunger can be pulled and pushed along inside a cylindrical...
|
Capacity : Syringes (2 ml) : 90 Lakh Nos. /Annum,Syringes (5 ml) : 90 Lakh Nos. /Annum |
Plant and Machinery cost: Rs. 245 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 26.00 |
|
Break Even Point (BEP): 46.00 |
TCI : Cost of Project : Rs. 455 Lakhs |
|
Cost of Project : 45500000 |
Peanut butter is not “butter” but butter like product made from ground nut or peanut. It consists essentially of cleaned, graded, blanched, roasted an...
|
Capacity : 3000 MT / Annum |
Plant and Machinery cost: Rs. 182 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 26.00 |
|
Break Even Point (BEP): 52.00 |
TCI : Cost of Project : Rs. 666 Lakhs |
|
Cost of Project : 66600000 |
Electronic wastes, "e-waste", "e-scrap", or "Waste Electrical and Electronic Equipment" ("WEEE") is a description of surplus, obsolete, broken or disc...
|
Capacity : 2164500 Kgs /Annum |
Plant and Machinery cost: Rs. 233 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 28.00 |
|
Break Even Point (BEP): 46.00 |
TCI : Cost of Project : Rs. 526 Lakhs |
|
Cost of Project : 52600000 |
Electronic wastes, "e-waste", "e-scrap", or "Waste Electrical and Electronic Equipment" ("WEEE") is a description of surplus, obsolete, broken or disc...
|
Capacity : 2164500 Kgs /Annum |
Plant and Machinery cost: Rs. 233 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 28.00 |
|
Break Even Point (BEP): 46.00 |
TCI : Cost of Project : Rs. 526 Lakhs |
|
Cost of Project : 52600000 |
E-waste is a popular, informal name for electronic products nearing the end of their useful life. While there is no generally accepted definition of e...
|
Capacity : 2164500 kgs. /annum |
Plant and Machinery cost: Rs. 233 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 22.91 |
|
Break Even Point (BEP): 49.81 |
TCI : Cost of Project: Rs. 500 Lakhs |
|
Cost of Project : 50000000 |